πŸ›ŽοΈ HotelCommercial AccommodationCompleted 2019

Holiday Inn Express

35-47 City Road, Southbank VIC 3006

  • 90 m tall Β· #45 in Southbank
  • 24 floors
  • 345 hotel rooms
  • 125 car spaces

What's available here Add a listing link

Looking toIn this buildingArea guideSearch the building
Book a stayβ€”β€”

Each link opens a Google search limited to that site.

7 years standing

Built in 5 mths

  1. 2016Planning application
  2. Aug 2018Construction started
  3. 2019Completed
  4. TodayStill standing

18 building permits Β· 2 news storiesFull timeline ↓

About Holiday Inn Express

Holiday Inn Express is a commercial accommodation building in Southbank with 24 floors above ground and a roof height of 90 m. Developed by Pro-Invest Group, designed by Reid Campbell and built by Hickory, it was completed in 2019.

At a glance

Key facts

Building type
πŸ›ŽοΈ Hotel
Completed
2019 Unconfirmed We don't have data to 100% confirm this data point as yet.
Height
90 m Unconfirmed We don't have data to 100% confirm this data point as yet.
#45 of 190 in Southbank
Floors
24
Footprint
1,699 mΒ²
Architect
Reid Campbell
Builder
Hickory
Hotel rooms
345
Car spaces
125
Strata plan
PS414012 Β· 1 lots
Planning zone
CCZ3
Permits on record
18

Score cards

πŸš† Transport7/10

Flinders Street Station 4 min walk Β· 3 tram stops within 400 m

β˜• Everyday amenities7/10

39 cafΓ©s, 3 grocers, 5 medical within 250 m

🌳 Greenery7/10

73 street trees within 150 m Β· park 146 m away

✨ Activity8/10

30,270 people pass daily nearby Β· 18 licensed venues within 200 m

Calculated from PTV timetable stops, the City of Melbourne business census, street trees, pedestrian sensors and liquor licences.

The building team

The people and companies behind the design, construction and management of Holiday Inn Express.

πŸ—DeveloperPro-Invest Group2015–2018verified2015-2018 Β· Site purchaser and hotel developer/operatorSource: The Urban Developer β†—
πŸ“ArchitectReid Campbell2018verified2018 Β· Design of the Australian Holiday Inn Express prototypeSource: apartments.com.au (Urban.com.au news) β†—
πŸ‘·BuilderHickory2018verified2018 Β· Construction contract awarded for the towerSource: apartments.com.au (Urban.com.au news) β†—
+Were you involved?Builders, architects, developers and managers can claim their role

Location & neighbourhood

Getting around

πŸš†Flinders Street Station
Train station
4 min Β· 348 m
πŸš†Flinders Street Railway Station
Train station
5 min Β· 400 m
πŸš‹Arts Precinct/Sturt St #17
Tram stop
3 min Β· 218 m
πŸš‹Arts Precinct/St Kilda Rd #14
Tram stop
3 min Β· 241 m
πŸš‹Flinders Street Station/Swanston St #13
Tram stop
5 min Β· 399 m

Straight-line walking estimate. Source: PTV GTFS, CC BY 4.0.

Within a 3-minute walk

39β˜• CafΓ©s & eateries
3πŸ›’ Grocers
1πŸ‹οΈ Gyms
5🩺 Medical
1πŸ’Š Pharmacies
0🧸 Childcare
6🍷 Pubs & bars

Who lives in Southbank

Residents18,670
Median age31
Households renting64%
Households without a car35%
Walk to work35%
Public transport to work32%

ABS Census 2016 via City of Melbourne (CC BY).

Timeline

Everything that has happened at Holiday Inn Express: listings, news, works, planning and history.

2026πŸ› 
Works
1 building permit Β· about $109k of new works
Largest: Tenancy 1 - Fitout
2025πŸ› 
Works
1 building permit and 1 certificate Β· about $737k of new works
Largest: Level 10 - Internal Office Fitout - Stage 2: Completion of all works
2023πŸ› 
Works
1 building permit and 1 certificate Β· about $195k of new works
Largest: Internal tenancy fitout for Bloch
2022πŸ› 
Works
1 building permit Β· about $343k of new works
Largest: Lot 2 & 3 - Level 5 - Office fitout
2021πŸ”„
Use change
Council census records it as commercial accommodation, 24 floors
Name recorded: Holiday Inn Express
2021πŸ› 
Works
1 certificate Β· about $3.0m of new works
Largest: Level 4 & Mezzanine - All Works to Opera Australia Fitout on Level 4
2020πŸ› 
Works
1 certificate Β· about $1.2m of new works
Largest: Tenancy fitout office.
2019πŸŽ‰
Milestone Β· Completed
Holiday Inn Express completed: 24 floors
Derived from City of Melbourne building census (CLUE) 2024
Nov 2019πŸ”‘
Milestone Β· First occupants
First occupancy permit issued
Derived from City of Melbourne building permits
2019πŸ”„
Use change
Council census records it as unoccupied - under construction, 24 floors
Name recorded: Holiday Inn Express
2019πŸ› 
Works
4 building permits and 22 certificates
Largest: Stage 18 - Rooftop Structural Works & Louvres
By 2018βœ…
Milestone Β· Approved
Planning permit granted (exact date not recorded)
Derived from City of Melbourne Development Activity Monitor
Aug 2018πŸ—
Milestone Β· Construction started
First major construction permit issued
Derived from City of Melbourne building permits
25 Jan 2018πŸ“°
News
Holiday Inn Express tower design and construction contract reported for 35-47 City Road
Urban.com.au reported on the design of the 35-47 City Road project, describing a 23-level building with 345 hotel suites and about 5,000 sqm of office space across three podium levels. It said the construction contract had been awarded to Hickory, with an 18-month build planned and completion expected by September 2019. The article's headline is critical of the design.
2018πŸ› 
Works
4 building permits Β· about $86.3m of new works
Largest: Stage 9 - Ground to Level 4 Services Only
2017πŸ”„
Use change
Council census records it as unoccupied - unused, 2 floors
Name recorded: The Opera Centre
2016πŸ“
Milestone Β· Planning application
Planning application TP-2016-557 lodged
Derived from City of Melbourne Development Activity Monitor
10 Nov 2015πŸ“°
News
Southbank site at 35-47 City Road sold to Pro-Invest for $25 million
The Urban Developer reported that a Southbank development site at 35-47 City Road had been sold to hotel developer Pro-Invest for $25 million. It said the developer planned a fourth Holiday Inn Express there under an InterContinental Hotels Group franchise agreement, and that it was seeking a permit for 300 hotel rooms across 20 storeys.
2014πŸ› 
Works
1 building permit Β· about $1k of new works
Largest: To allow the minor internal alterations to occur and to allow the change of use from the previous use to part use as an assembly building on
2013πŸ› 
Works
1 certificate Β· about $400 of new works
Largest: To allow the decommission of use of the fire indicator panel & smoke detectors to the existing building
2011πŸ”„
Use change
Council census records it as workshop/studio, 2 floors
Name recorded: The Opera Centre
2008πŸ”„
Use change
Council census records it as office, 2 floors
Name recorded: The Opera Centre
2002πŸ› 
Works
1 building permit Β· about $1.2m of new works
Largest: Stage 1 - Structural works only - Foxtel Studio.
2002πŸ“‹
First census
First council census entry: office, 2 floors
1995πŸ› 
Works
1 building permit Β· about $400k of new works
Largest: Refurbishment of office, showroom and car park

Planning & heritage

Planning controls

ZoneCAPITAL CITY ZONE - SCHEDULE 3 (CCZ3)
DDO1Design and Development Overlay: limits on building height, setbacks and design
DDO10Design and Development Overlay: limits on building height, setbacks and design
LSIO4Land Subject to Inundation: mapped as at risk of flooding from rivers or the bay
PO1Parking Overlay: controls on how much car parking new development can provide

Vicmap Planning, Β© State of Victoria (Department of Transport and Planning), CC BY 4.0. Plain-English summaries are ours. Check the planning scheme for exact controls.

Subdivision & permits

Plan of subdivision
PS414012
Lots on the plan
1
Owners corporation
Not recorded
Building permits on record
18
Estimated cost of works
About $93.4m
1995New works by year (estimated)2026

Costs are estimates declared on permits, not amounts spent. Stages of a project repeat its value, so we group them and count each project once. A value can cover a project spanning several buildings. Our calculation from City of Melbourne building permits, CC BY 4.0.

History of the site

How it's been recorded over time

2002Office Β· 2 floors
2008Office Β· 2 floors Β· "The Opera Centre"
2011Workshop/Studio Β· 2 floors Β· "The Opera Centre"
2017Unoccupied - Unused Β· 2 floors Β· "The Opera Centre"
2019Unoccupied - Under Construction Β· 24 floors Β· "Holiday Inn Express"
2021Commercial Accommodation Β· 24 floors Β· "Holiday Inn Express"

City of Melbourne Census of Land Use and Employment, since 2002.

Community

What people say about Holiday Inn Express in public forums and groups, and reviews left here.

No public discussion found yet. Know a thread or group about Holiday Inn Express? .

Guest reviews

No reviews of Holiday Inn Express yet. Be the first to tell future tenants what it's like.

Reviews are checked before they're published. No one is named without permission.

Rate and review Holiday Inn Express

Your rating

By posting, you agree to the contributor terms. See how we handle your details in the privacy policy.

Frequently asked questions

Is Holiday Inn Express residential or commercial?

Holiday Inn Express is a hotel or serviced apartments. The City of Melbourne lists its main use as commercial accommodation.

When was Holiday Inn Express built?

Holiday Inn Express was completed in 2019.

How many floors does Holiday Inn Express have?

Holiday Inn Express has 24 floors above ground.

Does Holiday Inn Express have hotel or student accommodation?

The City of Melbourne records 345 hotel rooms at Holiday Inn Express.

Who designed and built Holiday Inn Express?

Pro-Invest Group developed Holiday Inn Express, Reid Campbell designed it and Hickory built it. The building team section has the sources.

How tall is Holiday Inn Express?

About 90 metres, measured from the City of Melbourne's 3D building model. It's number 45 of 190 buildings in Southbank by height.

What public transport is near Holiday Inn Express?

Flinders Street Station is the nearest train station, about 4 minutes' walk. The nearest tram stop is Arts Precinct/Sturt St #17, about 3 minutes' walk.

What is the planning zone for Holiday Inn Express?

The site is in the Capital City Zone - Schedule 3 (CCZ3).

Does Holiday Inn Express have an owners corporation?

Plan of subdivision PS414012 has 1 lot.

Has any work been done on Holiday Inn Express recently?

The City of Melbourne has issued 18 building permits for Holiday Inn Express since 1995. The most recent was in May 2026.

Compare with nearby buildings

BuildingTypeDistanceFloorsCompleted
Holiday Inn ExpressHotelβ€”242019
Gallery Tower ApartmentsHotel35 m192002
TriptychMixed use58 m302010
Opus towerHotel59 m372015
Century TowerMixed use85 m291999
SouthpointMixed use121 m322003
SouthgateCommercial134 m26β€”

That's Built compiles information from public records, research and contributions. Details are checked against multiple sources where possible but may contain errors and aren't professional advice. Sources: City of Melbourne building permits (CC BY 4.0), CLUE building information (CC BY 4.0), CLUE business establishments (CC BY 4.0), Development Activity Monitor (CC BY 4.0), Geocoded National Address File (G-NAF) (Open G-NAF EULA (CC BY 4.0 based)). Street View and business details Β© Google Maps.

Holiday Inn ExpressNo listings linked yetFind listings

Suggest a correction

Something wrong or missing? Tell us what it should say. We check every suggestion before changing anything.

By sending, you agree to the contributor terms. See how we handle your details in the privacy policy.