πŸ› OtherUnoccupied - Under ConstructionCompleted 2002πŸ› Heritage overlay

Melbourne Visitor Centre

2 Swanston Street, Melbourne VIC 3000

    What's available here Add a listing link

    Under construction

    1. 2002Completed
    2. TodayIn progress

    28 building permitsFull timeline ↓

    About Melbourne Visitor Centre

    Melbourne Visitor Centre at 2 Swanston Street is under construction and not yet finished. The building is classed as an other building and sits under a heritage overlay. Bates Smart and Lab Architecture Studio are both architects of the building, and Multiplex is the builder.

    At a glance

    Key facts

    Building type
    πŸ› Other
    Completed
    2002 Unconfirmed We don't have data to 100% confirm this data point as yet.
    Height
    β€”
    Floors
    β€”
    Footprint
    7,921 mΒ²
    Architect
    Bates Smart
    Builder
    Multiplex Unconfirmed We don't have data to 100% confirm this data point as yet.
    Car spaces
    β€”
    Strata plan
    PS908972 Β· 1 lots
    Planning zone
    CCZ1
    Permits on record
    28

    Score cards

    πŸš† Transport9/10

    Flinders Street Station 3 min walk Β· 5 tram stops within 400 m

    β˜• Everyday amenities5/10

    31 cafΓ©s, 0 grocers, 0 medical within 250 m

    🌳 Greenery8/10

    99 street trees within 150 m Β· park 85 m away

    ✨ Activity5/10

    6,775 people pass daily nearby Β· 10 licensed venues within 200 m

    Calculated from PTV timetable stops, the City of Melbourne business census, street trees, pedestrian sensors and liquor licences.

    The building team

    The people and companies behind the design, construction and management of Melbourne Visitor Centre.

    πŸ“ArchitectLab Architecture Studio1997–2002reported1997-2002 Β· Design consortium lead for Federation SquareSource: Wikipedia β†—
    πŸ“ArchitectBates Smart1997–2002verified1997-2002 Β· Local executive architects for the second stageSource: Wikipedia β†—
    🌳Landscape architectKarres en Brands1997–2002reported1997-2002 Β· Consortium member for Federation SquareSource: Wikipedia β†—
    πŸ‘·BuilderMultiplex1999–2002reported1999-2002 Β· Construction manager for Federation SquareSource: Wikipedia β†—
    +Were you involved?Builders, architects, developers and managers can claim their role

    Location & neighbourhood

    Getting around

    πŸš†Flinders Street Station
    Train station
    3 min Β· 212 m
    πŸš†Flinders Street Railway Station
    Train station
    3 min Β· 265 m
    πŸš‹Russell St/Flinders St #6
    Tram stop
    2 min Β· 138 m
    πŸš‹Flinders Street Station/Swanston St #13
    Tram stop
    2 min Β· 186 m
    πŸš‹Flinders Street Station/Swanston St #5
    Tram stop
    3 min Β· 247 m

    Straight-line walking estimate. Source: PTV GTFS, CC BY 4.0.

    Within a 3-minute walk

    31β˜• CafΓ©s & eateries
    0πŸ›’ Grocers
    7πŸ‹οΈ Gyms
    0🩺 Medical
    0πŸ’Š Pharmacies
    0🧸 Childcare
    10🍷 Pubs & bars

    Who lives in Melbourne (CBD)

    Residents37,341
    Median age26
    Households renting70%
    Households without a car75%
    Walk to work40%
    Public transport to work43%

    ABS Census 2016 via City of Melbourne (CC BY).

    Timeline

    Everything that has happened at Melbourne Visitor Centre: listings, news, works, planning and history.

    2026πŸ› 
    Works
    2 building permits Β· about $200k of new works
    Largest: NGV-A Country Road X First Nations (G17-G18)
    2025πŸ› 
    Works
    1 certificate Β· about $223k of new works
    Largest: Tenancy fit out
    2024πŸ› 
    Works
    2 building permits and 3 certificates Β· about $942k of new works
    Largest: Fed Sq - Beer Deluxe Zinc Roof Replacement Works
    2022πŸ› 
    Works
    1 building permit and 1 certificate Β· about $785k of new works
    Largest: Stage 2 - DDA compliance upgrade in Alfred Deakin Building
    2021πŸ› 
    Works
    1 building permit and 2 certificates Β· about $192k of new works
    Largest: Tenancy 25 - Proposed alteration to existing retail
    2020πŸ”„
    Use change
    Council census records it as unoccupied - under construction, 1 floors
    Name recorded: Melbourne Visitor Centre
    2020πŸ› 
    Works
    3 building permits and 1 certificate Β· about $1.1m of new works
    Largest: Stage 3 - Smoke Seals & Reg 233 compliance
    2019πŸ› 
    Works
    4 building permits Β· about $1.9m of new works
    Largest: Stage 4 - Variation (New Sprinklers; Smoke Detectors; BOW)
    2018πŸ› 
    Works
    2 building permits Β· about $410k of new works
    Largest: Stage 2: Car Room Only
    2017πŸ› 
    Works
    2 building permits and 1 certificate Β· about $2.6m of new works
    Largest: Transport Building - Minor demolition, buildings and works to refurbish existing electronic screen and construct and display digital faΓ§ade
    2016πŸ› 
    Works
    1 building permit Β· about $33k of new works
    Largest: Demolition of Scorsese Exhibition & Fitout of Echo of the Shadow Exhibition
    2014πŸ› 
    Works
    1 building permit Β· about $50k of new works
    Largest: Lvl 3 tenancy demolition / strip-out works
    2008πŸ› 
    Works
    3 building permits and 2 certificates Β· about $4.7m of new works
    Largest: Internal alterations to ground level at ACMI Alfred Deakin Building Fed Square
    2007πŸ› 
    Works
    3 building permits and 2 certificates Β· about $537k of new works
    Largest: Pixar 20 years of animation exhibition internal fitout only. Basement Level screen gallery, Alfred Deakin Centre.
    2006πŸ› 
    Works
    2 building permits Β· about $105k of new works
    Largest: Eyes, lies and illusions gallery internal fitout. Basement level screen gallery, Alfred Deakin Centre.
    2002πŸŽ‰
    Milestone Β· Completed
    Melbourne Visitor Centre completed
    Derived from City of Melbourne building census (CLUE) 2024
    2002πŸ“‹
    First census
    First council census entry: retail - shop, 1 floors

    Planning & heritage

    Planning controls

    ZoneCAPITAL CITY ZONE - SCHEDULE 1 (CCZ1)
    DDO1Design and Development Overlay: limits on building height, setbacks and design
    DDO10Design and Development Overlay: limits on building height, setbacks and design
    HO1300Heritage Overlay: a permit is needed to demolish or change the outside of heritage places
    PO1Parking Overlay: controls on how much car parking new development can provide

    Vicmap Planning, Β© State of Victoria (Department of Transport and Planning), CC BY 4.0. Plain-English summaries are ours. Check the planning scheme for exact controls.

    Subdivision & permits

    Plan of subdivision
    PS908972
    Lots on the plan
    1
    Owners corporation
    Not recorded
    Building permits on record
    28
    Estimated cost of works
    About $13.9m
    2006New works by year (estimated)2026

    Costs are estimates declared on permits, not amounts spent. Stages of a project repeat its value, so we group them and count each project once. A value can cover a project spanning several buildings. Our calculation from City of Melbourne building permits, CC BY 4.0.

    History of the site

    How it's been recorded over time

    2002Retail - Shop Β· 1 floors Β· "Melbourne Visitor Centre"
    2020Unoccupied - Under Construction Β· 1 floors Β· "Melbourne Visitor Centre"

    City of Melbourne Census of Land Use and Employment, since 2002.

    Community

    What people say about Melbourne Visitor Centre in public forums and groups, and reviews left here.

    No public discussion found yet. Know a thread or group about Melbourne Visitor Centre? .

    Resident reviews

    No reviews of Melbourne Visitor Centre yet. Be the first to tell future tenants what it's like.

    Reviews are checked before they're published. No one is named without permission.

    Rate and review Melbourne Visitor Centre

    Your rating

    By posting, you agree to the contributor terms. See how we handle your details in the privacy policy.

    Frequently asked questions

    Is Melbourne Visitor Centre residential or commercial?

    Melbourne Visitor Centre is neither homes nor offices. The City of Melbourne lists its main use as unoccupied - under construction.

    When was Melbourne Visitor Centre built?

    Melbourne Visitor Centre was completed in 2002.

    Who designed and built Melbourne Visitor Centre?

    Bates Smart designed Melbourne Visitor Centre and Multiplex built it. The building team section has the sources.

    What public transport is near Melbourne Visitor Centre?

    Flinders Street Station is the nearest train station, about 3 minutes' walk. The nearest tram stop is Russell St/Flinders St #6, about 2 minutes' walk.

    What is the planning zone for Melbourne Visitor Centre?

    The site is in the Capital City Zone - Schedule 1 (CCZ1). It's also under a Heritage Overlay (HO1300).

    Does Melbourne Visitor Centre have an owners corporation?

    Plan of subdivision PS908972 has 1 lot.

    Has any work been done on Melbourne Visitor Centre recently?

    The City of Melbourne has issued 28 building permits for Melbourne Visitor Centre since 2006. The most recent was in February 2026.

    Compare with nearby buildings

    BuildingTypeDistanceFloorsCompleted
    Melbourne Visitor CentreOtherβ€”2002
    Flinders GateCommercial180 m121890

    That's Built compiles information from public records, research and contributions. Details are checked against multiple sources where possible but may contain errors and aren't professional advice. Sources: City of Melbourne building permits (CC BY 4.0), CLUE building information (CC BY 4.0), Geocoded National Address File (G-NAF) (Open G-NAF EULA (CC BY 4.0 based)). Street View and business details Β© Google Maps.

    Melbourne Visitor CentreNo listings linked yetFind listings

    Suggest a correction

    Something wrong or missing? Tell us what it should say. We check every suggestion before changing anything.

    By sending, you agree to the contributor terms. See how we handle your details in the privacy policy.