| Construction started | Mar 2012 | First major construction permit issued |
| First occupants | Feb 2014 | First occupancy permit issued |
| Completed | By Mar 2014 | WRAP Residence completed: 41 floors |
Each cost is the estimate on that record. Stages of a project often repeat its full value, so these don't add up to what was spent.
| 02 Apr 2026 | Proposed Cladding Replacement, Fire Rated GPOs and rectification of Electrical Penetration of Existing Combustible Cladding to an Existing Building | $416k |
| 26 July 2024 | External wall cladding fire safety upgrade works | $3.8m |
| 30 Apr 2019 | Lot 2G, Tenancy 2G - Partial fitout to existing tenancy excluding the construction of toilet facilities (non- structural) | $185k |
| 20 Oct 2016 | Ground - Alteration of smoke detection | $550 |
| 13 Apr 2016 | Australia 108, Ground Floor- Site Amenities Fitout | $50k |
| 07 Mar 2014 | WRAP Residential Apartments - Demolition Works | $87.0m |
| 28 Feb 2014 | Stage 2: Foundations and piling. WRAP Residential Apartments - Demolition Works | $87.0m |
| 28 Feb 2014 | Stage 4: In-ground services. Apartments - Demolition Works | $87.0m |
| 26 Feb 2014 | Stage 10: Architectural & Services to Levels 39 to 42/43 - WRAP Residential Apartments | $87.4m |
| 07 June 2013 | Stage 9: Level 17-38 - Electrical, Mechanical, Hydraulic and Fire Sprinkler Services Only - WRAP Residential Apartments | $87.0m |
| 05 Feb 2013 | Stage 8: Ground to Level 16 - Electrical, Mechanical, Hydraulic and Fire Sprinkler Services Only - WRAP Residential Apartments | $87.0m |
| 21 Jan 2013 | Stage 7: Architectural (Ground to Level 38 Only) - WRAP Residential Apartments | $87.0m |
| 28 Aug 2012 | Stage 6: Ground to Level 8 - Electrical, mechanical and hydraulic services (exclude fire services) | $87.0m |
| 15 June 2012 | Stage 5: Structural works only | $87.0m |
| 27 Mar 2012 | Stage 3: Pile caps and ground floor slab. Apartments - Demolition Works | $87.0m |
| 07 Sept 2010 | Advertising Signage | $10k |
| 03 May 1996 | Proposed internal fitout and shop front | $15k |
Is WRAP Residence residential or commercial?
WRAP Residence is a hotel or serviced apartments. The City of Melbourne lists its main use as commercial accommodation.
When was WRAP Residence built?
WRAP Residence was completed in 2014.
How many floors does WRAP Residence have?
WRAP Residence has 41 floors above ground.
What size apartments are in WRAP Residence?
The City of Melbourne's development record lists 129 1 bed, 154 2 bed and 4 3+ bed apartments. The built numbers may differ a little.
Who designed and built WRAP Residence?
Baracon developed WRAP Residence, Plus Architecture designed it and Contexx Probuild built it. The building team section has the sources.
How tall is WRAP Residence?
About 130 metres, measured from the City of Melbourne's 3D building model. It's number 18 of 190 buildings in Southbank by height.
What public transport is near WRAP Residence?
Flinders Street Station is the nearest train station, about 7 minutes' walk. The nearest tram stop is Casino/Southbank/Queens Bridge St #115, about 3 minutes' walk.
What is the planning zone for WRAP Residence?
The site is in the Capital City Zone - Schedule 3 (CCZ3).
Does WRAP Residence have an owners corporation?
Plan of subdivision PS619599 has 309 lots and common property, which means it is managed by an owners corporation.
Has any work been done on WRAP Residence recently?
The City of Melbourne has issued 10 building permits for WRAP Residence since 1996. The most recent was in April 2026.
Sources: City of Melbourne building permits (CC BY 4.0); CLUE building information (CC BY 4.0); CLUE business establishments (CC BY 4.0); CLUE residential dwellings (CC BY 4.0); Development Activity Monitor (CC BY 4.0); Geocoded National Address File (G-NAF) (Open G-NAF EULA (CC BY 4.0 based)). General information from public records, not legal, financial or building advice.