| Planning application | 2021 | Planning application TPMR-2021-10/B lodged |
| Approved | By 2024 | Planning permit granted (exact date not recorded) |
| Construction started | Aug 2024 | First major construction permit issued |
| Completed | By Sep 2026 | Market Way completed: 39 floors |
Each cost is the estimate on that record. Stages of a project often repeat its full value, so these don't add up to what was spent.
| 04 Dec 2025 | STAGE 02: HARD DEMOLITION WORKS (DEMOLITION OF 100 FRANKLIN STREET (WHOLE) DEMOLITION OF 104-106 (PART) & DEMOLITION OF EXISTING BASEMENT (WHOLE) | $990k |
| 07 Nov 2025 | Stage 10 – Roof Structural Steel and Louvers, Landscaping & DDA Performance Solutions | $213.0m |
| 31 July 2025 | Stage 9 - Services and Architectural – Level 7 to Roof | $190.0m |
| 10 June 2025 | Stage 8 – Services and Architectural – Basement to Level 6 | $190.0m |
| 30 May 2025 | Stage 7 – L11-Roof Slab, L11-Roof Columns, Walls, L14-Roof Core & Façade L7-Roof | $190.0m |
| 24 Mar 2025 | Stage 6 – Façade for Ground to Level 6 and Heritage Building Strengthening Works | $190.0m |
| 12 Mar 2025 | Stage 5 - Temporary Fire Services; Structural Works for L6-L10 Slabs & L5-L10 Columns & Walls; and L5-14 Core | $190.0m |
| 11 Nov 2024 | Stage 3 - Structural works for basement 1 to level 5 vertical elecments | $190.0m |
| 04 Oct 2024 | Stage 4 - Heritage Building Floor Infills | $190.0m |
| 26 Aug 2024 | STAGE 2 – FOOTINGS, SLAB ON GROUND, IN-GROUND SERVICES | $190.0m |
| 23 Aug 2024 | 100 Franklin St- Student Accommodation Building | $195.0m |
| 09 Jan 2024 | STAGE 02: HARD DEMOLITION WORKS (DEMOLITION OF 100 FRANKLIN STREET (WHOLE) DEMOLITION OF 104-106 (PART) & DEMOLITION OF EXISTING BASEMENT (WHOLE) | $990k |
| 01 Dec 2022 | Proposed part demolition of building. | $990k |
| 16 Nov 2016 | Alterations to Existing Building | $489k |
| 13 May 2013 | Internal alterations to existing university building Level 2 | $730k |
| 18 Sept 2012 | Internal alterations to existing educational building,LOt 1 | $120k |
| 11 Dec 2008 | Internal demolition works Stage 1 Ground | $308k |
| 18 Sept 2008 | Alterations to existing retail tenancy. Stage 2: All remaining building / fitout works. | $308k |
| 24 Aug 2007 | Internal Office Fitout Level 1 | $1.5m |
| 31 July 2007 | Proposed office fitout on Level 3. | $40k |
| 07 June 2007 | Internal office fitout for coretext to Level 2. | $40k |
| 17 Nov 2006 | Internal Office Fitout-Ground Floor | $490k |
| 01 Sept 2006 | Internal refurbishment works-Basement, Ground, Levels 1-3 Amended. Occupancy Permit: Internal refurbishment to existing office building, carpark and office. | $850k |
| 07 Aug 2000 | proposed intallation of alarm signalling equipment | $190 |
| 01 Sept 1998 | Residential fitout - Level 3, 100 Franklin St, Melbourne | $20k |
Is Market Way residential or commercial?
Market Way is student accommodation.
When was Market Way built?
Market Way was completed in 2026.
How many floors does Market Way have?
Market Way has 39 floors above ground.
Does Market Way have hotel or student accommodation?
The City of Melbourne records 1,038 student beds at Market Way.
Who designed and built Market Way?
Journal Student Living developed Market Way, Cox Architecture designed it and Multiplex built it. The building team section has the sources.
What public transport is near Market Way?
State Library Station is the nearest train station, about 4 minutes' walk. The nearest tram stop is Queen Victoria Market/Elizabeth St #7, about 2 minutes' walk.
What is the planning zone for Market Way?
The site is in the Capital City Zone - Schedule 1 (CCZ1). It's also under a Heritage Overlay (HO1043).
Who bought the site before the student tower was planned?
In January 2021, Landream bought the 100 Franklin Street site near Queen Victoria Market.
Has any work been done on Market Way recently?
The City of Melbourne has issued 23 building permits for Market Way since 1998. The most recent was in November 2025.