πŸ› OtherCompleted 2025πŸ› Heritage overlay

Town Hall Rail Station

9-29 Swanston Street, Melbourne VIC 3000

    What's available here Add a listing link

    1 year standing

    Built in 7 yrs 7 mths

    1. Mar 2018Construction started
    2. By Oct 2025Completed
    3. 2026Planning application
    4. TodayStill standing

    41 building permits Β· 4 news storiesFull timeline ↓

    About Town Hall Rail Station

    Town Hall Rail Station on Swanston Street in Melbourne is one of five new stations on the Metro Tunnel. Construction began in 2018. Hassell and Weston Williamson + Partners designed it, and Lendlease and Cross Yarra Partnership are among the builders.

    At a glance

    Key facts

    Building type
    πŸ› Other
    Completed
    2025
    Construction started
    2018 Unconfirmed We don't have data to 100% confirm this data point as yet.
    Height
    β€”
    Floors
    β€”
    Footprint
    160 mΒ²
    Architect
    Hassell
    Builder
    Cross Yarra Partnership
    Car spaces
    β€”
    Strata plan
    TP105019 Β· 1 lots
    Planning zone
    CCZ2
    Permits on record
    41

    Score cards

    πŸš† Transport10/10

    Town Hall Railway Station 1 min walk Β· 9 tram stops within 400 m

    β˜• Everyday amenities9/10

    113 cafΓ©s, 12 grocers, 25 medical within 250 m

    🌳 Greenery7/10

    56 street trees within 150 m Β· park 93 m away

    ✨ Activity10/10

    37,744 people pass daily nearby Β· 52 licensed venues within 200 m

    Calculated from PTV timetable stops, the City of Melbourne business census, street trees, pedestrian sensors and liquor licences.

    The building team

    The people and companies behind the design, construction and management of Town Hall Rail Station.

    πŸ‘·BuilderLendlease2017–2025verified2017-2025 Β· Joint venture partner in Cross Yarra Partnership, which led the contractSource: Wikipedia β†—
    πŸ‘·BuilderCross Yarra Partnership2017–2025verified2017-2025Source: Wikipedia β†—
    πŸ‘·BuilderJohn Holland2017–2025reported2017-2025 Β· Joint venture partner in Cross Yarra PartnershipSource: Architecture AU β†—
    πŸ‘·BuilderBouygues Construction2017–2025reported2017-2025 Β· Joint venture partner in Cross Yarra PartnershipSource: Architecture AU β†—
    πŸ“ArchitectHassell2018–2025verified2018-2025 Β· Co-designer of the station with WW+P and RSHPSource: Wikipedia β†—
    πŸ“ArchitectWeston Williamson + PartnersverifiedCo-designer of the station with Hassell and RSHPSource: Wikipedia β†—
    +Were you involved?Builders, architects, developers and managers can claim their role

    Location & neighbourhood

    Getting around

    πŸš†Town Hall Railway Station
    Train station
    1 min Β· 37 m
    πŸš†Flinders Street Station
    Train station
    1 min Β· 112 m
    πŸš‹Flinders Street Station/Swanston St #5
    Tram stop
    1 min Β· 58 m
    πŸš‹Collins St/Swanston St #11
    Tram stop
    1 min Β· 97 m
    πŸš‹Flinders Street Station/Swanston St #13
    Tram stop
    2 min Β· 138 m

    Straight-line walking estimate. Source: PTV GTFS, CC BY 4.0.

    Within a 3-minute walk

    113β˜• CafΓ©s & eateries
    12πŸ›’ Grocers
    2πŸ‹οΈ Gyms
    25🩺 Medical
    7πŸ’Š Pharmacies
    1🧸 Childcare
    11🍷 Pubs & bars

    Who lives in Melbourne (CBD)

    Residents37,341
    Median age26
    Households renting70%
    Households without a car75%
    Walk to work40%
    Public transport to work43%

    ABS Census 2016 via City of Melbourne (CC BY).

    Timeline

    Everything that has happened at Town Hall Rail Station: listings, news, works, planning and history.

    2026πŸ“
    Milestone Β· Planning application
    Planning application ID-2026-2 lodged
    Derived from City of Melbourne Development Activity Monitor
    2026πŸ› 
    Works
    1 certificate
    Largest: Stage 1 - OSD South Transfer Scope (ODS Development) - Structure
    16 Nov 2025πŸ“°
    News
    Metro Tunnel to open early on 30 November 2025 with Town Hall among five new stations
    The Victorian Government announced that the Metro Tunnel would open early on Sunday 30 November, with five new stations including Town Hall. Wikipedia records that the station opened on 30 November 2025 along with the rest of the tunnel.
    Covered by 2 outlets
    5 Oct 2025πŸ“°
    News
    Construction finished on Town Hall station
    The Victorian Government announced that major construction on Town Hall station was finished, making it one of the five Metro Tunnel stations to be completed. The station sits under Swanston Street between Collins and Flinders streets and links directly to Flinders Street Station.
    By Oct 2025πŸŽ‰
    Milestone Β· Completed
    Town Hall Rail Station completed
    Derived from Victorian Government (Premier of Victoria)
    Sep 2025πŸ”‘
    Milestone Β· First occupants
    First occupancy permit issued
    Derived from City of Melbourne building permits
    2025πŸ› 
    Works
    4 building permits and 17 certificates Β· about $505.0m of new works
    Largest: Stage 12 - Services - Construction Of Underground Train Station
    2024πŸ› 
    Works
    2 building permits Β· about $194.8m of new works
    Largest: Construction Of Underground Train Station - Stage 11 - FOSD Structure (Above Ground)
    9 Jun 2023πŸ“°
    News
    Town Hall station ahead of schedule, now due to open in 2025
    The Urban Developer reported that the Town Hall station was so far ahead of schedule that it would open in 2025 rather than the planned 2026.
    2022πŸ› 
    Works
    1 building permit Β· about $293.0m of new works
    Largest: Construction Of Underground Train Station - Stage 8 - Degraves Street Campbell Arcade
    2021πŸ› 
    Works
    1 building permit
    Largest: Stages 3, 2A, 2B and 4C – Structure from B2 to B5 Metro OSD South
    Jun 2020πŸ“°
    News
    Roadheaders break through into the central cavern at the future Town Hall station
    A roadheader tunnelling machine was due to break through into the central cavern, where other roadheaders had been excavating the Town Hall station and passenger walkways. The Victorian Government said the station would give commuters access to landmarks including Federation Square.
    2020πŸ› 
    Works
    1 building permit Β· about $286.6m of new works
    Largest: Stage 2 – Concrete Primary Structure Flinders Link
    2020πŸ“‹
    First census
    First council census entry: unoccupied - under construction, 1 floors
    2019πŸ› 
    Works
    1 building permit and 3 certificates
    Largest: KFC DEMOLITION – DEMOLITION OF GROUND SLAB – VARIATION – BASEMENT DEMOLITION WORKS
    Mar 2018πŸ—
    Milestone Β· Construction started
    First major construction permit issued
    Derived from City of Melbourne building permits
    2018πŸ› 
    Works
    7 building permits and 5 certificates Β· about $805k of new works
    Largest: KFC DEMOLITION – BALANCE OF WORKS (POST GANTRY INSTALLATION)
    2017πŸ› 
    Works
    2 building permits Β· about $2.2m of new works
    Largest: Stage 4 - Internal Non Structural Demolition of McDonalds
    2016πŸ› 
    Works
    1 building permit and 1 certificate Β· about $36k of new works
    Largest: Installation of ATM's
    2013πŸ› 
    Works
    1 building permit Β· about $35k of new works
    Largest: Alteration to New shopfront window and cafe fit out to existing convenience store
    2012πŸ› 
    Works
    3 building permits and 2 certificates Β· about $649k of new works
    Largest: KFC Restaurant Alterations
    2011πŸ› 
    Works
    1 certificate
    Largest: Additions and alterations to bank - CBA
    2010πŸ› 
    Works
    4 building permits and 1 certificate Β· about $1.1m of new works
    Largest: Refurbishment of an existing food premises (Hungry Jacks).
    2009πŸ› 
    Works
    1 building permit Β· about $70k of new works
    Largest: Internal alterations in Mcdonalds
    2008πŸ› 
    Works
    1 building permit Β· about $45k of new works
    Largest: Tenancy fitout shop 3 and 4 Flinders Street Thai food premises
    2007πŸ› 
    Works
    1 certificate Β· about $435k of new works
    Largest: Alterations to a bank ground level only.
    2005πŸ› 
    Works
    2 building permits and 1 certificate Β· about $380k of new works
    Largest: restaurant fitout - ground and first floor
    2003πŸ› 
    Works
    1 building permit and 1 certificate Β· about $210k of new works
    Largest: Shop fitout within an existing building.- City convenience Store. AKA 226 Flinders Street.
    2001πŸ› 
    Works
    1 building permit Β· about $300k of new works
    Largest: fire upgrade, basement & ground, 1 to roof, Basement & Ground (shop)
    2000πŸ› 
    Works
    3 building permits and 2 certificates Β· about $1.6m of new works
    Largest: stage 1 Burger king internal demolition & structural
    1996πŸ› 
    Works
    3 building permits Β· about $22k of new works
    Largest: New canopy for Port Philip Arcade

    Planning & heritage

    Planning controls

    ZoneCAPITAL CITY ZONE - SCHEDULE 2 (CCZ2)
    DDO1Design and Development Overlay: limits on building height, setbacks and design
    DDO2Design and Development Overlay: limits on building height, setbacks and design
    DDO2-A1Design and Development Overlay: limits on building height, setbacks and design
    DDO70Design and Development Overlay: limits on building height, setbacks and design
    HO505Heritage Overlay: a permit is needed to demolish or change the outside of heritage places
    PO2Parking Overlay: controls on how much car parking new development can provide
    SBO3Special Building Overlay: mapped as at risk of overland stormwater flooding

    Vicmap Planning, Β© State of Victoria (Department of Transport and Planning), CC BY 4.0. Plain-English summaries are ours. Check the planning scheme for exact controls.

    Subdivision & permits

    Plan of subdivision
    TP105019
    Lots on the plan
    1
    Owners corporation
    Not recorded
    Building permits on record
    41
    Estimated cost of works
    About $1287.3m
    1996New works by year (estimated)2026

    Costs are estimates declared on permits, not amounts spent. Stages of a project repeat its value, so we group them and count each project once. A value can cover a project spanning several buildings. Our calculation from City of Melbourne building permits, CC BY 4.0.

    History of the site

    How it's been recorded over time

    2020Unoccupied - Under Construction Β· 1 floors Β· "Town Hall Rail Station"

    City of Melbourne Census of Land Use and Employment, since 2002.

    Community

    What people say about Town Hall Rail Station in public forums and groups, and reviews left here.

    No public discussion found yet. Know a thread or group about Town Hall Rail Station? .

    Resident reviews

    No reviews of Town Hall Rail Station yet. Be the first to tell future tenants what it's like.

    Reviews are checked before they're published. No one is named without permission.

    Rate and review Town Hall Rail Station

    Your rating

    By posting, you agree to the contributor terms. See how we handle your details in the privacy policy.

    Frequently asked questions

    Is Town Hall Rail Station residential or commercial?

    Town Hall Rail Station is neither homes nor offices.

    When was Town Hall Rail Station built?

    Town Hall Rail Station was completed in 2025.

    Who designed and built Town Hall Rail Station?

    Weston Williamson + Partners designed Town Hall Rail Station and Bouygues Construction built it. The building team section has the sources.

    What public transport is near Town Hall Rail Station?

    Town Hall Railway Station is the nearest train station, about 1 minute's walk. The nearest tram stop is Flinders Street Station/Swanston St #5, about 1 minute's walk.

    What is the planning zone for Town Hall Rail Station?

    The site is in the Capital City Zone - Schedule 2 (CCZ2). It's also under a Heritage Overlay (HO505).

    Does Town Hall Rail Station have an owners corporation?

    Plan of subdivision TP105019 has 1 lot.

    Has any work been done on Town Hall Rail Station recently?

    The City of Melbourne has issued 41 building permits for Town Hall Rail Station since 1996. The most recent was in July 2025.

    Compare with nearby buildings

    BuildingTypeDistanceFloorsCompleted
    Town Hall Rail StationOtherβ€”2025
    Nicholas BuildingCommercial45 m101926
    UniLodge on FlindersStudent accommodation38 m141932
    55 Swanston StreetCommercial92 m151974
    Manchester HouseMixed use92 m81912

    That's Built compiles information from public records, research and contributions. Details are checked against multiple sources where possible but may contain errors and aren't professional advice. Sources: City of Melbourne building permits (CC BY 4.0), CLUE building information (CC BY 4.0), Development Activity Monitor (CC BY 4.0), Geocoded National Address File (G-NAF) (Open G-NAF EULA (CC BY 4.0 based)). Street View and business details Β© Google Maps.

    Town Hall Rail StationNo listings linked yetFind listings

    Suggest a correction

    Something wrong or missing? Tell us what it should say. We check every suggestion before changing anything.

    By sending, you agree to the contributor terms. See how we handle your details in the privacy policy.