| Completed | 1991 | Melbourne Central Tower completed: 52 floors |
Each cost is the estimate on that record. Stages of a project often repeat its full value, so these don't add up to what was spent.
| 21 July 2026 | Level 50 - Internal Lobby Alterations | $39k |
| 25 May 2026 | AHU Replacement for Fine Day Tenancy | $704k |
| 27 Feb 2026 | Level 16 - Internal Office Fitout | $224k |
| 20 Feb 2026 | Fire remediation works to part Level 50 | $310k |
| 12 Feb 2026 | Level 9 - Internal Office Alterations | $30k |
| 06 Jan 2026 | Internal Fit-out - Level 30 | $1 |
| 05 Dec 2025 | The proposed project is for the works to levels 10 & 11 comprising of the removal of interconnecting stairs between the two floors, and the fitout of new toilets, located at Melbourne Central Tower, 360 Elizabeth Street, Melbourne. | $507k |
| 31 Oct 2025 | Level 39 - Internal Office Alterations | $300k |
| 25 Oct 2025 | Level 11 - Rigby Cooke Office (Parts Only) - Internal Non Structural Alterations to Office | $144k |
| 11 Sept 2025 | Internal Fit-Out - Flappy's Fried Chicken (GD 013) | $350k |
| 30 July 2025 | Internal Defit & Make Good | $209k |
| 28 July 2025 | Partition alterations to Level 41 of existing building | $229k |
| 20 June 2025 | Alterations to an existing office building | $492k |
| 29 May 2025 | Level 2 and 22 - Project is for the new Fire Pump installation at 360 Elizabeth Street, Melbourne. | $568k |
| 23 May 2025 | Level 39 - Internal Office Fitout | $127k |
| 16 May 2025 | Fitness First fitout | $693k |
| 03 Apr 2025 | Level 9 - Internal office alterations at MCT located at level 9 & 10 | $1.2m |
| 19 Mar 2025 | Level 2 - Alterations to an existing office | $1.5m |
| 03 Mar 2025 | Internal alteration - Proposed Minor Office Alterations to Levels 28-31 | $457k |
| 13 Feb 2025 | Tenancy 246-249 - Mechanical ventilation upgrade works to Rebel Sport | $240k |
| 04 Feb 2025 | Proposed kiosk fitout for "180 Popcorn" | $54k |
| 04 Feb 2025 | Shop LG53 - Proposed shop fitout for "Pop Attack" | $90k |
| 22 Jan 2025 | Part Level 49 - Internal alteration - proposed office fitout | $213k |
| 14 Jan 2025 | Internal Office Alterations for GPT | $61k |
| 19 Dec 2024 | Tenancy Fitout of Office L13 | $325k |
| 13 Nov 2024 | Stage 2 - Balance of works | $1.1m |
| 27 Oct 2024 | Stage 3 - Levels 6 and 7 DDA Toileet | $2.1m |
| 24 Oct 2024 | Level 26, 360 Elizabeth Street - Proposed Internal Office Fitout for Total Energies | $1.7m |
| 23 Oct 2024 | Stage 1 - Levels 3-7 - Internal demolition and strip out | $2.0m |
| 22 Oct 2024 | Level 9 - Tenancy split and office fitout | $60k |
| 03 Oct 2024 | Part level 9 - Fit-out of Offices | $353k |
| 29 Aug 2024 | Level 32-33 - Installation of Break Glass Button | $7k |
| 28 Aug 2024 | Alteration to an Existing Building - Level 3, 4 & 5 DEWR Offices | $8.0m |
| 02 Aug 2024 | Level 26, 360 Elizabeth Street - Proposed Internal Office Fitout for Total Energies | $1.7m |
| 30 July 2024 | Level 41 360 Elizabeth Street - Alteration To An Existing Building Only | $1.0m |
| 26 July 2024 | Stage 1 - Level 46 - Internal Demolition | $1.1m |
| 23 July 2024 | Internal Office Alterations | $48k |
| 15 July 2024 | Level 42-45 - Additions and Alterations to Existing Office Tenancies | $1.5m |
| 12 July 2024 | Alterations to an existing Office (De-fit) | $56k |
| 09 July 2024 | Stage 2- Remaining scope, excluding DDA toilets | $2.1m |
| 17 June 2024 | Fitout works to existing office tenancy | $3.1m |
| 14 May 2024 | Strip Out Works to an Existing Tenancy - Level 27 | $110k |
| 12 Feb 2024 | Body Catalyst - Tenancy Fitout of Shop | $151k |
| 06 Feb 2024 | Level 36, Minor internal alterations to existing office tenancy | $60k |
| 05 Dec 2023 | Internal Office Alterations | $71k |
| 09 Nov 2023 | Level 41. Alterations, including extension to existing building | $141k |
| 15 Sept 2023 | GD070-71 - Proposed restaurant fitout to an existing building | $600k |
| 11 Sept 2023 | Alterations to an existing office building | $1.9m |
| 25 Aug 2023 | Internal Office Alterations | $44k |
| 06 July 2023 | Level 41. Alterations, including extension to existing building | $141k |
| 26 June 2023 | Alterations to existing Office (De-fit) & Tenancy Fitout of Office | $60k |
| 20 June 2023 | Level 41 - Alterations to existing building | $88k |
| 19 June 2023 | MCT Demolish Level 17 Sub-FIP | $10k |
| 19 June 2023 | MCT Demolish Level 23 Sub-FIP | $5k |
| 09 June 2023 | Level 21- Internal tenancy entrance alterations | $49k |
| 27 May 2023 | MCT Demolish Level 17 Sub-FIP | $10k |
| 26 May 2023 | MCT Demolish Level 23 Sub-FIP | $5k |
| 26 May 2023 | Part level 17 - Internal Defit and Make Good | $195k |
| 10 Jan 2023 | Part Level 45 - Minor Internal Office Alterations | $131k |
| 19 Dec 2022 | Stage 2: Balance of Works) - Level 43 - GPT Premum Suits - Office Fitouts | $2.9m |
| 29 Nov 2022 | Level 42 - GPT Premum Suits - Office Fitouts | $3.0m |
| 19 Nov 2022 | Stage 2: Balance of Works - Level 41 - GPT Premum Suits - Office Fitouts | $2.7m |
| 28 Sept 2022 | MCT 360 Elizabeth Street, Melbourne Vic 3000 - Alterations to Existing Office Building - Upgrade of SPF VSD | $256k |
| 27 Sept 2022 | Stage 2: Balance of Works - Level 44 - GPT Premum Suits - Office Fitouts | $3.0m |
| 17 Aug 2022 | Level 41 - GPT Premum Suits - Office Fitouts | $2.4m |
| 17 Aug 2022 | Level 42 - GPT Premum Suits - Office Fitouts | $2.4m |
| 17 Aug 2022 | Level 43 - GPT Premum Suits - Office Fitouts | $2.4m |
| 17 Aug 2022 | Level 44 - GPT Premum Suits - Office Fitouts | $2.4m |
| 01 Aug 2022 | Level 41-43 - Internal Tenancy Defit and Make Good | $864k |
| 15 July 2022 | Level 42-45 - Stage 2 - Additions and Alterations to Existing Office Tenancies. Balance of Works | $1.5m |
| 30 June 2022 | Level 45 Spec Suites at MCT Tower. | $2.6m |
| 16 June 2022 | MCT gas meter room upgrade | $83k |
| 14 June 2022 | Internal Office Fitout for Gentrack - Level 15 | $693k |
| 14 June 2022 | Level 12 (partial) - Internal fitout | $579k |
| 03 June 2022 | Stage 2 - To Permit the Construction of the ProposedIntertenancy Stair Between Level 18 & 19. | $10.9m |
| 25 May 2022 | Stage 4 - Level 45 - Fitout of speculative suite 4 | $2.4m |
| 29 Apr 2022 | Stage 3 - Level 45 - Fitout of speculative suite 1 & 2 | $2.3m |
| 11 Apr 2022 | Level 17-21 - Proposed Refurbishment of Commercial Office Tenancy | $10.9m |
| 11 Mar 2022 | Level 42-45 - Stage 2 - Additions and Alterations to Existing Office Tenancies. Balance of Works | $1.5m |
| 01 Mar 2022 | L01, 146, "Old Shanghai" - Construction of a Internal alterations to an existing shop | $165k |
| 12 Oct 2021 | Level 39 - Fitout of 3 New Spec Suites | $923k |
| 11 Aug 2021 | Melbourne Central Tower Heating Hot Water Upgrade | $1.9m |
| 26 July 2021 | Level 38 - Internal Alterations | $152k |
| 16 July 2021 | Demolition of structural wall and installation of support structure | $22k |
| 12 July 2021 | Level 50 - Alterations of Office Space | $10k |
| 05 July 2021 | MCT Level 1 Former Verizon Comms Room - Install Sprinklers | $8k |
| 30 June 2021 | Level 39 - Fitout of 3 New Spec Suites | $923k |
| 24 June 2021 | Level 41 - Upgrades | $467k |
| 31 Mar 2021 | Internal office alterations - Level 9 Airlock | $112k |
| 24 Feb 2021 | Level 9 Airlock - Internal office alterations | $112k |
| 18 Jan 2021 | Level 2. Alterations to an existing office. | $30k |
| 02 Dec 2020 | ASE Replacement | $2k |
| 02 Nov 2020 | Fit out to MCT mezzanine space. | $689k |
| 30 Oct 2020 | Build upgrades to the existing lobbies and amenities to levels 17, 20 and 21 within Melbourne Central Tower to current new standard. | $0 |
| 19 Oct 2020 | Level 17, 46, 50 and 51 - New spec suites. | $3.2m |
| 25 Sept 2020 | Level 46 Lobby Upgrade | $401k |
| 04 Aug 2020 | FIS Global Office Fitout - Stage 2 - Balance of Works (Including External Louvres and Hydrant Services) | $3.3m |
| 06 July 2020 | Replacement of the Existing Fire Services Water Storage Tanks | $866k |
| 18 June 2020 | Level 14. Proposed Office Fitout | $0 |
| 17 June 2020 | Levels 39-40 - FIS Global Office Fit-out - Stage 1 - Excluding Alterations to the Fire Hydrant System & Installation of External Louvers | $3.3m |
| 05 June 2020 | Level 15, Levels 24-31 - MCT, ME Bank Refubishment | $6.9m |
| 09 Apr 2020 | Stage 4 -Tower Lobby Upgrade Works Melbourne | $21.6m |
| 27 Feb 2020 | G220 - Internal Fitout | $193k |
| 06 Feb 2020 | Stage 2 - Hydrant Works | $50k |
| 24 Jan 2020 | Level 11. internal Non structural Minor Office Alterations to Part of the Existing Office Tenancy | $37k |
| 10 Jan 2020 | Fit-out of Part Level 9 Offices | $500k |
| 28 Nov 2019 | Level 14, 39 & 40 Lobby refurbishment only. | $2.4m |
| 11 Nov 2019 | Level 9 - Internal alterations to an existing office level | $1.4m |
| 01 Nov 2019 | CONVERSION OF BASEMENT STORE ROOMS AT MELBOURNE CENTRAL | $360k |
| 01 Oct 2019 | Stage 3 - Installation mechanical exhaust fans and ducts | $21.6m |
| 01 Oct 2019 | Stage 4 -Tower Lobby Upgrade Works Melbourne | $21.6m |
| 26 Sept 2019 | Internal Tenancy Fitout for Pretzel Dough & Happiness @ Melbourne Central | $186k |
| 26 June 2019 | Stage 5 - Additions to the HUB space | $21.6m |
| 22 May 2019 | CONVERSION OF BASEMENT STORE ROOMS AT MELBOURNE CENTRAL | $360k |
| 02 May 2019 | Level 9 - Make Good Works to an Existing Office Building | $73k |
| 01 May 2019 | CONVERSION OF BASEMENT STORE ROOMS AT MELBOURNE CENTRAL | $360k |
| 01 May 2019 | Melbourne Central Tower - EWOV Fitout | $2.3m |
| 16 Apr 2019 | Level 50 - Proposed Office Fitout for Dahua | $0 |
| 19 Mar 2019 | Melbourne Central Tower Level 18-21 Upgrade | $1.0m |
| 01 Mar 2019 | reconfiguration of tenancies GD025 & GD 026 | $45 |
| 26 Feb 2019 | Installation of intertenancy wall to tenancy 152 | $32k |
| 21 Feb 2019 | Stage 2 - External demolition to a building | $21.6m |
| 22 Jan 2019 | MCTL Stage 2 -Tower Lobby Upgrade Works Melbourne | $12k |
| 06 Dec 2018 | Tenancy 4, Level 49 - Tenancy Fit-Out | $255k |
| 05 Dec 2018 | Level 10- Office Fit-out | $296k |
| 04 Dec 2018 | Lower Ground Level Tenancy - Internal Alterations to Existing Building | $51 |
| 30 Nov 2018 | Reconfiguration of Tenancies LG 06 & LG 07 | $52k |
| 28 Nov 2018 | Level 3 & 4 - Office Fitout - Commercial | $50k |
| 22 Nov 2018 | Stage 2 - Completion of Works | $219k |
| 21 Nov 2018 | Level 32 - Internal Alterations to an Existing Office | $19 |
| 21 Nov 2018 | MCT - Fire detection and EWIS upgrade | $1 |
| 26 Oct 2018 | Stage 2 - Construction of store room Level 38 | $0 |
| 12 Oct 2018 | Tenancy 1, Level 37 - Construction of internal offices alterations | $811k |
| 27 Sept 2018 | Tenancy Fitout of Shop (L01-106) - New Internal Walls | $25k |
| 26 Sept 2018 | Level 38 - Tenancy Fitout To Existing Building | $1.3m |
| 08 Aug 2018 | Level 38- Alterations to an Existing Building | $39k |
| 03 Aug 2018 | Alterations to existing building | $397k |
| 23 July 2018 | Level 36 - Alterations to existing office | $950k |
| 20 July 2018 | Level 37 - Stage 1 - Tenancy Split Works Only | $638k |
| 20 July 2018 | Level 37 - Stage 2 - All Works | $638k |
| 02 July 2018 | Level 50 - Proposed Office Fitout for Dahua | $0 |
| 07 June 2018 | Tenancy 3 - Minior internal additions & alterations to an existing tenancy | $38k |
| 01 June 2018 | Stage 1 – Tenancy Split Works Only - Level 36 | $382k |
| 30 May 2018 | Level 38- Tenancy Split | $150k |
| 17 May 2018 | Level 34 - Internal Office Fit-outs for Tenancies T1-T5 | $1.3m |
| 05 Apr 2018 | Stage 1 – Tenancy Split Works Only - Level 36 | $382k |
| 21 Mar 2018 | Level P2 - Fitout works | $0 |
| 02 Mar 2018 | Level 35 - Tenancy Fit-out | $1.5m |
| 13 Dec 2017 | Level 16 - Office fitout Axicom | $765k |
| 11 Dec 2017 | Level 16 - Melbourne Central Tower, Tenancy 2 & 3 - Alteration | $299k |
| 01 Dec 2017 | Level 16 - Office Fitout | $297k |
| 25 Sept 2017 | STAGE 2 - Level 17, Accuraco office alterations - FITOUT & TENANCY SPLIT | $489k |
| 22 Sept 2017 | Level 17 - Fitout alterations, Construction of 3 New Rooms and Services Alterations | $150k |
| 04 Aug 2017 | Works to upgrade main lobbies and make good tenancy back to base building | $4.9m |
| 20 July 2017 | Level 12 - New Space & Co Facility | $1.6m |
| 15 July 2017 | Stage 2: Fitout to Level 13 - Remainder of services and layout | $2.0m |
| 13 July 2017 | Level 9 - Fit out works to existing office tenancy for Iress | $38k |
| 13 July 2017 | Stage 1: Level 13 - Wilson Parking Fitout - Construction of wall partitions and services relocations | $300k |
| 06 July 2017 | Ground Floor - Escalator Works | $549k |
| 12 May 2017 | Ground Floor - Escalator Works | $549k |
| 03 Mar 2017 | Level 17, Accuraco office alterations | $0 |
| 02 Feb 2017 | Shop L01, 151 Melbourne Central Shopping Centre - Starbucks Coffee fit-out | $380k |
| 24 Jan 2017 | Melbourne Central Tower - Lift Room | $1k |
| 10 Nov 2016 | Fit out works to existing office tenancies on Levels 14 & 15 | $1.0m |
| 10 Nov 2016 | Fit out works to existing office tenancy on level 42 | $300k |
| 21 Oct 2016 | Levels 39-41 & Level 45 - Fitout works to existing offices | $1.5m |
| 06 Oct 2016 | Stage 2 Fitout | $254k |
| 14 Sept 2016 | Level 2 - Allianz Fitout | $76k |
| 14 Sept 2016 | Shop LG07C - Internal Fitout to all parts | $50k |
| 01 Sept 2016 | Lobby upgrade and make good to office floors | $2.1m |
| 19 July 2016 | Shop LG07C - Internal Fitout to all parts | $50k |
| 12 July 2016 | Level 46 - Internal office alterations | $130k |
| 08 July 2016 | Level 49 - NBN fitout | $103k |
| 01 July 2016 | Levels 39-41 & Level 45 - Fitout works to existing offices | $1.5m |
| 05 Apr 2016 | Level 49, Internal office alterations | $347k |
| 14 Jan 2016 | Level 2 - Fit-out | $244k |
| 08 Dec 2015 | Level 20 - Internal alterations to Office | $98k |
| 02 Dec 2015 | Level 9 - alterations | $105k |
| 01 Dec 2015 | Level 50 - Tenancy split | $25k |
| 28 Oct 2015 | Level 49 - New Inter-Tenancy Wall | $32k |
| 21 Oct 2015 | Internal Alterations and Fit Out of Tenancy Offices | $52k |
| 19 Oct 2015 | Level 49, Internal office alterations | $110k |
| 07 Oct 2015 | Level 10 & 11 - Internal alterations to Building and Office and Meeting Room Fit Out | $31k |
| 23 Sept 2015 | Level 50 - Office Fit-Out | $189k |
| 02 July 2015 | Replacement of Chiller | $750k |
| 01 June 2015 | Fit-Out - End of Trip Facility | $2.0m |
| 19 May 2015 | Levels 42, 43 & 44 - NBN Co. Office tenancy fitout | $4.7m |
| 08 May 2015 | Level 10 - Fitout - Cafe Fourteen | $165k |
| 16 Apr 2015 | Level 2, 46 & 49 - Office Refurbishment | $1.1m |
| 16 Apr 2015 | Refurbishment Level 49, 360 Elizabeth Street | $236k |
| 02 Mar 2015 | Stage 1: Internal Demolition - Levels 42, 43 & 44 Only - Fit out of levels 42, 43, 44 | $716k |
| 25 Feb 2015 | Level 39 - Alterations to Myit Bar | $164k |
| 19 Feb 2015 | Levels 42, 43 & 44 - NBN Co. Office tenancy fitout | $4.7m |
| 10 Feb 2015 | Level 50 | $411k |
| 24 Nov 2014 | Level 6 - alterations to existing office | $62k |
| 20 Nov 2014 | Level 50 fitout | $134k |
| 19 Nov 2014 | Level 2, 46 & 49 - Office Refurbishment | $940k |
| 05 Nov 2014 | LED Screen - 360 Elizabeth | $51k |
| 28 Sept 2014 | LG 72 Proposed Fitout of tenancy | $180k |
| 11 Sept 2014 | Level 12, Office fit out. | $69k |
| 08 July 2014 | Stage 3: Levels 42 & 43 Amenities Fit-Out | $1.0m |
| 03 June 2014 | Level 17 McMillan Shakespeare Fitout | $400k |
| 27 May 2014 | Stage 2: Internal Fit-Out - Levels 42, 43 & 44 | $716k |
| 26 May 2014 | Lvl 11 & 17 Refurbishment | $495k |
| 16 Apr 2014 | Tenancy GD044A ROI Hairdressing | $40k |
| 07 Apr 2014 | Internal office alterations to level 9 | $160k |
| 01 Apr 2014 | Stage 2 - Works to completion including services Level 9 | $160k |
| 26 Mar 2014 | Stage 3: Partial Level 17 Fit-Out Only | $675k |
| 14 Mar 2014 | Lvl 10 and 11 Office Fitout alterations | $1.7m |
| 17 Jan 2014 | level 10 - Minor base building alterations including new walls between GPT office, and future Rigby Cookie office area | $40k |
| 05 Dec 2013 | Refurbishment works to an existing office building. Levels 24-31 | $3.8m |
| 06 Nov 2013 | Stage 3: Fire, hydraulic and security services, graphics and signage - including architectural and electrical services. Internal fit out Levels 32 & 33 | $4.7m |
| 18 Oct 2013 | Level 51 - Stair Infill | $75k |
| 01 Oct 2013 | Stage 2: Electrical, Mechanical & Architectural (excluding Graphics & Signage ) - Internal fit out Levels 32 & 33 | $4.7m |
| 17 Sept 2013 | Internal fit out Levels 32 & 33 | $4.7m |
| 23 Aug 2013 | Level 9- Office fit out | $120k |
| 29 July 2013 | Office (Part) fitout alterations - Level 10 - Melbourne Central Tower | $1.7m |
| 19 July 2013 | Stage 2: Level 46 - Lobby & Sanitary Upgrade & Fire Services Works - Alterations/segregation into three tenancies and back to base works to one tenancy Stage 1 Level 46 | $524k |
| 24 May 2013 | Internal office fitout alterations Level 5 | $69k |
| 08 May 2013 | Alterations/segregation into three tenancies and back to base works to one tenancy Stage 1 Level 46 | $85k |
| 04 Apr 2013 | Internal office fitout Level 46 | $152k |
| 28 Mar 2013 | Office refurbishment over 19 floors. | $330k |
| 05 Dec 2012 | Office Partitioning on Level 9 | $190k |
| 03 Dec 2012 | Proposed minor internal office alterations - Level 44 | $23k |
| 16 Nov 2012 | Internal office fitout Level 20 | $100k |
| 09 Oct 2012 | Alterations within the existing lobby and sanitary facilities- Level 20 Melbourne Central | $287k |
| 30 Aug 2012 | Internal demolition within existing building Level 20 | $100k |
| 10 Aug 2012 | Stage 2: Levels 9, 10, 50 & 51 - Back to base building refurbishment, lobby and amenities upgrade to Levels 8, 9, 10, 50 & 51. Stage 1: Level 8 Lobby and amenities upgrade | $1.8m |
| 24 July 2012 | Installation of break glass alarm to inter-tenancy door Level 44 | $1k |
| 16 July 2012 | Back to base building refurbishment, lobby and amenities upgrade to Levels 8, 9, 10, 50 & 51. Stage 1: Level 8 Lobby and amenities upgrade | $286k |
| 13 July 2012 | Alterations and fitout to Level 8 | $363k |
| 19 June 2012 | Fitout to office building - New Security Desk & Alterations to Equipment Room - Melbourne Central Tower - Ground & Level 2 | $85k |
| 23 May 2012 | Internal office alterations Level 44 | $210k |
| 20 Apr 2012 | Stage 1 - Conditional Excluding FH and FHR Coverage and Structural work - NBNCo Office fitout on Level 39 | $1.3m |
| 20 Feb 2012 | Variation to services and final works | $1.6m |
| 14 Feb 2012 | Internal office fitout Level 19 | $50k |
| 14 Dec 2011 | Stage 5: Back to base building refurbishment - Level 39, excluding lobby | $666k |
| 25 Nov 2011 | Alterations to existing store room | $38k |
| 22 Nov 2011 | External ME bank signage | $1.6m |
| 07 Nov 2011 | Internal office fitout Level 21 | $1.0m |
| 24 Oct 2011 | Stage 4: Internal fitout works of Levels 2, 21, 24, 25, 27, 32, & 33 (entire floor), and Level 34 (lobby only) | $6.4m |
| 03 Oct 2011 | Final Conditional - Variation (level 27 Quiet Room) Alterations - Members equity bank relocation | $7.7m |
| 31 Aug 2011 | Construction of office partitions level 46 | $42k |
| 26 Aug 2011 | Alterations Level 2-Air Conditioning System | $255k |
| 20 July 2011 | Alterations to Lwr Ground (ME Bank - Bike Store) | $80k |
| 20 Apr 2011 | Office fitout Level 24 | $50k |
| 18 Apr 2011 | Level 16 - Internal Office fitout | $87k |
| 09 Feb 2011 | INTERNAL OFFICE FITOUT | $2.8m |
| 07 Dec 2010 | Stage 3: Internal fitout works of Levels 3-7 (entire floor) and 26, 28-31 & 45 (lobbies only) | $4.8m |
| 16 Nov 2010 | Alterations - Members equity bank relocation | $7.7m |
| 29 Oct 2010 | Stage 2: Internal stripout works of levels 3-7 (entire floor) and 26, 28-31 and 45 (lobbies only) | $4.8m |
| 23 Sept 2010 | NBN Co Ltd Tenancy Fitout - Level 40 & 41 | $337k |
| 17 Sept 2010 | Hudsons Coffee - Melbourne Central, Lower Ground | $110k |
| 03 Aug 2010 | Property alterations to existing tenancy - Level 20 | $170k |
| 30 July 2010 | Lower ground - Bike store and locker room facility | $180k |
| 31 May 2010 | Revision of sprinkler system | $10k |
| 19 May 2010 | Next Wave Festival Event - Rooftop Level 3, Melbourne Central. | $0 |
| 25 Mar 2010 | Construction of kiosk fitout | $45k |
| 15 Mar 2010 | High Rise Loby & Toilet Refurbishment Level 35 - 41 | $1 |
| 28 Jan 2010 | Proposed Internal Tenancy Fit-Out- Sens Body and Mind | $100k |
| 11 Dec 2009 | Erection of a partition wall at 360 Elizabeth Street Melbourne | $5k |
| 02 Dec 2009 | Alterations to existing office tenancy | $16k |
| 05 Nov 2009 | Level 16 - Internal Office fitout | $87k |
| 01 Oct 2009 | Level 18, 19 & 20 (part) - Alterations | $1.5m |
| 04 Sept 2009 | Stage 2: Final. Alterations Levels 34, 35 & 36 | $3.0m |
| 11 Aug 2009 | Alterations Levels 34, 35 & 36 | $3.0m |
| 22 May 2009 | Partition Alterations | $90k |
| 17 Feb 2009 | Inter tenancy stair enclosure Levels 17 & 18 | $4k |
| 15 Dec 2008 | Telstra Accommodation Alterations - Level 4 360 Elizabeth Street, Melbourne | $128k |
| 10 Apr 2008 | Office partition alterations Levels 5, 6 & 8. Stage 2: Services alterations. | $81k |
| 31 Mar 2008 | Australian Competition and Consumer Commission. Alteration to office on Level 37 and 38. | $2.0m |
| 25 Mar 2008 | Alterations to building. Stage 1 - Lower ground floor sanitary facilities & level 11 to 20 toilet/lobby upgrades (excludes lower ground floor fire services) | $1.5m |
| 16 Oct 2007 | Office partition fitout to Levels 42 & 44. | $40k |
| 20 Sept 2007 | Partition alterations Level 43 | $60k |
| 05 Sept 2007 | Alterations Part Levels 19 & 20 | $46k |
| 21 June 2007 | Alterations to FIP & Alarm of EWIS & GFA | $3k |
| 18 May 2007 | Origin energy. Alterations to corner office Level 33. | $250k |
| 04 May 2007 | Alterations to Level 31 partitions | $454k |
| 04 Apr 2007 | Proposed internal alterations to an existing office, Level 35. | $30k |
| 07 Dec 2006 | Alterations to an office building. Installation of a new door, Level 18. | $17k |
| 08 Nov 2006 | Office partition alterations Levels 42,43,44 | $160k |
| 10 Oct 2006 | Proposed office fitout to level 42. | $30k |
| 28 Sept 2006 | Variation - Office partitions to Levels 42, 43 and 44 | $80k |
| 22 June 2006 | Variation: Internal alterations on Level 32. Origin energy. Alterations to an existing building, internal office alteration on level 21, 25, 27, 32 and 33. | $240k |
| 19 Apr 2006 | Origin energy. Alterations to an existing building, internal office alteration on level 21, 27, 32 and 33. | $200k |
| 12 Apr 2006 | Royal Donuts Fitout @ Melbourne Central retail construction, internal fitout works for royal donuts kiosk LG04A lower ground level | $99k |
| 16 Mar 2006 | CSA Melbourne - L11 tenancy fitout; Internal office alterations to level 11 | $820k |
| 22 Feb 2006 | Proposed office alterations to existing bathroom and lobby to level 11 | $160k |
| 01 Feb 2006 | Office fitout level 5 | $885k |
| 01 Feb 2006 | Variation - Construction of equipment room, office fitout level 5 | $885k |
| 09 Jan 2006 | Proposed office fitout to level 46 (part), all building works | $50k |
| 19 Dec 2005 | level 4, 6, 6 office fitout | $1.4m |
| 05 Dec 2005 | Internal alteration works Part Level 7 | $398k |
| 12 Oct 2005 | Alterations to office Level 2 | $8k |
| 29 Sept 2005 | Internal alterations Level 29 | $40k |
| 28 Sept 2005 | Internal alterations:Utilities & store room Level 49 | $35k |
| 22 Sept 2005 | Internal alterations part Level 10 | $5k |
| 20 Sept 2005 | Stage 1: removal and re-erection of partitions | $70k |
| 08 Sept 2005 | Level 16 Alterations | $30k |
| 25 Aug 2005 | tenancy fitout of shop | $215k |
| 02 Aug 2005 | Stage 2: Conditional - alterations to existing tenancy - variation - architectural and alterations to sprinklers only | $70k |
| 22 Mar 2005 | Stage 2: alterations to shop front & canopy | $110k |
| 16 Mar 2005 | Installation of new government telecommunication facility at Melbourne Central Tower | $120k |
| 11 Feb 2005 | Stage 1: alterations to boost juice - to permit the bi-folding doors as an exit | $110k |
| 03 Feb 2005 | Internal fitout to office tenancy level 46 | $90k |
| 13 Dec 2004 | office alterations to level 49. | $10k |
| 10 Dec 2004 | Tenancy 139A shop fitout | $44k |
| 07 Dec 2004 | Office Fitout to Level 16 - DFS Advisory Services Pty Ltd Fitout. | $115k |
| 30 Nov 2004 | Internal fitout to Shop -Tenancy 203 Level 2 | $200k |
| 10 Nov 2004 | Internal alterations Level 42,43 & 44 | $1.2m |
| 31 Aug 2004 | Full Tenancy fitout 4 Floors | $3.2m |
| 06 Aug 2004 | Internal Alterations. | $750k |
| 05 Aug 2004 | Melbourne Centreal lift lobby upgrade. Alterations to level 17-20. | $100k |
| 10 June 2004 | Office partitions alterations Levels 21 & 25 | $89k |
| 31 May 2004 | Shop front LG 03 | $130k |
| 16 Apr 2004 | Internal works Levels 50-51 | $60k |
| 06 Apr 2004 | Alterations to building. Stage 2- Conditional Lower ground floor fire services & variation to lower ground floor disabled sanitary facility | $1.5m |
| 22 Mar 2004 | Fitout of restaurant tenancy E01 | $454k |
| 21 Jan 2004 | Modicication to an Existing Traction Tie Station | $108k |
| 11 Aug 2003 | Alterations to an office. Alterations to Level 18 & Level 20, Computer Room | $1.1m |
| 08 July 2003 | Full- Penetrations for Video Conference Room-Level 38 | $45k |
| 25 June 2003 | Office fitout to Levels 26 & 31 | $80k |
| 04 June 2003 | Relocate exit signs and remove exits and relocate compactus to level 2 & level P3 | $2k |
| 02 June 2003 | Level 26 offices, alterations to existing building | $35k |
| 18 Mar 2003 | Perrin Office Tenancy alterations, Level 34 | $900k |
| 02 Dec 2002 | Internal office alteration on level 7 | $70k |
| 18 July 2002 | Level 11 - Office Fitout | $50k |
| 05 July 2002 | Stage 2 - Reconstruct Post Office - Roof area only. | $550k |
| 13 Mar 2002 | Tenancy 365 Alterations | $80k |
| 07 Mar 2002 | Level 46 - Sony Ericson Office Fitout | $45k |
| 31 Jan 2002 | Stage 1 - Part Demolition of Post Office, stage of work rood area only. | $500k |
| 17 Jan 2002 | Level 36 - Office Alterations | $100k |
| 21 Dec 2001 | Level 17 - Alterations to existing building, full reception area works only. | $60k |
| 17 Dec 2001 | Levels 21, 32 & 33 (part) - Fitout. | $600k |
| 20 Sept 2001 | Levels 39, 40 & 41 beehive office alterations | $435k |
| 15 Aug 2001 | Level 29, Internal fitout for BP tenancy. | $40k |
| 26 July 2001 | Level 10 Alterations to office building. | $20k |
| 15 June 2001 | Level 9 stage 2 office fit out for Kaz Computer Services | $167k |
| 18 May 2001 | lvl 37 & 38 Melb Central Office Tower - Ericsson tenancy | $80k |
| 16 May 2001 | office reception fit out to level 11 of existing building | $49k |
| 29 Mar 2001 | lvls 13 & 17 office alts | $120k |
| 02 Nov 2000 | L16 office alts | $11k |
| 20 Oct 2000 | Office alterations Level 34 Ericson Australia Melbourne Central | $1.1m |
| 07 July 2000 | Office fitout on level 49 | $66k |
| 05 May 2000 | Tenancy fitouts Levels 25-32 | $700k |
| 03 May 2000 | alts lvl 49 | $620k |
| 18 Apr 2000 | Office fitout on level 50 | $905k |
| 28 Mar 2000 | tenancy alterations on level 45 | $11k |
| 04 Mar 2000 | Tenancy fitout on level 14 | $85k |
| 19 Nov 1999 | Level 1, Office partition alterations to level 50, floor 46 | $233k |
| 19 Nov 1999 | Office partition alterations on level 10 | $18k |
| 22 Oct 1999 | Tenancy fitout for Australia Post Shop | $53k |
| 29 Sept 1999 | Proposed ACCC fitout to par of level 46 | $100k |
| 02 Sept 1999 | Office fitout for Ericsson Australia, 360 Elizabeth Street, Melbourne | $1.0m |
| 03 Mar 1999 | Office alterations | $65k |
| 06 Jan 1999 | Office fitout level 51 | $8k |
| 12 Nov 1998 | stage 2, Office partition alterations to level 50, floor 46 | $233k |
| 12 Oct 1998 | Minor partition fit-out - lvl 4, 360 Elizabeth St, Melbourne | $60k |
| 30 Sept 1998 | Construction of minor internal alterations to existing JB Hi Fi store | $2k |
| 14 Aug 1998 | Tenancy fitout for Ericsson''s on levels 43 & 44, 360 Elizabeth Street, Melbourne | $2.3m |
| 04 Aug 1998 | Internal alterations on levels 13, 15 & 17 | $121k |
| 04 Aug 1998 | Office alterations to level 12, The Tower, 360 Elizabeth Street, Melbourne | $150k |
| 23 July 1998 | Fitout on level 19 for Arthur Andersen, 360 Elizabeth Street, Melbourne | $32k |
| 18 May 1998 | On level 20 | $30k |
| 30 Apr 1998 | Fitout on Levels 2 to 8 | $4.8m |
| 21 May 1997 | Fitout levels 37 to 41 | $4.1m |
| 31 Jan 1997 | office fitout level 9 | $45k |
| 24 Jan 1997 | Office fitout to Level 14 | $30k |
| 06 Oct 1995 | Stage 1 - Demolish and replace partitions on Level 34 | $100k |
| 16 Mar 1995 | Partition alterations for level 11 | $21k |
Is Melbourne Central Tower residential or commercial?
Melbourne Central Tower is a commercial building. The City of Melbourne lists its main use as office.
When was Melbourne Central Tower built?
Melbourne Central Tower was completed in 1991.
How many floors does Melbourne Central Tower have?
Melbourne Central Tower has 52 floors above ground.
What businesses are in Melbourne Central Tower?
The latest council census counted 58 businesses in Melbourne Central Tower, including Acciona Energy Australia Global Pty Ltd, ACIC and AIRMASTER CORPORATION PTY LTD.
Is there office or retail space for lease in Melbourne Central Tower?
See the commercial listings on this page, or search this address on realcommercial.com.au and commercialrealestate.com.au.
Who designed and built Melbourne Central Tower?
Essington Limited developed Melbourne Central Tower and Bates Smart designed it. The building team section has the sources.
How tall is Melbourne Central Tower?
About 211 metres, measured from the City of Melbourne's 3D building model. It's number 18 of 1596 buildings in Melbourne by height.
What public transport is near Melbourne Central Tower?
Melbourne Central Station is the nearest train station, about 1 minute's walk. The nearest tram stop is Melbourne Central Station/Elizabeth St #5, about 1 minute's walk.
What is the planning zone for Melbourne Central Tower?
The site is in the Capital City Zone - Schedule 2 (CCZ2).
Does Melbourne Central Tower have an owners corporation?
Plan of subdivision PS310072 has 1 lot.
Has any work been done on Melbourne Central Tower recently?
The City of Melbourne has issued 241 building permits for Melbourne Central Tower since 1995. The most recent was in February 2026.
Sources: City of Melbourne building permits (CC BY 4.0); CLUE building information (CC BY 4.0); CLUE business establishments (CC BY 4.0); Geocoded National Address File (G-NAF) (Open G-NAF EULA (CC BY 4.0 based)). General information from public records, not legal, financial or building advice.