🏒 CommercialOfficeCompleted 1991

Melbourne Central Tower

316-360 Elizabeth Street, Melbourne VIC 3000

  • 211 m tall Β· #18 in Melbourne
  • 52 floors
  • 58 businesses

What's available here Add a listing link

Looking toIn this buildingArea guideSearch the building
Lease spaceβ€”β€”

Each link opens a Google search limited to that site.

35 years standing

  1. 1991Completed
  2. TodayStill standing

241 building permits Β· 1 news storyFull timeline ↓

About Melbourne Central Tower

Melbourne Central Tower is an office tower with 52 floors above ground, completed in 1991. Its roof stands 211 m high. It was developed by Kumagai Gumi and Essington Limited, with architecture by Hassell, Kisho Kurokawa and Bates Smart.

At a glance

Key facts

Building type
🏒 Commercial
Completed
1991
Height
210 m Unconfirmed We don't have data to 100% confirm this data point as yet.
#18 of 1596 in Melbourne
Floors
52
Footprint
3,254 mΒ²
Architect
Kisho Kurokawa Unconfirmed We don't have data to 100% confirm this data point as yet.
Businesses
58
Car spaces
β€”
Strata plan
PS310072 Β· 1 lots
Planning zone
CCZ2
Permits on record
241

Score cards

πŸš† Transport10/10

Melbourne Central Station 1 min walk Β· 8 tram stops within 400 m

β˜• Everyday amenities9/10

225 cafΓ©s, 21 grocers, 3 medical within 250 m

🌳 Greenery4/10

46 street trees within 150 m Β· park 461 m away

✨ Activity9/10

6,903 people pass daily nearby Β· 58 licensed venues within 200 m

Calculated from PTV timetable stops, the City of Melbourne business census, street trees, pedestrian sensors and liquor licences.

The building team

The people and companies behind the design, construction and management of Melbourne Central Tower.

πŸ—DeveloperKumagai Gumi1987–1999reported1987-1999Source: Wikipedia β†—
πŸ—DeveloperEssington LimitedreportedJoint venture partner in EKG DevelopmentsSource: Wikipedia β†—
πŸ“ArchitectHassell1985reported1985 Β· Designed the winning 1985 scheme, which was later reduced in scaleSource: Wikipedia β†—
πŸ“ArchitectKisho KurokawareportedSource: Wikipedia β†—
πŸ“ArchitectBates SmartreportedJoint documenter of the scheme alongside HassellSource: Wikipedia β†—
πŸ“ArchitectCox Architecture2018–2019reportedRefurbishment Β· 2018-2019Source: apartments.com.au (Urban.com.au content) β†—
πŸ“‹Project managerAccuracoreportedRefurbishmentSource: Accuraco β†—
🏦OwnerGPT Group1999–presentverifiedCurrent Β· 1999-presentSource: Wikipedia β†—
+Were you involved?Builders, architects, developers and managers can claim their role

Location & neighbourhood

Getting around

πŸš†Melbourne Central Station
Train station
1 min Β· 104 m
πŸš†Melbourne Central Railway Station
Train station
1 min Β· 111 m
πŸš‹Melbourne Central Station/Elizabeth St #5
Tram stop
1 min Β· 34 m
πŸš‹Melbourne Central Station/La Trobe St #5
Tram stop
1 min Β· 106 m
πŸš‹Melbourne Central Station/Swanston St #8
Tram stop
2 min Β· 198 m

Straight-line walking estimate. Source: PTV GTFS, CC BY 4.0.

Within a 3-minute walk

225β˜• CafΓ©s & eateries
21πŸ›’ Grocers
4πŸ‹οΈ Gyms
3🩺 Medical
28πŸ’Š Pharmacies
2🧸 Childcare
21🍷 Pubs & bars

Who lives in Melbourne (CBD)

Residents37,341
Median age26
Households renting70%
Households without a car75%
Walk to work40%
Public transport to work43%

ABS Census 2016 via City of Melbourne (CC BY).

Businesses in Melbourne Central Tower

58 businesses recorded in the City of Melbourne's latest business census.

Acciona Energy Australia Global Pty Ltd

Other Electricity Generation

ACIC

Management Advice and Other Consulting Services

AIRMASTER CORPORATION PTY LTD

Other Residential Building Construction

AITSL

Adult, Community and Other Education n.e.c.

Althea Company Pty Ltd

Alternative Health Services

Andersen Partnership

Employment Placement and Recruitment Services

Australian Communications & Media Authority

Central Government Administration

Australia Visa Link

Other Interest Group Services n.e.c.

AUSTROADS LTD

Other Transport n.e.c.

Looking for space in Melbourne Central Tower?

We'll try to put you in touch with an agent, though we can't promise a reply.
Source: City of Melbourne Census of Land Use and Employment, CC BY 4.0.

Timeline

Everything that has happened at Melbourne Central Tower: listings, news, works, planning and history.

2026πŸ› 
Works
2 building permits and 4 certificates Β· about $1.3m of new works
Largest: AHU Replacement for Fine Day Tenancy
2025πŸ› 
Works
12 building permits and 6 certificates Β· about $7.4m of new works
Largest: Level 2 - Alterations to an existing office
2024πŸ› 
Works
10 building permits and 10 certificates Β· about $20.2m of new works
Largest: Alteration to an Existing Building - Level 3, 4 & 5 DEWR Offices
2023πŸ› 
Works
9 building permits and 6 certificates Β· about $3.3m of new works
Largest: Alterations to an existing office building
2022πŸ› 
Works
12 building permits and 9 certificates Β· about $38.7m of new works
Largest: Stage 2 - To Permit the Construction of the ProposedIntertenancy Stair Between Level 18 & 19.
2021πŸ› 
Works
6 building permits and 5 certificates Β· about $3.6m of new works
Largest: Melbourne Central Tower Heating Hot Water Upgrade
2020πŸ› 
Works
7 building permits and 8 certificates Β· about $19.4m of new works
Largest: Stage 4 -Tower Lobby Upgrade Works Melbourne
2019πŸ› 
Works
9 building permits and 8 certificates Β· about $29.4m of new works
Largest: Stage 3 - Installation mechanical exhaust fans and ducts
20 Jun 2018πŸ“°
News
GPT plans $35m lobby upgrade for Melbourne Central Tower
GPT Group planned a $35 million lobby upgrade to the tower, designed by COX Architecture, with works expected to start in 2018 and completion slated for 2019.
2018πŸ› 
Works
15 building permits and 10 certificates Β· about $8.4m of new works
Largest: Level 35 - Tenancy Fit-out
2017πŸ› 
Works
5 building permits and 10 certificates Β· about $9.5m of new works
Largest: Works to upgrade main lobbies and make good tenancy back to base building
2016πŸ”„
Use change
Council census records it as office, 52 floors
Name recorded: Melbourne Central Tower
2016πŸ› 
Works
11 building permits and 2 certificates Β· about $7.7m of new works
Largest: Lobby upgrade and make good to office floors
2015πŸ› 
Works
11 building permits and 7 certificates Β· about $9.0m of new works
Largest: Levels 42, 43 & 44 - NBN Co. Office tenancy fitout
2014πŸ› 
Works
12 building permits and 4 certificates Β· about $5.6m of new works
Largest: Lvl 10 and 11 Office Fitout alterations
2013πŸ› 
Works
9 building permits and 3 certificates Β· about $11.2m of new works
Largest: Stage 3: Fire, hydraulic and security services, graphics and signage - including architectural and electrical services. Internal fit out Le
2012πŸ› 
Works
10 building permits and 4 certificates Β· about $5.0m of new works
Largest: Stage 2: Levels 9, 10, 50 & 51 - Back to base building refurbishment, lobby and amenities upgrade to Levels 8, 9, 10, 50 & 51. Stage 1: Leve
2011πŸ› 
Works
6 building permits and 6 certificates Β· about $5.9m of new works
Largest: Final Conditional - Variation (level 27 Quiet Room) Alterations - Members equity bank relocation
2010πŸ› 
Works
8 building permits and 4 certificates Β· about $15.0m of new works
Largest: Alterations - Members equity bank relocation
2009πŸ› 
Works
7 building permits and 1 certificate Β· about $3.2m of new works
Largest: Stage 2: Final. Alterations Levels 34, 35 & 36
2008πŸ› 
Works
1 building permit and 3 certificates Β· about $2.2m of new works
Largest: Australian Competition and Consumer Commission. Alteration to office on Level 37 and 38.
2007πŸ› 
Works
5 building permits and 2 certificates Β· about $633k of new works
Largest: Alterations to Level 31 partitions
2006πŸ› 
Works
9 building permits and 3 certificates Β· about $2.6m of new works
Largest: Office fitout level 5
2005πŸ”„
Use change
Council census records it as office, 52 floors
Name recorded: MELBOURNE CENTRAL TOWER
2005πŸ› 
Works
12 building permits and 2 certificates Β· about $2.5m of new works
Largest: level 4, 6, 6 office fitout
2004πŸ› 
Works
9 building permits and 5 certificates Β· about $7.9m of new works
Largest: Full Tenancy fitout 4 Floors
2003πŸ› 
Works
3 building permits and 3 certificates Β· about $2.1m of new works
Largest: Alterations to an office. Alterations to Level 18 & Level 20, Computer Room
2002πŸ› 
Works
6 building permits and 1 certificate Β· about $815k of new works
Largest: Stage 2 - Reconstruct Post Office - Roof area only.
2002πŸ“‹
First census
First council census entry: office, 51 floors
2001πŸ› 
Works
6 building permits and 3 certificates Β· about $1.6m of new works
Largest: Levels 21, 32 & 33 (part) - Fitout.
2000πŸ› 
Works
6 building permits and 2 certificates Β· about $3.5m of new works
Largest: Office alterations Level 34 Ericson Australia Melbourne Central
1999πŸ› 
Works
4 building permits and 3 certificates Β· about $1.3m of new works
Largest: Office fitout for Ericsson Australia, 360 Elizabeth Street, Melbourne
1998πŸ› 
Works
6 building permits and 3 certificates Β· about $7.7m of new works
Largest: Fitout on Levels 2 to 8
1997πŸ› 
Works
3 building permits Β· about $4.2m of new works
Largest: Fitout levels 37 to 41
1995πŸ› 
Works
2 building permits Β· about $121k of new works
Largest: Stage 1 - Demolish and replace partitions on Level 34
1991πŸŽ‰
Milestone Β· Completed
Melbourne Central Tower completed: 52 floors
Derived from City of Melbourne building census (CLUE) 2024

Planning & heritage

Planning controls

ZoneCAPITAL CITY ZONE - SCHEDULE 2 (CCZ2)
DDO1Design and Development Overlay: limits on building height, setbacks and design
DDO10Design and Development Overlay: limits on building height, setbacks and design
PO2Parking Overlay: controls on how much car parking new development can provide
SCO3Specific Controls Overlay: site-specific planning rules, often for a major project

Vicmap Planning, Β© State of Victoria (Department of Transport and Planning), CC BY 4.0. Plain-English summaries are ours. Check the planning scheme for exact controls.

Subdivision & permits

Plan of subdivision
PS310072
Lots on the plan
1
Owners corporation
Not recorded
Building permits on record
241
Estimated cost of works
About $240.9m
1995New works by year (estimated)2026

Costs are estimates declared on permits, not amounts spent. Stages of a project repeat its value, so we group them and count each project once. A value can cover a project spanning several buildings. Our calculation from City of Melbourne building permits, CC BY 4.0.

History of the site

How it's been recorded over time

2002Office Β· 51 floors Β· "MELBOURNE CENTRAL TOWER"
2005Office Β· 52 floors Β· "MELBOURNE CENTRAL TOWER"
2016Office Β· 52 floors Β· "Melbourne Central Tower"

City of Melbourne Census of Land Use and Employment, since 2002.

Community

What people say about Melbourne Central Tower in public forums and groups, and reviews left here.

No public discussion found yet. Know a thread or group about Melbourne Central Tower? .

Tenant reviews

No reviews of Melbourne Central Tower yet. Be the first to tell future tenants what it's like.

Reviews are checked before they're published. No one is named without permission.

Rate and review Melbourne Central Tower

Your rating

By posting, you agree to the contributor terms. See how we handle your details in the privacy policy.

Frequently asked questions

Is Melbourne Central Tower residential or commercial?

Melbourne Central Tower is a commercial building. The City of Melbourne lists its main use as office.

When was Melbourne Central Tower built?

Melbourne Central Tower was completed in 1991.

How many floors does Melbourne Central Tower have?

Melbourne Central Tower has 52 floors above ground.

What businesses are in Melbourne Central Tower?

The latest council census counted 58 businesses in Melbourne Central Tower, including Acciona Energy Australia Global Pty Ltd, ACIC and AIRMASTER CORPORATION PTY LTD.

Is there office or retail space for lease in Melbourne Central Tower?

See the commercial listings on this page, or search this address on realcommercial.com.au and commercialrealestate.com.au.

Who designed and built Melbourne Central Tower?

Essington Limited developed Melbourne Central Tower and Bates Smart designed it. The building team section has the sources.

How tall is Melbourne Central Tower?

About 211 metres, measured from the City of Melbourne's 3D building model. It's number 18 of 1596 buildings in Melbourne by height.

What public transport is near Melbourne Central Tower?

Melbourne Central Station is the nearest train station, about 1 minute's walk. The nearest tram stop is Melbourne Central Station/Elizabeth St #5, about 1 minute's walk.

What is the planning zone for Melbourne Central Tower?

The site is in the Capital City Zone - Schedule 2 (CCZ2).

Does Melbourne Central Tower have an owners corporation?

Plan of subdivision PS310072 has 1 lot.

Has any work been done on Melbourne Central Tower recently?

The City of Melbourne has issued 241 building permits for Melbourne Central Tower since 1995. The most recent was in February 2026.

Compare with nearby buildings

BuildingTypeDistanceFloorsCompleted
Melbourne Central TowerCommercialβ€”521991
Eporo TowerMixed use106 m442016
Melbourne Star ApartmentsMixed use111 m412013
Melbourne Sky ApartmentsMixed use111 m372013
Aurora Melbourne CentralMixed use134 m862016

That's Built compiles information from public records, research and contributions. Details are checked against multiple sources where possible but may contain errors and aren't professional advice. Sources: City of Melbourne building permits (CC BY 4.0), CLUE building information (CC BY 4.0), CLUE business establishments (CC BY 4.0), Geocoded National Address File (G-NAF) (Open G-NAF EULA (CC BY 4.0 based)). Street View and business details Β© Google Maps.

Melbourne Central TowerNo listings linked yetFind listings

Suggest a correction

Something wrong or missing? Tell us what it should say. We check every suggestion before changing anything.

By sending, you agree to the contributor terms. See how we handle your details in the privacy policy.