| Construction started | Aug 2003 | First major construction permit issued |
| First occupants | Dec 2005 | First occupancy permit issued |
| Completed | 2005 | 2 Southbank Boulevard completed: 38 floors |
Each cost is the estimate on that record. Stages of a project often repeat its full value, so these don't add up to what was spent.
| 08 June 2026 | Level 26 - Lemon Baxter Office - Internal non-structural alterations to parts of the existing office tenancy | $149k |
| 07 May 2026 | Level 5, 4 Freshwater Place - Microsoft Expansion | $282k |
| 10 Mar 2026 | Level 23 - Internal non structural alterations to parts of the existing office | $109k |
| 05 Mar 2026 | Tenancy Fitout of Office Level 10 | $253k |
| 10 Oct 2025 | Level 13, 16 - 19 & 20 (Part) -Stage 2: To Completion | $27.8m |
| 06 Oct 2025 | Level 4 - Installation of phone booths in existing office tenancy | $10k |
| 22 Aug 2025 | 2FWP L14 EXPERIAN - Alterations to an existing building | $1.0m |
| 22 Aug 2025 | 2FWP L15 BUILT - Alterations to an existing building - All works excluding the comms room | $5.6m |
| 22 Aug 2025 | Stage 2 - Fitout | $1.0m |
| 29 July 2025 | Level 13, 16 - 19 & 20 (Part) -Stage 1: Demolition and strip-out works including structural openings for new intertenancy stairs | $24.4m |
| 25 July 2025 | Stage 2: Comms room | $5.5m |
| 02 July 2025 | Level 14 - GPT Suite & Lobby & Amenities | $550k |
| 17 June 2025 | 2FWP Level 10 - Minor Alterations | $320k |
| 29 May 2025 | 2FWP L11 VISY MINOR ALTERATIONS | $25k |
| 02 Apr 2025 | Level 5 & 6 - 4FWP L5-7 Landlord Works (Stage 1 & 2) - Amenities and Stair Infill Works | $200k |
| 09 Dec 2024 | Level 3 A2 Milk - Alterations to Milk Meeting rooms | $90k |
| 09 Dec 2024 | Level 5 & 6 - 4FWP L5-7 Landlord Works (Stage 1 & 2) - Amenities and Stair Infill Works | $200k |
| 18 Oct 2024 | Level 29-32 Ausnet Minor Alterations | $500k |
| 14 Oct 2024 | 4FWP Level 5-6 - Microsoft Optimization - Alterations | $822k |
| 30 Sept 2024 | Level 19 - Space & Co Alteraions | Alterations to an existing building | $450k |
| 29 Aug 2024 | Ground floor - Refurbishment of existing lobby cafe - 2FWP Little Bang Lobby Cafe | $119k |
| 19 Aug 2024 | Stage 2: Remainder of Works | $4.5m |
| 16 Aug 2024 | Level 19 - Space & Co Alteraions | Alterations to an existing building | $450k |
| 19 July 2024 | 2FWP L9 Tenancy Split & Spec Suites | Tenancy Split and Spec Suites | $4.5m |
| 03 May 2024 | 4 Freshwater Place Level 4 - Installation of phone booths in existing office tenancy | $50k |
| 30 Apr 2024 | Level 22 - ESV Fitout - Alterations to an existing building | $1.8m |
| 01 Mar 2024 | Level 3 4FWP A2 Milk, 4 Freshwater Place - Minor alterations to office rooms within existing tenancy | $55k |
| 09 Jan 2024 | Ground Lobby Entrance Door - Alterations to an Existing Building | $16k |
| 26 Oct 2023 | Alterations to an existing office tenancy | $1.6m |
| 22 Sept 2023 | 2FWP Level 33 - IntelliHUB Fitout. Alterations to an existing building | $1.2m |
| 16 Aug 2023 | Part Level 34. Alterations to an existing building | $284k |
| 28 July 2023 | Stage 1 - Level 21 - Alterations to an existing building | $974k |
| 03 July 2023 | Alterations to an existing office tenancy | $1.6m |
| 03 July 2023 | Level 15 & 16 Make Good Works | $1.2m |
| 17 Mar 2023 | Level 15 & 16 - Lift Lobby Upgrades | $231k |
| 09 Mar 2023 | New signage | $138k |
| 22 Feb 2023 | Level 3 - 4FWP L3 Spec Suite & Amenities Upgrade | $1.2m |
| 31 Jan 2023 | 2FWP L10 Minor Alterations | Alterations to an existing building | $98k |
| 31 Jan 2023 | Level 9 2FWP - Tenancy Split & Fitout | $388k |
| 20 Jan 2023 | Stage 2: Levels 29-30 (Excluding Structural Stair and Coring Works) | $2.3m |
| 20 Jan 2023 | Stage 3: Level 29 - 30 - Structural coring and stair works. | $2.3m |
| 08 Dec 2022 | Level 33 - 2FWP L33 Corridor Alterations | Installation of Tenancy Corridor | $40k |
| 01 Dec 2022 | Level 26 - 2FWP L26 Spec Suites - Tenancy A | $1.6m |
| 25 Nov 2022 | Level 26, 2FWP L26 Spec Suites - Tenancy B & C | $1.3m |
| 11 Nov 2022 | 2FWP L27 Kraft-Heinz Alterations | $47k |
| 04 Oct 2022 | Stage 2 : Level 33 - Installation of Operable Wall and Hearing Augmentation | $2.3m |
| 16 Aug 2022 | 2FWP - Level 26 - Tenancy Split - Alterations to an existing building. Stage 1: Initial Tenancy Split | $764k |
| 16 Aug 2022 | 2FWP - Level 26 - Tenancy Split - Alterations to an existing building. Stage 2 - Second Tenancy Split | $764k |
| 16 Aug 2022 | 2FWP Level 28 - Spec Suites. Alterations to an existing building. | $762k |
| 16 Aug 2022 | Alterations to an existing building - Level 35 (Part) | $670k |
| 19 July 2022 | Level 34 - Alteration to existing building | $284k |
| 18 July 2022 | 2FWP L33 Palo Alto Fitout | Office Fitout within existing building - Level 33 | $2.3m |
| 12 July 2022 | 2FWP L23 Engie Alterations - Alteration to Existing Building. Stage 1: All works excluding installation of Modular Phonebooths | $528k |
| 12 July 2022 | Stage 2 : Modular Phonebooths Installation and Operable Wall Alterations 2FWP L23 Engie Alterations | $528k |
| 08 July 2022 | Alterations to existing Office - Cladding Rectification Works | $2.6m |
| 18 May 2022 | 4FWP Level 3 - Genesis (Back to Base) | Alterations to an existing building. | $122k |
| 06 May 2022 | 2FWP L14 VM Ware (Sprinkler Review) | Minor alterations to an existing Sprinkler systems - Level 14 | $6k |
| 14 Apr 2022 | 2FWP L27 Kraft Heinz R&D Test Kitchen | $396k |
| 11 Apr 2022 | Level 33 - 2 Freshwater Place | tenancy split works. | $405k |
| 16 Mar 2022 | Level 34 - Tenancy Fitout Works | $934k |
| 23 Dec 2021 | Stage 1: Office Alterations (L30 & L31) | $2.3m |
| 01 Dec 2021 | Level 34 Tenancy Split | $181k |
| 19 Nov 2021 | 2FWP Level 35 - Office Alterations (Marlo) | $423k |
| 15 Oct 2021 | 2FWP L28 Extension | Alterations to Existing Tenancy | $516k |
| 27 Sept 2021 | 2FWP L33 Back to Base Build | Back to Base Build Works | $390k |
| 20 Sept 2021 | Level 14 - Alterations to exisiting building | $156k |
| 17 Sept 2021 | 2FWP Level 10 Upgrades - Alterations to Existing Building | $0 |
| 17 Sept 2021 | 4FWP Level 4 Amenities | Amenities Upgrade | $97k |
| 02 Aug 2021 | 2FWP Level 35 Lift Lobby & Amenities. Lift Lobby & Amenities Upgrade | $172k |
| 30 June 2021 | Stage 2: Completion of Cladding Rectification Works | $2.1m |
| 17 June 2021 | Stage 1: Removal of Cladding from West Facade | $2.1m |
| 08 June 2021 | Level 28 - Spec Suites Fitout - Alterations to an Existing Building | $1.2m |
| 24 May 2021 | Level 13 - Lift Lobby & Amenities Upgrade | $178k |
| 11 May 2021 | 2SBB Bulk Works (L28, 33 & 34) | $959k |
| 03 May 2021 | 2FWP, Level 28 Warm Shell Demolition | $167k |
| 16 Apr 2021 | Level 28 - Spec Suites Fitout - Alterations to an Existing Building | $1.2m |
| 26 Feb 2021 | Stage 1 - Level 36-37 Apple tenancy fitout works. Demolition and soft strip out. | $1.6m |
| 14 Dec 2020 | 2SBB Bulk Works (L29-32) | $488k |
| 14 Dec 2020 | Alterations to an Exisiting Buiilding | $9k |
| 04 Dec 2020 | Level 36 - Alumina tenancy fitout. | $890k |
| 04 Dec 2020 | Stage 2: To Completion - Apple Tenancy Fitout Works | $1.6m |
| 18 Nov 2020 | ASE Replacement | $2k |
| 17 Nov 2020 | 2SBB Bulk Works (L28, 33 & 34) | $959k |
| 04 Nov 2020 | FWP L12 Strip out | 2 Southbank Boulevard Southbank VIC | $216k |
| 21 Sept 2020 | Level 28 (Ausnet) - Back to base build office alterations. | $206k |
| 30 July 2020 | Tenancy Split | $210k |
| 20 Apr 2020 | Level 12 - Office fitout for ICE Melbourne | $6.1m |
| 04 Mar 2020 | Level 29 & 30 AusNet Kitchen Breakout Space Upgrade | $548k |
| 24 Feb 2020 | Level - 12 Infill Works FWP | $220k |
| 14 Feb 2020 | Level 12 Alterations | $570k |
| 07 Feb 2020 | Level 12 - 2FWP, L12 Uniti Wireless Office Fitout | $384k |
| 20 Jan 2020 | Level 12 Alterations | $570k |
| 14 Jan 2020 | Level 31 & 32 AusNet Kitchen Breakout Space Upgrade | $548k |
| 13 Nov 2019 | Level 27 FWP1 Kraft Heinz Office Alterations - STAGE 1: SERVICES AND ARCHITECTURAL WORKS | $2.2m |
| 30 Sept 2019 | Level 4, 4FWP NPM Fit-out | $998k |
| 20 Sept 2019 | Level 4, 4FWP NPM Fit-out - Stage 2: To Completion | $998k |
| 15 Aug 2019 | Level 27 FWP1 Kraft Heinz Office Alterations - STAGE 1: SERVICES AND ARCHITECTURAL WORKS | $2.2m |
| 02 Aug 2019 | Level 24 - Alterations to an existing building | $42k |
| 15 July 2019 | FWP1 CUB LCR Room | $473k |
| 05 July 2019 | NPA Office Fitout, Level 35 | $280k |
| 28 June 2019 | Level 14 - Minor Office Alterations | $70k |
| 18 Feb 2019 | Level 17 - FWP1 BPM Office Tenancy Fitout | $275k |
| 20 Dec 2018 | Level 5 4FWP - Winslow Office Fit-out | $387k |
| 04 Dec 2018 | STAGE 8: BALANCE OF WORKS INCLUDING MINOR CHANGES | $13.5m |
| 16 Nov 2018 | Level 10- Lochard Energy Office Fitout | $550k |
| 16 Nov 2018 | STAGE 7: INFILL SLAB ON LEVEL 23 | $13.4m |
| 13 Nov 2018 | Level 17 - FWP1 BPM Office Tenancy Fitout | $275k |
| 02 Nov 2018 | Carlton & United Breweries Office Fitout | $13.4m |
| 02 Nov 2018 | STAGE 3: SERVICES ROUGH IN | $6.0m |
| 02 Nov 2018 | Stage 4: Architectural only | $13.4m |
| 12 Oct 2018 | STAGE 6: BALANCE OF WORKS | $13.4m |
| 09 Oct 2018 | STAGE 5: ELECTRICAL & HYDRAULIC SERVICES ONLY | $13.4m |
| 08 Oct 2018 | Stage 4: Architectural only | $13.4m |
| 10 Sept 2018 | Level 4 - 4FWP - Make Good Works | $930k |
| 14 Aug 2018 | Ground floor cafe fitout | $151k |
| 10 Aug 2018 | Stage 2: To completion, including ‘Glasshouse’ | $80k |
| 24 July 2018 | STAGE 2: STRIP OUT, BUILDING SERVICES EARLY WORKS, PARTITIONS, CEILINGS AND STAIRS | $13.4m |
| 18 July 2018 | Carlton & United Breweries Office Fitout | $13.4m |
| 17 July 2018 | Stage 2: Internal Office Fit-out Level 5 (part), Level 6 (part) & Level 7 (part) | $1.5m |
| 03 July 2018 | Stage 1 - Internal Demolition of Office Fitout on Part of Level 5 only | $1.5m |
| 29 June 2018 | Stage 2: Level 18 - To Completion | $1.4m |
| 21 June 2018 | FWP1, Level 26 -Stage 2: Ausnet Minor Office Alterations and Comms Room - To completion | $1.4m |
| 29 May 2018 | Stage 1: Strip out Works Only | $853k |
| 24 May 2018 | Level 19 - Fitout - Space & Co | $2.6m |
| 27 Apr 2018 | Stage 2: Architectural (excluding floor, wall and ceiling linings) - Level 24-25 - WPP Office Fitout | $5.4m |
| 14 Mar 2018 | Stage 2 - Ground Floor Internal Alterations Only | $5.1m |
| 20 Feb 2018 | Stage 3: To Completion - WPP Office Fitout | $5.4m |
| 25 Jan 2018 | Built Head Office Fitout | $2.5m |
| 21 Dec 2017 | Stage 1: Strip Out - Level 24-25 - WPP Office Fitout | $4.5m |
| 17 Nov 2017 | Stage 1: FWP1 - Level 10 - Frasers Property Fitout | $258k |
| 14 Nov 2017 | Stage 2 - FWP1 Upper Floor Alterations - To Completion | $10.6m |
| 01 Nov 2017 | FWP1, Level 26 -Stage 1: Ausnet Minor Office Alterations and Comms Room | $1.9m |
| 17 Oct 2017 | FWP1, Apple Tenancy Alterations, Level 37 (part) | $50k |
| 05 Oct 2017 | Level 4 - Genisis Alterations | $195k |
| 14 Sept 2017 | Stage 2: To completion - Tower 1, Level 27 - Internal Alterations | $856k |
| 25 Aug 2017 | Stage 1 - FWP1 Upper Floor Alterations - Internal Demolition Work | $10.6m |
| 24 Aug 2017 | FWP1 Ground Floor Alterations (Project Stage 02B) | $5.1m |
| 30 June 2017 | Level 14 (part) - VMWARE Office Tenancy Fitout | $1.8m |
| 31 May 2017 | Tower 1, Level 27 - Internal Alterations | $112k |
| 19 May 2017 | Levels 29-32 - FWP1 Ausnet alterations, including population increase | $300k |
| 23 Jan 2017 | Level 10 - BENTLEY FITOUT, A3 | $650k |
| 01 Dec 2016 | Stage 3: Remainder of Works (Level 11-21) | $47.8m |
| 01 Dec 2016 | Tenancy Fit Out of an Existing Office Building | $16.4m |
| 29 Nov 2016 | Level 10 - Intertenancy Wall Works | $58k |
| 25 Nov 2016 | Level 13 - Proposed office fitout | $115k |
| 05 Aug 2016 | Level 14 Office Fitout Alterations / Subdivision Works | $50k |
| 02 Aug 2016 | Level 36, Vanguard Office Fitout | $334k |
| 21 Mar 2016 | Stage 2: Architectural & Services (Level 17-21) | $47.8m |
| 17 Feb 2016 | Stage 2: To Completion, including fire services | $2.0m |
| 03 Feb 2016 | Level 8 - Childcare Centre Fitout (Change of Use) - Only About Children | $2.0m |
| 20 Nov 2015 | Level 35 Make Good Ex Lek Tenancy L35 | $55k |
| 29 Sept 2015 | Stage 2 - Tenancy 5R & 7R - Tenancy Fitout | $1.4m |
| 28 Aug 2015 | Stage 2: To Completion (including fire services) | $156k |
| 12 Aug 2015 | Stage 1 - Tenancy 5R & 7R - Fitout - Crinitis Restaurant Southbank | $100k |
| 23 July 2015 | Level 11, Visy Fitout | $156k |
| 22 July 2015 | Stage 2 Building Permit: All fire services excluding fire hydrant system | $904k |
| 22 July 2015 | Stage 3 Inclusion of Reg 309 - Fire Hydrant Shortfalls | $904k |
| 06 July 2015 | Level 34: Proposed Internal Office Alterations for Vanguard Investments | $30k |
| 15 June 2015 | End of Trip Refurb Project | $1.6m |
| 10 June 2015 | Level 10, Freshwater Place - Alterations | $12k |
| 23 Apr 2015 | Levels 5-7, 4 Freshwater Place - Internal Office Alterations for Microsoft | $904k |
| 04 Feb 2015 | Part level 10: Minor internal doorway alterations | $23k |
| 24 Dec 2014 | L9 Tenancy: Heinz Office Floor Fitout Alterations | $200k |
| 13 Oct 2014 | Level 24 office alterations | $25k |
| 30 Sept 2014 | Level 14 - Alterations to Office | $141k |
| 19 Aug 2014 | Proposed Internal Office Fitout - Level 34 | $840k |
| 25 July 2014 | Proposed Internal Office Fitout - Level 34 | $840k |
| 05 May 2014 | Levels L8-10 Tenancy - Heinz Office Floor Infill Works and Associated Alterations | $120k |
| 01 Apr 2014 | Proposed Internal Office Fitout - Levels 28 & 34 | $1.5m |
| 13 Jan 2014 | Stage 2 - Lvls 29 & 31- Office fit-out (remainder of works). SP Ausnet | $250k |
| 20 Dec 2013 | Lvls 29 & 31- Office fit-out SP Ausnet | $250k |
| 17 Oct 2013 | Fitout Alterations to an existing building; Level 4 (part), 4 Freshwater Place | $1.0m |
| 13 Sept 2013 | Proposed Internal Office Fitout - Level 34 | $840k |
| 16 Aug 2013 | Level 14 tenancy - Australand Office fitout alterations | $50k |
| 14 Dec 2012 | STAGE 1: Internal demolition works Levels 15 & 16 - Murray Goulburn Tenancy Alterations | $935k |
| 12 Dec 2012 | Variation - Level 14 tenancy - Australand Office fitout alterations | $40k |
| 13 Nov 2012 | Stage 2: Interanal alteration works - Murray Goulburn Tenancy Alterations, Level 15 & 16 | $935k |
| 12 Oct 2012 | Office Partition Fitout to Part level 32 | $40k |
| 19 June 2012 | Internal alterations to Freshwater Place, Level 30 & 31. | $11k |
| 24 Apr 2012 | Internal alterations to office Level 33 & 34 | $45k |
| 25 Aug 2011 | Internal alterations to Level 33 | $198k |
| 31 Mar 2011 | Proposed internal alterations to existing fitness club tenancy | $50k |
| 20 Dec 2010 | Proposed office partition alterations to exisiting tenancy on level 13 | $180k |
| 06 Sept 2010 | Proposed storage area and office works to existing building - Level 4 & 9 | $41k |
| 14 July 2010 | Internal Office fitout alterations to level 14 | $150k |
| 07 June 2010 | PWC L14 Office Fitout Alterations | $10k |
| 19 May 2010 | Stage 2: Level 9 works to completion | $153k |
| 23 Mar 2010 | Level 29 - Alteration to existing office. | $120k |
| 24 Feb 2010 | Eclipse Coffee - Ground Level Tenancy 10 - Proposed retail tenancy fitout | $70k |
| 01 Sept 2009 | Proposed office fitout works to an existing building Level 29,31,32 | $103k |
| 20 Jan 2009 | Office Fitout Alterations to Level L10 Heinz Tenancy | $15k |
| 02 May 2008 | Office fitout alterations Levels 10-11. Stage 1: Demolition of Existing Office Fitout. | $700k |
| 03 Mar 2008 | Sprinkler Control Valve Alterations to Fire Pump Room | $6k |
| 01 Feb 2008 | Heinz Tenancy, Alterations to office exit path to Level 10, Lot 1&2. | $10k |
| 31 Jan 2008 | Proposed internal alterations to existing office tenancy - installation of workstations Levels 33 & 34. | $91k |
| 20 Dec 2007 | Office fitout to Level 35. | $57k |
| 13 Nov 2007 | Level 10 Tenancy subdivision Lot 1&2. | $15k |
| 22 Aug 2007 | Facade roof extension, Level 1 over tenancies 03 and 04, Lot 1&2. | $120k |
| 10 Aug 2007 | Facade at Level 1 to TE.01 and TE.02 (retail zone), Lot 1&2. | $217k |
| 10 Aug 2007 | Microsoft Tenancy. Fitout alterations to Level 5 - New Computer Room, Lot 1 & 2. | $90k |
| 26 June 2007 | Internal fitout Tenancy CG.27 | $100k |
| 10 Apr 2007 | Freshwater retail "new fit-out to ground floor - retail zone", lot 1 & 2. Alteration to Yar restaurant ground and first floors, stage 2: Architectural and services design disciplines. | $630k |
| 30 Mar 2007 | Australand Office, Minor fit-out alterations to Level 14, Lot 1 & 2. | $40k |
| 01 Mar 2007 | Levels 8, 9 & 10, Freshwater Place Commercial Office Tower. Stage 1: Construction of partitions on level 9. Office fitouts on levels 8,9 & 10, new level 8 mezzanine and new interconnecting stair. | $120k |
| 01 Mar 2007 | Levels 8, 9 & 10, Freshwater Place Commercial Office Tower. Stage 3: All remaining building works, excluding fire hydrant coverage. Office fitouts on levels 8,9 & 10, new level 8 mezzanine and new interconnecting stair. | $1.6m |
| 22 Nov 2006 | SPLASH Tenancy, "Fit-Out Alterations to Existing Tenancy", lot 1 & 2. Alterations to office, levels 30, 31 & 32. | $260k |
| 16 Oct 2006 | Freshwater retail "new fit-out to ground floor - retail zone", lot 1 & 2. Alteration to Yar restaurant ground and first floors, stage 1: structural only. | $630k |
| 26 Sept 2006 | Tenancy fitout-Ground & Mezzanine, Lot 1&2. | $240k |
| 01 Sept 2006 | Fitout Podium Level 4 - Tribeca fitout | $550k |
| 16 Aug 2006 | Fitout Levels 5, 6, & 7 | $2.6m |
| 31 July 2006 | Fitout Works Level 12 | $600k |
| 26 July 2006 | Podium Level 4 - Construction of Intertenancy Corridor, Freshwater Place commercial | $35k |
| 30 June 2006 | Tenancy fitout- Medical Centre Mezzanine Level, tenancy no. TM04. Office/Medical Suites, Lot 1&2. | $269k |
| 27 June 2006 | Freshwater place, lot 1 & 2 alterations to an existing building, office level 13 (part) "Paradigm" tenancy fitout. | $187k |
| 02 June 2006 | Zinifex minor office fitout (internal works only) alterations level 29, lot 1 & 2. | $12k |
| 01 June 2006 | Office fitout alterations to level 10 and level 11. Stage 2: Office fitout alterations, lot 1 & 2. | $180k |
| 15 May 2006 | level 12 (part) PMP office tenancy alterations. Stage 1 - floor structure infill, lot 1 & 2. | $60k |
| 15 Mar 2006 | Stage 1: All building work excluding fire hydrant coverage. Office fitout to existing tenancy on level 13. | $576k |
| 08 Mar 2006 | Fitout Tenancy Level 36 | $187k |
| 07 Mar 2006 | Alterations to Level 12 | $30k |
| 06 Mar 2006 | Office tenancy alterations to existing building | $55k |
| 17 Jan 2006 | Internal tenancy fitout CG.27; Tenancy fitout for palleroma cafe; Stage 2 amendment dispensation to permit reduced stair width | $250k |
| 22 Dec 2005 | office fitout level 28 | $60k |
| 19 Dec 2005 | Meat and Wine Company Retail fitout | $650k |
| 14 Dec 2005 | Office fitout on levels 36 and 37 for "Arrive Wealth Management" tenancy | $200k |
| 13 Dec 2005 | New office fitout - Australand fitout to level 14 Freshwater Place Commercial Tower lot 1 & 2 | $420k |
| 23 Nov 2005 | stage 2 PWC signage stage | $340k |
| 12 Oct 2005 | Stage 2: Entire works: $2,900,000 - Alteration - freshwater place commercial tower - levels 30, 31 & 32 | $2.7m |
| 23 Sept 2005 | Stage 2: Fire hydrant coverage; Office fitout to existing tenancy on level 13 (East Tenancy) | $576k |
| 16 Sept 2005 | Alterations Level 11 | $25k |
| 07 Sept 2005 | Levels 8, 9 & 10, Freshwater Place Commercial Office Tower. Stage 2: Construction of partitions Level 10. Office fitouts on levels 8,9 & 10, new level 8 mezzanine and new interconnecting stair. | $1.8m |
| 02 Sept 2005 | New inner tenancy corridor walls Level 13 part | $22k |
| 23 Aug 2005 | Stage 2: Alterations to services. Partition fitout to existing office tenancy on levels 36 & 37. | $200k |
| 16 Aug 2005 | Entire works: $2,900,000 - Alteration - freshwater place commercial tower - levels 30, 31 & 32 | $200k |
| 06 Aug 2005 | Internal shop fitout - 6 Freshwater Place - Ground and Mezzanine Floor | $400k |
| 01 Aug 2005 | Office fitout. Level 35, 4 Freshwater Place. | $120k |
| 27 June 2005 | stage 1 new signage facade alteration | $60k |
| 20 Apr 2005 | office fitout level 35 non structural | $300k |
| 06 Aug 2004 | Stage 9.6, Construction of a commercial Building - Freshwater Place - Stage 9.6 level 20 support steel | $4.7m |
| 01 Aug 2004 | Stage 9.5, Construction of a commercial Building - Freshwater Place - Stage 9.5 podium glazing, supporting framework, connections and supporting steelwork up to underside of level 2, podium balcony PE046 and PE047 | $5.0m |
| 19 May 2004 | Officer fitout to PWC Level 15 to level 27 | $23.2m |
| 14 Nov 2003 | Stage 9.4, Construction of a commercial Building - Freshwater Place - Stage 9.4 Level 34-39 structure, level 21-33 curtain wall, corner panels and level 20 fins | $2.0m |
| 06 Oct 2003 | Stage 9.2, Construction of a commercial Building - Freshwater Place - Stage 9.2 Facade podium louvres | $2.0m |
| 06 Oct 2003 | Stage 9.3, Construction of an Apartment Building - Freshwater Place - Stage 9.3 facade podium windows & louvre level 3 | $2.0m |
| 22 Sept 2003 | Stage 9.1, Construction of a commercial Building - Freshwater Place - Stage 9.1 Facade levels 9-19, podium, levels 2-8 | $9.7m |
| 27 Aug 2003 | Stage 10, Construction of a commercial Building - Freshwater Place - Stage 10 :Structure - Levels 8 and level 8 mezzanine | $2.0m |
| 25 Aug 2003 | Stage 7, Construction of a commercial Building - Freshwater Place - Stage 7: Architectural | $24.3m |
| 26 Oct 2001 | Demolition of building 1. Mail centre. | $328k |
| 01 Sept 1998 | New sign - Advertising Sign | $200k |
| 17 Mar 1997 | Building 2, Riverside Quay Alterations - Ground Floor | $80k |
| 31 Oct 1996 | Stage 1 - New BMW dealership | $6.7m |
Is 2 Southbank Boulevard residential or commercial?
2 Southbank Boulevard is a commercial building. The City of Melbourne lists its main use as office.
When was 2 Southbank Boulevard built?
2 Southbank Boulevard was completed in 2005.
How many floors does 2 Southbank Boulevard have?
2 Southbank Boulevard has 38 floors above ground.
What businesses are in 2 Southbank Boulevard?
The latest council census counted 32 businesses in 2 Southbank Boulevard, including Access Group, ALUMINA LIMITED and APD Engineering.
Is there office or retail space for lease in 2 Southbank Boulevard?
See the commercial listings on this page, or search this address on realcommercial.com.au and commercialrealestate.com.au.
Who designed and built 2 Southbank Boulevard?
Australand developed 2 Southbank Boulevard, Bates Smart designed it and Multiplex Construction built it. The building team section has the sources.
How tall is 2 Southbank Boulevard?
About 159 metres, measured from the City of Melbourne's 3D building model. It's number 13 of 190 buildings in Southbank by height.
What public transport is near 2 Southbank Boulevard?
Flinders Street Station is the nearest train station, about 7 minutes' walk. The nearest tram stop is Casino/Southbank/Queens Bridge St #115, about 2 minutes' walk.
What is the planning zone for 2 Southbank Boulevard?
The site is in the Capital City Zone - Schedule 3 (CCZ3).
Does 2 Southbank Boulevard have an owners corporation?
Plan of subdivision PS504017 has 5 lots and common property, which means it is managed by an owners corporation.
Has any work been done on 2 Southbank Boulevard recently?
The City of Melbourne has issued 161 building permits for 2 Southbank Boulevard since 2001. The most recent was in May 2026.
Sources: City of Melbourne building permits (CC BY 4.0); CLUE building information (CC BY 4.0); CLUE business establishments (CC BY 4.0); Development Activity Monitor (CC BY 4.0); Geocoded National Address File (G-NAF) (Open G-NAF EULA (CC BY 4.0 based)). General information from public records, not legal, financial or building advice.