| Planning application | 2020 | Planning application ID-2020-3 lodged |
| Approved | Approved | Planning permit granted (exact date not recorded) |
Each cost is the estimate on that record. Stages of a project often repeat its full value, so these don't add up to what was spent.
| 04 Feb 2026 | Level 6 - Tenancy Fitout of Office | $20k |
| 18 Dec 2025 | Level 17 - Internal alteration - proposed office fitout | $190k |
| 16 Dec 2025 | Internal tenancy split & office fitout - Stage 2: Completion of All Works, Excluding IT Office | $1.6m |
| 15 Sept 2025 | Rectification of Fire Rated Shaft | $20k |
| 12 May 2025 | Level 22 - Project is for HMC Capital Office Fitout, located at Level 22/40 City Road, Melbourne, VIC. | $2.0m |
| 15 Apr 2025 | Proposed alterations to existing retail shop P08 | $123k |
| 08 Nov 2024 | Stage 2 - Retail amenities (exclusing upper mezzanine female bathroom) | $1.8m |
| 29 Oct 2024 | Shop G33-34 - Proposed alterations to existing retail | $457k |
| 16 Oct 2024 | Stage 2 - Main office fitout works | $900k |
| 19 Aug 2024 | Mid Level Shops M24; M25 & M28 Facade (Part Only) & Existing Seating Zone Area - Alterations to Part of the Existing Restaurant | $200k |
| 16 Aug 2024 | Proposed alterations to existing retail tenancy | $269k |
| 13 Aug 2024 | Level 20 - Internal Office Fitout and Tenancy Split for ESR | $753k |
| 24 Oct 2023 | Stage One: Level 15 & 16, Refurbishment of existing tenancy | $977k |
| 19 Oct 2023 | Stage two - Level 15 & 16 - Remainder of Works to Quiet Rooms and Phone Booths | $977k |
| 19 July 2023 | Tenancy G26 - proposed alterations to existing retail | $120k |
| 29 June 2023 | Level 4 - Alterations to existing office tenancy | $425k |
| 20 Apr 2023 | Internal Fitout | $327k |
| 19 Apr 2023 | Proposed partitions to new office at Level 7 Suite 7.04 | $17k |
| 24 Jan 2023 | Stage 3: Level 24 Fitout) - Level 22-24 Alterations to existing building | $2.9m |
| 13 Jan 2023 | L7, IBM Tower - Alterations to Existing Office | $124k |
| 20 Dec 2022 | PROPOSED ALTERATIONS TO EXISTING OFFICE | $1.2m |
| 04 Oct 2022 | Stage 2: Construction Level 22 & 23) - Level 22-24 Alterations to existing building | $2.9m |
| 02 Sept 2022 | Level 22-24 Alterations to existing building | $2.9m |
| 18 July 2022 | Internal Office Fitout for Sage Group - Level 21 | $380k |
| 22 Mar 2022 | Level 17 - Alterations to existing office tenancy | $1k |
| 07 Mar 2022 | Level 26 & 27 - Alterations to an existing office building | $384k |
| 03 Dec 2021 | IBM - Stage 1: Demolition. Level 7 - Alterations to an existing building | $1.5m |
| 19 Oct 2021 | Stage 1: Level 6 Demolition Works -- IBM Tower | $395k |
| 26 Aug 2021 | Level 10 - Alterations to an existing office building | $410k |
| 26 Aug 2021 | Level 12 - Alterations to an existing office building | $373k |
| 10 Aug 2021 | Stage 2: Balance of Works | $1 |
| 29 July 2021 | IBM - Stage 1: Demolition. Level 7 - Alterations to an existing building | $1.5m |
| 23 July 2021 | IBM - Level 22 - Tenancy Fitout works | $360k |
| 20 Jan 2021 | IBM - Level 6 - Alterations to an existing office tenancy. All works. | $8k |
| 13 Oct 2020 | The Langham - Handling units replacement. | $226k |
| 10 July 2020 | IBM - Level 26. Lobby upgrade works | $0 |
| 09 June 2020 | HWT Level 15 & 16 - Internal alterations to existing tenancy | $1 |
| 18 May 2020 | IBM - Level 27. Office Fit-out and Partitioning Works | $0 |
| 14 May 2020 | IBM - Level 7. Lobby upgrade works | $0 |
| 23 Apr 2020 | IBM Level 10 - Upgrade Works | $0 |
| 09 Apr 2020 | 3 Southgate Avenue - Tenancy M15-16 - Strip Out Works | $109k |
| 06 Mar 2020 | HWT - Tenancy M2 & M3 - Proposed Tenancy Extension to Max Therapy | $0 |
| 15 Jan 2020 | IBM - Alterations to an existing building | $377k |
| 11 Dec 2019 | Level 2, HWT Tower, 40 - Minor Works | $25k |
| 25 Nov 2019 | HWT - Proposed Internal Tenancy Fitout for JB Hi-Fi - Stage 2: Inculding Internal Installation of Roller Door | $50k |
| 01 Nov 2019 | IBM - Level 9 - Internal Office Fit-Out for Honan Insurance | $1.4m |
| 28 Oct 2019 | HWT Stage Two Building Permit – Including Installation of Roller Shutter Door | $38k |
| 23 Oct 2019 | HWT - JB HI-FI - Tenancies P12 & P13, Southgate Shopping Centre - Stage one building permit = Excluding installation of roller shutter doors | $50k |
| 07 Oct 2019 | IBM - Level 9 - Internal office alterations to an existing building | $1.2m |
| 04 Oct 2019 | 3 Southgate Avenue - Shop UR2 - Alterations to shop front | $77k |
| 03 Oct 2019 | HWT & IBM Towers - Lobby Ugrades | $759k |
| 23 Sept 2019 | IBM Ground Floor Lobby Refurbishment - Stage 1- Strip Out | $2.1m |
| 17 Sept 2019 | 3 Southgate Avenue - SHOP G24 - RETAIL TENANCY FITOUT | $75k |
| 27 Aug 2019 | HWT - Suite 2401 - Internal alterations to office (Level 24) | $18k |
| 11 July 2019 | Level 20 IBM Tower - Fitout alteration to existing office | $507k |
| 29 May 2019 | HWT Tower, L14 & L15 - Lift Lobby Upgrade Works | $64 |
| 27 May 2019 | HWT - LEVEL 22 - Level 22 Office Fitout | $90k |
| 10 May 2019 | HWT - Level 17 & 19 - Alterations to existing building, OFFICE FITOUT | $520k |
| 24 Apr 2019 | IBM - Podium, Levels 1-5, 19, Part Levels 6 & 8 - Proposed office fitout | $50k |
| 24 Apr 2019 | IBM - Stage 2 - Demolition - non-structural on Podium Level, Levels 1, 2 & 19 | $689k |
| 24 Apr 2019 | IBM - Stage 3 – Fitout works to Podium Levels & Levels 1-5, Part Level 6, 8 & Level 19. | $0 |
| 24 Apr 2019 | IBM - Stage 5 – Fire hydrant & fire hose reels (coverage), sprinkler drenchers & fire rated glazing | $680k |
| 15 Apr 2019 | HWT - Ray White Internal fit-out works | $286k |
| 01 Apr 2019 | IP Australia Level 5 HWT Tower - Alterations to an existing building | $15k |
| 04 Mar 2019 | IBM - Stage 4 – Services and balance of fitout works including new walls bounding new interconnecting stairs, approval of finishes linings & materials, and stair balustrades. | $0 |
| 08 Feb 2019 | Level 5, HWT Tower - IP Australia Office Fit-Out Works | $1.5m |
| 17 Jan 2019 | Level 6 40 HWT Tower - Tenancy Fit-out | $2.1m |
| 19 Nov 2018 | HWT - Level 20 Fitout works | $249 |
| 09 Nov 2018 | Langham Hotel (Melbourne) prototype rooms. Alterations to an existing building, construction of prototype rooms. | $167k |
| 08 Nov 2018 | HWT - Stage 1 - Level 6 & Level 7 - Stripout Internal Stair | $325k |
| 19 Oct 2018 | HWT - Level 21- Construction of alterations to existing building | $400k |
| 15 Oct 2018 | HWT Level 9 - Project One HWT Kitchen Joinery Level 9 fit-out works | $87k |
| 09 Oct 2018 | Level 1 IBM Tower - Whole Floor Make Good & Lift Lobby Upgrade Works | $175k |
| 08 Oct 2018 | HWT Tower, L14 & L15 - Lift Lobby Upgrade Works | $2.1m |
| 08 Oct 2018 | Lvl 16 HWT- Lift Lobby Upgrade Works | $677k |
| 28 Aug 2018 | HWT - Level 20 - Tenancy and Lift Lobby Upgrade Works to L20 HWT Tower | $460k |
| 21 Aug 2018 | HWT - Stage 2 - Level 6 & Level 7 - Stair removal & void infill | $325k |
| 10 Aug 2018 | Stage 2 – Security Races Works - HWT Tower, Podium Level - Re-furbishment | $1.6m |
| 27 July 2018 | HWT Level 17 - Internal alterations | $400k |
| 10 July 2018 | IBM - Level 16 - Minor Internal Office Partitioning works | $74k |
| 22 June 2018 | HWT - Stage 2 - Level 6 & Level 7 - Stair removal & void infill | $325k |
| 01 June 2018 | IBM - Part Level 8 - Alterations to an existing office tenancy | $35k |
| 16 Apr 2018 | HWT - Internal demolition and make good works on the Podium Level | $61k |
| 23 Mar 2018 | 3 Southgate Avenue - Tenancy P8A - Tenancy fitout of Proposed retail fitout and alterations for a dry clean store | $67k |
| 01 Mar 2018 | HWT Tower, Level 7 - Tenancy Fit-out | $25k |
| 23 Feb 2018 | HWT - Level 3 - Proposed Internal Office Fitout for Judo Capital (To completion of proposed works only) | $769k |
| 25 Oct 2017 | IBM - Level 12 - Tenancy Fitout | $786k |
| 25 Oct 2017 | IBM - Stage 2 - Architectural Fitout Works Excluding Services | $786k |
| 11 Sept 2017 | IBM - Stage 3 - Installation of Services | $875k |
| 08 Sept 2017 | IBM- Level 3 - Internal alterations to existing offices | $25k |
| 08 Sept 2017 | Level 22 and 23 - HWT Internal alterations to existing offices | $26k |
| 31 Aug 2017 | IBM - L17 & L27 - DDA Toilets | $254k |
| 28 Aug 2017 | IBM - Level 26 - Proposed internal office alterations for Next Business Energy | $24k |
| 17 Aug 2017 | HWT Level 17 - Additions & alterations to existing building | $220k |
| 17 Aug 2017 | IBM - Level 4 & 5 - Internal make good and refurbishment works | $1.3m |
| 28 July 2017 | IBM Tower, Level 27 - Office fit-out | $379k |
| 21 July 2017 | IBM - Level 6 - Proposed internal office partitions | $50k |
| 11 July 2017 | 3 Southgate Avenue - Stage 2 - Ground & Level 1 - All works to completion | $1.7m |
| 07 July 2017 | The Langham Hotel - Stage 2: Internal Alterations to Existing Club King Room 2225 | $270k |
| 31 May 2017 | IBM - Level 17 - Alterations to an existing building - Stellar Melbourne Office Fitout | $1.3m |
| 16 May 2017 | Level 3, 4, 18 HWT Tower - Make Good & Refurbishment Works | $1.2m |
| 05 May 2017 | IBM - Level 12 - Internal fitout to existing office tenancy | $120k |
| 03 May 2017 | IBM - Level 11 - Office Alterations | $1.6m |
| 24 Apr 2017 | HWT Tower, Level 22-23 - Internal Tenancy Fitout | $0 |
| 19 Apr 2017 | IBM - Levels; 11, 13-17, 27 - Internal tenancy refurbishment including lift lobbies on | $4.2m |
| 03 Mar 2017 | IBM Tower, Level 12 - Alterations to an existing building | $102k |
| 16 Feb 2017 | 3 Southgate Avenue - Proposed internal pergola | $35k |
| 10 Feb 2017 | IBM Tower, Level 2 - Demolition & Make Good Works to Level 2 | $530k |
| 10 Feb 2017 | Level 2 & 3, HWT Tower – Lift lobby and Accessible Sanitary Compartment | $222k |
| 10 Feb 2017 | Level 3, 4, 18 HWT Tower - Make Good & Refurbishment Works | $1.2m |
| 13 Jan 2017 | IBM - Level 27 - Proposed Internal Office Fitout for Payton | $258k |
| 15 Dec 2016 | 3 Southgate Avenue - Ground & Level 1 - Alterations to existing Cafe/Restsurant | $60k |
| 15 Dec 2016 | 3 Southgate Avenue - Stage 2 - Ground & Level 1 - All works to completion | $1.7m |
| 23 Nov 2016 | Level 26, IBM Building - Alterations | $113k |
| 09 Nov 2016 | Stage 1 - Internal Fitout Works Excluding Security Races Works - HWT Tower, Podium Level - Re-furbishment | $1.3m |
| 26 Oct 2016 | IMB Tower, Level 12 - Internal Tenancy Demolition | $60k |
| 21 Oct 2016 | 3 Southgate Avenue - Stage 1, building works which includes Internal demolitions works only. | $50k |
| 21 Oct 2016 | 3 Southgate Avenue - Stage 2 - building works which includes infill slab on ground floor, installation of structural support for level 2 floor, excluding (posi-strut) works, also excluding facade works, services and architectural | $100k |
| 14 Oct 2016 | 3 Southgate Avenue - Stage 3 - Building Works Include Upper Mezzanine, Services and Architectural | $980k |
| 07 Oct 2016 | 3 Southgate Avenue - Bear Brass Extension / Internal Fitout / Alteration/ Extension | $750k |
| 26 Sept 2016 | Podium Level - HWT Tower - Alterations to an existing building | $210k |
| 20 Sept 2016 | IBM - Level 17 - Proposed Internal Office Fitout of Existing Tenancy | $164k |
| 14 Sept 2016 | 3 Southgate Avenue - Fitout of tenancy G2 for Roll'd | $140k |
| 31 Aug 2016 | IBM - Stage 1 - Internal alterations - excluding external louvre and structural works | $700k |
| 31 Aug 2016 | IBM - Stage 2 - Level 16 External louvre and structural works only | $700k |
| 30 Aug 2016 | Podium Level, 40 HWT Tower - Internal Demolition & Refurbishment | $97k |
| 10 Aug 2016 | Stage 2 - Lift Lobby Refurbishment Works at IBM Tower | $180k |
| 28 July 2016 | 3 Southgate Avenue - Stage 3: Structural, Architectural & Services Works excluding works associated to the Building Notice | $950k |
| 22 July 2016 | IBM - Stage 1 - Internal alterations - excluding external louvre and structural works | $700k |
| 08 July 2016 | 3 Southgate Avenue - Stage 1, building works which includes Internal demolitions works only. | $50k |
| 08 July 2016 | Level 26, IBM Building - Alterations | $113k |
| 07 July 2016 | 3 Southgate Avenue - Stage 2 - Tenancy GR2 - Internal works only within the existing building | $950k |
| 04 July 2016 | IBM - Level 17 - Proposed internal office fitout - Ramco | $278k |
| 30 June 2016 | 3 Southgate Avenue - Fitout of tenancy G2 for Roll'd | $140k |
| 30 May 2016 | Level 12 - Lift Lobby Refurbishment Works at IBM Tower | $180k |
| 11 May 2016 | The Langham Hotel - room 2229 and club king room 2225 Alterations to existing Hotel | $70k |
| 03 May 2016 | 3 Southgate Avenue - Ground & Level 1 - Alterations to existing Cafe/Restsurant | $60k |
| 12 Apr 2016 | 3 Southgate Avenue - Stage 1 - Demolition Works Only | $950k |
| 21 Feb 2016 | 3 Southgate Avenue - Shop P1 & P2 - Fitout of a shop | $190k |
| 22 Jan 2016 | Level 6 - Alterations to offices | $46k |
| 21 Jan 2016 | IBM - Levels; 11, 13-17, 27 - Internal tenancy refurbishment including lift lobbies on | $4.2m |
| 18 Dec 2015 | IBM - Level 20 - Linkedln Office Fitout Only | $1.5m |
| 06 Nov 2015 | IBM - Level 7: Proposed Tenancy Split | $290k |
| 07 Sept 2015 | 3 Southgate Avenue - Mid-Level: Proposed new wall & parcel lockers to existing retail building | $10k |
| 21 Aug 2015 | IBM - L20: Proposed Tenancy Split | $150k |
| 02 July 2015 | IBM - Level 7: Proposed Tenancy Split | $264k |
| 29 May 2015 | IBM - Level 6: Proposed office partition works | $18k |
| 11 May 2015 | Level 10 IBM Building Internal Office Alterations | $384k |
| 26 Mar 2015 | level 19, HWT tower - internal office fitout | $558k |
| 23 Feb 2015 | 3 Southgate Avenue -Shop U04 - Internal Alterations to an Existing Shop | $41k |
| 12 Dec 2014 | IBM & HWT - Stage 2: Level 19 - New Tenancy Split | $669k |
| 04 Dec 2014 | IBM - Alteration Part Level 13 | $495k |
| 05 Sept 2014 | HWT - Level 2 - Internal Non Structural Alterations Juniper Tenancy - Part Only to the Existing Office | $20k |
| 25 Aug 2014 | IBM & HWT - Level 8 & 19 Refurbishment & Tenancy Split | $548k |
| 06 Aug 2014 | IBM - LEVEL 8, TOWER 1 PROPOSED OFFICE FIT-OUT | $160k |
| 28 July 2014 | 3 Southgate Avenue - Balcony canopy upgrade | $133k |
| 20 June 2014 | 3 Southgate Avenue - Tenancy UR1 Proposed Fit Out - Artusi 3 Southgate Avenue | $300k |
| 13 May 2014 | 3 Southgate Avenue - Stage 1 - Back of House Area Only - Tenancy Fitout - MR05 Southgate Bier Cafe Redrock Leisure | $1.0m |
| 08 Apr 2014 | IBM - Office Fit-Out Level 10 | $8k |
| 26 Feb 2014 | 3 Southgate Avenue - Studio works alterations - Podium Level 1 | $17k |
| 19 Dec 2013 | 3 Southgate Avenue - Stage 2 - Final | $0 |
| 21 Oct 2013 | 3 Southgate Avenue - Internal alterations to tenancies MRG5 & U09 | $90k |
| 21 Oct 2013 | HWT - Proposed Alterations to Office Lift Lobby - levels 22,23 & 24 | $206k |
| 15 Oct 2013 | IBM - Proposed alterations to Offices on Level 10. Stage 1 - Infill of existing doorway | $22k |
| 03 Sept 2013 | HWT - Fitout of an existing office Level 17 | $543k |
| 09 Aug 2013 | IBM - Proposed Alterations to Office Lift Lobby - level 3 | $55k |
| 06 Aug 2013 | IBM - Internal alterations Level 4 Part Dairy Australia | $55k |
| 02 July 2013 | The Langham Hotel - Balustrading /Screens & Decks to Rooms 1025, 1027, 1029, 1031, 1033, 1035 Level 10 | $404k |
| 26 June 2013 | HWT - Office fitout to Podium Level | $18k |
| 31 May 2013 | HWT - Proposed Alterations to Offices - Level 20 | $328k |
| 27 May 2013 | IBM - Alterations to Offices on Level 10. Stage 2 - Fitout works | $107k |
| 22 May 2013 | IBM - Office Fitout to Level 18 | $90k |
| 29 Apr 2013 | 3 Southgate Avenue - Internal Alterations & fitout Max Therapy Tenancy M02 | $118k |
| 16 Apr 2013 | The Langham Hotel - Chiller Works Upgrade to an existing building | $758k |
| 20 Mar 2013 | 3 Southgate Avenue - Stage 2: Internal alterations to tenancies MRG5 & U09 | $2.7m |
| 31 Oct 2012 | IBM - Office fit-out works - Level 12 | $40k |
| 19 Sept 2012 | 3 Southgate Avenue - Stage 2: All works. Refurbishment of Shopping Centre | $11.3m |
| 07 Sept 2012 | IBM - Office fitout to existing tenancy - Level 28 | $338k |
| 07 Aug 2012 | HWT - Internal office fitout Level 4 | $15k |
| 13 June 2012 | 1 Southgate Ave: Construction of new balconies. | $490k |
| 13 June 2012 | Replacement of fire detection and EWIS system at the Langham hotel | $437k |
| 04 May 2012 | 3 Southgate Avenue - Retail fitout for Rhumbas | $55k |
| 01 May 2012 | 3 Southgate Avenue - Alteration to Shop M08 (Dada & Co) | $60k |
| 04 Apr 2012 | 3 Southgate Avenue - Restaurant fitout Midlevel M10-M13 | $584k |
| 20 Mar 2012 | HWT - Internal refurbishment Level 3 | $495k |
| 20 Mar 2012 | HWT - Stage 2: Fitout of the creative space | $50k |
| 02 Mar 2012 | Internal alterations to existing office Level 6 | $38k |
| 02 Mar 2012 | LangHam Hotel - Tenancy Fitout - Joy Cupcakes | $150k |
| 07 Dec 2011 | 3 Southgate Avenue - Stage 1- Internal demolition and fit-out works- Tenancy Fitout Shop No. 1.2 Watergrill Bar & Grill | $350k |
| 06 Dec 2011 | Alterations to HWT Tower on Levels 4-13 & 18 | $892k |
| 30 Nov 2011 | 3 Southgate Avenue - Alterations Tenancy fitout Shop M17 | $78k |
| 28 Nov 2011 | 3 Southgate Avenue - Alterations to EWIS System - Upper Podium Level | $5k |
| 09 Nov 2011 | 3 Southgate Avenue - Fitout to Tenancies U1 & U2 | $200k |
| 09 Nov 2011 | 3 Southgate Avenue - Retail fitout for shop No. GR3B, GR3C and G20 at Southgate Retail Precinct, 16-60 City Road, Southbank VIC 3006 | $650k |
| 20 Oct 2011 | 3 Southgate Avenue - Internal alterations to U3 | $60k |
| 13 Oct 2011 | 3 Southgate Avenue -Tenancy fitout Shop M14 (GASP) | $104k |
| 10 Oct 2011 | 3 Southgate Avenue - Retail fitout alterations Shop 24M (American Rag) | $38k |
| 29 Sept 2011 | 3 Southgate Avenue - Shop Fitout to Tenancy M25 'Origen' | $50k |
| 12 Sept 2011 | HWT - Office fitout Level 17 | $150k |
| 05 Sept 2011 | 3 Southgate Avenue- A retail tenancy fit out G09-G11 | $390k |
| 01 Sept 2011 | 3 Southgate Avenue - Proposed Construction of new fit-out- Simply Thai Tenancy G8 | $160k |
| 01 Sept 2011 | 3 Southgate Avenue - Tenancy Fitout - cafe Rive Gauche Shop G27 | $110k |
| 01 Sept 2011 | 3 Southgate Avenue - Think Asia Shop G26 Internal Tenancy Fitout | $160k |
| 25 Aug 2011 | 3 Southgate Avenue- Tenancy MR3 - Wagamama Southgate | $800k |
| 18 Aug 2011 | HWT - Internal Office Fitout level 2 | $60k |
| 16 Aug 2011 | Upgrade to Ewis System & indicator Panels of Existing Building to HWT & IMB Towers | $491k |
| 08 Aug 2011 | 3 Southgate Avenue - Internal non structural walls-Tenancy fitout MR6 Lot R1 Stage 1 | $0 |
| 11 July 2011 | 3 Southgate Avenue - Alteration Level 18 | $6k |
| 06 July 2011 | 3 Southgate Avenue - Shop G3A, Bear Brass Refurbishment | $330k |
| 23 June 2011 | 3 Southgate Avenue - Alterations and Additions to Existing Building Shop M04 | $180k |
| 01 June 2011 | 3 Southgate Avenue - Stage 2 - To completion | $300k |
| 18 May 2011 | 3 Southgate Avenue - Stage 2: Completion of restaurant fit-out, including new basement cold storage and services | $935k |
| 18 Apr 2011 | 3 Southgate Avenue - Internal alterations Shop G18 | $120k |
| 18 Apr 2011 | HWT - Proposed office fitout to existing tenancy - Level 19 | $110k |
| 15 Apr 2011 | 3 Southgate Avenue - Tenancy fitout of Coffee Minded (6) | $60k |
| 07 Apr 2011 | HWT - Proposed office fitout to existing tenancy - Level 19 | $110k |
| 30 Mar 2011 | Alterations to existing tenancy Level 27, 60 City Road MELB | $1.6m |
| 25 Mar 2011 | HWT - Retail tenancy fitout to level 1 at 16-60 City Road, Southbank 3006 | $400k |
| 23 Feb 2011 | IBM - Toilet refurbishment to levels 2, 4, 5, 6, 7, 8, 9, 10, 12 and 20 | $677k |
| 14 Feb 2011 | IBM - Proposed alteration to existing office tenancy on level 13 & 28 | $60k |
| 27 Jan 2011 | HWT - Proposed office fitout to Level 19 | $300k |
| 14 Dec 2010 | 3 Southgate Avenue - Fitout alterations to an existing building | $196k |
| 23 Nov 2010 | IBM - Propsed office fitout to existing tenancy - Level 27 | $850k |
| 30 Sept 2010 | 3 Southgate Avenue - Refurbishment of Shopping Centre | $11.3m |
| 22 Sept 2010 | IBM Tower - Ground Floor Locker Room Refurbishment | $91k |
| 20 Sept 2010 | 3 Soutthgate Avenue - Shop G25 Southgate Retail Precinct - shop fitout | $75k |
| 25 Aug 2010 | HWT - Internal office fitout | $95k |
| 16 July 2010 | 3 Southgate Avenue - Internal stripout of an existing building | $100k |
| 18 June 2010 | 3 Southgate Avenue - Fitout alterations to an existing building | $196k |
| 16 June 2010 | HWT - Proposed office fitout - Level 19 | $60k |
| 15 June 2010 | HWT - Stage 2: All works to completion. Levels Podium, 1. 2&3 refurbishment | $229k |
| 27 May 2010 | 3 Southgate Avenue - Fitout Tenancy G30, K3 | $80k |
| 14 May 2010 | HWT - Levels Podium, 1. 2&3, 40 City Road: Refurbishment to an existing building. | $229k |
| 06 May 2010 | 3 Southgate Avenue - Alteration shop fitout, Salsa's Mexican Grill - Tenancy G1 Lot R1 | $120k |
| 16 Apr 2010 | IBM - Level 18, 60 City Road: Partition Fitout. | $400k |
| 26 Mar 2010 | 3 Southgate Avenue - Tenancy fitout to shop G34 | $70k |
| 15 Mar 2010 | HWT Tower - Tenancy Extension | $80k |
| 03 Mar 2010 | Fitout Alterations to an existing building Ground Floor (office). Stage 1: Internal Stripout Works Only. | $373k |
| 27 Jan 2010 | IBM Sanitary Facilities - Upgrade Works to an Existing Building - Levels 1, 3, 11, 16, 19, 21, 22, 23, 24, 26 and 27 | $606k |
| 18 Dec 2009 | HWT - Level 20 - Partition Fitout | $120k |
| 14 Dec 2009 | IBM Office fitout Level 10 | $33k |
| 04 Dec 2009 | HWT An internal demolition/stripout work to level 3 at 40 City Road | $400k |
| 06 Nov 2009 | Fire safety alterations to Basement carparking levels | $211k |
| 22 Oct 2009 | IBM Level 10 - Office alterations | $13k |
| 15 June 2009 | Fitout for Melbourne Convention & Visitors Bureau | $429k |
| 12 June 2009 | Sanitary facilities upgrade works Levels 3, 14, 17, 18, 22-25 & 28 | $473k |
| 05 June 2009 | Level 18 office fitout alterations to an existing building | $275k |
| 04 June 2009 | Office partition alterations Level 8 | $209k |
| 30 Apr 2009 | Fitout Alterations to an existing building Ground Floor. Stage 2: All works to completion | $373k |
| 20 Mar 2009 | Alterations to an existing office Level 26, 60 City Road Southbank | $35k |
| 20 Jan 2009 | HWT Tower Level 14, 15 & 16 Sanitary Facilities Upgrade 40 City Road, Southbank | $300k |
| 19 Jan 2009 | Alterations to existing office, level 8. | $25k |
| 03 Nov 2008 | Alterations to Office Level 12 & 18 | $11k |
| 10 Sept 2008 | Langham Hotel Melbourne - Front Entry Refurbishment. Alterations to an Existing Building - Façade Works. Stage 2: All Works to Completion. | $130k |
| 15 Aug 2008 | Langham Hotel Melbourne - Front Entry Refurbishment. Alterations to an Existing Building - Façade Works. | $130k |
| 19 June 2008 | Internal Stripout Levels 6, 7 & 9 | $1.2m |
| 29 Feb 2008 | Proposed internal office fitout to Level 9. | $300k |
| 09 Jan 2008 | IBM VOIP Network Room Upgrades. Office fitout alterations to an existing building Level 13 and 14. | $20k |
| 05 Dec 2007 | Office alterations Level 6 Part & Level 7 | $1.2m |
| 19 Dec 2006 | IBM Tower, Part Level 10. Office fitout alterations to an existing building. | $42k |
| 16 Nov 2006 | Fitout alterations Level 10 | $20k |
| 11 Oct 2006 | Part Level 19 Office fitout | $38k |
| 24 Aug 2006 | Tenancy MR6 The River - Internal Demolition to restaurant Mid Level West. | $9k |
| 17 Aug 2006 | Refurbishment and alterations to an existing building. Langham Hotel - Melba Restaurant & Tisane Lounge | $1.6m |
| 09 June 2006 | Alterations to office level 12 and 18. | $24k |
| 08 June 2006 | Refurbishment and Alterations - Part Mezzanine Level. Langham Hotel - Melba Restaurant & Tisane Lounge Refurbishment. | $1.6m |
| 22 Feb 2006 | tenancy M12 Retail fitout alterations to an existing building; Restaurant fitout for (part) - The Deck Restaurant. | $40k |
| 09 Feb 2006 | tenancy 'Trampoline' G24 - Alterations to windows for new Bi-Fold doors and construction of new steps up to the seating area, retail construction | $65k |
| 11 Jan 2006 | Office fitout Level 16 | $225k |
| 11 Jan 2006 | Tenancy subdivision - Level 19 | $18k |
| 08 Dec 2005 | Fire systems upgrade | $323k |
| 24 Nov 2005 | Office fitout alterations to an existing building | $200k |
| 23 Nov 2005 | level 24 Alterations to an existing building | $280k |
| 31 Oct 2005 | Alterations to Lobby | $910k |
| 06 Oct 2005 | office fitout alterations to an existing building - level 25 | $501k |
| 29 Sept 2005 | Office fitout Level 21 Stage 2 Services works | $411k |
| 14 Sept 2005 | Level 4 - Internal Alterations | $66k |
| 13 Sept 2005 | tenancy on level 29. Office partition alterations to existing | $33k |
| 30 Aug 2005 | level 19 16-60 city road southgate office alterations | $50k |
| 29 Aug 2005 | 16-60 CITY ROAD SOUTHBANK AKA 1-3 SOUTHGATE AVENUE SOUTHBANK | $150k |
| 12 Aug 2005 | Level 18 office Stage 1 conditional, Architectural and Services excluding hydrants | $15.0m |
| 21 July 2005 | Restaurant Fitout - Miyako Japanese Restaurant | $400k |
| 19 July 2005 | office fitout alterations to an existing building, level 11 | $1.2m |
| 15 July 2005 | HWT retail fitout to an existing building | $94k |
| 27 June 2005 | Stage 2: all works to completion | $1.2m |
| 20 June 2005 | Stage 1: alterations to part of an exisiting buildingand conversion to offices | $23k |
| 03 May 2005 | Office fitout to an existing building no. 4 dudley street part gound floor and Second floor | $11k |
| 17 Feb 2005 | Fitout alterations level 28 | $794k |
| 17 Feb 2005 | Office fitout Podium level | $1.3m |
| 20 Jan 2005 | Alterations to level 10 - sprinkler alterations and partition removal | $22k |
| 23 Dec 2004 | Alterations- Fitout part Level 16 | $600k |
| 15 Dec 2004 | Alterations to level 18 office. | $38k |
| 13 Dec 2004 | Internal alterations to existing building shop 4 & 5 ground floor | $70k |
| 08 Dec 2004 | Alterations to tenancy Shop M24 | $15k |
| 24 Nov 2004 | fit-out to existing tenancy M28. | $150k |
| 16 Nov 2004 | Alterations Ground Floor | $459k |
| 14 Oct 2004 | Tenancy split Level 19 | $88k |
| 29 Sept 2004 | Construct glazed balcony awnings | $520k |
| 30 Aug 2004 | Change of use, alterations and refurbishment works to existing offices and health club. Structual works Only | $3k |
| 27 Aug 2004 | cafe fitout and alterations to an existing building | $94k |
| 26 Aug 2004 | Office tenancy fitout (part level 17) | $30k |
| 24 Aug 2004 | refurbishment of existing wine bar toilet facilities. | $30k |
| 04 Aug 2004 | fitout of 1 restaurant. | $200k |
| 10 June 2004 | Partial Internal demolition and new food shop G26 | $80k |
| 20 May 2004 | Office fitout Level 21 | $411k |
| 12 May 2004 | Level 27 & 28. minor internal office works to existing building. | $2k |
| 11 May 2004 | Demolition of lay flat hose reels within the existing Sheraton Towers Hotel | $500 |
| 04 May 2004 | Office fitout Level 24 | $1.3m |
| 28 Apr 2004 | Office alterations to part 27th floor | $100k |
| 05 Apr 2004 | Office fitout level 21 | $140k |
| 02 Apr 2004 | Level 22. Office fitout alterations to an existing building. | $1.2m |
| 09 Mar 2004 | Stage 2 Remainder of works Shop fitout GR 2 | $50k |
| 28 Jan 2004 | Fitout Shop GR 2 Stage 1 | $150k |
| 18 Dec 2003 | Office alterations part level 26 | $548k |
| 12 Dec 2003 | Tenancy fitout alterations Level 17 | $680k |
| 20 Oct 2003 | Installation of two revolving doors Galleria 2 | $132k |
| 17 Oct 2003 | Minor alterations Tenancy G 31 to Gallery | $156k |
| 02 Oct 2003 | DEMOLITION WORKS STAGE 1 | $120k |
| 14 Aug 2003 | Office Tenancy Subdivision of an existing floor. Level 17 | $40k |
| 27 June 2003 | Alterations to an existing building, Installation of safety restraint devises to external perimeter windows. Sheraton Towers Southgate | $600 |
| 20 June 2003 | Office fitout alterations to an existing building. Level 1 (part) - Mail Room & Level 19 - Office | $1.6m |
| 05 June 2003 | Fitout of Tenancy TAB P12 & 13 | $54k |
| 14 Mar 2003 | Office partition alterations to levels 4 & 5 | $371k |
| 05 Mar 2003 | Office Tenancy fitout to an existing building. Level 17 (Part) | $250k |
| 04 Mar 2003 | Office fitout alterations to an existing building. Level 17 (part) | $40k |
| 12 Feb 2003 | Shop fitout Tenancy G33 | $50k |
| 08 Jan 2003 | Internal fitout alterations to an existing tenancy. Tenancy Ground 27. Southgate Food Court, 3 Southgate Avenue , Southbank (Rive Gauche Cafe) | $125k |
| 18 Dec 2002 | Construction of partitions in an office building. Level 12 | $11k |
| 17 Dec 2002 | Office partition alterations to Level 12. Stage 1: Construction of partitions. Cost of Stage 1: $152,000.00 | $201k |
| 10 Dec 2002 | Shop G30 Southgate Food Wharf - Shop Fitout - Boost Juice | $60k |
| 28 Nov 2002 | Alterations to an existing building - Level 12 IBM Tower Southgate | $9k |
| 01 Nov 2002 | Retail shop fitout to tenancy G02- Southgate Food Court. Stage 1: All Building work excluding alterations to sprinklers. Cost of stage 1: $140,000 | $150k |
| 25 Sept 2002 | Proposed Shop fitout for Nando''s. Shop G32 Southgate Food Wharf, Melbourne | $110k |
| 16 Sept 2002 | Internal Alterations for Shop Fitout for a Food Retail Outlet - Shop G3 (Healthy Habits) | $50k |
| 14 Aug 2002 | Level 24 - Alterations to an existing buiding and creation of a new doorwary opening b/w maids storage and butlers room. | $4k |
| 14 Aug 2002 | Level 24 - Creation of new doorway opening between kitchen and maids store. | $7k |
| 26 July 2002 | Tenancy G25 - Internal Alterations (Cafe - Sohji) | $100k |
| 23 July 2002 | Constuction of Tenancy Fitout - Tenancy G23 - Nutshack - Southgate Food Wharf | $60k |
| 17 July 2002 | Tenancy G31 - Fitout for the ''Crepe Shoppe'', in the food wharf. | $80k |
| 10 July 2002 | Tenancy M21 (3 Southgate Ave) - Internal Shop Fitout and Installation of condensor unit in Loading Dock. | $50k |
| 07 June 2002 | Southgate Food Court - Alterations and New Ceiling | $605k |
| 07 June 2002 | Stage 1 - Glazed Balcony Awnings - Mid Level - Construction of Balcony Awnings | $62k |
| 08 Apr 2002 | Office Fitout - Ground Floor Reception Area (Herald and Weekly Times) | $47k |
| 05 Feb 2002 | Level 21, Fitout alteration to an existing building | $40k |
| 18 Dec 2001 | Alterations to existing building. Cafe. Kiosk 2,Galleria, Southgate Podium | $120k |
| 29 Nov 2001 | Proposed internal alterations to an existing office. Mid Level Southgate. Southgate Parents Room | $4k |
| 23 Nov 2001 | stage 1 Internal demolition and stripout. Alterations to retail shop. | $800k |
| 18 Sept 2001 | Level 7 - Construction of office partition alterations to an existing building | $20k |
| 02 Aug 2001 | Tenancy C1.Podium Level - Consultancy Suite. Office fitout alterations to an existing building. | $103k |
| 02 July 2001 | internal alterations to an existing shop - Tenancy A1 (Singapore Money Exchange) | $77k |
| 14 June 2001 | Level 21, Office fitout to an existing building | $40k |
| 04 June 2001 | Stage 1 level 17 part office fit out HWT | $200k |
| 19 Apr 2001 | Office fit out level 20 | $300k |
| 07 Feb 2001 | installation of alarm signalling equipment | $190 |
| 23 Jan 2001 | Retail pharmacy shop C3 fit out podium level Southgate | $15k |
| 23 Jan 2001 | Southgate Podium Redevelopment tenancy C3 retail galleria office/foyer retail space ( variation no 1 issued 8/5/01) | $5.8m |
| 08 Aug 2000 | Alterations to an existing retail shop. Tenancy M11 | $95k |
| 01 Aug 2000 | lvl 9 west tower office fit out alts | $300k |
| 16 June 2000 | Partition alts on level 7 | $4k |
| 20 July 1999 | New shower/change room to carpark. Level P1 to Level 3 | $1.4m |
| 06 May 1999 | Internal alterations of a building. Levels Ground to 3. | $1.4m |
| 12 Mar 1999 | Office fitout level 26 IBM Tower | $52k |
| 19 Feb 1999 | Office fitout alterations to an existing building. Level 26 | $7k |
| 12 Feb 1999 | New dividing wall - podium level. Stripout of partitions - level 1 and 2 | $300k |
| 02 Dec 1998 | Partition alterations on Levels 17 & 21 | $238k |
| 24 Nov 1998 | Alteration to spiral stair adjacent to tenancy mr-3 southgate | $40k |
| 19 Nov 1998 | Tenancy fitout on level 18 | $185k |
| 21 Oct 1998 | Office fitout alterations to an existing building. Level 1 (Part) | $115k |
| 31 Mar 1998 | Existing building office fitout alterations. Level 3, HWT Tower | $100k |
| 31 Mar 1998 | existiting bldg, office fitout alterations. Level 26, IBM Tower | $110k |
| 18 Sept 1997 | Alteration of a building - Office fitout for NBA. Level 4 | $100k |
| 19 Aug 1997 | Stage 3 - Existing Building; retail fitout alterations to Beacon Level. | $900k |
| 08 July 1997 | Stage 2 - Balance of Works (Services) Extensions to Beacon Level, new stair and related refurbishment works to the existing Building. | $900k |
| 03 July 1997 | Office partition fitout to levels 4 & 5 | $650k |
| 19 June 1997 | Office fitout alterations. Business Centre Fitout. Level 3 | $490k |
| 06 June 1997 | Extensions to Beacon Level, new stair and related refurbishment works to the existing Building. | $900k |
| 09 May 1997 | Internal alterations for Blue Train restaurant. Tenancy MR5, Mid Level | $80k |
| 11 Mar 1997 | Fitout tenancy G 14/15/16 | $235k |
| 19 Dec 1996 | existing bldg, tenancy fitout to noodle bar | $50k |
| 16 Dec 1996 | Stage 4 - Balance of works - refurbishment works program for the existing bldg. | $3.0m |
| 11 Nov 1996 | Tenancy G4/5 fitout | $25k |
| 08 Nov 1996 | Fitout to restaurant | $350k |
| 28 Oct 1996 | Alterations for temporary Display centre. Beacon Level. | $400k |
| 07 Oct 1996 | Stage 3 - South Galleria Enclosure, Podium Level, South Galleria Entry - refurbishment works program for the existing bldg. | $3.0m |
| 26 Sept 1996 | Stage 2- Balcony extensions, ground level east & west entries, upper podium east entry & related works. ''Category 1'' internal alterations | $3.0m |
| 11 Sept 1996 | Demolition of existing office building. No 4 - 12, Southgate, Southbank | $500k |
| 08 Aug 1996 | Stage 1 - Balcony enlosures to the north elevation. | $3.0m |
| 02 July 1996 | Shop fitout alterations - Tenancy P5 & P6 | $60k |
| 04 May 1995 | Shop fitout alterations. Shop M16-18 | $109k |
| 19 Oct 1993 | Tenancy No G8 Ground Floor - The Australian Craft Store. Fit out space for use as a specialty retail outlet. | $28k |
| 01 Sept 1993 | Level 19, Tower 2, Office Fitout. Gateway Law Offices. | $350k |
| 16 Aug 1993 | Tenancy fitout MR5 - Blue Train Expresso | $150k |
| 09 July 1993 | Tenancy U3 Le Ritz Fitout works within the existing tenancyspace for use as a retail outlet. | $20k |
| 02 July 1993 | Tenancy Fitout for Mission Energy Level 20 (Part Only), East Tower | $200k |
| 02 July 1993 | Tenancy G3 Feast Sandwiches/Daily Bread. Fitout works within the existing tenancy space for use as a food outlet | $30k |
| 02 July 1993 | Tenancy M28 Bonsbons Fitout works within the existing tenancy space for use as a food outlet. | $90k |
| 02 July 1993 | Tenancy U9 Retail Fitout to Desert Gems. | $30k |
| 15 Mar 1993 | Tenancy G 12 & G 13 Ground Floor, Southgate Aquarium. Retail shop for sale of Australiana and aquarium for public vieiwing. | $100k |
| 12 Mar 1993 | Tenancy No G25 - Ground Level - T25 Trio - Fitout works within the existing tenancy space for use as a retail food outlet. | $60k |
| 02 Mar 1993 | Tenancy M13 - Mid Level Dukes Cafe Jeanery. Fitout works within the existing tenancy space for use as a retail and food outlet. | $50k |
| 01 Mar 1993 | Tenancy G21/A Mythic Reality. Fitout works within the existing tenancy space for use as a specialty retail outlet. | $12k |
| 22 Feb 1993 | Tenancy 1 Podium Level - Sheraton Hotel. Fitout works within the existing tenancy space for use as a specialty retail outlet. | $5k |
| 19 Feb 1993 | Tenancy G21B Ground Level - Maxilab - Fitout works within the existing tenancy space for use as a photographic supply and processing retail outlet. | $30k |
| 19 Feb 1993 | Tenancy No UR1 Walters Wine Bar. Construction of canvas awnings to the external balcony areas. | $10k |
| 04 Feb 1993 | Tenancy No. G16 Ground Level Australiagate Theatrette. The architectural fitout of the existing bilding shell of Class VI classification to change the use to Class 1Xb classification. | $150k |
| 20 Jan 1993 | Tenancy No G18 - Ground Level- Mary Martin Book Shop. Fit out space for use as a bookshop. | $50k |
| 20 Jan 1993 | Tenancy No M14 Mid Level The Magic Wheel Fit out space for use as a specialty retail outlet. | $28k |
| 12 Jan 1993 | Tenancy No M9 Mid Level Domino Fit out space for use as a specialty retail outlet. | $25k |
| 19 Nov 1992 | Tenancy U12 Upper Podium Level, Fitout works for use as an art and craft shop. | $40k |
| 30 Oct 1992 | Tenancy No UR3 Upper Podium Level Fit out space for use as a restaurant. | $300k |
| 29 Oct 1992 | Tenancy No M4/5 Modecqo. Retail fitout | $57k |
| 28 Oct 1992 | Bank fitout, partititons - Tenancy P4 - Southgate retail project. | $45k |
| 22 Oct 1992 | Sinage for tenany no. UR1 Walters Wine Bar | $5k |
| 15 Oct 1992 | Fitout to tenancy MR 1,2 & 3 - Mid level, Arts & Leisure presinct. | $500k |
| 01 Oct 1992 | Fletcher Construction Australia tenency Level 1 - 2, East Office Tower. | $1.2m |
| 01 Oct 1992 | Level 22, 23 & 24 Fitout Works, East Tower Amcor Tenancy. | $820k |
| 21 Sept 1992 | Tenancy No U5 Upper Podium Level Aero - Fit out space for use as a specialty retail outlet. | $20k |
| 17 Sept 1992 | Construction of Tenancy U11. Fashion Retail. | $92k |
| 16 Sept 1992 | Tenancy No M8 Mid Level Bella Cobocho Fit out space for use as specialty retail outlet. | $56k |
| 10 Sept 1992 | Tenancy No G18 Virtual Reality Fit out space for use as a specialty retail outlet. | $31k |
| 10 Sept 1992 | Tenancy No M10 Mid Level The Rugby Factory Fit out space for use as specialty retail outlet. | $35k |
| 10 Sept 1992 | Tenancy U6 Upper Podium Level Bella Donna - Fitout works within the existing tenancy space for use as a speciality retail outlet. | $60k |
| 09 Sept 1992 | Tenancy No P7 Podium Level Commonwealth Bank. The archetictural fitout of the existing building shell of Class VI classification to change the use to Class V classification. | $189k |
| 04 Sept 1992 | Tenancy No U7 Upper Podium Level Coogi - Fit out space for use as a specialty retail outlet. | $70k |
| 04 Sept 1992 | Tenancy No U9A Upper Podium Level Made in Japan - Fit out space for use as a speciality retail outlet. | $140k |
| 03 Sept 1992 | Tenancy G3A Fitout to Cleaners Room | $25k |
| 03 Sept 1992 | Tenancy No U2 Upper Podium Level. Deruta of Italy Fitout space for use as a specialty retail outlet. | $32k |
| 02 Sept 1992 | Tenancy No M1 Mid Level Parents Room Fit out space for use as sanitary facilities. | $45k |
| 02 Sept 1992 | Tenancy No M2 Ground Level Art Shop - Fit out space for use as an art shop. | $29k |
| 02 Sept 1992 | Tenancy No U10 Upper Level Art & Craft Fit out space for use as a art & craft retail outlet. | $39k |
| 02 Sept 1992 | Tenancy No. U1 Upper Podium Level. Fitout space for use as an art and craft shop. | $40k |
| 01 Sept 1992 | Tenancy G2 Nutshack Fit out space for food/retail outlet. | $20k |
| 01 Sept 1992 | Tenancy No GR3-B E Gusto - Fit out space for use as a restaurant. | $154k |
| 01 Sept 1992 | Tenancy No P6 Podium Level Ves Vian Salon - Fit out space for use as a hairdressing outlet. | $90k |
| 01 Sept 1992 | Tenancy UR2 Simply French, fitout space for use as restaurant. | $150k |
| 31 Aug 1992 | Tenancy G11 Florist, Fitout space for retail outlet. | $10k |
| 31 Aug 1992 | Tenancy G30 - Ritzy Fish Fitout works for use as a food retail outlet. | $80k |
| 31 Aug 1992 | Tenancy G5 Ground Level, Bright Eyes (Australia) Sunglasses. Fitout works with the existing tenancy space for use as a specialty retail outlet for sunglasses. | $25k |
| 31 Aug 1992 | Tenancy G9/10 Body Map Australia P/L. Fitout works within the existing tenancy space for use as a specialty retail outlet. | $175k |
| 31 Aug 1992 | Tenancy No G27 Ground Level Rive Gauche - Fit out space for use as a food retail outlet. | $60k |
| 31 Aug 1992 | Tenancy No GR1 Greek Restaurant Kostas. Fit out space for use as a restaurant outlet. | $200k |
| 31 Aug 1992 | Tenancy No GR2 Blakes Restaurant Fit out space for use as a restaurant. | $300k |
| 31 Aug 1992 | Tenancy No. GR3C Ground Floor - Bistro Vite - Additions - Fitout. | $150k |
| 31 Aug 1992 | Tenancy No M6 Bodyline - Fit out space for use as a speciality retail outlet. | $11k |
| 28 Aug 1992 | Tenancy G14, Retail Fitout | $35k |
| 28 Aug 1992 | Tenancy no G6/7, G23, G24, G26, G28, G29, G31 Ground Level. Southgate food market, architectural fitout of the exisitng building sheell of Class VI classification comprising of seven food retail outlets. | $1.3m |
| 25 Aug 1992 | Fitout Tenancy G4 for use as food, retail outlet. | $20k |
| 20 Aug 1992 | Tenancy No MR4 Scusa Mi - Fit out space for use as a restaurant. | $160k |
| 18 Aug 1992 | Tenancy No UR1 Walters Wine Bar - Fit out space for use as a wine bar / restaurant. | $245k |
Is Southgate residential or commercial?
Southgate is a commercial building.
How many floors does Southgate have?
Southgate has 21 floors above ground.
What businesses are in Southgate?
The latest council census counted 0 businesses in Southgate.
Is there office or retail space for lease in Southgate?
See the commercial listings on this page, or search this address on realcommercial.com.au and commercialrealestate.com.au.
Who designed and built Southgate?
ARA Australia developed Southgate and Fender Katsalidis designed it. The building team section has the sources.
What public transport is near Southgate?
Flinders Street Station is the nearest train station, about 3 minutes' walk. The nearest tram stop is Arts Precinct/St Kilda Rd #14, about 3 minutes' walk.
What is the planning zone for Southgate?
The site is in the Capital City Zone - Schedule 3 (CCZ3).
Does Southgate have an owners corporation?
Plan of subdivision PS328901 has 1 lot.
Has any work been done on Southgate recently?
The City of Melbourne has issued 291 building permits for Southgate since 1992. The most recent was in September 2025.
Sources: City of Melbourne building permits (CC BY 4.0); Development Activity Monitor (CC BY 4.0); Geocoded National Address File (G-NAF) (Open G-NAF EULA (CC BY 4.0 based)). General information from public records, not legal, financial or building advice.