| Construction started | Jun 2016 | First major construction permit issued |
| First occupants | Mar 2020 | First occupancy permit issued |
| Completed | 2020 | South Tower completed: 40 floors |
Each cost is the estimate on that record. Stages of a project often repeat its full value, so these don't add up to what was spent.
| 21 July 2026 | Internal Tenancy Split & Fitout - Levels 9, 10 and 25 | $7.8m |
| 29 June 2026 | Levels 23 - 24 - Internal Tenancy Split & Fitout | $4.6m |
| 20 Apr 2026 | The proposed project is the Forever Fit Out located at level 36, 80 Collins Street, Melbourne, VIC, 3000. | $4.2m |
| 26 Feb 2026 | Internal Office Alterations Level 22 | $1.7m |
| 02 Feb 2026 | Level 30 (part only) - Tenancy Split & Fitout | $1.9m |
| 01 Dec 2025 | Level 27 - Internal Refurbishment | $3k |
| 28 Nov 2025 | Alterations for Dexus Club | $1.7m |
| 27 Nov 2025 | Levels 17 & 33, Internal Office Fitout | $2.4m |
| 30 Oct 2025 | Alterations to an Existing Building - Level 20, MA Financial Workspace (Fitout Works to Level 20 Southside of Office) | $813k |
| 23 Oct 2025 | Level 10 - Defit & Make Good | $720k |
| 16 July 2025 | Levels 20, 21 and 23-25 - Internal Defit & Make Good | $4.1m |
| 10 July 2025 | Stage 3 - Levels 27-28, 30 & 37 - Completion of level 27 and 28 works) | $8.8m |
| 27 June 2025 | Internal Tenancy Split and Office Fitout for Velocity Legal | $1.3m |
| 11 June 2025 | Stage 2 - Levels 27-28, 30 & 37 - Completion of level 30 and 37 works | $8.8m |
| 23 May 2025 | Levels 27-28, 30 & 37 - Defit & Make Good, Lobby and Amenities Area Upgrade and Internal Office Fitout - Stage 1: Completion of internal demolition works only | $8.8m |
| 23 May 2025 | Stage 2 - Levels 27-28, 30 & 37 - Completion of level 30 and 37 works | $8.8m |
| 16 May 2025 | 80 Collins, Levels 22 ,41, 44 and 45 - Internal Office Fitout | $2.5m |
| 28 Apr 2025 | Tenancy K0.04 - Internal alterations to an existing shop | $97k |
| 17 Mar 2025 | Stage 2 - Levels 27-28, 30 & 37 - Completion of level 30 and 37 works | $8.8m |
| 31 Jan 2025 | Level 37 - Stage 1 – Early Demolition Works before Tenancy Fitout | $816k |
| 24 Jan 2025 | Level 33, 36, & 39 - Internal base building upgrades | $2.6m |
| 24 Jan 2025 | Levels 20, 21 and 23-25 - Internal Defit & Make Good | $4.1m |
| 03 Dec 2024 | Level 37 - Stage 2 - Construction works for office fit out | $816k |
| 25 Nov 2024 | Level 7 - Reinstatement of meeting room on | $104k |
| 28 Oct 2024 | Level 42 - Internal Alterations to Existing Office Tenancy | $181k |
| 16 Sept 2024 | Level 38 - Internal Defit and Fitout for McCormack | $4.4m |
| 29 Aug 2024 | PROPOSED ALTERATIONS TO EXISTING RETAIL TENANCY T10 | $350k |
| 29 Aug 2024 | Shop T09 - Proposed alterations to existing retail shop | $520k |
| 30 July 2024 | Level 38 - Internal Defit and Fitout for McCormack | $150k |
| 18 July 2024 | Level 8 - Internal Office Alterations | $151k |
| 03 July 2024 | Level 29 - Internal Office Fitout for Treasury Corp Victoria | $1.9m |
| 18 June 2024 | Stage 4 - South Tower - Level 32, 33, 34 & 35 - New Focus Quiet Pods | $7.3m |
| 11 June 2024 | Levels 50 & 51 - Alterations to existing building – tenancy fitout | $1.3m |
| 03 June 2024 | Level 8 - Internal Office Alterations | $151k |
| 29 May 2024 | Stage 2: Fitout of retail tenancy | $180k |
| 29 May 2024 | Tenancy K0.04, FEIT Store - Alterations | $180k |
| 12 Apr 2024 | Kiosk K0.04 - Internal alterations to an existing building - Internal Kiosk Defit and Make Good (Kiosk K0.04) | $33k |
| 06 Mar 2024 | Internal alteration to existing building - proposed office fitout - Level 49 | $421k |
| 09 Feb 2024 | Level 35, 80 Collins Street - Proposed Internal Office Fitout for Tesserent. | $1.1m |
| 09 Feb 2024 | Level 35 - Proposed Internal Demolition of Existing Fitout and Refurbishment of Lift Lobby & Bathrooms | $1.1m |
| 22 Jan 2024 | Internal Alterations to Link Bridges | $150k |
| 21 Dec 2023 | Shop T09 - Proposed alterations to existing retail shop | $520k |
| 20 Dec 2023 | STAGE 2 - NORTH TOWER - LEVEL 31 & 32 STAIRCASE | $7.0m |
| 19 Dec 2023 | Levels 11 & 12 - Tenancy Split and Internal Office Fitout | $4.0m |
| 14 Dec 2023 | Tenancy T09 - Penetration and installation of structural steel work for internal stairs at | $319k |
| 12 Dec 2023 | Internal Fitout to existing retail tenancy | $1.6m |
| 12 Dec 2023 | Levels B1 & B2, 80 Collins Street - Internal Structural Works | $265k |
| 24 Nov 2023 | Internal structural works | $761k |
| 14 Nov 2023 | STAGE 3 - SOUTH TOWER - LEVEL 34 - 3 NEW FOCUS QUIET PODS | $7.0m |
| 11 Oct 2023 | STAGE 2 - NORTH TOWER - LEVEL 31 & 32 STAIRCASE | $7.0m |
| 05 Oct 2023 | Internal Alterations to Link Bridges | $150k |
| 05 Sept 2023 | Level 26 - Alterations & fit-out works | $485k |
| 04 Aug 2023 | Levels 11 & 12 - Tenancy Split and Internal Office Fitout | $4.0m |
| 10 July 2023 | Level 16-18 and 19 - Internal Office Fitout for Yajilarra | $510k |
| 05 July 2023 | Stage 1 - Suite 3 Level 40 - Early Works, Construction of Comms Room and Ceiling Demolition Works | $50k |
| 28 June 2023 | Level 11 - Alterations to an existing building | $249k |
| 27 June 2023 | Level 18 - Internal Tenancy Split | $232k |
| 06 June 2023 | Level 42 - Internal Office Fitout | $774k |
| 17 May 2023 | Stage 2 - Mechanical services | $84k |
| 05 May 2023 | Stage 1 Tenancy Alterations excluding mechanical services | $194k |
| 24 Apr 2023 | Stage 2 - Suite 3 Tenancy Fitout Level 40 | $1.2m |
| 29 Mar 2023 | Ronenco Integrated Design_ESV Lab Fitout works - Alteration - Level 46 ESV Lab Works | $303k |
| 24 Mar 2023 | Level 47 Proposed Office Fit out for LAWD | $1.2m |
| 28 Feb 2023 | Level 17 - Alterations to existing office tenancy | $600k |
| 03 Feb 2023 | Base build upgrade works | $2.4m |
| 02 Feb 2023 | Level 18, Suite 01 - Internal office fitout | $2.1m |
| 18 Jan 2023 | Alterations to existing office building – new store room | $59k |
| 12 Dec 2022 | Level 47 Proposed Office Fit out for LAWD | $1.2m |
| 02 Dec 2022 | Level 34 - Minor office alterations - Removal of two office partitions and one door to make way for six more workstations. Ceiling, Floor and Walls to be made good | $174k |
| 28 Nov 2022 | level 11 - Replace DDA toilet unisex signage with all gender signage | $7k |
| 21 Nov 2022 | 3x Speculative Office Fit-outs on Level 42 | $1.4m |
| 11 Nov 2022 | Level 40 - Construction of Accessible Sanitary Facility | $87k |
| 10 Nov 2022 | Part Level 40 - Fitout of offices | $251k |
| 26 Oct 2022 | Level 37 Tenancy Subdivision - South Tower (Tower 2) | $381k |
| 18 Oct 2022 | Level 48 - Proposed Office Alterations | $300k |
| 29 Sept 2022 | Alteration - Reception works - Level 31 | $83k |
| 28 Sept 2022 | Proposed office suite fit outs Level 13 & Level 15 | $3.4m |
| 24 Aug 2022 | Level 37, South Tower - CEFC Tenancy Fitout Works | $1.3m |
| 29 July 2022 | Level 19 - Alterations | $1.8m |
| 15 July 2022 | Stage 2 – Internal Alterations to existing building (Installation of artwork) – Excluding all other building worksAlteration - Reception works - Level 31 | $83k |
| 10 June 2022 | Tenancy T0M.16 - Internal Fitout for Pure Physio | $280k |
| 08 June 2022 | Proposed IT Tenancy Split - Level 40 | $79k |
| 21 Apr 2022 | Proposed Iberdrola Office Fit out - Level 40, 80 Collins Street Melbourne VIC 3000 | $575k |
| 31 Mar 2022 | Level 34 Proposed tenancy split and fit out of three (3) Tenancies. | $1.2m |
| 07 Mar 2022 | Level 19 Subdivision Works | $72k |
| 07 Mar 2022 | Stage 2: Fitout of Suite 01 & 03 | $1.2m |
| 21 Feb 2022 | Internal Office Alterations for DLA Piper | $662k |
| 09 Feb 2022 | Level 5 - Proposed Tenancy Split & Internal Fit-Out | $379k |
| 03 Feb 2022 | Stage 2 - Level 5 - Remainder of Dexus fitout works including vermiculite works and a DDA report. | $2.2m |
| 17 Dec 2021 | Stage 5 - To Completion of All Works | $8.6m |
| 15 Dec 2021 | Level 42 - Back to Base Alterations | $424k |
| 14 Dec 2021 | Level 34 - Office Tenancy Fit out for Gallagher Jeffs | $573k |
| 10 Dec 2021 | Level 19 - Knight Frank Ashurst Fitout Works | $1.4m |
| 08 Dec 2021 | Level 5 - Fitout Works | $2.3m |
| 29 Nov 2021 | Alterations to an Existing Office Level 34 | $279k |
| 15 Nov 2021 | Level 14 - Internal Office Fitout for Dexus Test Fit | $1.5m |
| 27 Oct 2021 | Internal Alterations for MSSB Upgrade | $160k |
| 15 Oct 2021 | Level 21-28 - Door hardware alterations and acoustic panel introduction | $1.9m |
| 07 Oct 2021 | Alterations to an Existing Office – Dexus Fibre Access Node | $860k |
| 07 Oct 2021 | Alterations to an Existing Office Level 34 | $279k |
| 04 Oct 2021 | BMU Replacement Works | $145k |
| 02 Oct 2021 | Stage 2 - Level 4 Axis Tenancy - Operable Wall | $334k |
| 30 Sept 2021 | Construction of Vergola for Farmers Daughters | $40k |
| 22 Sept 2021 | Stage 2 - To Complettion of Works, Excluding Sanitary Facilities to Levels 30, 31, 32 40 and 47 | $0 |
| 22 Sept 2021 | Stage Three - To Completion of All Works | $6.0m |
| 11 Aug 2021 | Level 12 - Alterations- Tenancy fitout | $700k |
| 14 July 2021 | Level 5-7 - Change of Use and Alterations for Dexus Place | $8.0m |
| 30 June 2021 | Intertenancy Fitout to Levels 21 to 28 - Stage 1: Fit-out works to levels 21 to 28, interconnecting stair void only from levels 23 to 27. This permit Excludes works related to Regulation 129 Chief officers consent (refer to Appendix B for clarification of scope). This permit Excludes works related to construction of intertenancy stair and balustrades. | $24.4m |
| 30 June 2021 | Stage 2: Fit out works to levels 21 to 28. Works related to Regulation 129 Chief officers consent, works related to construction of intertenancy balustrades and glazing, works related to hearing augmentation. | $24.4m |
| 28 June 2021 | Level 43 - Internal office alterations for Dexus | $1.3m |
| 18 June 2021 | Level 43 - Internal Demolition of Office for Dexus | $44k |
| 09 June 2021 | Level 30 - Tenancy alterations | $147k |
| 19 May 2021 | Relocation of Diesel Exhaust | $80k |
| 13 May 2021 | Stage 2 - Level 36 Terrace Works | $305k |
| 10 May 2021 | Level 19 & 30 - Office Fit out for Spec Suites | $2.4m |
| 07 May 2021 | Proposed alterations to existing Retail Tenancy T0.03 | $0 |
| 31 Mar 2021 | Stage Three - To Completion of All Works | $6.0m |
| 26 Mar 2021 | Levels 29, 34, 42 & 46 - Base Building Upgrades to Levels 29, 34, 40 and 46 in the North Tower | $2.3m |
| 10 Mar 2021 | Yakitori Restaurant & Bar Tenancy K0.05 - Alteration | $4.7m |
| 04 Mar 2021 | Level 12 - Alterations | $534k |
| 23 Feb 2021 | Alterations to Lower Ground Storage 01 & Egress Corridor | $72k |
| 15 Feb 2021 | Planter & Booster enclosure relocation | $90k |
| 12 Feb 2021 | Internal Defit, Make Good and Refurbishment of Sanitary Facilities | $6.0m |
| 02 Feb 2021 | Stage 1A.1 - Preliminary enabling works to north tower (structural demolition). Demolition works and enabling works (only). | $2.3m |
| 02 Feb 2021 | Stage 5C2.C - Retail facades (tenancy T2.02 and bridge links). | $346.9m |
| 02 Feb 2021 | Stage 6B - New hotel early works including basement B2 and B1 (structural only). | $119.8m |
| 29 Jan 2021 | Level 16 and 24. Gas installation works | $489 |
| 28 Jan 2021 | Stage 2: Fit out works to levels 21 to 28. Works related to Regulation 129 Chief officers consent, works related to construction of intertenancy balustrades and glazing, works related to hearing augmentation. | $24.4m |
| 24 Jan 2021 | Stage 2 - To Completion of Structural Demolition Works Only | $8.0m |
| 24 Jan 2021 | Stage 3 - To Completion of Non-Structural Internal Partitioning and Installation of Services Only, Excluding Fire Services | $8.6m |
| 24 Jan 2021 | Stage 4 - To Completion of All Works, Excluding Terraces | $8.6m |
| 19 Jan 2021 | Intertenancy Fitout to Levels 21 to 28 - Stage 1: Fit-out works to levels 21 to 28, interconnecting stair void only from levels 23 to 27. This permit Excludes works related to Regulation 129 Chief officers consent (refer to Appendix B for clarification of scope). This permit Excludes works related to construction of intertenancy stair and balustrades. | $24.4m |
| 15 Jan 2021 | Stage1 - Internal alterations: Friends of Macquarie space. Wall alteration | $266k |
| 18 Dec 2020 | Yakitori Restaurant & Bar Tenancy K0.05 - Alteration | $4.7m |
| 16 Dec 2020 | Level 19. Alterations | $1.1m |
| 10 Dec 2020 | Level 38 - Alterations to existing office | $2.8m |
| 09 Dec 2020 | Tenancy Alterations on level 30 | $98k |
| 19 Nov 2020 | Fit out of existing tenancy T0-01 for Saint Lauren. | $2.9m |
| 19 Nov 2020 | Stage 2 - New shopfront to tenancy T0-01 for Yves Saint Laurent | $0 |
| 16 Nov 2020 | Sepia Restaurant Fitout - Tenancy 2.01 - 80 Collins Street (St Tower) Alteration | $9.7m |
| 16 Nov 2020 | Sepia Restaurant Fitout - Tenancy 2.01 - 80 Collins Street (St Tower) Alteration - EXTERNAL PAVILION | $9.7m |
| 06 Nov 2020 | Tenancy Fit Out to Levels 12, 13, 14 & 15 | $0 |
| 28 Oct 2020 | Collins Quarter wall and make good works. | $413.7m |
| 28 Oct 2020 | South tower amenities alterations. | $413.7m |
| 28 Oct 2020 | Stage 10E - Facade and architectural elements. | $413.7m |
| 28 Oct 2020 | Stage 1A - Preliminary enabling works and demolition of carpark exhaust stack and tenancy. | $1.5m |
| 28 Oct 2020 | Stage 5C2.B updated - Retail facades (north tower laneway entry and revolving door D now included). | $346 |
| 28 Oct 2020 | Stage 5C2.F - Retail tenancy facades. | $413.7m |
| 28 Oct 2020 | Stage 7D.1 - Services to south tower levels 4 to 37 (only). | $345.7m |
| 28 Oct 2020 | Stage 7D.2 - Services to levels 38 to roof (only) and Mckinsey floor modifications (levels 30 to 32). | $346.9m |
| 07 Oct 2020 | Stage 2 - Amenities and make good. | $8.0m |
| 02 Oct 2020 | Level 4 Fitout Works - Stage 1 - Alterations | $334k |
| 15 Sept 2020 | Stage 2 - External Grandstand Seating | $456k |
| 09 Sept 2020 | MGL sky signage. | $413.7m |
| 09 Sept 2020 | Stage 1B.2 - South tower early works including piling/ retention and bulk excavation (including works within expunged easement E-3). | $9.6m |
| 09 Sept 2020 | Stage 2 - North tower temporary lobby works. | $26.9m |
| 09 Sept 2020 | Stage 3C - South tower B2 to underside of ground (structural only). | $19.4m |
| 09 Sept 2020 | Stage 5C2.G – Retail facades (laneway kiosk K0.01 and K0.02). | $413.7m |
| 09 Sept 2020 | Stage 7B - Architectural and services to underside of ground. | $54.4m |
| 09 Sept 2020 | Stage 8A - Architectural to levels 00 to level 3A (only). | $174.3m |
| 09 Sept 2020 | Stage 8B.1 - Architectural to south tower levels 4 to 37 (only) | $345.7m |
| 09 Sept 2020 | Stage 8H - Level 36 MGL glass box (only). | $345.7m |
| 26 Aug 2020 | Stage 1 - Level 11-18. Refurbishment works to lift lobbies, amenities, tenancy areas. Alterations to existing building. | $8.0m |
| 26 Aug 2020 | Tenancy T0.14 - Handpicked Wines | $1.4m |
| 14 Aug 2020 | Stage 4C and 4D - South tower level 7 to level 33 (structural only). | $117.0m |
| 11 Aug 2020 | Construction of Hotel - Stage 6C - Structural (Only) for Ground Level 00 to Level 24 (Excludes Plant Room) | $50.0m |
| 11 Aug 2020 | Stage 6C Variation - Hotel Tower Levels 00 to Level 24 (Structural variation only) | $100.1m |
| 11 Aug 2020 | Stage 6E.3 - HOTEL FACADES (LEVELS 00-0M) | $100.1m |
| 11 Aug 2020 | Stage 7F & 7G - Hotel Services for LOO to Roof | $87.9m |
| 11 Aug 2020 | Stage 7G Variation - Hotel Services for LOS to Roof (Guestroom Levels only & up to Roof Levels) | $100.1m |
| 11 Aug 2020 | Stage 8D - Hotel FOH Architect_B2 - L03 | $107.3m |
| 11 Aug 2020 | Stage 8F - Hotel Architect - L04 - Roof | $100.1m |
| 04 Aug 2020 | Level 16-18 - Ashurt Tenancy Fitout | $0 |
| 30 July 2020 | Level 29 - Proposed Office fitout to existing tenancy | $1.4m |
| 29 July 2020 | Tenancy alterations to Level 28 | $443k |
| 20 July 2020 | Level 38 - Alterations to existing office | $2.8m |
| 20 July 2020 | Pink Alley Retention | $549k |
| 03 July 2020 | Tenancy T0.02 - Tenancy Fitout | $230k |
| 30 June 2020 | People's Coffee - Proposed alterations to existing tenancy TO. 16. | $123k |
| 25 June 2020 | Level 11. Alterations to existing of Office | $0 |
| 24 June 2020 | Levels 32-36 & 37 - Macquarie Fitout - Variation | $800k |
| 23 June 2020 | Stage 1A - 1A.2 - North tower enabling works excluding fire services to basement levels and reloction of the generator to level 16. | $14.7m |
| 23 June 2020 | Stage 1A - 1A.2 - North tower enabling works including fire services to basement levels. | $26.4m |
| 23 June 2020 | Stage 3A - Ground construction loading deck. | $9.8m |
| 23 June 2020 | Stage 4E - South tower level 33 to level 38 (structural only). | $166.3m |
| 12 June 2020 | Stage 10A - Le Louvre early works for demolition, structural, civil and conservation works (only). | $346 |
| 12 June 2020 | Stage 10B - Le Louvre demolition (only). | $411.8m |
| 12 June 2020 | Stage 1A - 1A.2 - North tower enabling works including fire services to basement levels. | $19.4m |
| 12 June 2020 | Stage 1B.2 - South tower early works including piling/retention and bulk excavation (excluding works within sewerage easement E-3). | $9.6m |
| 12 June 2020 | Stage 2 - New shopfront to tenancy T0-01 for Yves Saint Laurent | $0 |
| 12 June 2020 | Stage 4A and 4B - South tower ground to level 6 (structural only). | $50.3m |
| 12 June 2020 | Stage 4F - South tower level 39 to roof (structural). | $346.9m |
| 12 June 2020 | Stage 4G - Commercial office tower. South tower facade excluding podium. | $158.5m |
| 12 June 2020 | Stage 5A and 5B - North tower retail L00 (structural only). | $60.8m |
| 12 June 2020 | Stage 5C.1 - North tower level L01 and L01M (structural only). | $122.4m |
| 12 June 2020 | Stage 5C2.B - Retail facades (tenancies 6 and 7 to Exhibition Street and north tower entry). | $345.7m |
| 12 June 2020 | Stage 5C2.D - Retail tenancy facades. | $411.8m |
| 12 June 2020 | Stage 8B.2 - Architectural to levels 38 to roof (only) and Mckinsey floor modifications (levels 30 to 32). | $346.9m |
| 29 May 2020 | Levels 6-10 South Tower - Proposed office tenancy fitout | $11.5m |
| 18 May 2020 | Permit Variation - Revised architectural and services layouts and tenancy T0.01 secondary steelwork. | $413.7m |
| 18 May 2020 | Stage 7C - Commercial office tower. Services level 00 to level 3A. | $138.6m |
| 18 May 2020 | Stage 8G - Landscape and associated civil works. | $411.8m |
| 13 May 2020 | Tenancy Fitout. T0.02 | $680k |
| 11 May 2020 | Tenancy Fit Out to Levels 12, 13, 14 & 15 | $0 |
| 07 May 2020 | Stage 2 - Level 32-36 Tenancy Alterations | $5.2m |
| 23 Apr 2020 | Stage 10C - Le Louvre structure and civil ground works. | $413.7m |
| 23 Apr 2020 | Stage 1A.1 - Preliminary enabling works to north tower (soft strip/non-structural demolition). | $1.8m |
| 23 Apr 2020 | Stage 3B - South tower foundations (structural only). | $16.4m |
| 23 Apr 2020 | Stage 6A - New hotel early works including piling/retention, pile caps and columns up to L00. | $61.7m |
| 15 Apr 2020 | Stage 5C2.E - Retail facades (tenancies T0.06 Benson Lane, T0.16, T0.16M, T0.12/T0.13 Laneway). | $413.7m |
| 03 Apr 2020 | Tenancy T0.11 - Maverick Cafe Fitout | $462k |
| 30 Mar 2020 | Tenancy 17 - Proposed alterations to existing tenancy. | $238k |
| 25 Mar 2020 | Internal Tenancy Fitout for Nick and Nora’s | $1.2m |
| 17 Mar 2020 | Alterations | $0 |
| 12 Mar 2020 | Le Louvre above ground structure and services. | $413.7m |
| 12 Mar 2020 | Tenancy T0.12 External Canopy & Grandstand Furniture | $0 |
| 03 Mar 2020 | Tenancy 02. Proposed alterations to existing building. | $348k |
| 27 Feb 2020 | Level 24 - Installation of new door | $5k |
| 27 Feb 2020 | Permit Variation – Revised Services to Hotel Levels L00-L4 | $0 |
| 27 Feb 2020 | Tenancy Alterations | $280k |
| 19 Feb 2020 | Level 43 - To completion of proposed works only | $209k |
| 18 Feb 2020 | Tenancy K0.01 - Internal fitout to existing tenancy | $0 |
| 17 Feb 2020 | Fit out of existing tenancy T0-01 for Saint Lauren. | $2.9m |
| 30 Jan 2020 | PROPOSED ALTERATIONS TO EXISTING RETAIL TENANCY T0.12 | $200k |
| 23 Jan 2020 | McKinsey Workplace Level 30 & 31 - Alteration | $7.7m |
| 16 Jan 2020 | Tenancy K0.02 - Internal Tenancy Fitout for Upstate Coffee | $251k |
| 19 Dec 2019 | RETAIL TENANCY FITOUT TO T0.04 | $550k |
| 11 Nov 2019 | Tenancy T0.11 - Maverick Cafe Fitout | $462k |
| 18 Apr 2019 | Stage 6D - Hotel Level 25 to Roof/Plant (Structural only) | $87.9m |
| 15 Apr 2019 | Level 40 - Alterations to office - new kitchenette | $83 |
| 10 Apr 2019 | Stage 3 - Fitout works – Full ScopeArchitectural/ Services/Fire Curtain etc | $18.9m |
| 19 Mar 2019 | Stage 2 - Fitout works - Services Variation to Levels 32 to 34 and Amended Conditions | $18.9m |
| 25 Feb 2019 | Macquarie Fitout - Alterations | $18 |
| 04 Feb 2019 | Stage 5C2.A - Retail facades (tenancies 7, 9, 10, 11 and 12). | $345.7m |
| 25 Jan 2019 | Level 41 - Alterations to existing Office | $386k |
| 17 Jan 2019 | STAGE 6E.2 - HOTEL FACADE TO LEVELS L5 TO L25 ONLY | $87.9m |
| 14 Nov 2018 | Level 19- Rolex Fitout Works | $212k |
| 16 Oct 2018 | Stage 2 - Services Works Only | $127 |
| 15 Oct 2018 | Stage 6E.1 - Hotel facade to Levels L0M to L4 Only | $87.9m |
| 03 Aug 2018 | Stage 1 - Architectural Works Only (Excludes Services) | $127k |
| 18 July 2018 | Level 25 - Alterations to existing Office | $29k |
| 25 June 2018 | Stage 8C - Hotel Architectural for Basement Levels B1 & B2 (only) and additional structural works for previous Stage 6C | $50.0m |
| 12 June 2018 | DEDJTR Meeting room works to levels 35 & 37 | $203k |
| 31 May 2018 | Construction of Hotel - Stage 7E - Basement B1 & B2 Hotel Services | $50.0m |
| 29 May 2018 | Level 13 - Internal alterations - - Demolition of Internal Walls to negotiation rooms bounding corridor and reconfiguration | $44k |
| 05 Feb 2018 | Levels 7-10 - Partition Works | $500k |
| 01 Feb 2018 | North Tower Levels 5 & 6 Demolition Works | $530k |
| 23 Jan 2018 | Level 30 - Office ftout and alterations for "QIC" | $120k |
| 17 Nov 2017 | Level 33 - Proposed Partitions Work Teneancy | $30k |
| 28 Sept 2017 | Level 24 & 25 - Internal Office Alterations | $450k |
| 01 Sept 2017 | Level 45 - Proposed new unisex accessible sanitary facility to existing office tenancy | $27k |
| 21 July 2017 | Stage 2 - Levels 49, 50 & 51 - Tenancy fitout works for partitions, ceilings and services (excluding L51 cafe, joinery and finshes) | $4.5m |
| 21 July 2017 | Stage 3: Levels 49, 50 & 51 - Tenancy Fitout works for Joinery, Doors and Finishes (Excluding L51 Cafe Works) | $4.5m |
| 21 July 2017 | Stage 4 - Tenancy Fitout Works Including L51 Cafe Works | $4.5m |
| 24 May 2017 | Level 48 - Alterations to an existing office space | $218k |
| 03 Apr 2017 | Level 41 and 42 - Alterations to fire stair access | $5k |
| 16 Mar 2017 | Stage 1: Levels 49, 50 & 51 - AON Melbourne Accommodation Project - Tenancy Demolition Works Only (Levels 49 & 50) | $4.5m |
| 10 Mar 2017 | Level 48-49 - Internal Demolition Works | $27k |
| 31 Jan 2017 | Level 19, Fit out | $409k |
| 31 Jan 2017 | Level 40 - Alterations | $78k |
| 25 Jan 2017 | Level 42 - Internal alterations | $553k |
| 06 Dec 2016 | Level 26 - Alterations to Existing Building | $1.5m |
| 04 Oct 2016 | Level 19 (Part) - Paragon Funds Management Fitout | $64k |
| 13 Sept 2016 | Proposed internal office alterations on level 23. | $28k |
| 30 Aug 2016 | Level 28 - Proposed alterations to existing office tenancy - new secure door & wall | $15k |
| 29 Aug 2016 | Level 29 - Office Fit-Out | $220k |
| 17 June 2016 | Demolition / Façade Remediation - 74-80 Collins Street Melbourne | $1.1m |
| 04 May 2016 | Level 23 - Internal office alterations | $9k |
| 02 Mar 2016 | Level 40 - Internal alterations to Existing Building | $661k |
| 21 Oct 2015 | Fire Services Alterations - 80 Collins Street Melbourne | $5k |
| 30 Sept 2015 | Alterations - IMES - 80 Collins Street Melbourne | $1.0m |
| 17 Sept 2015 | Levels 37 & 50 - Alterations to offices | $20k |
| 08 July 2015 | Level 19 Office Fit Out | $400k |
| 24 June 2014 | Stage 3: Part Office Fit-Out | $165k |
| 18 June 2014 | Stage 1: Internal Demolition Works - Level 41 & 43 | $90k |
| 03 June 2014 | Stage 2: Internal Fit-Out and Amended Cost of Works | $165k |
| 01 Aug 2013 | Level 49 Construction of Fire rated enclosure to seal off internal stair | $26k |
| 17 June 2013 | Office fitout to existing tenancy Level 46 | $620k |
| 14 May 2013 | Construction of new office Level 25 | $45k |
| 24 Apr 2013 | Alterations Part Level 43 | $24k |
| 05 Apr 2013 | Alterations to a Building Level 19 & 26 Only | $1.6m |
| 26 Mar 2013 | partition alterations to levels 10 & 11 | $250k |
| 04 Mar 2013 | Stage 2: Office Alterations excluding services to new corridor - Office Alterations - Level 13 | $95k |
| 23 Jan 2013 | Alterations to Level 47 | $590k |
| 10 Jan 2013 | Stage 1: Office Alterations excluding services to new corridor - Office Alterations - Level 13 | $95k |
| 10 Oct 2012 | Office partition alterations to existing tenancy - level 29 | $140k |
| 11 Sept 2012 | Internal demolition works Level 47 | $22k |
| 19 Dec 2011 | Proposed alterations to existing office Levels 35, 50 & 51 | $85k |
| 23 Sept 2011 | Alterations Level 34 | $450k |
| 16 Sept 2011 | Internal fitout Tenancy 8 | $132k |
| 16 Aug 2011 | Office fit out - alterations to an existing building (level 14) | $80k |
| 09 Aug 2011 | Internal alterations to existing office building Level 20 | $110k |
| 03 Aug 2011 | OFFICE FITOUT TO EXISTING TENANCY | $350k |
| 09 June 2011 | Internal Office Fitout | $23k |
| 15 Apr 2011 | LEVEL 17 office fitout and alterations to existing building | $193k |
| 14 Apr 2011 | Internal office fit out to part of level 44 | $25k |
| 14 Apr 2011 | Office alterations to part of level 45 | $23k |
| 07 Apr 2011 | Stage 1 - Level 14 Internal Alterations | $22k |
| 10 Mar 2011 | Northern Trust offices Level 47 | $600k |
| 14 Jan 2011 | An office fitout on level 30 | $50k |
| 21 Dec 2010 | Alterations Level 47 (Final/conditional) | $396k |
| 01 Dec 2010 | LEVEL 30 FITOUT | $620k |
| 03 Nov 2010 | Stage 2: fire services. Level 30 fitout | $620k |
| 05 Oct 2010 | Minor internal alterations to an existing office tenancy on levels 24 and 25 | $73k |
| 29 Sept 2010 | Alterations Level 47 | $19k |
| 23 Sept 2010 | Variation: Alterations (Base Building upgrade) on Levels 30 & 32 | $0 |
| 02 Sept 2010 | Variation. Alterations (Base Building upgrade) on Levels 30 & 32 | $880k |
| 12 Aug 2010 | PROPOSED OFFICE PARTITION ALTERATIONS TO EXISTING TENANCY - LEVEL 7: 80 COLLINS ST | $200k |
| 21 June 2010 | Alterations (Base Building upgrade) on Levels 30 & 32 | $830k |
| 06 May 2010 | Level 28 - Office partition alterations to existing tenancy | $40k |
| 15 Apr 2010 | Proposed Internal Office Alterations to existing Office - Level 11 & 12 | $45k |
| 02 Feb 2010 | Office fitout alterations Level 39 | $642k |
| 13 Nov 2009 | Level 22 - Office fitout alterations to an existing building | $580k |
| 25 Sept 2009 | Tenancy Fitout Lvl 49 | $1.2m |
| 31 July 2009 | Stage 2: All works to completion | $568k |
| 05 June 2009 | Office Fitout Alterations to and existing Building. Stage 1 Works (All works excluding external louvres). | $568k |
| 20 May 2009 | Alterations to office building, refurbishment to levels 4, 16, 30, 33 to 47, 50 to 53. Stage 2: Remainder of works. | $12.7m |
| 06 May 2009 | Office refurbishment levels 23 to 25. Stage 2: All works to completion | $3 |
| 24 Apr 2009 | Proposed office partition alterations to existing tenancy Levels 35, 36, 37, 50 & 51 80 Collins Street, Melbourne | $572k |
| 17 Apr 2009 | Office refurbishment levels 23 to 25. Stage 1: All Works Excluding Façade Louvres. | $3.4m |
| 03 Feb 2009 | (Office) Tenancy fitout Level 48 & 49. Stage 3: All Services Works for the Tenancy Fitout to Level 48. | $1.0m |
| 17 Nov 2008 | Internal partition alterations to an existing office tenancy Level 18, 80 Collins Street MELB | $17k |
| 05 Sept 2008 | (Office) Tenancy fitout Level 48 & 49. Stage 2: Architectural Works only for the tenancy fitout to Level 48. | $1.0m |
| 03 Sept 2008 | Proposed Construction of Comms/sever Room Level 38. Stage 2: To completion of internal alterations including all fire services. | $2.3m |
| 29 Aug 2008 | (Office) Tenancy fitout Level 48 & 49. Stage 1: Structural Works Associated with the Inter-Tenancy Stair Opening between Level 48 and 49. | $1.0m |
| 21 Aug 2008 | Office fitout to existing tenancy Level 42. Stage 2: Services alterations. | $500k |
| 24 July 2008 | Alteration to an office building Level 44 and 45, structural and architectural services. | $2.2m |
| 24 June 2008 | Proposed Construction of Comms/sever Room Level 38. Stage 1: To completion of internal alterations excluding all fire services. | $2.3m |
| 06 June 2008 | Internal Office Alterations Levels 19 & 26 (Part) | $400 |
| 22 Apr 2008 | Office partition fit out. Level 27 | $29k |
| 18 Apr 2008 | Proposed Construction of Comms/sever Room Level 38. To completion of internal comms room only. | $120k |
| 27 Mar 2008 | DOI & SSC 80 Collins Refurbishment. Fitout alterations to an existing building. Stage 4: All Works to Completion. | $6.2m |
| 26 Mar 2008 | Office partition fitout to Level 43 | $120k |
| 14 Mar 2008 | Proposed Office Alterations to Existing Tenancy Level 28 | $170k |
| 29 Feb 2008 | Alterations to office building, refurbishment to levels 4, 16, 30, 33 to 47, 50 to 53. | $12.7m |
| 18 Jan 2008 | DOI & SSC 80 Collins Refurbishment. Fitout alterations to an existing building. Stage 3: All services (excluding fire hydrants and hose reels to Levels 5 and 13). | $6.2m |
| 03 Jan 2008 | DOI & SSC 80 Collins Refurbishment. Fitout alterations to an existing building. Stage 2: All partitioning works, Level 5 - 18. | $6.2m |
| 10 Dec 2007 | DOI & SSC 80 Collins Refurbishment. Fitout alterations to an existing building. Stage 1: Internal strip out in preparation of office fitout, Level 5 - 18. | $6.2m |
| 30 Nov 2007 | New facade advertising sign. | $180k |
| 07 Oct 2007 | Building Facade advertising signage | $180k |
| 22 Aug 2007 | Alterations-Office fitout Levels 34-37 & 39 & 50-51 | $5.9m |
| 12 July 2007 | Proposed office fitout to Level 43, 46 & 47. | $166k |
| 10 Nov 2006 | Proposed office fitout level 11. | $0 |
| 15 Sept 2006 | Proposed office fitout level 11. | $20 |
| 05 June 2006 | Alteration to existing building, internal office fitout level 47. | $22k |
| 23 May 2006 | Proposed tenancy fitout to existing office level at level 28. | $473k |
| 20 Mar 2006 | Office alterations, part of level 46. | $42k |
| 28 Feb 2006 | Proposed stripout of existing offices to level 44 & 45 | $192k |
| 05 Oct 2005 | Internal office refurbishment part Level 20 | $150k |
| 26 Aug 2005 | Office redevelopment Part Level 26 | $90k |
| 19 July 2005 | Office refurbishment level 5 | $157k |
| 18 July 2005 | Office fitout - level 41 | $70k |
| 27 June 2005 | Office alterations Part Level 17 | $50k |
| 06 June 2005 | Office fitout part level 48 | $200k |
| 31 May 2005 | Alterations Level 35 & 41 | $139k |
| 02 May 2005 | Levels 50 & 51 - Internal strip out of existing office fitout and return floors back to base building - Stage 1 - All works excluding mechanical, electrical and sprinkler services | $200k |
| 11 Apr 2005 | Level 27 - Office partition alterations | $5k |
| 21 Dec 2004 | Partition alterations Level 23 | $100k |
| 15 Sept 2004 | Level 36 - Office Alterations | $102k |
| 24 June 2004 | Alterations to building. Mechanical alterations to Level 45 | $40k |
| 22 June 2004 | Alterations to building. Stage 2 - Level 14 & 17 - Internal alterations. | $22k |
| 12 May 2004 | Partition alterations to office on level 27 | $715k |
| 06 Apr 2004 | Level 26, Office alterations to building. | $17k |
| 16 Jan 2004 | Levels 7 & 8 - Tenancy Fitout. | $1.5m |
| 26 Nov 2003 | Computer room extension Part Level 14 | $50k |
| 11 Nov 2003 | Office fitout - Part Level 13 | $20k |
| 31 Oct 2003 | Storage area construction - Part Level 12 | $14k |
| 14 Oct 2003 | Office fitout Level 48 | $35k |
| 02 Oct 2003 | Partitions alterations to office Level 43 | $20k |
| 24 Sept 2003 | Level 10, New offices /reconfiguration of workstations | $41k |
| 19 Sept 2003 | New partitions and security doors - Part Level 30 | $22k |
| 15 Aug 2003 | Nauru House. Office Fitout Level 3. | $4k |
| 12 Aug 2003 | Level 23 Office fitout | $11k |
| 09 Aug 2003 | Alterations to a shop and shop fitout - Unit 1 - OPSM store | $90k |
| 06 Aug 2003 | Office fitout Level 10 | $16k |
| 02 June 2003 | Demolition of a solid partition. Level 17. Building Permit Amendment is for a variation in the scope of works to include construction of a door and a solid partition. | $3k |
| 27 May 2003 | Partition fitout to Part level 21 | $76k |
| 07 May 2003 | Demolition of a solid partition. Level 17 | $3k |
| 11 Apr 2003 | Office fitout for Department of Infrastructure. Part Level 9 | $25k |
| 01 Apr 2003 | Office fitout. Level 17 (Part) | $20k |
| 21 Nov 2002 | Office fitout part level 10 | $16k |
| 11 Nov 2002 | Alterations to existing offices. Partition alterations. Part Level 18 | $53k |
| 23 Oct 2002 | Level 6 - Service Upgrade - Base Building Works and Nauru House | $450k |
| 15 Oct 2002 | Internal alterations to part level 42 | $92k |
| 20 Aug 2002 | internal alterations to existing office, Level 5, 80 Collins Street Nauru House | $150k |
| 12 Aug 2002 | Level 48 - Internal fitout Alterations - Department of Innovation, Industry and Regional Development | $400k |
| 26 July 2002 | Level 16 (part) - New Mezzanine Floor at Nauru House | $30k |
| 17 July 2002 | Level 26 - Proposed Office fitout for the Department of Infrastructure. | $110k |
| 18 June 2002 | Levels: 33, 34, 37, 38. Alterations and additions | $61k |
| 13 June 2002 | Level 20 (part) - Office Fitout | $15k |
| 31 May 2002 | Level 6, Office Fitout | $680k |
| 20 May 2002 | Level 33 (Part) Office Alterations | $22k |
| 16 May 2002 | Level 43 Office Partition Alterations | $10k |
| 16 Apr 2002 | Level 50 - Office Alterations | $18k |
| 22 Mar 2002 | Level 15 - Alterations to office Partitions and Exit Changes. | $1k |
| 21 Mar 2002 | Level 37 & 38. Tenancy alterations | $5k |
| 19 Mar 2002 | Level 15 - Proposed office fitout | $120k |
| 12 Mar 2002 | Level 21 - Office Fitout. | $5k |
| 11 Feb 2002 | Level 50 Nauru Housegoods lift over run extension & lift motor rooms lvls 52,53 & 54 | $250k |
| 08 Feb 2002 | Level 13, New wall and security door to reception. | $12k |
| 06 Dec 2001 | Level 48 - Alterations to office partition. | $50k |
| 04 Dec 2001 | Alterations to office building Dentist Tenancy alterations. | $3k |
| 26 Nov 2001 | Level 17 - Office Partition Alterations. | $5k |
| 15 Oct 2001 | Alterations to level 29, east of south building for Dept of Infrastructure | $255k |
| 15 Oct 2001 | Alterations to level 36 of existing building (office) | $8k |
| 10 Apr 2001 | Internal office alterations Level 42 | $10k |
| 10 Apr 2001 | Office alterations to level 38 | $7k |
| 22 Mar 2001 | Office alterations to Level 42 for Johnson Taylor Potter | $9k |
| 04 Dec 2000 | Office tenancy fitout to level 48. | $45k |
| 24 Nov 2000 | Security upgrade to egress doors levels 33-38 & 40 -42 | $36k |
| 02 Nov 2000 | New ramp to level 9 Nauru House | $16k |
| 08 Aug 2000 | Proposed Installation of Alarm Signalling Equipment. | $190 |
| 25 July 2000 | STAGE 4 LVL 35 office fitout FIRE SVCS | $35k |
| 13 July 2000 | lvl 47 office fitout | $80k |
| 10 July 2000 | Tenancy fitout on level 46 | $30k |
| 20 June 2000 | Tenancy fitout on level 30 | $130k |
| 30 May 2000 | alteration to office partitions lvl 45 & 48 | $15k |
| 27 Jan 2000 | Partition Fitout level 43 | $25k |
| 20 Oct 1999 | Tenancy fitout to level 30 | $50k |
| 30 Sept 1999 | Office fitout on level 18 | $876k |
| 28 Sept 1999 | Office fitout on level 5 | $110k |
| 02 Sept 1999 | Partition altreations on level 11 | $420k |
| 11 June 1999 | Tenancy fitout on level 48 | $25k |
| 13 May 1999 | Level 28, office internal alterations to existing building (new computer room) | $14k |
| 23 Apr 1999 | Tenancy fitout on level 31 | $125k |
| 14 Apr 1999 | Tenancy alterations on level 24 | $20k |
| 01 Feb 1999 | Office fitout level 46 | $60k |
| 30 Nov 1998 | Construction of lift lobby refurbishment to level 45 | $75k |
| 05 Nov 1998 | Office partition alterations on level 48 | $33k |
| 15 Oct 1998 | Office fitout - floor 6, 82 Collins St, Melbourne | $140k |
| 08 May 1998 | Office partitions on level 48 | $150k |
| 03 Mar 1998 | Refurbishment of existing office | $58k |
| 13 Feb 1998 | Demolition & removal of partitions to level 18 | $19k |
| 13 Feb 1998 | Ground floor lobby upgrade | $1.8m |
| 03 Feb 1998 | Office fitout | $413k |
| 02 Feb 1998 | Lift lobby upgrade | $180k |
| 11 Dec 1997 | Lift lobby upgrade | $54k |
| 08 Aug 1997 | Office fitout on levels 9, 10, 11, 12, 13, 14, 19, 20, 21, 22, 23, 25, 26 and 29 | $2.5m |
| 28 July 1997 | Tenancy fitout | $160k |
| 18 July 1997 | Office fitout on Level 42 | $2k |
| 16 Apr 1997 | Remove internal partitions | $7k |
| 27 Mar 1997 | Alterations to office Level 6 | $8k |
| 19 Mar 1997 | Retail fitout | $23k |
| 06 Dec 1996 | Alterations to partitions on Level 28 | $7k |
| 14 Nov 1996 | Shop fitout | $60k |
| 15 Oct 1996 | Alterations to building | $9k |
| 04 Oct 1996 | Alterations to office on Level 48 | $18k |
| 11 Sept 1996 | Office fitout | $208k |
| 28 June 1996 | Alterations to office partitions | $6k |
| 08 May 1996 | Alterations to existing building | $310k |
| 17 Apr 1996 | Lift lobby upgrade Levels 33-42 | $600k |
| 09 Jan 1996 | Tenancy alterations to Levels 31 and 32 | $700k |
| 08 Mar 1995 | Alterations to existing building | $50k |
| 05 Dec 1994 | Tenancy fitout | $15k |
Is South Tower residential or commercial?
South Tower is a commercial building. The City of Melbourne lists its main use as office.
When was South Tower built?
South Tower was completed in 2020.
How many floors does South Tower have?
South Tower has 40 floors above ground.
What businesses are in South Tower?
The latest council census counted 24 businesses in South Tower, including Anna Thomas Boutique, Ashurst and AXIS COMMUNICATIONS PTY LTD.
Is there office or retail space for lease in South Tower?
See the commercial listings on this page, or search this address on realcommercial.com.au and commercialrealestate.com.au.
Who designed and built South Tower?
QIC Global Real Estate developed South Tower, UNStudio designed it and Multiplex built it. The building team section has the sources.
What public transport is near South Tower?
Parliament Railway Station is the nearest train station, about 4 minutes' walk. The nearest tram stop is 101 Collins St/Collins St #7, about 1 minute's walk.
What is the planning zone for South Tower?
The site is in the Capital City Zone - Schedule 1 (CCZ1).
Has any work been done on South Tower recently?
The City of Melbourne has issued 268 building permits for South Tower since 1994. The most recent was in February 2026.
Sources: City of Melbourne building permits (CC BY 4.0); CLUE building information (CC BY 4.0); CLUE business establishments (CC BY 4.0); Geocoded National Address File (G-NAF) (Open G-NAF EULA (CC BY 4.0 based)). General information from public records, not legal, financial or building advice.