| Completed | 1991 | Bourke Place completed: 52 floors |
Each cost is the estimate on that record. Stages of a project often repeat its full value, so these don't add up to what was spent.
| 28 Aug 2026 | Stage 2 - Internal alterations - Tenancy removal - Level 10, 18, 22,23, 40 | $6.5m |
| 25 May 2026 | Alteration - Clyde & Co Fitout – Bourke Place – Level 10 | $2.1m |
| 22 Apr 2026 | Level 48, 600 Bourke St - Alteration - Tenancy fitout | $1.4m |
| 15 Apr 2026 | Stage 3 - Internal Alterations – Tenancy Fitout - Level 10, 18,23, 40 | $6.5m |
| 26 Feb 2026 | Level 18 - The proposed project is for Chartered Accountants Australia New Zealand (CAANZ) office fitout | $1.4m |
| 14 Jan 2026 | Tenancy 006 VBCX Humble - Alterations (Tenancy Fitout - Spyglass) | $214k |
| 06 Oct 2025 | Tenancy LG01 - Little Dragon - Alteration | $282k |
| 22 Aug 2025 | Construction of Feature Ceiling | $742k |
| 21 Aug 2025 | Level 4 - Tenancy Alterations | $66k |
| 07 Aug 2025 | Bourke Place - Tenancy Fitout – Level 29 | $509k |
| 29 July 2025 | Bourke Place – Fitout Works – Level 48 | $385k |
| 01 July 2025 | Level 41 - Bourke Place Office Fit Out / Alterations | $324k |
| 19 June 2025 | Bourke Place – Fitout Works – Level 21 | $391k |
| 07 Apr 2025 | Level 3 - Tenancy Alterations – Bourke Place | $890k |
| 01 Apr 2025 | Level 10 - Intertenancy Walls Alteration | $256k |
| 25 Mar 2025 | Stage 2 - Levels 10-11 - Completion of all works | $2.3m |
| 17 Mar 2025 | Level 48 - Internal Office Fitout for M3 Property | $1.1m |
| 12 Mar 2025 | Stage 2 - Level 3 - Tenancy alterations | $890k |
| 14 Feb 2025 | Level 46 - Magentus CEO office alteration | $113k |
| 24 Jan 2025 | Level 18 - Alterations to intenancy wall | $126k |
| 19 Dec 2024 | Internal Office Fitout for Barry Nilsson - Stage 1 - Levels 10-11 completion of works, excluding fire hydrants | $2.3m |
| 10 Dec 2024 | Level 48 - Bourke Place - Intertenancy wall works | $140k |
| 26 Nov 2024 | Level 18 - Alterations to intenancy wall | $126k |
| 18 Oct 2024 | Level 34 - Alterations | $341k |
| 26 Sept 2024 | Level 12 - APRA Melbourne - Tenancy Fitout | $3.1m |
| 25 Sept 2024 | Level 15 - Tenancy Fitout | $777k |
| 09 Aug 2024 | FITOUT TO ANZ MELBOURNE - BOURKE PLACE | $998k |
| 17 June 2024 | Stage 2 - Internal alterations to existing tenancy | $880k |
| 29 May 2024 | Bourke Place – Lift Lobby Upgrade – Level 48 | $469k |
| 10 Apr 2024 | Level 25-28, Alterations Stage 1: Early Works - Ceiling demolition and site establishment works | $8.1m |
| 04 Apr 2024 | Level 22 - Internal Alterations Stage 1 - Existing Tenancy Demolition | $880k |
| 21 Feb 2024 | Level 23 - Internal tenancy fitout | $1.2m |
| 21 Feb 2024 | Level 49 - Cachetgroup Zurich Melbourne - Alterations | $2.9m |
| 28 Nov 2023 | Level 25-28, Alterations - Stage 2: Office Fitout - Level 25 to 28 | $8.1m |
| 11 Oct 2023 | Level 20 Tenancy Fitout for Axiom | $935k |
| 09 Oct 2023 | Level 25-28, Alterations Stage 1: Early Works - Ceiling demolition and site establishment works | $8.1m |
| 13 Sept 2023 | Level 23 - Alteration - Tenancy make good | $660k |
| 18 Aug 2023 | Level 35 - Lockton tenancy fitout | $952k |
| 05 May 2023 | Level 7 - Alteration Sonic Health Plus | $279k |
| 03 May 2023 | Level 35 - Office Fitout Alteration | $609k |
| 01 May 2023 | Level 46 - Alteration Office Tenancy | $2.6m |
| 19 Apr 2023 | Level 50 - Alteration - Lobby Extension & Tenancy Split | $469k |
| 20 Feb 2023 | Level 24 - Office fitout - Tilt Renewables | $3.0m |
| 20 Feb 2023 | Level 24 - Office fitout - Tilt Renewables: Stage 2 – Internal Alterations / Fit Out Works to Existing Office Tenancy – Level 24 (Excluding All Other Building Works) | $2.5m |
| 27 Jan 2023 | Level 35 - Tenancy Make Good, Alterations. | $198k |
| 23 Nov 2022 | Level 23 - Alteration - Tenancy make good | $660k |
| 17 Aug 2022 | Stage 2 - Internal Alteration to existing office tenancy – Level 45 (Part) Inclusion of Operable Wall | $702k |
| 25 July 2022 | Level 35 - Make Good and Base Building Upgrade | $974k |
| 10 June 2022 | Office tenancy fitout - Level 45 | $600k |
| 20 May 2022 | Bourke Place - Lift Motor Room Works - Alteration | $200k |
| 12 Apr 2022 | Stage 1 - Internal Alteration to existing office tenancy – Level 45 (Part) Excluding Operatable Wall | $673k |
| 23 Mar 2022 | Internal Office Fitout for Michael Page | $757k |
| 28 Jan 2022 | Stage 3 - Base Building Works - Internal Demolition Works - Level 9-12, Level 24-28, Level 46-48, Level 50, Level 51 | $21.9m |
| 28 Jan 2022 | Stage 4 - Base Building Works - Level 9-12, Level 24-28, Level 46-48, Level 50, Level 51 | $21.9m |
| 06 Dec 2021 | Level 42 - Office fitout | $2.4m |
| 23 Nov 2021 | Internal Alterations to existing office tenancy – Level 19 (Part) Only | $493k |
| 20 Sept 2021 | Stage 2 – Lobby works only | $503k |
| 09 July 2021 | Level 44 & 45. Office Tenancy Fit Out | $2.0m |
| 01 July 2021 | Level 15 - Tenancy Fitout. Bourke Place Project | $555k |
| 21 June 2021 | Alterations Level 9-12, 24-28, 42, 44-51. | $3.4m |
| 30 Apr 2021 | Stage 2 - Conditional – Base Building Works – Level 45 – Lobby Amendments and Intertenancy Walls | $3.8m |
| 19 Apr 2021 | Alteration | $354k |
| 04 Feb 2021 | Level 8: Alterations to Internal Office Wall Layout | $0 |
| 14 July 2020 | Alteration | $66k |
| 03 July 2020 | Tenancy Make Good - Levels 42 to 51 | $1.0m |
| 16 June 2020 | Ground Floor – Demolition – Enabling Works | $26.2m |
| 16 June 2020 | Ground Floor & Lower Ground Floor – Internal Works Only | $26.2m |
| 16 June 2020 | Lower Ground Floor - Enabling Works | $20.0m |
| 16 June 2020 | Stage 4 - Ground Floor & Lower Ground Floor – External Works | $26.2m |
| 16 June 2020 | Variation - Architechtural, Structural and Services Modifications | $27.9m |
| 16 June 2020 | Variation - Structural Modifications | $0 |
| 31 Mar 2020 | Minor Internal Office Alteratoins | $159k |
| 20 Feb 2020 | Tenancy LG03 - Internal Tenancy Fitout for SpudBar | $250k |
| 19 Feb 2020 | Office Alterations | $48k |
| 10 Feb 2020 | Office Alterations - Level 3 | $200k |
| 19 Dec 2019 | Tenancy LG03 - Internal Tenancy Fitout for SpudBar | $250k |
| 27 Nov 2019 | Level 16 - Alteration - Scottish Pacific Fitout, Bourke Place | $193k |
| 01 Nov 2019 | Fit-out to an Existing Tenancy | $261k |
| 11 Sept 2019 | Level 39 - Alteration | $254k |
| 30 Aug 2019 | Stage 2: Lift Motor Room Alterations | $330k |
| 12 July 2019 | Alteration Bourke Place - 600 Bourke Street - Bn Law Refurbishment Level 6 | $770k |
| 28 June 2019 | Level 4 Fitout Works | $600k |
| 14 Mar 2019 | RETAIL TENANCY FITOUT TO SHOP LG08 | $110 |
| 06 Mar 2019 | Alterations to Bourke Place - Retail Works - Stage 4C - Priority 3 | $1.9m |
| 06 Mar 2019 | New goods lift - Lower Ground to Basement Level 3 | $1.4m |
| 06 Mar 2019 | Stage 3 - ATM Zone -Alterations to Bourke Place - Retail Works | $2.0m |
| 01 Mar 2019 | OFFICE FITOUT TO TENANCY LG06 | $250 |
| 31 Jan 2019 | Level 4 - Lobby Refurbishment | $801 |
| 18 Dec 2018 | Bourke Place - Sonic Clinical Services - Alteration | $1.4m |
| 27 Nov 2018 | LG15/16 - Shapes Studio - Alteration -04 | $280k |
| 12 Nov 2018 | Tenancy 2 - Case Meallin Office Fitout | $392k |
| 26 Oct 2018 | Alterations to Bourke Place Retail Refurbishment Works - 600 Bourke Street | $259k |
| 26 Oct 2018 | Stage 2 - Internal Alterations to Upper Ground Retail Areas – Infill Slab | $625k |
| 26 Oct 2018 | Stage 2 - RETAIL ALTERATIONS - EXTERNAL ALTERATIONS - LG13 | $287k |
| 05 Sept 2018 | Level 7 & 8 - Alterations | $2.4m |
| 16 Aug 2018 | Level 18 - Heidrick & Struggles Office Fitout | $163k |
| 14 Aug 2018 | LG04 Basement - Plant Room Alterations | $21k |
| 09 Aug 2018 | Stage 2 - Bourke Place Plaza Lift Lobby Refurbishment & Removal of Fireman's Telephone System | $871k |
| 18 June 2018 | Stage 2 - Level 5 Works - Level 5 & Level 29 - Internal alteations to offices (O-I office fitout) | $750k |
| 04 June 2018 | Alterations to Existing Building | $37k |
| 30 Apr 2018 | Level 7 - Intertenancy Walls Alteration | $200k |
| 19 Apr 2018 | Level 7, Tenancy 3 - Office Fitout | $247k |
| 16 Apr 2018 | Stage 1 - Level 29 Works Only - Level 5 & Level 29 - Internal alteations to offices (O-I office fitout) | $250k |
| 12 Apr 2018 | Alterations to Level 18, 600 Bourke Street, Melbourne | $102k |
| 12 Apr 2018 | Level 22 - Alterations to Bourke Place - 600 Bourke Street - Stage 4E | $499k |
| 19 Mar 2018 | Level 18 & 21 - Office Fitouts | $533k |
| 23 Feb 2018 | Level 20 (part) - Office Fit-Out | $820k |
| 05 Feb 2018 | Level 21 - Alteration to Offices | $779k |
| 02 Nov 2017 | Level 23 - Minor Internal Office Alterations | $38k |
| 27 Oct 2017 | Level 29 Tenancy A - Office Fitout | $473k |
| 13 Oct 2017 | Stag 1 - Retail Upper Ground Floor - Alteration | $577k |
| 10 Oct 2017 | Bourke Place - Level 21 - Intertenancy walls | $100k |
| 27 Sept 2017 | Bourke Place Plaza Lift Lobby Refurbishment & Removal of Fireman's Telephone System | $871k |
| 22 Sept 2017 | Stage 2: Level 32 - Finish remaining building works: construction of smoke lobby doors | $2.4m |
| 08 Sept 2017 | Level 21 - Office fitout | $601k |
| 05 Sept 2017 | BN Law - Level 16 - Alteration | $98k |
| 25 Aug 2017 | Level 41 - Base Building Alterations Additional Lobby Works | $2.6m |
| 18 Aug 2017 | Stage 2 - Infill of stair void - Level 21 | $1.4m |
| 09 Aug 2017 | Proposed tenancy fit out for Oli & Levi | $105k |
| 26 July 2017 | Ground Floor - Internal alterations to existing building | $76k |
| 17 July 2017 | Level 23 - Lift Lobby Refurbishment | $385k |
| 14 July 2017 | Stage 1: Level 32 - Fit out of Attorney General’s Department, excludes construction of smoke lobby doors | $2.4m |
| 21 June 2017 | Alterations to Bourke Place - Lower Ground Floor Amenities Refurbishment | $366k |
| 08 June 2017 | Alteration - Bourke Place Amenities Upgrade, Level 42 & 44 - 50 - Stage 5E, 600 Bourke Street Melbourne | $0 |
| 08 June 2017 | Stage 2 - Internal Alterations to Amenities Areas - Level 50 | $2.4m |
| 10 May 2017 | Stage 2 - Stair Penetration Between Level 32 and Level 33 | $3.6m |
| 10 May 2017 | Stage 3 - Fitout of level 32 (part) level 33 and level 34 | $4.6m |
| 10 Mar 2017 | Level 3 - NTC Fitout - 600 Bourke Street, Melbourne | $1.3m |
| 03 Mar 2017 | Fitout of Level 41 (Part) - Excluding Fire Services | $597k |
| 03 Mar 2017 | Stage 2 - Fitout of Level 41 (Part) - Fire Services | $597k |
| 27 Feb 2017 | Tenancy L04 - Shop Fitout to Sushi Hub | $300k |
| 22 Feb 2017 | Level 7 & 41 Base Building Alterations | $2.4m |
| 10 Feb 2017 | King & Wood Mallesons - Level 49 Café - 600 Bourke Street, Melbourne | $8k |
| 02 Feb 2017 | Level 3 - AMP Office Refurbishment | $150k |
| 16 Jan 2017 | Stage 2 - Completion of Works | $448k |
| 16 Dec 2016 | Level 31 - Bourke Place - Engineers Australia - Additional Works | $70k |
| 16 Dec 2016 | Stage 2 - Additional Works to Level 30 and 31 | $124k |
| 24 Nov 2016 | Level 22 - Alterations to existing building | $300k |
| 21 Nov 2016 | Alterations to Bourke Place Refurbishment - Level 3 - Stage 5D | $1.1m |
| 21 Nov 2016 | Office alterations on level 22 for Interpro | $30k |
| 11 Nov 2016 | Levels 33 & 34 - Alterations - Bourke Place - Office for the Australian Government Solicitor | $3.6m |
| 17 Oct 2016 | Level 18 - Chartered Accountants Fit-out Only | $1.3m |
| 22 Sept 2016 | Stage 5 - Levels 33 and 34 - Base Building fitout | $5.3m |
| 29 July 2016 | Level 18 - Chartered Accountants Fit-out Only | $1.3m |
| 28 July 2016 | Tenancy LG005 - Installation of Kiosk | $125k |
| 28 June 2016 | Alterations to Level 18, 600 Bourke Street, Melbourne | $102k |
| 17 June 2016 | Refurbishment and Fitout - Level 39, 600 Bourke Street | $2.9m |
| 23 May 2016 | Stage 3 - Strip Out Works | $3.2m |
| 13 May 2016 | Alterations to Bourke Place - Level 8, 600 Bourke Street | $1.0m |
| 05 May 2016 | Level 20 - Partitions to create new offices (2) | $13k |
| 26 Apr 2016 | Alterations - Stage 2 Office Alterations - JCP Investment Partners | $398k |
| 26 Apr 2016 | Office Alterations - Level 23 - JCP Investment Partners | $270k |
| 21 Apr 2016 | Stage 2 - All - Internal alteration to level 32 | $2.1m |
| 11 Apr 2016 | Alterations to Bourke Place - 600 Bourke Street - Level 40 - Stage 4a Priority 2 | $810k |
| 11 Apr 2016 | Alterations to Bourke Place - Stage 4B - Levels 32 to 36 | $1.1m |
| 11 Apr 2016 | Stage 4 - Level 35 - Base Building fitout | $3.2m |
| 30 Mar 2016 | Alterations to Level 35, 600 Bourke Street | $800k |
| 02 Mar 2016 | Tenancy LG5 & LG6 - Alterations to Bourke Place - Base Building Works | $80k |
| 15 Feb 2016 | Level 40 Alterations to existing Offices | $99k |
| 10 Feb 2016 | Stage 2 - Fitout Works | $2.9m |
| 20 Jan 2016 | Alterations - FM Global Melbourne, 600 Bourke Street Melbourne | $1.7m |
| 19 Jan 2016 | LG 3 Bourke Place, Proposed Joinery Fitout & Minor Electrical Works to Tattersalls Newsagency | $50k |
| 19 Jan 2016 | Stage 2 - Including FIre Services Works - LG 3 Bourke Place, Proposed Joinery Fitout & Minor Electrical Works to Tattersalls Newsagency | $50k |
| 21 Dec 2015 | STAGE 1 - ALL WORKS EXCLUDING FIRE SERVICES | $306k |
| 17 Dec 2015 | Level 9 - Alterations to existing Office | $823k |
| 15 Dec 2015 | Level 30 - Propsed Office fit out | $350k |
| 18 Nov 2015 | Stage 2 - Levels 30 & 31 - 600 Bourke Street - Engineers Australia - Final - Tenancy Fitout | $5.8m |
| 18 Nov 2015 | Stage 3 - RETAIL ALTERATIONS -INTERNAL ALTERATIONS - LG13 - LESSOR WORKS | $312k |
| 19 Oct 2015 | Levels 30 & 31 (Part) - Alteration / Demolition - 600 Bourke Street - Engineers Australia Fitout | $250k |
| 14 Oct 2015 | Alterations Level 30, 600 Bourke Street Melbourne | $302k |
| 13 Oct 2015 | Alterations to existing Office | $300k |
| 29 Sept 2015 | Internal alterations to Existing Tenancy, Level 24 | $3.0m |
| 10 Sept 2015 | Alterations to Tenancy | $181k |
| 31 Aug 2015 | Stage 2: All - Alterations to Level 18 - Base Building Refurbishment | $699k |
| 27 Aug 2015 | Tenancy fitout - LG17 | $515k |
| 27 July 2015 | Stage 3: Fire Services Approval | $900k |
| 17 July 2015 | Tenancy fitout - LG17 | $250k |
| 10 July 2015 | Alterations - Bourke Place Refurbishment - Stage 4A Levels 18, 30 &31 | $1.6m |
| 19 June 2015 | Stage 4 - Building Services Works | $78k |
| 17 June 2015 | Stage 2 - CONDITIONAL - BASE BUILDING WORKS TENANCY LG 10, LG 11 AND BASEMENT LEVEL 2 | $320k |
| 15 June 2015 | Stage 2: LEVEL 17 - PART FLOOR REFURBISHMENT Stage 4F | $800k |
| 09 June 2015 | Stage 3 - External Awning Signage | $638k |
| 01 June 2015 | Level 5 - Bankwest office fitout | $2.0m |
| 01 June 2015 | Stage Two: To completion of all works | $1.9m |
| 25 May 2015 | Stage 2 - Fit-Out for Basement Stock Room & Ancillary Areas) - Additions & Alterations for Woolworths | $638k |
| 20 May 2015 | Stage 2: Architectural & Services Excluding Fire Hydrant & Hose Reels. Level 22 - Office Fit-Out Bank of Tokyo | $900k |
| 18 May 2015 | Bourke Place - 600 Bourke Street - Level 17 - Stage 4F - Alterations | $800k |
| 18 May 2015 | Level 22 - Office Fit-Out Bank of Tokyo | $300k |
| 14 May 2015 | Stage 1: INTERNAL DEMOLITION WORKS TENANCY LG11 & BASEMENT LEVEL 2 | $320k |
| 04 May 2015 | Stage 1, Internal Alterations & Fit-Out Only - Excludes Any External Shopfront Works & Base Building Works to the Basement | $638k |
| 16 Feb 2015 | Alterations to Level 29 Tenancy, 600 Bourke Street | $579k |
| 02 Feb 2015 | Tenancy 1, Level 20, Internal office fit-out | $173k |
| 16 Jan 2015 | LG09 - Tenancy Fitout Nashi | $128k |
| 13 Jan 2015 | STAGE 2 - Final - conditional | $306k |
| 03 Nov 2014 | Alterations - Bourke Place - Level 29 Tenancy Split | $95k |
| 31 Oct 2014 | Internal Tenancy Fitout for Kale | $150k |
| 21 Oct 2014 | Level 25 Alterations to existing Office | $922k |
| 16 Oct 2014 | Alterations - Level 20, 600 Bourke Street Melbourne | $630k |
| 25 Aug 2014 | Ground Level, Internal Tenancy Fit-Out for Mistress Bourke & The King | $161k |
| 13 Aug 2014 | Alterations - Level 17, 600 Bourke Street Melbourne | $210k |
| 08 Aug 2014 | Stage 2A conditional: LEVEL 4, 5, 16 AND 23 - Bourke Place Refurbishment | $104.2m |
| 31 July 2014 | Alterations to Bourke Place - Level 20 | $600k |
| 31 July 2014 | Ground Floor - Bourke Place - Refurbishment, Lobby Works | $300k |
| 29 July 2014 | Alterations to ANZ Bank Tenancy - 600 Bourke Street | $834k |
| 23 July 2014 | Alterations to ANZ Bank Tenancy - 600 Bourke Street | $834k |
| 11 June 2014 | Alterations to existing Office Level 9 | $620k |
| 28 May 2014 | Alterations to Bourke Place - Level 9 and 19 | $2.0m |
| 24 Jan 2014 | Stage 2E Works - Level 20 & 29 Bourke Place Refurbishment | $15.1m |
| 19 Dec 2013 | STAGE 1 - INTERNAL STRIP OUT Level 17 | $200k |
| 01 Nov 2013 | Internal office fitout alterations to building Level 43 | $2.3m |
| 25 Sept 2013 | Alterations to Level 15 - Wootton Kearney | $1.3m |
| 06 Sept 2013 | Level 17 office fit out Tenancy B | $154k |
| 08 Aug 2013 | Office fitout Level 17 | $154k |
| 01 Aug 2013 | Stage 2: Final - Conditional - Internal Fitout | $200k |
| 29 July 2013 | Internal office fitout alterations to building Level 43 | $2.3m |
| 04 July 2013 | Installation of an Antenna | $35k |
| 20 June 2013 | Alterations | $180k |
| 20 June 2013 | Stage 4: Basement Amenities - Bourke Place Refurbishment | $10.4m |
| 24 Jan 2013 | Alterations to Offices - Part of Level 17, QPL Limited Tenancy | $9k |
| 22 Aug 2012 | Alterations - Ground Floor Control Room | $200k |
| 07 July 2012 | Shop fit out to existing shop | $5k |
| 04 July 2012 | Stage 2: Alterations | $1.1m |
| 03 July 2012 | Minor tenancy alterations to Level 5 - North East corner. | $5k |
| 23 May 2012 | Stage 2: All works to completion. Internal office fitout Level 6 | $1.1m |
| 21 May 2012 | Office fitout to Tenancy Level 16 | $320k |
| 11 May 2012 | Stage 2: All works to completion. Internal office fitout | $518k |
| 01 May 2012 | Internal office fitout Level 12 Stage 1 | $518k |
| 27 Apr 2012 | Internal office fitout Level 6 | $0 |
| 27 Apr 2012 | Stage 3: Conditional - Level 10, 11, 12, 15, 18, 22, 24,25, 26, 27, 28, 43 | $9.2m |
| 18 Apr 2012 | Tenancy alterations Level 5 | $60k |
| 28 Mar 2012 | Minor internal office alterations Level 22 (Bank of Tokyo Mitsubishi) | $605k |
| 27 Feb 2012 | Tenancy fitout Level 3 | $112k |
| 17 Feb 2012 | Tenancy alterations Level 17 | $47k |
| 18 Oct 2011 | Additions & alterations Level 4 & 5 | $125k |
| 15 July 2011 | Works to be carried out on Level 48 | $76k |
| 11 July 2011 | Alterations - Java Cafe | $150k |
| 27 June 2011 | Retail Fitout Alterations Level 8 | $21k |
| 24 May 2011 | Alterartions - Smoke Detection Relocation. | $10k |
| 19 May 2011 | Tenancy alterations Level 20 & 21 | $348k |
| 09 Mar 2011 | Office fitout on level 24 | $75k |
| 07 Dec 2010 | Tenancy alterations; Office building level 24 & 26 | $20k |
| 21 Oct 2010 | PROPOSED OFFICE PARTITION ALTERATIONS TO EXISTING TENANCY - LEVELS 24, 26 & 28 | $35k |
| 13 Oct 2010 | UPGRADE EXISTING EWIS SYSTEM | $307k |
| 18 Aug 2010 | Level 17: internal alterations to an existing building. | $55k |
| 23 Apr 2010 | Level 23 - Office Partitioning | $40k |
| 12 Apr 2010 | Level 18 Office fitout | $140k |
| 12 Mar 2010 | Bank West - Level 4 - Alterations | $75k |
| 29 Oct 2009 | Minor alterations to existing tenancy Level 5 | $20k |
| 26 Oct 2009 | An internal office fitout on level 11 | $140 |
| 02 Oct 2009 | Make good stairs in commercial office | $52k |
| 29 June 2009 | ALL - INTERNAL OFFICE FIT OUT | $202k |
| 15 June 2009 | Alteration to Office - Internal Fitout Level 22 | $498 |
| 13 Mar 2009 | Office partitioning | $26k |
| 30 Jan 2009 | Alterations to an existing building, office fitout level 17 (part) | $285k |
| 15 Aug 2008 | Alterations on Level 15 for office partitioning | $18k |
| 01 Aug 2008 | Construction of an internal shop fit out - 'Sui Hair' (Shop LG14). | $60k |
| 07 July 2008 | Alterations to an existing building - Lobby Level 23 (part) | $88k |
| 26 Mar 2008 | Internal alterations part Level 4 | $664k |
| 15 Feb 2008 | Alterations. Bourke Place Screen | $20k |
| 14 Dec 2007 | Office partition fitout Level 3 | $11k |
| 05 Dec 2007 | Office partitioning to Level 22, non-habitable. | $25k |
| 24 Sept 2007 | Electrical alterations- Emergency & exit sign lighting upgrade: Basement L4-L1, Upper Ground L1-L2, Lower ground-Upper Ground, Levels 3-53 | $460k |
| 29 Aug 2007 | Office fitout Level 8 | $1.2m |
| 17 Aug 2007 | Tenancy office fitout Level 23 | $808k |
| 03 Aug 2007 | Internal stripout Level 3 Stage 1 | $130k |
| 27 July 2007 | Alterations to office. Stage 2: Internal fitout on Level 3 (part). | $130k |
| 03 July 2007 | Alterations-Fitout works Level 19 | $110k |
| 14 June 2007 | Partial tenancy fitout Level 24 | $120k |
| 31 May 2007 | Office partitioning Level 22 | $22k |
| 04 May 2007 | AMP alterations to an existing building, level 8 lobby upgrade | $95k |
| 12 Apr 2007 | Temporary workstations. Alteration to office, Level 19 (part). | $5k |
| 22 Mar 2007 | Internal alterations Shop LG2 | $12k |
| 04 Jan 2007 | Radius Office fit-out, alterations to existing building. | $35k |
| 31 Oct 2006 | Alterations to office, tenancy fitout level 18. | $75k |
| 31 Oct 2006 | Internal office fitout for HBOSA level 5. To completion of level 5 internal office fitout. | $800k |
| 12 Oct 2006 | HBOSA office fitout - partition removal level 5. | $43k |
| 11 Oct 2006 | Alterations to exit lights and door hardware, tenancy fitout. | $3k |
| 04 Oct 2006 | HBOSA part demolition and office fitout level 4. Alterations to an existing office building level 4. | $20k |
| 28 Sept 2006 | APES Board - fitout. Office fitout alterations to an existing building, level 7 (part). | $169k |
| 28 Sept 2006 | Lander & Roger fitout. Alterations to office, level 12 (pt). | $332k |
| 26 July 2006 | Office fitout alterations to an existing building , Level 7 - Stage 2 - All works to completion | $750k |
| 24 May 2006 | Alterations to Little Bourke St. new canopy & entry. Services only. Retail construction ground floor. | $200k |
| 19 May 2006 | Alterations to Little Bourke street new canopy & entry. Retail constructions ground floor. | $200k |
| 12 Apr 2006 | Internal office fit out for H Bosa level 6 | $1.0m |
| 16 Mar 2006 | Level 19 & 20 600 Bourke St | $80k |
| 20 Jan 2006 | Proposed tenancy fitout to existing building; Office fit-out to existing tenancy on level 9 | $1.0m |
| 20 Dec 2005 | level 39 office fitout | $50k |
| 09 Dec 2005 | Alterations, office fitout to level 20 | $674k |
| 29 Nov 2005 | tenancy fitout | $132k |
| 25 Nov 2005 | Fitout | $60k |
| 09 Nov 2005 | Internal partition alterations -Level 39, 600 Bourke St. | $57k |
| 04 Nov 2005 | fitout to tenancy | $14k |
| 25 Oct 2005 | Office fitout Level 18 | $900k |
| 05 Sept 2005 | Stage 1: works - excluding structural signage works | $144k |
| 22 Aug 2005 | Shop G12, 600 Bourke Place - Tenancy fitout of a food premises. | $79k |
| 05 July 2005 | internal alterations | $30k |
| 15 June 2005 | Stage 2- Level 10 Architectural | $87k |
| 03 June 2005 | Internal alterations Level 32 North | $1.0m |
| 03 June 2005 | shop fitout LG15 - Daishou Teppanyaki | $43k |
| 24 May 2005 | Internal tenancy & storeroom fitout LG17 & LG20 | $50k |
| 18 May 2005 | Shop fitout LG 8 | $5k |
| 16 May 2005 | Alterations Level 25 | $7k |
| 21 Apr 2005 | office fit-out | $60k |
| 18 Apr 2005 | office partition fitout on level 19 | $636k |
| 18 Apr 2005 | stage 1 - strip-out | $87k |
| 30 Mar 2005 | Office partition fitout Level 22 | $65k |
| 17 Mar 2005 | Installation of new government telecommunication facility - level 37 | $70k |
| 16 Feb 2005 | Tenancy fitout Shop LG16 | $194k |
| 03 Feb 2005 | Internal alterations Level 3 | $743k |
| 07 Nov 2004 | alterations to an existing building on level 50 (boardroom) | $102k |
| 05 Nov 2004 | Alterations to building. LG9 shop fitout. | $300k |
| 01 Nov 2004 | Fitout works Tenancy UG8 | $70k |
| 01 Nov 2004 | Internal tenancy fitout LG 12 | $50k |
| 07 Sept 2004 | Office Fitout to an Existing Building. Level 29 | $850k |
| 26 Aug 2004 | Internal Alterations for level 30 to 31 | $2.3m |
| 20 Aug 2004 | Stage 1: removal Works. Fitout to office level 4 (part) & 5 | $85k |
| 03 Aug 2004 | Alterations to existing building. Tenanacy fitout for levels 32 to 36. | $7.8m |
| 19 July 2004 | Fitout shop LG 18 | $100k |
| 08 July 2004 | Internal office alterations Level 22 Part | $375k |
| 02 July 2004 | Tenancy LG 11 Fitout | $59k |
| 28 June 2004 | office partitions on level 15 | $10k |
| 09 June 2004 | Fire Isolated stair Re-entry | $398k |
| 07 Apr 2004 | Level 41 alterations to building. Stage 1-Internal demolition and partitions | $250k |
| 09 Mar 2004 | Alterations to building. Stage 2-Internal demolition works (excluding core) | $25k |
| 22 Jan 2004 | Alterations to building. Stage 1 - Construction of temporary fitout Level 46 (Part) | $25k |
| 22 Dec 2003 | Variation - Conditional - Demolition of Level 11 (part) Rooms 11.24a, 11.24b, 11.25 to 11.27 | $552k |
| 07 Nov 2003 | Shop LG7 at 600 Bourke Street, Flight Centre fitout | $41k |
| 30 Sept 2003 | Level 23 Fitout of office for Jardine Capital Partners. | $40k |
| 27 Aug 2003 | Demolition of a building. Stage 1: Hazardous Material Removal, non-structural demoliton works only. Basement - Roof | $650k |
| 15 Aug 2003 | Variation - Conditional - Demolition of Level 11 (part) Rooms 11.03A, 11.03B & 11.4 | $516k |
| 21 July 2003 | alterations to an office on level 44 for BHP Billiton | $45k |
| 21 July 2003 | Alterations to Office Level 43 Partition Alterations. 600 Bourke Street Melbourne 3000. Cost $10,000 | $10k |
| 21 July 2003 | Level 28 & Level 45 Alterations to an existing building Partition. | $8k |
| 21 July 2003 | level 48 office alterations for BHP | $18k |
| 21 July 2003 | Level 9, North - Office Fitout. | $35k |
| 21 July 2003 | partition alterations on level 42 | $4k |
| 21 July 2003 | partition alterations on level 46 | $12k |
| 11 June 2003 | Conditional - Stage 2 Demolition of Level 12 (Part) and Level 18 (part) - of an office building | $492k |
| 27 Mar 2003 | Stage 1 Demolition Level 12 | $378k |
| 17 Jan 2003 | Variation (Balance of Level 28 Works). Levels 24-28 of Gaden Lawyers Office Fitout. | $1.1m |
| 21 Oct 2002 | Alterations to an existing building (partition fitout - 600 Bourke Street, Melbourne | $5k |
| 13 Oct 2002 | office partitions on level 29 | $8k |
| 26 Sept 2002 | Stage 2: levels 24, 26, 27, 28 office fit out for Gadens Lawyers | $1.1m |
| 10 Sept 2002 | Gaden Lawyers Office Fitout - Level 25 | $1.1m |
| 11 July 2002 | Level 11 - Office Alterations | $130k |
| 28 Mar 2002 | office fitout on level 16 for Jones Lang La salle | $26k |
| 28 Feb 2002 | Level 18 - Alterations to Office | $100k |
| 20 Dec 2001 | Level 17 - Partition alterations to office building. | $12k |
| 18 Dec 2001 | Level 12 (Partial) Fitout. Permit Conditions | $330k |
| 18 Dec 2001 | Level 9 - Office partition alterations. Level 8 - Plumbing work. | $10k |
| 07 Sept 2001 | stage 2: levels 20 and 21, Jones Lang La salle, alterations to offices and to lift lobby (to completion) | $100k |
| 05 Sept 2001 | Office partition fitout to existing tenancy on level 17 | $43k |
| 30 Aug 2001 | a fit out to shop G5 fitout on the ground floor (Java Food) | $100k |
| 21 June 2001 | stage 1 office fitout (excluding lobby area). | $1.4m |
| 20 June 2001 | Level 11 office alterations | $20k |
| 08 May 2001 | Stage 1: Internal strip out of a projection room, non structural, on level 50 | $63k |
| 22 Mar 2001 | stage 1 alterations to office level 15 - St. Paul tenancy | $19k |
| 23 Feb 2001 | alterations to office partitons on level 45, 600 Bourke Street, Melbourne | $49k |
| 16 Jan 2001 | Office partition alterations to existing tenancy on level 10 | $12k |
| 25 Nov 2000 | Floor 9 office alterations | $15k |
| 17 Oct 2000 | office partitions on level 41 | $8k |
| 06 Oct 2000 | level 44 office partititions | $210k |
| 22 Sept 2000 | levels 36 & 45 office alterations to partitions & services | $65k |
| 13 Sept 2000 | alterations to an office on level 16 | $11k |
| 07 Sept 2000 | office partition alterations to an existing tenancy on level 17 | $33k |
| 21 Aug 2000 | Stage 4: alterations on levels 3 and 9, 600 Bourke Street, Melbourne | $9k |
| 17 July 2000 | Stage 3: alterations on levels 3 & 9, 600 Bourke Street, Melbourne | $9k |
| 21 June 2000 | partition alterations on level 16 | $12k |
| 02 June 2000 | alterations to an existing building | $90k |
| 03 May 2000 | Internal stripout in preparation for tenancy fit out | $436k |
| 17 Apr 2000 | Level 10 Office fitout | $90k |
| 12 Apr 2000 | Office alterations on level 51 | $11k |
| 21 Feb 2000 | Full alterations on level 24 | $70k |
| 25 Jan 2000 | Tenancy fitout on level 18 | $32k |
| 14 Jan 2000 | Stage 1 - Office partition alterations on level 20 Construction of partitions | $318k |
| 08 Nov 1999 | Deletion of fire hydrant flat fire hoses | $500 |
| 26 Aug 1999 | Level 15 office partition alterations to Saxby Bridge pty Ltd tenancy | $8k |
| 24 June 1999 | Internal alterations on level 23 | $30k |
| 26 May 1998 | Fitout for Energy Australia on level 16 | $52k |
| 26 May 1998 | Partitions on level 20 - stage 1 | $21k |
| 27 Mar 1998 | Office partition fitout Level 18 | $162k |
| 12 Feb 1998 | Building & fitout works on level 22 & 23 | $20k |
| 08 Dec 1997 | revolving doors | $212k |
| 30 Oct 1997 | Partition alterations to north west tenancy on level 17 - Stage 1 Construction of partitions | $60k |
| 21 Oct 1997 | Partitions on Level 20 and new stairs connecting Levels 19 & 20 | $290k |
| 23 Apr 1997 | Office fitout alterations | $20k |
| 17 Apr 1997 | Replacement of duct walls Level 40 | $10k |
| 27 Feb 1997 | Office partition fitout to north western tenancy on level 15 | $67k |
| 07 Aug 1996 | Partition fitout on Level 15 | $20k |
| 08 July 1996 | Level 24 - Mitsui tenancy fitout | $30k |
| 17 June 1996 | Stage 1 - All works, excluding mechanical, sprinkler and fire services to offices on level 15 | $40k |
| 12 June 1996 | Fitout to Level 18 for Bank of Tokyo, Mitsubishi. | $130k |
| 01 Mar 1996 | Level 17 - New wall between offices | $5k |
| 26 Feb 1996 | Tenancy fitout to cafe. Ground Floor. | $60k |
| 08 Sept 1995 | Fitout to Level 16 office | $25k |
| 10 May 1995 | Tenancy fitout to part Level 10 (North East Corner) | $38k |
| 05 May 1995 | Ground Floor - Alterations to two revolving doors. | $200k |
| 20 Mar 1995 | Alteration to an exisitng roof mounted communications tower. Existing antenna structure. Roof Level Only. | $20k |
| 13 Feb 1995 | Fitout to Level 17 | $90k |
| 16 Jan 1995 | Partition fitout | $95k |
| 27 Oct 1994 | Part of Level 10 - Partition fitout | $40k |
Is Bourke Place residential or commercial?
Bourke Place is a commercial building. The City of Melbourne lists its main use as office.
When was Bourke Place built?
Bourke Place was completed in 1991.
How many floors does Bourke Place have?
Bourke Place has 52 floors above ground.
What businesses are in Bourke Place?
The latest council census counted 57 businesses in Bourke Place, including ALLEN AND CLARKE CONSULTING PTY LTD, ANZ Bank and ASRWEALTH PTY LTD.
Is there office or retail space for lease in Bourke Place?
See the commercial listings on this page, or search this address on realcommercial.com.au and commercialrealestate.com.au.
Who designed and built Bourke Place?
Godfrey & Spowers designed Bourke Place and Probuild built it. The building team section has the sources.
How tall is Bourke Place?
About 203 metres, measured from the City of Melbourne's 3D building model. It's number 20 of 1596 buildings in Melbourne by height.
What public transport is near Bourke Place?
Southern Cross Station is the nearest train station, about 5 minutes' walk. The nearest tram stop is William St/Bourke St #3, about 2 minutes' walk.
What is the planning zone for Bourke Place?
The site is in the Capital City Zone - Schedule 1 (CCZ1).
Has any work been done on Bourke Place recently?
The City of Melbourne has issued 235 building permits for Bourke Place since 1994. The most recent was in May 2026.