| Completed | 1972 | 570 Bourke completed: 32 floors |
Each cost is the estimate on that record. Stages of a project often repeat its full value, so these don't add up to what was spent.
| 05 Mar 2026 | Fitout works on level 22 - Additions and alterations to an existing building | $272k |
| 03 Dec 2025 | Level 1 - End of trip upgrade work to ambulant toilets | $289k |
| 13 Nov 2025 | Level 23 - Tenancy fit out | $1.5m |
| 24 Oct 2025 | Tenancy G14 - Proposed alterations to existing retail | $100k |
| 23 Oct 2025 | Level 16 - Internal Office Alterations | $32k |
| 22 Oct 2025 | Levels 18 & 30, Internal tenancy fitouts - Stage 2: All remaining works excluding exit travel distances | $5.3m |
| 03 Sept 2025 | Levels 18 & 30, Internal tenancy fitouts - Stage 1: Levels 18 & 30 Demolition Only | $5.3m |
| 16 June 2025 | Stage 3 - Ground floor works (including external works) | $5.1m |
| 15 May 2025 | Level 7 - Installation of booth | $11k |
| 22 Mar 2025 | Stage 1 – Ground Floor Lobby Demolition Works to Existing Office Building | $5.1m |
| 31 Jan 2025 | Stage 2 - Ground floor lobby fitout works (excluding external works) | $5.1m |
| 20 Dec 2024 | Level 19 - Office Fit out | $236k |
| 18 Dec 2024 | Stage 3 - Demolition and refurbishment works to levels 22 and 27 | $3.3m |
| 29 Nov 2024 | Services Australia Alterations on Level 7 Design Hub | $572k |
| 26 July 2024 | Stage 2 - Internal refurbishment of levels 14 & 31 only | $2.5m |
| 17 July 2024 | Level 14, 22, 23, 27, & 31 - Internal fitout works | $2.5m |
| 16 May 2024 | Level 12 - Tenancy A - Internal alteration - proposed fitout | $99k |
| 28 Feb 2024 | Internal Office Fitout for Marubeni Itochu Steel | $660k |
| 01 Sept 2023 | Internal alterations to an existing building. | $429k |
| 01 Sept 2023 | Internal Office Alterations (Stage One - To Completion of All Works, Excluding Electrical and Mechanical Services) | $429k |
| 01 Sept 2023 | Levels 18, 20, 21, 25, 26, 28 - 30 - Internal tenancy fitout works. | $1.9m |
| 14 Apr 2023 | Internal Office Alterations (Stage One - To Completion of All Works, Excluding Electrical and Mechanical Services) | $429k |
| 14 Feb 2023 | Construction of alterations to an existing building | $30k |
| 07 Feb 2023 | Level 29 - Commercial office fitout | $1.5m |
| 26 Oct 2022 | Level 15 - Alteration | $1.0m |
| 16 Mar 2022 | ASE replacement | $2k |
| 23 Sept 2021 | Additions and Alterations to Fire Sprinkler System in Existing Building | $178k |
| 13 July 2021 | Level 8 - Tenancy alterations | $380k |
| 10 Nov 2020 | Level 19 - Internal Tenancy Fitout | $0 |
| 07 Aug 2020 | Level 20 - Tenancy Fitout | $0 |
| 03 June 2020 | Level 25. Proposed alterations to existing office tenancy | $0 |
| 30 Apr 2020 | Level 19. Proposed Office tenancy establishment works | $45k |
| 14 Apr 2020 | Additions and Alterations to Fire Sprinkler System in Existing Building | $59k |
| 06 June 2019 | Level 14 - Stage 1 - Construction of partitions (excludes relocation of fire hose reels and hydrants) | $900k |
| 03 May 2019 | Alteration to Office Tenancy | $19k |
| 26 Apr 2019 | Fit-out works to Level 7 | $523k |
| 15 Jan 2019 | Level 9-13 - Fitout / Alterations to existing building | $1 |
| 11 Jan 2019 | Stage 2 - Tenancy A and C | $900 |
| 18 Dec 2018 | Alterations to FIP ASE Unit | $240 |
| 13 Nov 2018 | Level 14 - Internal Office Fitout for Acumen | $309 |
| 29 June 2018 | Level 16 - Internal Fit-Out Works | $1.1m |
| 12 June 2018 | Level 27 - Internal Office Fitout for Fusion5 - Stage One - All Works Excluding Services | $557k |
| 29 May 2018 | Level 27 - Internal Office Fitout for Fusion5 - Stage 2 - To Completion of All Works) | $557k |
| 21 May 2018 | Level 13-30 - Make Good Works | $2.0m |
| 10 May 2018 | Level 17 - Compass Office Fitout | $1.2m |
| 10 May 2018 | Level 17 - Stage 2 - Services fit out | $1.2m |
| 04 May 2018 | Part Ground Floor - Internal Tenancy Fitout for Saron Beteramoia (Amendment: To permit reduced Path of Travel to an Exit) | $198k |
| 14 Mar 2018 | Level 16, 17 & 27 Internal Demolition, Lobby Alterations new DDA Toilet on each floor (excludes deletion of smoke lobbies), Base Building Refurbishment & Make Good Works | $2.0m |
| 19 Feb 2018 | Level 16, 17 & 27 Internal Demolition, Lobby Alterations new DDA Toilet on each floor (excludes deletion of smoke lobbies), Base Building Refurbishment & Make Good Works | $2.0m |
| 19 Dec 2017 | Level 18 - Internal office alterations | $900k |
| 15 Dec 2017 | Alterations & Fit Out Works to Level 22 & 23 | $1.9m |
| 08 Dec 2017 | Level 2 - Internal Alterations to Victorian Ombudsman Office | $150k |
| 10 Oct 2017 | Level 21 - Office Fit Out | $111k |
| 05 Sept 2017 | Stage 2: Level 12 - Internal Non-Structural Fitout Building Works to Office Community Space Only - To Permit the Installation of Fire Hydrants and Fire Hose Reels | $450k |
| 19 June 2017 | Level 19 - Make good and fit out | $248k |
| 13 June 2017 | Level 31 - Ensure Recruitment Office Fitout | $141k |
| 01 June 2017 | Stage 1: Level 12 - Internal Non-Structural Fitout Building Works to Office Community Space Only - Completion of all internal non-structural fitout works (Excluding Installation of Fire Hydrants and Fire Hose Reels) | $450k |
| 12 Apr 2017 | Levels 9, 10, 11 & 12 - Alterations to existing building | $7.6m |
| 17 Mar 2017 | Level 31 - Air China Inter-Tenancy Office Works | $135k |
| 16 Mar 2017 | Level 26 - Internal office alterations | $75k |
| 06 Mar 2017 | Level 13 to 17,19, 23, 27 & 31 - Lobbies & amenities refurbishment - (excluding fire performance solution for extended travel distances to Level 13 -16 - Option not taken up) | $2.2m |
| 23 Jan 2017 | Level 6 (North), Make Good Works | $214k |
| 18 Nov 2016 | (Level 31) Refurbishment | $30k |
| 04 Nov 2016 | Proposed base building upgrades to tenancy - Sakura Lounge | $200k |
| 26 Oct 2016 | Tenancy T03 & T05 Ground & First Floor - Proposed fitout to Sakura Lounge | $375k |
| 18 Oct 2016 | Level 13 to 17,19, 23, 27 & 31 - Lobbies & amenities refurbishment - (excluding fire performance solution for extended travel distances to Level 13 -16 - Option not taken up) | $2.2m |
| 20 Sept 2016 | Stage 2 - Alterations to and fitout of Levels 6 & 7 Only | $4.9m |
| 15 Aug 2016 | Victorian Ombudsman Office Fitout | $2.7m |
| 12 Aug 2016 | Stage 1 - Internal alterations excluding works to southern meeting room partitions | $2.6m |
| 12 Aug 2016 | Stage 2 - Remainder of Works - Complete Fit Out | $2.6m |
| 08 Aug 2016 | Stage 1 - Level 1 of 3 floor fitout - Levels 5, 6 & 7 - Alterations and Fitout | $3.0m |
| 02 Aug 2016 | internal alterations | $13k |
| 18 July 2016 | 18 - Guard Room - New building | $15k |
| 16 June 2016 | Stage 2 - Remainder of Works - Complete Fit Out | $2.6m |
| 03 June 2016 | Stage 1 - Internal alterations excluding works to southern meeting room partitions | $2.6m |
| 26 May 2016 | Levels 3 & 4 - Alterations and fitout of offices | $125k |
| 26 May 2016 | Stage 2 - All remaining works, including alterations to services - Levels 3 & 4 - Alterations and fitout of offices | $6.7m |
| 06 May 2016 | Ground Floor - Proposed refurbishment works of proposed security office | $100k |
| 18 Mar 2016 | Office Fit-Out | $856 |
| 21 Dec 2015 | Fit out of Office Tenancy (Level 19 & 29) | $829k |
| 30 Oct 2015 | Satge 2: Tenancy Fit-out | $0 |
| 05 Aug 2015 | Tenancy Fit-out | $1.9m |
| 10 July 2015 | Level 19 & 24: Base Building Works | $77k |
| 10 July 2015 | Level 24: Base Building Works | $115k |
| 29 May 2015 | Stage 4 - Alterations and extensions to Floor Plates | $81.5m |
| 29 May 2015 | Stage 6 - Alterations and extensions to Floor Plates | $81.5m |
| 29 May 2015 | Stage 9: Architectural Building Permit (Internal), Office extension | $81.5m |
| 05 May 2015 | Tenancy 02: Construction of internal shop fitout - The Common | $250k |
| 15 Jan 2015 | Level 26- Office Fitout | $30k |
| 18 Dec 2014 | Level 28, Internal office alterations | $20k |
| 12 Dec 2014 | Stage 8: Architectural Building Permit (Internal), Office extension | $25.8m |
| 21 Oct 2014 | Stage 7- Building Services | $81.5m |
| 28 July 2014 | Stage 4 - Alterations and extensions to Floor Plates | $0 |
| 19 June 2014 | Stage 3 - Structural works (columns, connections, L1 & L2 slab, concrete to G-L1, L1 & 2 steelwork, L3 grillage, steel truss and concrete columns). | $81.5m |
| 22 May 2014 | Demolition, foundations, basement structure and basement services diversion works | $8.3m |
| 14 May 2014 | Stage 2 - Services Diversion Works | $81.5m |
| 27 Nov 2013 | Office fitout Part Level 25 | $60k |
| 26 Oct 2013 | Office fitout Level 31 | $11k |
| 25 Oct 2013 | Stage 2: Fire Services Installation to Level 27 Only - Minister of Finance - Internal Office Fitout Levels 23 & 27 | $969k |
| 11 Oct 2013 | Minister of Finance - Internal Office Fitout Levels 23 & 27 | $916k |
| 04 Oct 2013 | Alterations to building Level 20 | $52k |
| 28 Aug 2013 | Interanl alterations to office building at Level 26 & 30 | $2.1m |
| 16 Aug 2013 | Level 25 Stage 1 - Construction of tenancy separating walls and associated services only. | $1.2m |
| 04 June 2013 | Internal Office Fitout - level 24 | $45k |
| 20 Feb 2013 | Alterations / Make Good - Level 27 | $226k |
| 19 Dec 2012 | Internal Alterations - Level 18 | $21k |
| 02 Aug 2012 | Stage 2: Office fitout Amended cost of works Internal alterations Level 18 | $442k |
| 27 June 2012 | Stage 1: Strip out - Internal alterations Level 18 | $36k |
| 03 Apr 2012 | Level 17 - Alterations | $15k |
| 23 Mar 2012 | Level 17 - Alterations | $15k |
| 22 Dec 2011 | Stage 1: Office Alterations - Part Level 31 | $955k |
| 09 Dec 2011 | Office fitout Level 31 | $72k |
| 22 Sept 2011 | Proposed alterations to existing office tenancy on Level 29 | $400k |
| 01 Sept 2011 | Office Alterations, Stage 2, Part Level 18, 25-27 | $955k |
| 01 Sept 2011 | Office Tenancy fitout Level 31 (Air China) | $60k |
| 24 June 2011 | Office partition alterations ground & mezzanine levels | $140k |
| 16 June 2011 | Office defit Levels 25 & 26 & part office defit Level 27 | $320k |
| 03 Feb 2011 | CHARTER HALL MELBOURNE OFFICE ALTERATIONS | $9k |
| 21 Dec 2010 | Level 19 & 24 VIT - Fit Out | $500k |
| 20 Oct 2010 | Alterations Levels 22 & 29 | $442k |
| 12 Aug 2010 | Office fitout Level 21 | $164k |
| 20 Apr 2010 | Amendment to Stage 2: Rectify incorrect building permit Issue Date. (Level 8 - Internal Fit-out Works Fire Service. Internal alterations and fit-out for Japanese Consulate Generals Office) | $0 |
| 20 Apr 2010 | Level 8 - Internal alterations and fit-out for Japanese Consulate Generals Office. | $1.0m |
| 20 Apr 2010 | Stage 2: Level 8 - Internal Fit-out Works Fire Service. Internal alterations and fit-out for Japanese Consulate Generals Office. | $1.0m |
| 07 Apr 2010 | Level 28 / 570 Bourke St: Office Fitout (Amendment : Increased cost of works) | $305k |
| 19 Mar 2010 | Level 28 / 570 Bourke St: Office Fitout. | $100k |
| 09 Mar 2010 | Stage 2 - Alterations & Services. Level 18 - Charter Hall Office Fitout | $160k |
| 01 Mar 2010 | Level 18 - Charter Hall Office Fitout | $160k |
| 01 Dec 2009 | Alterations to Office Level 31 | $10k |
| 12 Oct 2009 | EMC2 Fitout Works | $600k |
| 04 May 2009 | Alterations Level 27 | $66 |
| 04 Feb 2009 | Alteration to existing Office (internal minor works) 31 / 570 Bourke Street MELB | $10k |
| 20 Jan 2009 | Office fitout - Itochu Level 28, 570 Bourke Street Melbourne | $270k |
| 18 Nov 2008 | Office Internal Demolition Part Level 8 only | $200k |
| 11 Nov 2008 | Amenities Upgrade (Ground, Levels 27 & 28) & Lift Lobby Upgrade(Levels 27 & 28) - 570 Bourke Street MELB | $844k |
| 09 Oct 2008 | Office alterations to Level 8 (part). Remainder of works (architectural and services) and corrected cost of works. | $130k |
| 29 Sept 2008 | Internal demo level 8 | $20k |
| 30 July 2008 | (Office) Internal demolition Level 7 | $50k |
| 06 May 2008 | Internal alterations Level 25 and 26 | $25k |
| 03 Oct 2007 | Ground floor alterations | $10k |
| 14 Sept 2007 | Office alterations to existing tenancy, Levels 6 and 18. | $26k |
| 28 Aug 2007 | Marland House - Part Ground floor office alterations. | $6k |
| 27 July 2007 | Office building, installation of automatic sliding doors to Levels 10 and 11. | $30k |
| 19 Feb 2007 | Office tenancy fitout Level 18 | $170k |
| 30 Nov 2006 | Internal alterations to existing building - partition wall and entry door, level 27. | $5k |
| 08 Nov 2006 | Alterations to office, tenancy reinstatement level 18. | $90k |
| 19 Sept 2006 | Alterations to office building, tenancy re-instatement level 3. | $309k |
| 07 July 2006 | Office fitout Level 23 | $6k |
| 12 May 2006 | Alterations to office fitout level 22 | $743k |
| 02 May 2006 | Alterations to an existing building. Alteration to office, office layout. | $83k |
| 18 Apr 2006 | Level 20 - Alterations and fitout to existing office. Internal tenancy fitout - non structural. | $30k |
| 07 Mar 2006 | Alterations to an existing building; Office fitout | $378k |
| 06 Sept 2005 | Office Fitout | $190k |
| 18 Aug 2005 | Level 20/570 - Tenancy Division | $45k |
| 08 June 2005 | Office alterations to level 19 | $50k |
| 01 June 2005 | Fitout Level 31 | $250k |
| 24 May 2005 | Office partition alterations to levels 19 and 29 | $650k |
| 17 Mar 2005 | Alterations to levels 19 and 20 of office | $413k |
| 17 Mar 2005 | Tenancy Re-instatement Levels 4 and 5 | $545k |
| 14 Feb 2005 | Alterations to office fitout, level 19. Stage 2: Completion of works. | $60k |
| 25 Jan 2005 | Alterations to office fitout, level 19. Stage 1: Partitions only. (No. Docs.) | $60k |
| 08 Dec 2004 | Tenancy fitout Level 24 | $784k |
| 08 Nov 2004 | Alterations to office- Level 30 | $12k |
| 03 Nov 2004 | Office fitout Level 8 | $62k |
| 06 Sept 2004 | office alterations part level 28 | $40k |
| 07 July 2004 | Stage 2 Services Works | $800k |
| 27 May 2004 | Tenancy re - instatement to Levels 21,23,24 | $1.3m |
| 07 May 2004 | Alterations to building. Level 31. Internal alterations to utility and kitchen area. | $40k |
| 13 Apr 2004 | Office alterations to level 18. | $9k |
| 15 Mar 2004 | Foyer Refurbishment to an existing office building. Stage 1: Internal Works Only. Ground Floor. | $2.6m |
| 04 Mar 2004 | Office partition fitout on level 23. | $850k |
| 27 Jan 2004 | Alteration to Cafe Ground Floor | $150k |
| 21 Oct 2003 | Office partition alterations Level 10 | $2k |
| 30 July 2003 | Office partitioning and fitout - Level 22 | $132k |
| 21 July 2003 | Tenancy works and partition alterations on level 8 | $190k |
| 28 Oct 2002 | Office alterations to Level 31 | $10k |
| 04 Oct 2002 | Levels 25, 26 and 27 - Part Refurbishment of Office | $50k |
| 09 Apr 2002 | Level 3 - Internal Office Alterations | $15k |
| 02 Apr 2002 | Tenancy fitout of office, Level 6, 7 Part 28. | $300k |
| 18 Jan 2002 | Level 24 - Internal Fitout | $30k |
| 18 Dec 2001 | Level 31 - Internal alterations to existing building. | $14k |
| 31 Oct 2001 | Level 31 (part), office refurbishment and alterations. | $50k |
| 22 Aug 2001 | level 28 office alterations | $48k |
| 11 July 2001 | Ground floor mezzanine - levels 9 to 17. Internal Fitout. | $5.0m |
| 08 June 2001 | Office alterations levels 2, 8, 19, 20 ANZ Marland House. Alterations to existing building | $2.4m |
| 19 Apr 2001 | Levels 2, 3, 4 and 5 office fit out Marland House | $3.5m |
| 24 Jan 2001 | Level 22 office alterations | $15k |
| 13 Dec 2000 | Proposed office fit-out to level 18, Class 5 | $75k |
| 06 Sept 2000 | proposed office refurbishment | $90k |
| 29 Aug 2000 | Alterations to level 29 | $398k |
| 09 Aug 2000 | Levels 6 and 7 office alterations Ansett customer contact area | $520k |
| 13 Apr 2000 | Level 18 fit out | $200k |
| 15 Feb 2000 | Stage 1 - Stripout of levels 2 to 17 inclusive | $4.5m |
| 11 Jan 2000 | Infill slabs on levels 5 & 6 | $12k |
| 30 Nov 1999 | Office partition alterations on level 29 | $380k |
| 05 Oct 1999 | Infill concrete slabs on levels 5 & 6 | $12k |
| 18 Jan 1999 | Levels 18-19 office alterations | $200k |
| 01 Oct 1998 | Office fitout for MIMI Insurance Group on levels 25 and 26, 570 Bourke Street, Melbourne | $800k |
| 02 Sept 1998 | Office fitout on level 30, Marland House, 570 Bourke Street, Melbourne | $499k |
| 18 June 1998 | Alterations to ground and levels 21-24 | $1.9m |
| 22 July 1997 | Office fitout | $30k |
| 15 Oct 1996 | Stage 1 - Mechanical Services - Levels 18, 21, 27, 32 and 33. Structural Work - Levels 2, 3, 18 and 19. Fire, Hydraulics, Communications and Building Automation. | $2.6m |
| 23 Aug 1994 | Level 31 - Office Tenancy Fitout. Alterations to an exisitng building | $20k |
| 18 July 1994 | Level 7 (part) - Internal alterations to existing building | $61k |
Is 570 Bourke residential or commercial?
570 Bourke is a commercial building. The City of Melbourne lists its main use as office.
When was 570 Bourke built?
570 Bourke was completed in 1972.
How many floors does 570 Bourke have?
570 Bourke has 32 floors above ground.
What businesses are in 570 Bourke?
The latest council census counted 29 businesses in 570 Bourke, including Adoption Services Victoria, Air China and Cbre (V) Pty Limited.
Is there office or retail space for lease in 570 Bourke?
See the commercial listings on this page, or search this address on realcommercial.com.au and commercialrealestate.com.au.
Who designed and built 570 Bourke?
Charter Hall developed 570 Bourke, Hassell designed it and Brookfield Multiplex built it. The building team section has the sources.
How tall is 570 Bourke?
About 118 metres, measured from the City of Melbourne's 3D building model. It's number 93 of 1596 buildings in Melbourne by height.
What public transport is near 570 Bourke?
Flagstaff Station is the nearest train station, about 5 minutes' walk. The nearest tram stop is William St/Bourke St #3, about 1 minute's walk.
What is the planning zone for 570 Bourke?
The site is in the Capital City Zone - Schedule 1 (CCZ1).
Has a Victorian government department leased space at 570 Bourke?
Yes. In November 2020, the Victorian Department of Treasury and Finance took over the lease at 570 Bourke Street.
Has any work been done on 570 Bourke recently?
The City of Melbourne has issued 134 building permits for 570 Bourke since 1994. The most recent was in March 2026.
Sources: City of Melbourne building permits (CC BY 4.0); CLUE building information (CC BY 4.0); CLUE business establishments (CC BY 4.0); Development Activity Monitor (CC BY 4.0); Geocoded National Address File (G-NAF) (Open G-NAF EULA (CC BY 4.0 based)). General information from public records, not legal, financial or building advice.