| Completed | 1973 | 500 Collins completed: 28 floors |
Each cost is the estimate on that record. Stages of a project often repeat its full value, so these don't add up to what was spent.
| 03 June 2026 | Level 9, Tenancy 4. Fitout works | $223k |
| 17 Apr 2026 | Level 15 - internal alterations for Hapag Lloyd | $216k |
| 06 Mar 2026 | Fitouts to Level 15, Tenancy 2 and Level 17, Tenancy 2 | $736k |
| 16 Dec 2025 | Level 22 Tenancy 2 - Alterations | $212k |
| 09 Dec 2025 | Decommissioning existing diesel tank and Installation of Diesel Bulk Tank | $199k |
| 17 Sept 2025 | Level 6 - Tenancy alterations | $25k |
| 26 Aug 2025 | Level 2 - Make Good Works. To completion. | $473k |
| 20 Aug 2025 | LEVEL 13 TENANCY A FIT OUT | $201k |
| 08 Aug 2025 | Level 12 - Alterations to Rooftop Terrace Change of Use and Additions for Rooftop Restaurant | $799k |
| 18 July 2025 | LEVEL 6 TENANCY A MINOR ALTERATIONS | $22k |
| 07 July 2025 | Level 20 - Northside Tenancy Fitout | $751k |
| 25 May 2025 | LEVEL 2 FIT OUT WORKS | $507k |
| 07 May 2025 | Exit sign removal for Henry Fox tenancy (9-12) and embroidery shop tenancy (4-4a) | $680 |
| 02 May 2025 | Shop 5A - Proposed alterations to existing retail shop | $245k |
| 13 Mar 2025 | Level 5 - Tenancy D - Minor alterations to tenancy D | $29k |
| 11 Feb 2025 | Level 5, Tenancy 5.01 - minor alterations to office | $14k |
| 25 Nov 2024 | LEVEL 15 TENANCY 3 & LEVEL 19 TENANCY 2 FITOUT | $553k |
| 03 July 2024 | Level 4 - Internal Fitout Works | $930k |
| 24 May 2024 | INTERNAL ALTERATION TO LEVEL 18 | $279k |
| 07 May 2024 | LEVEL10 SPEC SUITE | $1.1m |
| 08 Feb 2024 | Stage 0 – Internal alterations to existing tenancy | $39k |
| 15 Dec 2023 | LEVEL 10 TENANCY SPLIT WORKS | $156k |
| 20 July 2023 | Part Level 7 & 21 - Fitout works to spec suites | $663k |
| 17 July 2023 | Level 3 - Office fitout | $1.5m |
| 14 July 2023 | Level 27 - Minor office alterations | $14k |
| 05 July 2023 | Retail Tenancy 4 & 4A - Removal of internal non load bearing wall | $42k |
| 19 June 2023 | Level 3 - Internal works to the atrium. | $131k |
| 17 Nov 2022 | Replacement of Fire Indicator Panel (FIP) | $52k |
| 06 Oct 2022 | Level 3 - Decking Board Installation | $36k |
| 30 Sept 2022 | Level 2 - Make Good Works. To completion. | $473k |
| 26 Sept 2022 | Level 19, Tenancy Fitout (Tenancy B) | $294k |
| 01 Sept 2022 | MINOR INTERNAL ALTERATIONS TO EXISTING OFFICE (MEETING ROOMS) | $65k |
| 23 Aug 2022 | Level 2 - Optom tenancy fitout | $60k |
| 01 July 2022 | Level 25 - Tenancy Alteration Reconfiguration | $414k |
| 01 July 2022 | Tenancy Split - Ground floor, tenancy 3 | $95k |
| 22 June 2022 | Level 8 - Proposed internal Office Fitout for TSA Management | $1.8m |
| 22 June 2022 | Level 8 - Stage 2 - To permit remainder of proposed fit-out works. | $1.8m |
| 15 June 2022 | Level 10 - Internal demolition and make good works | $318k |
| 17 Mar 2022 | Level 8 - Stage 2 - To permit remainder of proposed fit-out works. | $1.8m |
| 08 Mar 2022 | Levels 2 & 3 - Installation of additional hydraulics systems | $80k |
| 16 Feb 2022 | Level 8 - Internal demo & make good works | $195k |
| 27 Jan 2022 | Level 1 - Old end of trip make good. | $147k |
| 14 Dec 2021 | Level 20 Tenancy B - Fitout | $412k |
| 10 Dec 2021 | New BMU Walkway | $69k |
| 29 Nov 2021 | Level 28 (part) - BMU Structural Steel Upgrade | $33k |
| 12 Nov 2021 | Level 6 Tenancy Split | $312 |
| 19 Oct 2021 | Level 9, Tenancy 5 - Fitout of Offices | $224k |
| 09 Sept 2021 | Budgen Allen Lawyers Office - Office Alteration to Level 9 | $14k |
| 01 Sept 2021 | Recladding of non-complaint material for compliant material to parts of the building adjacent to hotel | $406k |
| 16 Aug 2021 | Level 21 - Proposed alterations to an existing office Tech Mahindra Office | $427k |
| 20 July 2021 | Level 26 - South tenancy fitout | $408k |
| 20 July 2021 | Level 6 - Tenancy Fitouts | $997k |
| 17 June 2021 | LEVEL 21 SOUTH TENANCY MAKEGOOD - Office Tenancy alterations fitout | $105k |
| 07 Apr 2021 | Level 21 - South tenancy alterations | $110k |
| 07 Apr 2021 | Level 26 - Alterations to Office Level | $92k |
| 16 Mar 2021 | Level 15 - Tenancy 15C Alterations | $46k |
| 14 Dec 2020 | Ground floor business lounge. | $588k |
| 25 Nov 2020 | Installation of video wall in lobby entry. | $62k |
| 21 Oct 2020 | Levels 12 & 13 - De-fit and base building works | $300k |
| 13 Aug 2020 | Level 21 - Internal Make Good of Tenancy | $54k |
| 07 Aug 2020 | Level 25 - Fitout works. Alterations to an existing office building. | $145k |
| 04 Mar 2020 | Minor Internal Alterations Only (Completion of Internal Stair to Existing Tenancy) | $200k |
| 17 Feb 2020 | Stage 4: Back Retail Area (Excluding Facade Works on Church Lane) | $2.5m |
| 14 Feb 2020 | Stage 3: External Works (Front Entry) | $2.5m |
| 30 Jan 2020 | END OF TRIP & RETAIL UPGRADE | $2.5m |
| 28 Jan 2020 | TENANCY 17B, LEVEL 17 - OFFICE TENANCY ALTERATIONS | $102k |
| 16 Dec 2019 | Stage 2: Remainder of End of Trip to Compeletion | $2.1m |
| 08 Nov 2019 | TENANCY 5A ALTERATIONS | $7k |
| 14 Oct 2019 | Level 25 - Tenancy Fitout DLA South End | $425k |
| 04 Oct 2019 | Internal Alterations to Office Tenancy | $37k |
| 17 Sept 2019 | Level 25 North - Internal alterations to office tenancy | $313k |
| 22 Aug 2019 | INTERNAL ALTERATIONS TO COMMERCIAL EYES OFFICE TENANCY | $0 |
| 26 July 2019 | Level 24 - INTERNAL ALTERATIONS TO LEVEL 24 OFFICE | $875k |
| 27 May 2019 | Tenancy 06 & 09, Level 1 - Cafe Fit-Out - KAB Express and Kartel | $450k |
| 14 Mar 2019 | LevelS 5, 13 & 14 - Office tenancy fitouts and reconfiguraitons | $1.4m |
| 27 Nov 2018 | LEVEL 14 - NEUBERGER BERMAN TENANCY RECONFIGURATION | $22 |
| 26 Oct 2018 | Level 5 - Alteration of office | $127k |
| 18 Oct 2018 | Stage 2 - Services: Mechanical, Electrical & Fire | $100k |
| 11 Oct 2018 | Level 13 (Tenancy A) - Proposed office fitout to existing tenancy | $120k |
| 24 Sept 2018 | Level 16 - Internal alterations to First Samuel Office tenancy | $169k |
| 20 Aug 2018 | Level 13 - Stage 1 - Architectural fitout and Electrical works | $600k |
| 12 July 2018 | Level 13- Intertenancy wall | $175k |
| 27 Apr 2018 | Level 12, 13 & 24 - office refurb | $1.1m |
| 20 Apr 2018 | Level 20 - Internal alterations to Rightship office tenancy | $13k |
| 06 Apr 2018 | Level 9 - Office tenancy fitout | $39k |
| 02 Mar 2018 | VLine Office Alterations | $60k |
| 25 Jan 2018 | Levels 2 & 3 - Proposed alterations to existing office tenancy | $50k |
| 03 Nov 2017 | Level 16 - AAT Melbourne Office Fit-out | $550k |
| 28 Aug 2017 | Level 19 - Office tenancy fitout | $41k |
| 28 June 2017 | Level 19 - Tenancy Fitout | $45k |
| 01 May 2017 | Level 2 - Internal office alterations | $87k |
| 04 Oct 2016 | Level 22C - Proposed Internal Office Fitout | $65k |
| 27 Sept 2016 | Level 22 - Air New Zealand Office Fitout | $285k |
| 04 Apr 2016 | Level 22 - Proposed office fit out | $55k |
| 26 Feb 2016 | Tenancy 10 - alterations to restaurant detectors | $3k |
| 19 Feb 2016 | Level 9 - Refurbishment of Existing Office Space | $79k |
| 12 Feb 2016 | Level 23 - Alterations to existing building | $260k |
| 10 Feb 2016 | Level 9 - Internal office alterations | $9k |
| 18 Nov 2015 | Shop 2 - Retail tenancy fit out | $35k |
| 26 Oct 2015 | Level 19 - Alterations to existing Office | $800k |
| 16 Oct 2015 | Inter-tenancy wall | $86k |
| 13 Oct 2015 | Level 13 - proposed office fit out | $20k |
| 15 Sept 2015 | Internal Fitout to shop All Parts | $44k |
| 22 June 2015 | Installation of Stair Pressurisation System | $607k |
| 20 Mar 2015 | Rialto - Tenancy Fit-out for M.J Bale | $110k |
| 01 Dec 2014 | Level 9 Alteration to office | $45k |
| 20 Nov 2014 | Level 20 - Fit out of office tenancy | $54k |
| 06 Oct 2014 | LEVEL 2 PROPOSED PARTITION ALTERATIONS | $151k |
| 02 Oct 2014 | Level 22 Alteration | $67k |
| 11 Sept 2014 | Suite 3, Level 9 Alteration to Office | $17k |
| 25 July 2014 | Ground Floor Shop 2: Retail Tenancy fitout | $50k |
| 03 July 2014 | Alterations to fire stair | $15k |
| 02 Apr 2014 | Proposed Office fitout - Level 14 | $200k |
| 26 Mar 2014 | Internal alterations to Office Partitions Level 18 | $33k |
| 29 Dec 2013 | Internal fitout alterations to an existing office tenancy, Level 7 | $30k |
| 29 Nov 2013 | Proposed alterations to existing office tenancy - Level 3 | $26k |
| 24 Oct 2013 | Minor office alteration works to part level 11 office tenancy | $0 |
| 10 Sept 2013 | Truss Installation to BMU Beam/Rail | $25k |
| 17 Dec 2012 | Proposed alterations to existing office tenancy - Level 6 | $4k |
| 07 Nov 2012 | Level 9 -Office alterations | $32k |
| 12 Oct 2012 | Office fitout to existing tenancy - level 20 | $80k |
| 30 July 2012 | Level 7 Office Alterations | $8k |
| 12 July 2012 | Internal office fitout alterations to an existing building | $38k |
| 04 June 2012 | Stage 2 - Final - Architectural and services works | $143k |
| 25 May 2012 | Office Relocation Level 17 (TBH). Stage 1 Internal strip out | $143k |
| 01 May 2012 | Internal office fitout Level 3 (Hospira) | $77k |
| 31 Jan 2012 | Office fitout Level 15 | $123k |
| 25 Jan 2012 | Office fitout Levels 11 & 18 Revised floor plan layout Level 11 | $950k |
| 21 Dec 2011 | Internal office fitout alterations to level 4 | $766k |
| 12 Dec 2011 | Proposed office fitout Levels 11 & 18 | $950k |
| 06 Dec 2011 | Office fitout Level 23 | $745k |
| 16 Nov 2011 | Internal office alterations Level 26 | $147k |
| 11 Nov 2011 | Office fitout Level 20 | $120k |
| 03 Nov 2011 | Office fitout to level 15 | $100k |
| 26 Oct 2011 | Tenancy alterations Level 14 | $33k |
| 21 Oct 2011 | Level 20 Tenancy Seperation | $83k |
| 21 Oct 2011 | Proposed office fitout Levels 11 & 18 | $950k |
| 29 Aug 2011 | Proposed alterations to an existing restaurant on the ground floor at 500 Collins Street Melbourne | $150k |
| 08 Aug 2011 | Office alterations Level 15 | $50k |
| 08 July 2011 | Shop fitout Ground Floor | $5k |
| 16 June 2011 | Office Fitout to Level 15 | $108k |
| 30 May 2011 | Office fitout alterations Level 5 | $696k |
| 08 Mar 2011 | Sungard office fitout. Stage 2: To Completion - PERMIT CANCELLED AS AT 24/7/2011 | $600k |
| 24 Feb 2011 | sungard office fitout - PERMIT CANCELLED AS AT 24/7/2011 | $600k |
| 21 Feb 2011 | Level 2 & 3 - Office fitout alterations to an existing building | $1.5m |
| 23 Dec 2010 | Stage 2: To completion. Alterations to Level 26 & 27 | $2.4m |
| 22 Dec 2010 | PROPOSED FITOUT TO EXISTING TENANCY | $200k |
| 22 Dec 2010 | Stage 4F additional stage of works to 11, 15, 18, 26 | $4.8m |
| 29 Oct 2010 | Fire pump alterations | $29k |
| 17 Aug 2010 | Office fitout to an existing tenancy - Level 16 | $420k |
| 03 Aug 2010 | Intertenancy walls and display suite - Levels 11 and 15 | $100k |
| 12 July 2010 | Alterations to Level 26 & 27 | $2.4m |
| 14 Apr 2010 | Level 7, 500 Collins St: office fit-out alterations to an existing building. | $28k |
| 26 Mar 2010 | Level 16 - Office Fitout | $110k |
| 10 Mar 2010 | Level 7 - Quantum office fitout | $90k |
| 04 Feb 2010 | Level 7 - Internal Office Fitout | $138k |
| 13 Jan 2010 | Alterations to level 3. | $1.4m |
| 04 Dec 2009 | Level 1 - Proposed tenancy fit-out | $20k |
| 07 May 2009 | Proposed alterations to existing office tenancy | $39k |
| 22 Apr 2009 | Alterations on levels2 and 3. Stage 2: To completion, including architectural & services. | $1.4m |
| 18 Feb 2009 | Office fitout Level 7 | $140k |
| 03 Feb 2009 | Alterations to Levels 2,3,4,5,6,7,11,24,23,and 25 (Construction Stage 4E). Stage 1: Excluding pressurisation system installation. | $10.2m |
| 22 Dec 2008 | Office Fitout - L1, 500 Collins Street MELB | $506k |
| 18 Dec 2008 | Proposed restaurant fitout Tenancies 10,11 & 12 500 Collins Street Melbourne 3001 | $700k |
| 17 Oct 2008 | Office fitout Level 9 | $43k |
| 09 Sept 2008 | Office Fitout Level 14 (Alterations) | $500 |
| 28 Aug 2008 | Office fitout Level 25 | $439k |
| 07 July 2008 | Fitout of intertenancy walls on Level 7 | $130k |
| 04 July 2008 | Retail internal tenancy fitout for Kantina Kartel, tenancy 6 Level 1. | $200k |
| 04 July 2008 | (Retail) Internal tenancy (Tenancy 09, Level 1) fitout for Express Kartel. | $75k |
| 19 June 2008 | Office Fitout of Level 17. Stage 2: To completion. | $140k |
| 24 Apr 2008 | Tenancy fitout of shop 4B and 5 (Cafenatics). | $200k |
| 07 Mar 2008 | Proposed 'O-Bento' Japanese Restaurent Re-fitout Works at Tenancy 5A | $150k |
| 05 Mar 2008 | Level 9 intertenancy walls fitout (office). | $110k |
| 22 Feb 2008 | Proposed office fitout to existing tenancy space, Levels 12 & 13. Stage 2: Fire hydrant coverage. | $1.2m |
| 08 Feb 2008 | Demolition works & Minor structural works Stage 1 | $8.0m |
| 13 Dec 2007 | Fitout to shop T7 - Cacao Chocolates. | $110k |
| 03 Dec 2007 | Proposed office fitout to existing tenancy space, Levels 12 & 13. Stage 1: All building work, excluding fire hydrant coverage. | $1.2m |
| 26 Nov 2007 | Retail tenancy fitout to Shop 4 & 4A on Ground Floor. | $80k |
| 16 Nov 2007 | Internal office partitions on Level 21. | $80k |
| 16 Nov 2007 | Office fitout to Level 10. | $1.3m |
| 04 Sept 2007 | Fitout Internal Tenancy Wall Level 17 | $44k |
| 22 Aug 2007 | Alteration Signage | $521k |
| 01 June 2007 | Robert Bird Group tenancy reconfiguration fitout (office), Level 9. | $60k |
| 21 May 2007 | Social security appeals tribunal internal office fitout. To completion of fit out works to Level 24. | $772k |
| 12 Apr 2007 | Retail development on Level 1 & Mezzanine Level. Stage 2: To completion of the construction stage 3C. | $6.6m |
| 01 Feb 2007 | Alterations to office. Building refurbishment, stage 4D Levels 10 & 24. | $1.8m |
| 05 Dec 2006 | To completion of office fitout level 21. | $300k |
| 06 Nov 2006 | Alterations & Office fitout Level 26 | $37k |
| 22 Aug 2006 | Office building refurbishment. Stage 2- Stage 3AB Works - Ground and first floor fitout and alterations (including Collins Street upgrade), Basement and Mezzanine alterations, Passenger Lift upgrade and associated fire services upgrade works. Amended Building Permit to include additional Fire Hydrant drawings. | $20.0m |
| 12 May 2006 | New office tenancy fitout level 19. | $500k |
| 04 May 2006 | Office fitout level 22 | $305k |
| 03 Apr 2006 | Tenancy 1 (part level 9) - office fitout on level 9 | $40k |
| 24 Jan 2006 | Office alterations to level 13, 19 and 22 | $2.5m |
| 20 Jan 2006 | Alterations to an existing office building, level 9 (part) | $110k |
| 25 Nov 2005 | Partition alterations to level 10 | $39k |
| 14 Oct 2005 | Office partition alterations Level 5 | $65k |
| 19 Sept 2005 | Stage 6 Facade repairs | $1.5m |
| 08 July 2005 | Stage 3: to completion of chilled water pipework & generator room alterations | $500k |
| 05 July 2005 | Stage 4A, Refurbishment Levels 9,12 & 14 | $300k |
| 15 June 2005 | Tenancy fitout Shop 1 | $27k |
| 04 May 2005 | Stage 2: alterations to sprinklers and mechanical services | $95k |
| 26 Apr 2005 | stationary retail | $210k |
| 15 Apr 2005 | Stage 1: all works excluding alterations to sprinklers and mechanical services | $95k |
| 21 Mar 2005 | Office partition fitout - level 8 | $6k |
| 05 Nov 2004 | Alterations to Level 6 | $40k |
| 02 Sept 2004 | Office fitout Level 5 | $18k |
| 16 July 2004 | Office alteration Level 11 | $6k |
| 19 Apr 2004 | OFFICE FITOUT LEVEL 16 | $15k |
| 18 Dec 2003 | Alterations to existing building. Stage 1- services and associated works. | $330k |
| 15 Aug 2003 | Tenancy fitout to office Level 22 | $9k |
| 28 Oct 2002 | Tenancy Office Partitions Part Floor 21 | $15k |
| 21 Oct 2002 | Internal alterations to existing tenancy for an office on Level 13, 500 Collins Street, Melbourne | $40k |
| 23 Oct 2001 | Alterations to office partitions. | $20k |
| 15 Oct 2001 | Tenancy fitout of level 20 - office building | $45k |
| 04 Sept 2001 | ground floor office alterations | $5k |
| 30 Aug 2001 | Level 11 (part), office fitout alteration to an existing building. | $90k |
| 24 Apr 2001 | office fit out part lvl 10 | $140k |
| 25 Oct 2000 | lvl 9 office fit out | $19k |
| 17 Oct 2000 | office fitout on level 26 | $27k |
| 06 Oct 2000 | Lvl 10 office fit out | $20k |
| 07 Aug 2000 | installation of alarm signalling equipment. | $190 |
| 31 July 2000 | Tenancy fitout on lvl 1 | $44k |
| 20 July 2000 | Office partitions on level 10 | $250k |
| 06 July 2000 | stage 1 office partition alterations to existing tenancy on lvl 23 | $154k |
| 22 May 2000 | Tenancy fitout on level 10 | $20k |
| 10 Apr 2000 | fit out office level 9 | $19k |
| 29 Nov 1999 | Level 11 Alterations to existing office | $12k |
| 22 July 1999 | Office fitout | $167k |
| 12 May 1999 | Office fitout level 13 | $20k |
| 08 Apr 1999 | Office partitioning and fitout work | $45k |
| 01 Mar 1999 | Office fitout on level 5 500 Collins Street Melbourne | $15k |
| 18 Sept 1998 | Office partition alterations on level 19, 500 Collins St, Melb (Stage 1 - Construction of partitions & alterations to sprinkler & electrical services) | $150k |
| 14 May 1998 | Partition fitout for office on level 12, 500 Collins Street, Melbourne | $100k |
| 16 Apr 1998 | Alterations to partitions on level 16 | $18k |
| 16 Jan 1998 | office partitions for level 15 | $398k |
| 15 May 1997 | Partition to offices | $40k |
| 20 Sept 1996 | Partial office fitout | $20k |
| 20 June 1996 | Office fitout Level 5 | $30k |
| 02 Apr 1996 | Office partitions to 24 | $35k |
| 26 Mar 1996 | Office fitout | $10k |
| 26 Feb 1996 | Office fitout to Level 13 | $20k |
| 04 Sept 1995 | Office fitout alterations | $120k |
| 12 July 1995 | Alterations | $150k |
| 20 June 1995 | Alterations to existing building | $115k |
| 26 May 1995 | Alterations to Level 1 | $35k |
| 09 Mar 1995 | Alterations to part Level 1 | $120k |
| 21 Feb 1995 | Alterations to building | $45k |
| 29 Nov 1994 | Alterations for office tenancy fitout | $25k |
| 30 Sept 1994 | Alterations to an existing building, part level 1 | $120k |
| 12 Aug 1994 | Alterations to Level 23 | $250k |
Is 500 Collins residential or commercial?
500 Collins is a commercial building. The City of Melbourne lists its main use as office.
When was 500 Collins built?
500 Collins was completed in 1973.
How many floors does 500 Collins have?
500 Collins has 28 floors above ground.
What businesses are in 500 Collins?
The latest council census counted 53 businesses in 500 Collins, including Afeat Pty Ltd, AUSSIE BROADBAND LIMITED and Best Embroidery.
Is there office or retail space for lease in 500 Collins?
See the commercial listings on this page, or search this address on realcommercial.com.au and commercialrealestate.com.au.
Who built 500 Collins?
The building team section lists who's known so far. Builders, architects and developers can claim their role on this page.
How tall is 500 Collins?
About 106 metres, measured from the City of Melbourne's 3D building model. It's number 107 of 1596 buildings in Melbourne by height.
What public transport is near 500 Collins?
Southern Cross Railway Station is the nearest train station, about 5 minutes' walk. The nearest tram stop is Collins St/William St #4, about 2 minutes' walk.
What is the planning zone for 500 Collins?
The site is in the Capital City Zone - Schedule 1 (CCZ1).
Does 500 Collins have an owners corporation?
Plan of subdivision TP815437 has 1 lot.
Has any work been done on 500 Collins recently?
The City of Melbourne has issued 165 building permits for 500 Collins since 1994. The most recent was in April 2026.
Sources: City of Melbourne building permits (CC BY 4.0); CLUE building information (CC BY 4.0); CLUE business establishments (CC BY 4.0); Geocoded National Address File (G-NAF) (Open G-NAF EULA (CC BY 4.0 based)). General information from public records, not legal, financial or building advice.