| Completed | 1983 | 385 Bourke Street completed: 41 floors |
Each cost is the estimate on that record. Stages of a project often repeat its full value, so these don't add up to what was spent.
| 09 Apr 2026 | Level 14 - Internal Office Alterations | $322k |
| 05 Nov 2025 | Level 29 - Kapitol HQ alterations to office re-design fitout | $720k |
| 28 Oct 2025 | CBA Bourke Street - Entry Works Non-Structural | $95k |
| 07 Aug 2025 | Stage 2: -Services Fit Off and Architectural Fitout (Completion of Works) | $1.2m |
| 04 Aug 2025 | L30, Suite 2, 385 Bourke St - Alterations to Partition Walls and Doors. | $33k |
| 24 July 2025 | Level 5 - Minor Alterations to Existing Tenancy | $142k |
| 03 June 2025 | Retail tenancy fit out to Australia Post | $600k |
| 22 May 2025 | Alterations to an Existing Building - Level 14 Spec Suite Stage 1: Internal Strip of Existing Fitout, Rough in of Services and Construction of Partition Walls | $1.2m |
| 09 May 2025 | Level 27 - Additions and Alterations to existing tenancy | $88k |
| 21 Jan 2025 | Levels 11 & 22 - Fitout - Stage 1: Internal Strip Out Works | $1.5m |
| 13 Nov 2024 | Levels 11 & 22 - Fitout - Stage 2: Fitout works to Level 11 & 22 | $1.5m |
| 02 Oct 2024 | Level 29 - Alteration Office Fit Out | $1.3m |
| 07 July 2024 | Shop E12 (Nosh) - Proposed alterations to an existing restaurant | $100k |
| 05 July 2024 | Level 12 & 15 Tenancies - Internal Fit-Out Works | $775k |
| 11 June 2024 | Level 13 - Spec suite fit-out works | $998k |
| 17 May 2024 | Make good of existing office tenancy | $305k |
| 02 May 2024 | Shop R01-001 and R01-003 - Fit out of existing retail tenancy for Helly Hansen | $182k |
| 10 Feb 2023 | Level 30 - Internal Office Fitout for NPM | $628k |
| 17 Jan 2023 | Level 15 - Internal Office Fitout for McMillen Jacobs Associates | $705k |
| 02 Nov 2022 | Level 15 - Additions and Alterations to an Existing Office Tenancy/Split. | $130k |
| 18 Oct 2022 | Level 30 - Internal Office Fitout for Envirosuite | $1.2m |
| 14 Oct 2022 | Level 33 & 34 - Removal of Stair and Slab Infill | $174k |
| 11 Oct 2022 | Level 33 - Proposed Cold Shell Fit out / defit & make good works | $545k |
| 16 Aug 2022 | Additions and Alterations to an Existing Office Tenancy | $100k |
| 13 Aug 2021 | Stage 1 – Ground Floor Lobby Refurbishment Works excluding aluminium sheet cladding to Elizabeth Street | $544k |
| 05 Aug 2021 | Replacement of Combustible Cladding to an Office Building | $236k |
| 19 July 2021 | Stage 1: Levels 27 and 29-34 refurbishment works. Strip out. | $5.4m |
| 19 July 2021 | Stage 4: Levels 27 and 29-34 refurbishment works. Infill existing stairs between Levels 32 and 33. | $5.9m |
| 01 June 2021 | Level 23 - Lot 1 - tenancies 1, 2 & 3. Fitout works | $1.2m |
| 19 May 2021 | Stage 1 - Internal fitout works (tenancies 1,2,3) | $1.2m |
| 26 Apr 2021 | level ground, basement 1 & 2 only - To allow the minor internal alterations to occur inside the existing building - Lift upgrades | $280k |
| 10 Dec 2020 | Level 9 - Internal Office Alterations for Cushman & Wakefield | $20k |
| 20 Feb 2020 | Alterations to existing office space - Level 39 | $0 |
| 30 Oct 2019 | Space E20, - Tenancy Fit-Out | $45k |
| 30 July 2019 | Installation of bollards at existing entrances (CBA Tenancy) | $22k |
| 12 Apr 2019 | Level 35-38 - Alterations to existing office space | $3.2m |
| 20 Feb 2019 | Level 26 - Internal Office Fitout for RedZed | $900 |
| 20 Dec 2018 | Level 24, 25 and 26 - Commercial fit-out & refurbishment work for IRESS | $384k |
| 20 Dec 2018 | Stage 2- Levels 23, 24 & 26 (Part) Remainder of Works. | $2.7m |
| 12 Nov 2018 | Level 24 - Alterations to an existing building | $1.2m |
| 06 Apr 2018 | Tenancy B08 - Retail Tenancy Fit-Out | $200k |
| 22 Mar 2018 | Level 22 - Alteration to Offices | $25k |
| 13 Feb 2018 | Level 14 - Additions and Alterations | $134k |
| 27 Sept 2017 | Level 5 (Part) Office Fit-out | $400k |
| 25 Sept 2017 | Level 13 - Office fit out | $343k |
| 08 Aug 2017 | Tenancy B16 - Alteration to Restaurant (6a) | $250k |
| 21 Apr 2017 | Tenancy E09 - Shop fit out | $50k |
| 23 Mar 2017 | Retail - Proposed internal alterations and upgrades | $257k |
| 23 Mar 2017 | Stage Two Building Permit - All Internal Works to Elizabeth Street & Bourke Street Levels (No Works Permitted to the Exterior) | $3.1m |
| 15 Dec 2016 | Tenancy B15 'Sushi Hub' fitout | $0 |
| 14 Dec 2016 | Galleria - Proposed lessor works for Starbucks tenancy | $40k |
| 14 Dec 2016 | Unit E25, The Galleria - Tenancy Fitout for Starbucks Cafe | $322k |
| 16 Sept 2016 | Tenancy B07 - Internal Tenancy Fit-Out Works, New Structural Canopy, Including Services | $127k |
| 31 Aug 2016 | Stage 2 - External Works | $600k |
| 04 Aug 2016 | Stage 3 - External Works (Final Stage) | $3.3m |
| 03 Aug 2016 | Updates to Basement Carpark Pedestrian Entry Doors & Associated Sprinkler Works | $19k |
| 13 Nov 2015 | Tenancy E02, E05, E08, B4-B6 Retail fitout Kathmandu | $600k |
| 07 Oct 2015 | Lot 1 - Internal works to existing Office | $12k |
| 16 Sept 2015 | Level 16 - Aspect Fit-Out (Aspect Fit-out Partial Level 13 Only) | $841k |
| 15 Sept 2015 | Lower Ground Level - Construction of Storeromm | $19k |
| 20 Aug 2015 | Stage 1 - Office Fit-Out | $77k |
| 07 Aug 2015 | Existing fire alarm monitoring system converted to another approved monitoring system | $2k |
| 26 May 2015 | Stage 1 - Shop E27 - Retail tenancy fit out | $85k |
| 10 Apr 2015 | Mezzanine level - New toilets and corridor | $262k |
| 14 Oct 2014 | B12 Galleria - Proposed Shop Fit-out | $118k |
| 08 Oct 2014 | B11 Galleria - Proposed Shop Fit-out | $120k |
| 09 Sept 2014 | Level 16 - Proposed Internal Fitout Works - | $430k |
| 27 May 2013 | refurbishment works to tenancy on level 1 | $16k |
| 08 Aug 2012 | Replacement of Hydrant Pump | $290k |
| 12 Aug 2011 | Additional Construction Details - Inclusion of sub-dividing wall between 2 tenancies - Stage 2 | $816k |
| 11 July 2011 | Alterations - Level 39 | $761k |
| 28 Apr 2011 | Stage 3: Level 34 fitout. Alterations to existing building. TRU Energy | $7.5m |
| 15 Mar 2011 | Fitout Level 26 (Iress) | $378k |
| 21 May 2010 | Stage 2: Alterations to existing building. TRU Energy accommodation Levels 28-33 | $5.8m |
| 30 Apr 2010 | Internal Alterations - Level 39 | $59k |
| 24 Mar 2010 | RBS Tenancy - Part Level 4 - Refurbishment alterations | $770k |
| 19 Feb 2010 | Office fitout to Level 23. | $55k |
| 09 Nov 2009 | Level 12 - CBA Tenancy Refurbishment - Alterations | $2.3m |
| 05 Nov 2009 | CBA Tenancy Alterations - Credit Decisioning Refurbishment - Level 9 (Part) | $115k |
| 23 July 2009 | Alterations to CBA- New Tenancy Fitout on Level 16 | $1.1m |
| 21 Nov 2008 | Office fitout to existing tenancy (Message Media) Level 22, 385 Bourke Street MELB | $107k |
| 02 July 2008 | Proposed internal alterations (Fitout) of Tenancies E07 & B03. The North Face - Tenancy E07(B03) Galleria, Ground Floor (Tenancy E07), First Floor (Tenancy B03). | $400k |
| 17 June 2008 | Alterations Full Fitout on Mezzanine Level Office Fitout | $50 |
| 14 Feb 2008 | Galleria alterations - Elizabeth Street Entry. Stage 2: Proposed refurbishment to retail tenancies, Ground Floor (part). | $2.2m |
| 18 Dec 2007 | Proposed internal alterations (fitout) of Tenancy E06@Galleria. The Galleria, Rockport Tenancy E06 Ground Floor. | $250k |
| 23 Nov 2007 | Office alterations for CPA on Level 29 & 30 (including alterations to the sprinkler system). | $43k |
| 01 Nov 2007 | Alterations to retail, Joe Black fitout, tenancy E12 Galleria. | $300k |
| 26 Oct 2007 | Galleria Alterations to Elizabeth Street Entry, the north face (Tenancy B03 & E07). | $228k |
| 12 Oct 2007 | Computer Fleet Office fitout Level 23 | $4k |
| 01 Oct 2007 | Alterations to office Level 27 fitout | $350k |
| 03 Sept 2007 | Variation: Internal alterations to Tenancy E02 (Ground Floor - Tenancy 02). | $2.2m |
| 28 Aug 2007 | Internal stripout of tenancies (Ground Level) | $2.8m |
| 20 Mar 2007 | Alterations Stage 1 Tenancy Fitout | $340k |
| 16 Feb 2007 | CBA Office Tenancy Alterations for Five D. Proposed internal alterations to office on Level 16 (part). | $11k |
| 07 Feb 2007 | Alterations to office fitout Level 28. | $689k |
| 15 Jan 2007 | Alterations to office fitout Level 28. | $689k |
| 21 Dec 2006 | Shine Technologies - Tenancy upgrade on level 34. Alterations to office building. Proposed inter-tenancy wall on 34 (part) to suit new layout as documented. | $40k |
| 07 Dec 2006 | Construct pastry kiosk Shop B 15 | $50k |
| 31 Aug 2006 | Medicare Australia - Galleria fitout Stage 2: Final including fire services | $340k |
Is 385 Bourke Street residential or commercial?
385 Bourke Street is a commercial building. The City of Melbourne lists its main use as office.
When was 385 Bourke Street built?
385 Bourke Street was completed in 1983.
How many floors does 385 Bourke Street have?
385 Bourke Street has 41 floors above ground.
What businesses are in 385 Bourke Street?
The latest council census counted 33 businesses in 385 Bourke Street, including ABRAHAMS MEESE LAWYERS PTY LTD, Acquisitive and Ambition Group Limited.
Is there office or retail space for lease in 385 Bourke Street?
See the commercial listings on this page, or search this address on realcommercial.com.au and commercialrealestate.com.au.
Who designed and built 385 Bourke Street?
Eggleston MacDonald & Secomb designed 385 Bourke Street. The building team section has the sources.
How tall is 385 Bourke Street?
About 170 metres, measured from the City of Melbourne's 3D building model. It's number 37 of 1596 buildings in Melbourne by height.
What public transport is near 385 Bourke Street?
Town Hall Station is the nearest train station, about 4 minutes' walk. The nearest tram stop is Elizabeth St/Bourke St #5, about 1 minute's walk.
What is the planning zone for 385 Bourke Street?
The site is in the Capital City Zone - Schedule 2 (CCZ2).
Does 385 Bourke Street have an owners corporation?
Plan of subdivision PS646708 has 1 lot.
When did construction of 385 Bourke Street begin?
One source gives 1983 as the year construction started. The building was completed in 1983 as well.
Has any work been done on 385 Bourke Street recently?
The City of Melbourne has issued 68 building permits for 385 Bourke Street since 2006. The most recent was in April 2026.
Sources: City of Melbourne building permits (CC BY 4.0); CLUE building information (CC BY 4.0); CLUE business establishments (CC BY 4.0); Geocoded National Address File (G-NAF) (Open G-NAF EULA (CC BY 4.0 based)). General information from public records, not legal, financial or building advice.