| Completed | 1993 | Queen & Collins completed: 37 floors |
Each cost is the estimate on that record. Stages of a project often repeat its full value, so these don't add up to what was spent.
| 20 Feb 2026 | Reine La Rue Private Dining Room - Ground Floor - Proposed alterations to existing ground floor tenancy | $2.4m |
| 14 Aug 2025 | Level 3 - Internal Office Alterations | $29k |
| 08 Aug 2025 | Level 3 - Project is expanded tenancy, located at Level 3, 100 Queen Street | $200k |
| 06 Aug 2025 | Level 20-21 - Alterations to an Existing Building | $3.3m |
| 07 May 2025 | Level 20-21 - Alterations to an Existing Building | $3.3m |
| 03 Feb 2025 | Level 16 - Internal Office Alterations | $50k |
| 19 Dec 2024 | Stage 2 - Balance of works | $17.1m |
| 15 Aug 2024 | Internal Alterations to Existing Basement | $70k |
| 12 Aug 2024 | Levels 28-31 - Hall & Wilcox Office Fitout | $17.1m |
| 23 July 2024 | Level 14, 100 Queen Street - Office fitout | $2.6m |
| 08 July 2024 | Internal Fitout - Ground Level | $660k |
| 21 May 2024 | Level 24 - Snowflake Internal Office Alterations | $39k |
| 17 May 2024 | Level 16, 100 Queen street - Internal Office Alterations for Triskele Labs | $102k |
| 16 May 2024 | Alterations to an Existing Building: Fit-out of Level 9 Office | $2.5m |
| 14 Apr 2024 | Level 14, 100 Queen Street - Office fitout | $2.6m |
| 19 Jan 2024 | Internal Alterations to Existing Basement | $70k |
| 15 Dec 2023 | Level 34 - MaxCap Fit Out | $4.1m |
| 07 Dec 2023 | Internal Tenancy Fitout for Purple Pit | $677k |
| 07 Dec 2023 | Internal Tenancy Fitout for Purple Pit - Stage Two - To Completion of All Works | $677k |
| 04 Dec 2023 | Tenancy UG1 - Internal Tenancy Fitout for A25 | $150k |
| 10 Nov 2023 | Internal Fitout - Ground Level | $660k |
| 19 Oct 2023 | Ground floor - Alterations to Ground Floor ANZ Bank and Museum | $3.1m |
| 04 Sept 2023 | Level 32 (Part) - IGA - Internal Non Structural Alterations to parts of existing office | $1.7m |
| 17 Aug 2023 | Level 34 - MaxCap Fit Out | $4.1m |
| 11 Aug 2023 | Stage 2: Level 9 - Remainder of building works, including external wall alterations and weatherproofing | $190k |
| 10 Aug 2023 | Alteration to an existing window for fire stair number 07 | $38k |
| 19 July 2023 | Drainage to Upper ground - Lot CM Plan | $100k |
| 19 July 2023 | Proposed alterations to existing retail tenancy LG3 Cathedral Room | $650k |
| 07 July 2023 | MINOR INTERNAL TENANCY ALTERATIONS TO LEVEL 25 | $27k |
| 19 June 2023 | Widening of an existing opening fronting Briscoe Lane | $100k |
| 07 June 2023 | Basement Level 1 - Alteration to an existing building | $67k |
| 07 June 2023 | Level 9 - Alterations to the Existing Balustrades | $15k |
| 09 Mar 2023 | Removal of existing fire door & replace with a glazed fire door | $39k |
| 01 Mar 2023 | Judo Bank Melbourne HQ office tenancy fitout at Queen & Collins Tower | $5.3m |
| 01 Feb 2023 | Internal Office Fitout for FinClear | $728k |
| 20 Dec 2022 | Level 11 - Internal Office Fitout for Shape | $2.6m |
| 20 Dec 2022 | Level 3 - Base building works on 380 Collins Street, Melbourne. | $81k |
| 20 Dec 2022 | Level 3 Internal office fit out | $906k |
| 18 Nov 2022 | Stage 2 - Levels 25, 26 & 27 - Judo Bank Melbourne HQ office tenancy fitout at Queen & Collins Tower | $5.3m |
| 07 Nov 2022 | Alterations to existing cold shell space (excluding the tiered seating) | $3.1m |
| 04 Nov 2022 | Level 3 - Base building works on 380 Collins Street, Melbourne. | $81k |
| 03 Nov 2022 | Judo Bank Melbourne HQ office tenancy fitout at Queen & Collins Tower | $5.3m |
| 27 Sept 2022 | Level 3 Internal office fit out | $906k |
| 21 Sept 2022 | Stage 2 - Multiple Levels of Fitout (Separate Tenancies) at Queen & Collins Tower | $2.4m |
| 19 Sept 2022 | Stage 2 - Balance of works including (health room 02, focus room 03 & quiet room 04) | $2.5m |
| 15 Sept 2022 | Level 15, Alteration to an existing building | $1.9m |
| 02 Sept 2022 | Fitout works to part of basement 1 and basement 2 to create a contractor amenities space | $290k |
| 01 Sept 2022 | Alterations to existing warm shell space. | $1.3m |
| 19 Aug 2022 | Stage 2 - Alterations to existing cold shell space - Including the tiered seating. | $3.1m |
| 10 Aug 2022 | LG4 - Proposed alterations to existing retail shop | $3.2m |
| 07 July 2022 | Removal of existing fire door & replace with a glazed fire door | $39k |
| 22 June 2022 | Stage 2 - To Permit Remainder of Proposed Works Including Internal Fitout to Full Office Space | $1.2m |
| 20 June 2022 | Stage 1 - Alterations of existing cold shell space (excluding health room 02, focus room 03 & quiet room 04) - Level 13, 100 Queen Street - Multiple Levels of Fitout (Separate Tenancies) at Queen & Collins Tower | $2.5m |
| 06 June 2022 | Level 12 - Fitout of existing cold shell space - Excluding Quiet Room L12-01 | $2.4m |
| 23 May 2022 | Stage 2 - level 4 - Remainder of level 4 fitout works | $5.2m |
| 30 Mar 2022 | Level 24 - Internal Office Fitout | $2.4m |
| 17 Mar 2022 | Alterations to levels 2 & 3 | $384k |
| 11 Mar 2022 | Stage 1 - To Allow Construction of New Comms Room Only | $1.2m |
| 11 Mar 2022 | Stage 2 - To Permit Remainder of Proposed Works Including Internal Fitout to Full Office Space | $1.2m |
| 08 Feb 2022 | Removal & replacement of the existing wall & floor linings. | $26 |
| 25 Jan 2022 | Level 22 - Fitout works to tenancy 2 (Level 22 only) | $1.3m |
| 18 Jan 2022 | Stage 2 - Internal Alterations - Level 5 & 6 - Internal fitout | $512k |
| 11 Jan 2022 | Level 10 - Office Fitout | $3.0m |
| 15 Dec 2021 | Stage 2 - Alteration to an existing building Levels 5 - 8, 100 Queen Street | $14.9m |
| 15 Dec 2021 | Stage 3 - Remainder of Fit Out Scope: Fire rated partitions, fire services, joinery, signage, loose furniture, workstations, staircases, balustrades & operable walls | $14.9m |
| 06 Dec 2021 | Stage 1 - level 4 - Alterations to an existing building | $5.2m |
| 30 Nov 2021 | Safe Deposit Building – Level 1 Wellness Retreat | $120k |
| 22 Nov 2021 | Level 14-15 - Inter-tenancy stair demolition and slab infill works | $113k |
| 18 Nov 2021 | Tenancy 1 Only - Level 22 Fitout Works | $1.2m |
| 14 Oct 2021 | Stage 13 - Change of Use and alterations to existing building | $119.1m |
| 01 Oct 2021 | Lift Upgrades works | $960k |
| 17 Sept 2021 | Level 5 & 6 - Internal fitout | $512k |
| 16 Sept 2021 | Stage 2- To Permit Remainder of Proposed Works Only. | $1.6m |
| 14 Sept 2021 | Tenancy UG.3 - Proposed alterations to existing retail | $370k |
| 13 Sept 2021 | Additional Minor Alterations to Level 17 Fitout Including 3x Meeting Rooms | $231k |
| 13 Aug 2021 | Stage 1 - To Permit Internal Fitout Works Exlcuding Structural Operable Wall only | $1.6m |
| 10 Aug 2021 | Stage 1: Office fitout on Level 1 & 2. All works (excluding level 2 pod D). | $5.5m |
| 03 Aug 2021 | Stage 6 - Remainder of architectural works excluding facade works | $118.8m |
| 29 June 2021 | Level 17. Fit-out works | $1.9m |
| 29 June 2021 | Stage 1 - Demolition to 100 Queen Tower (B3 - L34), 90 Queen and 380 Collins (excluding demolition of facade and capping beam to Collins St). Slab breakout to basement 3 and new foundation works as well as foundation strengthening (refer Basement 3 foundation works) | $118.8m |
| 29 June 2021 | Stage 2 - Level 16 Fit-Out Works Only | $0 |
| 29 June 2021 | Stage 8 - Facade Types FT01 & FT04 and 90 Queen Street and 380 Collins Street Punch Windows | $118.7m |
| 28 June 2021 | Stage 12 - Change of Use and alterations to existing building | $119.1m |
| 25 June 2021 | Stage 7 - 100 Q facade works only | $118.8m |
| 04 June 2021 | Stage 6 - Remainder of architectural works excluding facade works | $118.8m |
| 03 June 2021 | Stage 11 - Change of Use and alterations to existing building | $118.7m |
| 26 May 2021 | Stage 2: Office fitout on Level 1 & 2. Office fitout. | $5.5m |
| 12 May 2021 | Removal / Relocation of Services within proposed void zone. Installation of new trimmer beams on Level 6 & 7. Structural strengthening of the existing beams/slab on Level 8. Installation of scaffolding to support the weight of the cut. Demolition & removal of slab to create interconnecting voids. | $17.1m |
| 20 Apr 2021 | Stage 10 - Change of Use and alterations to existing building | $118.7m |
| 20 Apr 2021 | Stage 3 - Remainder of mechanical, electrical, hydraulic and fire services to 100 Queen and all mechanical, electrical, hydraulic &and fire services to 90 Queen and 380 Collins | $118.8m |
| 19 Apr 2021 | Stage 9 - Remaining Architectural facades (FT 02, FT03, FT05, FT07, FT08) | $118.7m |
| 01 Apr 2021 | Level 20 & 21 - Fitout Works - New Inter-Connecting Stair | $4.0m |
| 15 Mar 2021 | Stage 2 - Level 16 Fit-Out Works Only | $0 |
| 02 Mar 2021 | Level 17 - Fit-out works only | $1.9m |
| 17 Nov 2020 | ASE Replacement | $2k |
| 13 Nov 2020 | Stage 5 - Level 10-18 architectural works only | $118.8m |
| 09 Nov 2020 | Stage 2 - Services to Levels 3-34 excluding Levels 19 & 33 and excluding wet and dry fire services | $118.8m |
| 16 June 2020 | Stage 6 - Remainder of architectural works excluding facade works | $118.8m |
| 21 Feb 2020 | Stage 4 - B2 - L9 structural works | $118.8m |
| 29 July 2019 | Levels B1, 2 and 3 - Alterations to existing Office - Stage 1 - All works except those on Level 1 | $363k |
| 30 May 2019 | Demolition 84-90 Queens Bridge Street SOUTHBANK | $165k |
| 22 Dec 2015 | Alterations to Mechanical Services | $1.5m |
| 05 Aug 2015 | Level 6 - Replacement of Plant Room Chillers | $2.9m |
| 04 Aug 2015 | Replacement of Electrical Switchboards | $1.7m |
| 29 July 2015 | Level 3, ANZ Proposed Minor Internal Refurbishments to Existing Digital Room | $359k |
| 12 June 2015 | Repairs to roof, including structural assessment of roof members and replacement of roof covering Roof | $212k |
| 28 May 2015 | Repairs to Roof Lantern Structure amd Maintenance Access Works | $433k |
| 21 Apr 2015 | Levels 21, 23 & 27 (Alt 100 Queen Street) - New Auto Doors | $45k |
| 21 Jan 2015 | (100 Queen Street) Level 27 - New Disabled Accessible Sanitary Facility | $50k |
| 11 Dec 2014 | Level 21, New DDA toilet. | $50k |
| 27 Nov 2014 | Level 26 - Fit Out ( known as 100 Queen St) | $50k |
| 30 Oct 2014 | Level 4, Internal Alterations. | $700k |
| 30 Sept 2014 | Level 1 New Kitchen | $50k |
| 11 July 2014 | Construction of stone work to building facade | $955k |
| 11 July 2014 | Internal Alterations Level 6 | $130k |
| 07 July 2014 | Office fitout on Level 5 | $400k |
| 25 Nov 2013 | Stage 1: Part Level 30 only - Internal Alterations Lvl 21,29,30 100 Queen Street | $77k |
| 13 Nov 2013 | Alterations Level 5 | $125k |
| 08 Oct 2013 | Alterations to Level 2 | $110k |
| 03 Oct 2013 | Alterations Level 28 | $125k |
| 03 Oct 2013 | Alterations to Level 27 | $251k |
| 15 Aug 2013 | Infill slab to Level 6 & fitout | $398k |
| 18 June 2013 | Stage 2: New External Shopfront - Alterations to existing bank tenancy Ground Floor | $1.0m |
| 13 June 2013 | Alterations to Level 22 | $113k |
| 31 May 2013 | Alterations to Level 25 | $121k |
| 09 May 2013 | Alterations to existing bank tenancy Ground Floor | $1.0m |
| 18 Apr 2013 | Alterations to Level 24 | $84k |
| 11 Sept 2012 | Stage 2: Relocation of fire hydrant and fire hose reel. Alterations to an existing building | $1.2m |
| 30 Aug 2012 | Alterations to existing building services | $350k |
| 17 July 2012 | Alterations to an existing building - all works excluding relocation of the existing fire hydrants & fire hose reels | $1.2m |
| 10 July 2012 | Lift lobby and base building toilet upgrades to Levels 23 and 24 | $660k |
| 19 Apr 2012 | Stage 10: Fitout of levels 12, 13, 14 15, 16, 18 | $21.3m |
| 21 Dec 2011 | Stage 8: Internal demolition works within Levels 12, 13, 14, 15, 16 & 18. ANZ Fitout | $15.1m |
| 14 Dec 2011 | Stage 11: Alterations to the Foreign Exchange Shopfront within the Ground Floor Lobby | $21.5m |
| 01 Dec 2011 | Internal alterations to restaurant (Bellini) | $20k |
| 31 Aug 2011 | Alterations to roof level plantroom. | $955k |
| 23 Aug 2011 | Stage 9: Alterations to the Bellini internal shopfront within the ground floor lobby | $15.2m |
| 29 July 2011 | Stage 7: Fitout of ground lobby plus Queen Street and Little Collins Street facade alterations. ANZ Fitout | $14.6m |
| 15 July 2011 | Stage 5: Fitout of levels 2, 3, 4 | $12.9m |
| 05 July 2011 | ANZ Fitout Project. Stage 6: Internal demolition works within ground floor lobby. | $0 |
| 16 Mar 2011 | Alterations to level 1 office | $41k |
| 21 Feb 2011 | ANZ Building - Internal fitouts to an existing building. Stage 1 : Levels 28 & 32 | $0 |
| 03 Feb 2011 | Alterations to Level 25 | $94k |
| 24 Sept 2010 | ANZ Fitout Project. Stage 4: Installation of sanitary facilities, showers, locker room and storage rooms within the existing B1 basement level | $7.1m |
| 08 Sept 2010 | ALTERATIONS TO LEVEL 23 | $139k |
| 13 Aug 2010 | Stage 3: Fitout of Levels 5, 10 & 30 | $6.5m |
| 26 May 2010 | Stage 2: Fitout of Level 31. ANZ Building - Internal fitouts to an existing building. | $2.2m |
| 24 Mar 2010 | Level 3 - Alterations. | $23k |
| 11 Mar 2010 | Level 4 - Installation of security door | $16k |
| 09 Feb 2010 | Levels 5, 20 & 28 - Proposed alterations to existing tenancy | $198k |
| 21 Dec 2009 | Internal office alterations | $17k |
| 27 Oct 2009 | Internal alterations to an office on level 23 at 100 Queen Street, Melbourne | $25 |
| 09 Sept 2009 | Internal Alterations - ANZ | $9k |
| 01 June 2009 | Alterations to toilets on level 6 | $78k |
| 26 Mar 2009 | Demolation of Non Load Bearing Internal Wall Level 7 | $11k |
| 15 Dec 2008 | Upgrade & refurbishment to WC Level 6-8 | $461k |
| 09 Dec 2008 | Alterations to an Existing Building - Office Fitout, Level 9 & 11. Stage 2: All Remaining Works to Completion. | $3.3m |
| 17 Oct 2008 | Alterations to a building Level 6, 100 Queen Street MELB 3000 | $982k |
| 30 July 2008 | New wheel chair incline lift installation Part ground floor | $82k |
| 16 May 2008 | Minor office alterations to Level 28 | $25k |
| 01 May 2008 | Internal office alterations Level 12 | $40k |
| 23 Apr 2008 | Office internal alterations , level 29 | $35k |
| 01 Apr 2008 | Minor internai office alterations Part Level 10 | $60k |
| 01 Apr 2008 | Office fitout alterations to an existing building Level 6, Level 7 & Level 8. Stage 1: Internal Stripout Works Only. | $16.0m |
| 19 Mar 2008 | Office internal demolition works only Level 5. | $100k |
| 14 Mar 2008 | (Office) Wall demolition & removal of 3 sprinklers Level 30 (only). | $13k |
| 07 Mar 2008 | Internal office alterations Level 20 (part). | $80k |
| 17 Dec 2007 | Office fitout alterations to an existing building - Relocation of sprinkler head Level 14 (part). | $850k |
| 22 Nov 2007 | Alterations to a building. FIP panel, EWIS panel and smoke detectors upgrade, office and basement carpark. | $360k |
| 19 Oct 2007 | Internal alterations to Office Level 10 | $9k |
| 17 Oct 2007 | Minor Internal Alterations Part Level 6 | $75k |
| 09 Oct 2007 | Minor internal alterations Level 3 | $15k |
| 26 Sept 2007 | Minor office alterations Level 14 | $8k |
| 17 Aug 2007 | Alterations to a building, internal office alterations to part Level 8 only. | $23k |
| 12 July 2007 | Alterations to an existing office building, part Level 27. | $35k |
| 12 July 2007 | Internal office alterations. Stage 2: Mechanical ventilation installation. Level 5. | $30k |
| 12 July 2007 | Minor internal alterations Part Level 26 | $8k |
| 19 June 2007 | Internal office alterations Level 15 | $80k |
| 30 Mar 2007 | Alterations to office, minor partition alterations to Level 20. | $10k |
| 26 Mar 2007 | Ofiice fitout Level 23 | $577k |
| 14 Feb 2007 | Office tenancy fitout Level 34 | $300k |
| 27 Nov 2006 | Alteration to an office building, installation of windows, demolition level 2 only. | $175k |
| 06 Oct 2006 | Alterations to a building, minor alterations to an existing building part level 17. | $20k |
| 26 Sept 2006 | Demolition works Level 2 Stage 1 | $0 |
| 01 Sept 2006 | Alterations Sanitary Upgrade Basement Level 2 | $148k |
| 27 June 2006 | Alterations to a building, internal office alterations part level 17 only. | $700k |
| 17 Apr 2006 | Alterations to a building, bank office fitout minor partition alterations to level 29 | $12k |
| 14 Mar 2006 | Alterations to a building; Office partition alterations on level 2 only | $60k |
| 15 Feb 2006 | Alterations to a building, bank minor partition alterations to level 23 | $14k |
| 14 Feb 2006 | Alterations to a building, office internal alterations level 2 (part only) | $300k |
| 02 Feb 2006 | Alterations to an existing building, office level 28 only | $750k |
| 30 Nov 2005 | Level 12 Alterations | $60k |
| 21 Oct 2005 | Internal alterations- Part Level 2 & 3 | $200k |
| 09 Sept 2005 | level 22 378-390 collins st AKA 74-110 queen street melbourne | $58k |
| 08 July 2005 | internal office alterations - levels 12, 13 & 22 | $115k |
| 08 June 2005 | internal works - levels 29 and 30 | $95k |
| 25 May 2005 | International alterations to the ground floor foyer in no. 100 | $40k |
| 12 May 2005 | Alterations to a building; Office partition demolition on level 15 only | $7k |
| 15 Apr 2005 | alterations to level 20 only | $297k |
| 01 Apr 2005 | proposed internal non-structural alterations, level 5 | $470k |
| 21 Mar 2005 | internal alterations to levels 29, & 30. | $50k |
| 17 Mar 2005 | Alterations to part of level 32 office in no. 100 Queen St. | $600k |
| 15 Mar 2005 | ANZ Bank, alterations to a building, internal office alterations level 13 | $25k |
| 31 Jan 2005 | Internal alterations to level 29 & 30 in No. 100 Queen St | $200k |
| 28 Jan 2005 | Internal alterations Southern West Level 3 | $25k |
| 11 Jan 2005 | Internal alterations Level 14 | $245k |
| 03 Nov 2004 | Partition alterations Level 3 | $15k |
| 16 Sept 2004 | Construct new offices Part Level 27 | $15k |
| 08 July 2004 | Internal alterations part level 4 | $90k |
| 29 June 2004 | Alterations Level 22 | $13k |
| 12 May 2004 | Alterations to building. Stage 0 - Office fitout Level 16. | $34k |
| 19 Feb 2004 | Internal alterations to Level 12 | $23k |
| 26 Nov 2003 | Alterations to an existing Building: AWIS Upgrade. Basement Levels 1 - 4 & Ground Levels 1 - 34. AKA 100 QUEEN STREET, MELBOURNE | $59k |
| 21 Aug 2003 | Ground floor alterations | $10k |
| 03 July 2003 | Internal Fitout to an office, Level 27. AKA 74-110 QUEEN STREET, MELBOURNE | $40k |
| 27 May 2003 | Alterations to an existing building, to carpark guard office. Ground Level | $100k |
| 13 May 2003 | Level 4 alteration | $58k |
| 28 Apr 2003 | Level 2 Tenancy | $45k |
| 28 Apr 2003 | Tenancy alterations Level 3 | $200k |
| 10 Apr 2003 | Alterations to tenancy on level 5 (office) | $22k |
| 24 Mar 2003 | Internal Alterations to Office. Part Level 22 | $27k |
| 13 Mar 2003 | Office alteration to part of Level 20 | $7k |
| 14 Jan 2003 | Internal office alterations excluding mechanical ventilitation. Level 5. Total Cost: $100,000. | $70k |
| 10 Jan 2003 | Internal office fitout to level 4 only | $40k |
| 03 Dec 2002 | Alterations to an existing building. Internal office fitout. Level 26 AKA 100 Queen Street, Melbourne | $12k |
| 15 Oct 2002 | Internal alterations for small partitioning. Level 12 (aka 100 Queens Street,Melbourne) | $13k |
| 16 Aug 2002 | Ground Floor Restaurant Alterations and Mezzanine Level | $1.4m |
| 23 July 2002 | Level 20 - Internal Office Fitout | $12k |
| 16 July 2002 | Level 3 - Internal Office Alterations | $16k |
| 07 Mar 2002 | Level 14 - Internal Fitout Alterations | $45k |
| 19 Feb 2002 | Internal Fitout to Bank | $240k |
| 01 Feb 2002 | Interior fitout, office alterations. | $30k |
| 16 May 2001 | grnd lvl ANZ bank security office fit out | $400k |
| 15 May 2001 | lvl 10 office refurbishment at ANZ bank 100 Queen St | $336k |
| 09 May 2001 | lvl 26 office alts -ANZ | $630k |
| 24 Nov 2000 | lvls 12 & 13 office tenancy fit out for ANZ | $75k |
| 13 Nov 2000 | office fitout to level 6, class 5. | $145k |
| 23 Oct 2000 | Office fitout on level 27 100 queen st | $600k |
| 04 Aug 2000 | lvl 7 ANZ office fit out | $750k |
| 13 June 2000 | remedial works to anz gothic bank spire 380 collins street | $87k |
| 11 Apr 2000 | ANZ fitout Level 8, 9 & 14 | $1.4m |
| 04 Apr 2000 | Installation of alarm signalling equipment | $190 |
| 10 Mar 2000 | Partition alterations to levels 20, 21, 22 and 23 | $408k |
| 10 Mar 2000 | Tenancy fitout on level 11 | $302k |
| 06 Mar 2000 | Alterations to partitions level 5 | $30k |
| 03 Mar 2000 | Construction and alterations to partitions | $80k |
| 11 Jan 2000 | Tenancy alterations on level 25 | $480k |
| 03 Dec 1999 | Alterations to an existing building part l3 | $325k |
| 25 Oct 1999 | Office fitout | $250k |
| 12 Oct 1999 | Fitout for ANZ Bank on level 17 | $22k |
| 08 Apr 1999 | Tenancy alterations | $45k |
| 22 Mar 1999 | Tenancy fitout on level 6 | $185k |
| 25 Jan 1999 | Office fitout on levels 29 & 30, 100 Queen Street, Melbourne | $311k |
| 06 Jan 1999 | Partition alterations on levels 2 and 4 | $235k |
| 29 Oct 1998 | Partition fitout levels 31 and 32 | $335k |
| 26 June 1998 | Office fitout on levels 29 & 30, 100 Queen Street, Melbourne | $311k |
| 12 June 1998 | Alterations to Level 16 office | $55k |
| 03 Mar 1998 | Alterations on levels 3 24 25 27 (all part of floor) | $15k |
| 16 Oct 1996 | Fitout to Level 14 | $40k |
| 01 Apr 1995 | ANZ Museum and Heritage works | $300k |
| 27 Sept 1994 | Office partitions to level 2 | $180k |
Is Queen & Collins residential or commercial?
Queen & Collins is a commercial building. The City of Melbourne lists its main use as office.
When was Queen & Collins built?
Queen & Collins was completed in 1993.
How many floors does Queen & Collins have?
Queen & Collins has 37 floors above ground.
What businesses are in Queen & Collins?
The latest council census counted 29 businesses in Queen & Collins, including A25 Pizzeria Centro, AFTERPAY AUSTRALIA PTY LTD and ALVAREZ & MARSAL.
Is there office or retail space for lease in Queen & Collins?
See the commercial listings on this page, or search this address on realcommercial.com.au and commercialrealestate.com.au.
Who designed and built Queen & Collins?
GPT Group developed Queen & Collins, Peddle Thorp designed it and Grocon built it. The building team section has the sources.
How tall is Queen & Collins?
About 162 metres, measured from the City of Melbourne's 3D building model. It's number 45 of 1596 buildings in Melbourne by height.
What public transport is near Queen & Collins?
Town Hall Station is the nearest train station, about 6 minutes' walk. The nearest tram stop is Elizabeth St/Collins St #5, about 2 minutes' walk.
What is the planning zone for Queen & Collins?
The site is in the Capital City Zone - Schedule 1 (CCZ1). It's also under a Heritage Overlay (HO604).
Has any work been done on Queen & Collins recently?
The City of Melbourne has issued 172 building permits for Queen & Collins since 1994. The most recent was in February 2026.
Sources: City of Melbourne building permits (CC BY 4.0); CLUE building information (CC BY 4.0); CLUE business establishments (CC BY 4.0); Geocoded National Address File (G-NAF) (Open G-NAF EULA (CC BY 4.0 based)). General information from public records, not legal, financial or building advice.