| Planning application | 2015 | Planning application TP-2015-800 lodged |
| Approved | Approved | Planning permit granted (exact date not recorded) |
| Completed | 1975 | Optus Centre completed: 34 floors |
Each cost is the estimate on that record. Stages of a project often repeat its full value, so these don't add up to what was spent.
| 08 Apr 2026 | Stage 2 - Completion of All Works) | $16.7m |
| 01 Apr 2026 | Alterations to existing office | $544k |
| 19 Feb 2026 | Level 21 - Tenancy fit out of office | $25k |
| 13 Feb 2026 | Level 29 - Internal tenancy split | $408k |
| 12 Feb 2026 | LG50 - Office - Internal defit / makegood | $98k |
| 27 Jan 2026 | Level 13 - Alterations to the Existing Building, Removal of the Booths | $30k |
| 08 Dec 2025 | Level 29 - Internal Office Alterations | $492k |
| 24 Nov 2025 | The proposed project is for the minor works at the Colliers tenancy comprising of moving workstations and creating two new meeting rooms located at 367 Collins Street, Melbourne. | $297k |
| 22 Oct 2025 | Stage 2 - Completion of All Works) | $16.7m |
| 10 Oct 2025 | Levels 4-6 & 12 - Internal Tenancy Splits and Office Fitouts | $11.6m |
| 06 Oct 2025 | Project is for a ground floor lobby upgrade located at 367 Collins Street, Melbourne. | $12.3m |
| 05 Aug 2025 | Level 24 - Alterations to an Existing Building - Fitout Works | $1.4m |
| 05 Aug 2025 | Stage 2 - Level 24 - Alterations to an Existing Building - Fitout Works | $1.4m |
| 02 July 2025 | Level 22 - Internal Amenities Alteration | $698k |
| 20 June 2025 | Stage 2 - Completion of all works | $2.2m |
| 23 May 2025 | Bathroom and Lift Lobbies Upgrade (Levels LG, 1, 3-21, 23, 26, 27, and 29-32) (Stage One - Completion of Demolition Works) | $16.7m |
| 04 Apr 2025 | Stage 2 - Level 22 - Completion of all works | $698k |
| 21 Mar 2025 | Level 13 - Internal Fit-Out Works for Existing Sportsbet Tenancy | $1.3m |
| 18 Mar 2025 | Ground floor - Removal of Existing Display Suite & Make Good Works to Warm Shell | $66k |
| 07 Mar 2025 | Level 14 - Internal Fitout - Office Level 14 Only | $20k |
| 03 Dec 2024 | Level 11 - Warm Shell Works | $556k |
| 21 Nov 2024 | Suite 02, Level 16 Construction of an internal office fitout (Hileon Head Office) | $132k |
| 12 Nov 2024 | Level 22 - Internal Office Fitout - Stage One - Completion of Internal Demolition Works Only | $2.1m |
| 01 Oct 2024 | Internal Office Fitout | $126k |
| 01 Aug 2024 | Stage 2 - Balance of works levels 4-9 | $3.3m |
| 05 July 2024 | Stage 1 – Levels 4-12, 367 Collins St - Cold shell works to Levels 10-12 Only | $3.3m |
| 10 May 2024 | Stage 2 - Installation of mechanical plant equipment on the roof | $200k |
| 01 May 2024 | Stage 1 Construction of Data Room on Level 1 (excluding plant equipment on the roof) | $1.9m |
| 03 Apr 2024 | Lots 1, 2 and 4 - Proposed Internal Alterations | $31k |
| 31 Jan 2024 | Tenancy 2 - Alterations to existing shop | $164k |
| 05 July 2023 | Display fitout for Colliers | $250k |
| 31 Mar 2023 | Office Fitout to Level 28 (BG&E) | $2.2m |
| 16 Jan 2023 | Mezzanine Level - Removal of Existing Display Suite & Make Good Works to Warm Shell | $25k |
| 14 Dec 2022 | Base Building Upgrade on Level 28 | $1.9m |
| 07 Dec 2022 | Internal Demolitions works to office | $466k |
| 07 Dec 2022 | Level 29 - Internal Demolition Stripout Works to Office | $514k |
| 20 Oct 2022 | Level 25 (Part) - Grillo Higgins Lawyers Office - Internal non structural alterations to the existing office tenancy. | $456k |
| 26 July 2022 | Tenancy 6 - Ground Floor - Alterations to existing Office | $140k |
| 04 July 2022 | Level 25 - Proposed Fitout of Morgan's Holdings (Aust) Office. | $1.2m |
| 27 June 2022 | Make good and upgrade works to an existing tenancy in the lobby. | $552k |
| 20 May 2022 | Proposed tenancy separation for Mirvac office | $273k |
| 17 Jan 2022 | Level 24 Tenancy Alterations | $330k |
| 07 Sept 2021 | Stage 2: Remainder of works to office space of levels 13-18 & 21 | $7.6m |
| 13 Aug 2021 | Stage 1: Internal demolition works & construction of new partitions to existing office space of levels 13-18 & 21 | $1.5m |
| 19 May 2021 | Stage 1 - Level 25. Base Building Refurbishment Works | $0 |
| 26 Apr 2021 | Level B2 - To allow the minor internal alterations to occur to the exisiting lift pit access doors | $50k |
| 22 Dec 2020 | Reconfiguration to the existing Australian Red Cross Lifeblood CBD Donor Centre. | $248k |
| 14 Dec 2020 | Stage 2 - Balance of Works - Base Building Refurbishment Works | $0 |
| 14 Oct 2020 | Internal office fit out. Display suite. | $515k |
| 30 July 2020 | Level 27 - Internal Office Fitout for INSYNC | $0 |
| 17 June 2020 | Level 13 - Proposed Plug Fan Upgrade | $228k |
| 20 Mar 2020 | Stage 1 - Tenancy fitout of display suite (excluding fire services) | $500k |
| 12 Feb 2020 | Internal Office Fitout for NDIA | $978k |
| 11 Dec 2019 | DUPLICATE (SEE BP-2020-23) - Stage 1 - Tenancy fitout of display suite (excluding fire services) | $500k |
| 25 Nov 2019 | Level 31 - Building Permit Fees | $249k |
| 22 Nov 2019 | Part levels 26 & 27 - Proposed alterations to an existing office | $80k |
| 08 Oct 2019 | Level 20 - Internal Office Fitout for NDIA | $334k |
| 19 July 2019 | Tenancy 3 & 8 - Proposed restaurant fitout for Tian 38 | $500 |
| 27 Feb 2019 | Tenancy 1, Ground floor - Fitout | $1.7m |
| 21 Jan 2019 | Level 12 - Upgrade of Accessible Sanitary Facility on Level 12 | $26k |
| 17 Dec 2018 | Tenancy 4 - Proposed restaurant fitout fitout for "Co Hanh" | $230k |
| 06 Dec 2018 | Lower Ground Floor Corridor and Lobby Upgrade | $227k |
| 30 Nov 2018 | L29 - Internal Office Alterations | $1.2m |
| 21 Aug 2018 | Level 24- Alterations to existing building | $379k |
| 10 Aug 2018 | Tenancy 1, Ground floor - Fitout | $1.7m |
| 06 July 2018 | Ground Floor - All fit-out works excluding stairs - Colliers Our Space | $895k |
| 06 July 2018 | Stage 2 - Remaining works | $895k |
| 01 June 2018 | Levels 26, 27 & 30 Internal Office make good works | $2.1m |
| 08 May 2018 | Stage 4, Structural Works & Services | $13.6m |
| 13 Apr 2018 | Redevelpomentof lower levels | $2.0m |
| 13 Apr 2018 | Stage 3, Remainder of Demolition Works | $13.6m |
| 09 Apr 2018 | Bensons Marketing Suits - Level 3 Office Fitout | $120k |
| 13 Dec 2017 | Level 29 - Office fitout | $674k |
| 14 Nov 2017 | Stage 2, Internal, Non-Structural Demolition Works) | $13.6m |
| 14 Nov 2017 | Stage 5, Balance Works (Additions & Alterations to an Existing Commercial Building) | $13.6m |
| 05 Nov 2017 | Shop 7 - Internal alterations to an existing tenancy into a new gymnasium | $270k |
| 18 Oct 2017 | Shop T5 - Fitout of Café | $205k |
| 22 Sept 2017 | Level 29 - Internal Demolition Stripout Works to Office | $514k |
| 28 Apr 2017 | Stage 1 – Internal Demolition Works Only - Levels 9, 10, 11 - Three level internal office fit-out for Optus | $1.5m |
| 28 Apr 2017 | Stage 2 – Alterations to an Existing Building - Levels 9, 10, 11 - Three level internal office fit-out for Optus | $1.5m |
| 10 Aug 2016 | Stage 2 - Fit-out to Level 19 | $5.7m |
| 02 June 2016 | Level 19 - Internal Office Make Good Works & New Disabled Toilet | $818k |
| 29 Mar 2016 | Levels 15 & 21-23 - Internal Alterations | $4.2m |
| 21 Mar 2016 | Level 32 - Proposed office fitout | $638k |
| 11 Feb 2016 | LEVEL 4 & 6 - Refurbishment Works | $280k |
| 01 Feb 2016 | Office Fitout - ARCBS Donor Centre | $2.1m |
| 14 Oct 2015 | Level 3 - Alterations to existing building | $70k |
| 06 Oct 2015 | Internal Make Good Office works | $2.2m |
| 16 Sept 2015 | Stage 1 - Tenancy B, Level 27 - Internal Office Alterations | $165k |
| 11 Sept 2015 | Office Fitout - ARCBS Donor Centre | $2.1m |
| 30 July 2015 | Internal Make Good Office works | $242k |
| 12 June 2015 | Level 24: Office Fit-Out | $1.2m |
| 29 May 2015 | Level 28: Proposed alterations to existing office tenancy | $30k |
| 04 May 2015 | Level 20 - fitout | $1.7m |
| 23 Apr 2015 | Office fitout to existing tenancy space (stair opening existing) | $1.5m |
| 31 Mar 2015 | Part Level 27 - Internal Office Alterations | $90k |
| 15 Jan 2015 | Alterations to level 14 | $93k |
| 12 Dec 2014 | Ground Floor Mezzanine - internal alterations to existing office | $618k |
| 11 Oct 2014 | Mezzanine & Level 30 Proposed partition alterations | $1.8m |
| 30 Sept 2014 | Levels 26, 27 & 30 Internal Office make good works | $2.3m |
| 21 Aug 2014 | Level 12 "Meridian Lawyers' office tenancy fitout | $875k |
| 11 Apr 2014 | Level 18 proposed Office fit out | $1.2m |
| 05 Mar 2014 | Lvl 18 Proposed Refurbishment | $520k |
| 12 Nov 2013 | Iinternal Alterations Level 15 | $7k |
| 23 Oct 2013 | Office Refurbishment - Level 1 | $1.4m |
| 29 May 2013 | Proposed Internal Tenancy Fitout - Lobby | $25k |
| 23 Apr 2013 | Office fitout - Level 13-17 (5 levels) | $4.2m |
| 19 Dec 2012 | RETAIL TENANCY FIT OUT - L26 | $2k |
| 02 Oct 2012 | Stage 5: Internal Office Fitout, Lower Ground, Level 4-12 | $7.8m |
| 26 Sept 2012 | Base building refurbishment | $11.7m |
| 21 Aug 2012 | Refurbishment of Existing Office - Level 28 | $180k |
| 17 Aug 2012 | Construction of New Accessible Sanitary Facilities Level 13-17 | $100k |
| 17 Aug 2012 | Office Fitout Level 3 & 30 | $45k |
| 02 Apr 2012 | Fitout - Level 26 | $385k |
| 27 Mar 2012 | Office alterations Level 29 | $340k |
| 05 Mar 2012 | (Office) Base building refurbishment of Level 31. | $711k |
| 13 May 2011 | Office fitout- Optus centre Level 4-12 | $5.8m |
| 27 Apr 2011 | Proposed fitout to existing cafe tenancy on rear ground floor. Tenancy 2 | $120k |
| 17 Mar 2011 | Internal fitout to commercial building at 359-373 Collins Street, Melbourne | $30k |
| 01 Feb 2011 | Office fitout on Level 29 | $50k |
| 13 Oct 2010 | OFFICE FITOUT | $325k |
| 01 Oct 2010 | Level 31: fitout of office | $100k |
| 30 Sept 2010 | Internal Office Alterations | $200k |
| 27 Aug 2010 | An office fitout on level 30 at 367 Collins Street | $165k |
| 06 Aug 2010 | int fit out of Bank offices grnd | $15k |
| 25 May 2010 | Levels 28 & 32 - office/sanitary facility refurbishment | $281k |
| 13 May 2010 | Stage 2- Remainder of Works-Levels 28 & 32 - office/sanitary facility refurbishment | $593k |
| 17 Feb 2010 | Alterations base building refurbishment- Lvl 28 | $248k |
| 20 Jan 2010 | Stage 2 Variation: Increase scope of works | $1.3m |
| 16 Nov 2009 | Office fitout- Optus centre Level 4-12 | $6.0m |
| 12 Oct 2009 | Alteration to offices, base building refurbishment of levels 1, 3 & 25 and ground level mezzanine toilet refurbishment. | $1.9m |
| 22 Sept 2009 | Stage 2: All works to completion - Office fitout alterations to existing building | $1.3m |
| 28 Aug 2009 | Office fitout alterations to existing building | $1.3m |
| 15 July 2009 | Base building refurbishment Level 28 | $248k |
| 12 June 2009 | LATERATIONS TO AN EXISTING BUILDING | $0 |
| 12 June 2009 | Level 17. Alterations to an existing building | $20k |
| 24 Nov 2008 | Base Building Refurbishment of Lower Ground Floor | $244 |
| 14 Nov 2008 | Alterations to a building - Level 18 367 Collins STreet MELB | $496k |
| 26 Sept 2008 | Proposed hair salon | $8k |
| 03 July 2008 | Level 3; Alterations to an existing building - Office Fitout | $1.3m |
| 27 June 2008 | Brencorp Office Fitout Level 31 | $890k |
| 18 June 2008 | Office tenancy fitout to Level 23. | $1.1m |
| 16 June 2008 | Office Fitout, Level 19, | $120 |
| 29 May 2008 | Alterations to Existing Bank CBA Ground Floor, 367 Collins Street | $75 |
| 05 May 2008 | Base building refurbishment of Level 19 (office). | $380k |
| 01 May 2008 | Construction of tenancy office alterations @ Level 19 | $550k |
| 18 Feb 2008 | Optus Singtel. Alterations to an existing office building, erection of partitioning to Level 1. | $83k |
| 06 Feb 2008 | Office fitout to Level 25. | $310k |
| 01 Feb 2008 | Construction of an internal cafe fitout (JAVA) Ground South West. | $250k |
| 09 Nov 2007 | Office fitout to Level 25. | $310k |
| 05 Oct 2007 | Alterations and fitout to offices on Level 26 & 27. | $2.0m |
| 02 Oct 2007 | Alterations/Office fitout Level 20 | $200k |
| 28 Sept 2007 | Office tenancy make good works, Level 19. Stage 1: Internal demolition/strip-out work. | $120k |
| 13 Aug 2007 | New external kitchen exhaust duct & works for ground floor to Cafe | $250k |
| 13 June 2007 | Refurbishment of Level 20 including Fire Engineering Assessment to entire building | $443k |
| 23 Apr 2007 | Refurbishment to Bank | $880k |
| 14 Mar 2007 | Tenancy Office fitout-Mezzanine level | $215k |
| 09 Feb 2007 | Office fitout Level 30 | $800k |
| 11 Dec 2006 | Alteration-Defit Tenancy & Base building refurbishment Level 30 | $433k |
| 07 Aug 2006 | Fire Safety Upgrade | $23k |
| 14 June 2006 | Alphawest fitout. Alterations and minor internal works to an existing building levels 11(part) & 12(part) | $120k |
| 04 May 2006 | Alterations to existing basement change rooms, basement car park level. | $183k |
| 24 Oct 2005 | Stage 2- internal office refurbishment Levels 21 & 22 | $219k |
| 25 Aug 2005 | fresh air upgrade to level 22, 367 Collins | $22k |
| 07 July 2005 | Extensions part ground | $30k |
| 20 June 2005 | office partitioning and changes to services | $195k |
| 19 May 2005 | minor internal office alterations | $18k |
| 08 Apr 2005 | office fit-out and alterations to an existing building | $50k |
| 25 Feb 2005 | Office partition fitout Level 28 | $250k |
| 04 Jan 2005 | Installation of service risers in stairs from level 3 to 33 in no. 367 Collins St. | $200k |
| 09 Aug 2004 | Satge 2: Structual Works to existing building. Alterations | $200k |
| 29 June 2004 | Partition alterations Level 23 | $250k |
| 24 June 2004 | Remove internal stair and replace | $59k |
| 17 June 2004 | Office fitout Level 3 | $100k |
| 16 June 2004 | Stage 1 alteration All works except structural | $7.9m |
| 21 Apr 2004 | Internal office fitout Level 18 | $36k |
| 15 Apr 2004 | Alterations to offices fitout/partition alterations level 14. | $71k |
| 15 Apr 2004 | Alterations to workstations Level 9 | $65k |
| 25 Mar 2004 | Office partition alterations Levels 23 & 24 | $15k |
| 21 Oct 2003 | Office fitout Level 20 | $58k |
| 04 Apr 2003 | Office Alterations to Level 22 | $30k |
| 20 Mar 2003 | Cafe fiout. Ground Level | $140k |
| 13 Feb 2003 | Alterations Part Ground Level | $290k |
| 18 Sept 2002 | Internal floor alterations Level 3 | $140k |
| 13 May 2002 | Alterations to Ground Floor Entry Door - Disabled Persons Access | $7k |
| 12 Oct 2001 | Part level 18, office fitout to existing building | $198k |
| 09 Oct 2001 | Internal office partition to level 30 - alterations to partition layout | $154k |
| 07 June 2001 | lvl 31 office alts | $5k |
| 16 May 2001 | lvl 22 office partition alts | $34k |
| 29 Jan 2001 | lvl 11 alts to offices | $20k |
| 31 Aug 2000 | level 18 alterations | $189k |
| 10 Aug 2000 | Partition alts on level 32 | $5k |
| 19 June 2000 | ground floor office alterations to existing building | $285k |
| 12 Apr 2000 | Office fitout on level 18 | $52k |
| 25 Nov 1999 | Fitout to level 3 office | $6k |
| 25 Oct 1999 | Tenancy alterations to levels 23 and 24 367 Collins Street Melbourne | $852k |
| 06 May 1999 | Fitout on level 27 | $8k |
| 06 May 1999 | Office fitout on levels 26 & 27, 367 Collins Street, Melbourne | $1.5m |
| 19 Oct 1998 | Minor fitout works within Fitzroy tenancy - Level 29, 367 Collins St, Melbourne | $20k |
| 02 Oct 1998 | Fitout for Hartley Poynton Ltd on level 20, 367 Collins Street, Melbourne | $480k |
| 13 Mar 1998 | Internal alterations Levels 1 & 3 | $216k |
| 12 Mar 1998 | Alterations to part of level 18 | $9k |
| 19 Dec 1997 | partition fitout | $247k |
| 03 Sept 1997 | Alterations and additions | $20k |
| 01 Sept 1997 | Base building refurbishment to levels 18, 20 & 26 | $1.5m |
| 15 July 1997 | Fitout on Level 22 | $40k |
| 26 Mar 1997 | Tenancy fitout level 19 and 30 | $53k |
| 16 Dec 1996 | Office fitout | $12k |
| 16 July 1996 | Alterations to Level 27 | $225k |
| 31 May 1996 | Internal alterations | $1.5m |
| 23 May 1996 | Fitout to Level 5 | $500k |
| 29 Apr 1996 | New ground floor sign | $3k |
| 16 Apr 1996 | Base building works | $900k |
| 03 Aug 1995 | all - base building works | $35k |
| 27 July 1995 | Partition fitout on Levels 4 and 5 | $500k |
| 21 June 1995 | Alterations to existing building | $900k |
| 07 June 1995 | Construct a sign | $30k |
Is Optus Centre residential or commercial?
Optus Centre is a commercial building. The City of Melbourne lists its main use as office.
When was Optus Centre built?
Optus Centre was completed in 1975.
How many floors does Optus Centre have?
Optus Centre has 34 floors above ground.
What businesses are in Optus Centre?
The latest council census counted 23 businesses in Optus Centre, including Anytime Fitness Melbourne CBD2, Australian Institute Of Company Directors and Australian Red Cross Society.
Is there office or retail space for lease in Optus Centre?
See the commercial listings on this page, or search this address on realcommercial.com.au and commercialrealestate.com.au.
Who designed and built Optus Centre?
Bates Smart designed Optus Centre. The building team section has the sources.
How tall is Optus Centre?
About 158 metres, measured from the City of Melbourne's 3D building model. It's number 48 of 1596 buildings in Melbourne by height.
What public transport is near Optus Centre?
Flinders Street Station is the nearest train station, about 4 minutes' walk. The nearest tram stop is Elizabeth St/Collins St #5, about 2 minutes' walk.
What is the planning zone for Optus Centre?
The site is in the Capital City Zone - Schedule 1 (CCZ1). It's also under a Heritage Overlay (HO1322).
Does Optus Centre have an owners corporation?
Plan of subdivision TP513276 has 1 lot.
How much was Optus Centre sold for?
Pacific Alliance Group bought Optus Centre for $340 million, with the sale reported in June 2024. In April 2023, Mirvac was marketing the building for about $400 million.
Has any work been done on Optus Centre recently?
The City of Melbourne has issued 143 building permits for Optus Centre since 1995. The most recent was in April 2026.
Sources: City of Melbourne building permits (CC BY 4.0); CLUE building information (CC BY 4.0); CLUE business establishments (CC BY 4.0); Development Activity Monitor (CC BY 4.0); Geocoded National Address File (G-NAF) (Open G-NAF EULA (CC BY 4.0 based)). General information from public records, not legal, financial or building advice.