| Completed | 1925 | London Stores completed: 10 floors |
Each cost is the estimate on that record. Stages of a project often repeat its full value, so these don't add up to what was spent.
| 21 May 2024 | De-Fit - Make Good Works ~ Level 2 & 3 Only | $240k |
| 14 July 2023 | Optus tenancy S005 - Proposed alterations to existing building | $0 |
| 14 July 2023 | Stage 3 - External works only | $90k |
| 06 Apr 2023 | Optus tenancy S005 - Proposed alterations to existing building | $50k |
| 21 Mar 2023 | Tenancy S007 -Proposed alterations to existing retail. | $60k |
| 03 Aug 2022 | COMPLIANCE UPGRADES TO CURRENT CODES - INCLUDING FIRE SERVICES, SMOKE LOBBIES ETC BETWEEN BASEMENT & LEVEL 3 - STAGE 1: FIRE SERVICES, SITE SETUP AND HYDRAULIC DISCONNECTION | $752k |
| 03 Aug 2022 | STAGE 2: Completion of all remaining works - COMPLIANCE UPGRADES TO CURRENT CODES - INCLUDING FIRE SERVICES, SMOKE LOBBIES ETC BETWEEN BASEMENT & LEVEL 3 | $752k |
| 25 Sept 2020 | Bevilles - Shop 7 - Proposed alterations to existing retail tenancy. | $22k |
| 14 May 2020 | Extension of Lift Shaft to Existing Building | $220k |
| 27 Mar 2020 | Amenities Upgrade - Stage 2 - Internal Fitout Works | $550k |
| 11 Mar 2020 | Proposed Alterations to Existing Shop 006 | $62k |
| 02 Mar 2020 | Stage 2 - External Works and Signage Installation | $0 |
| 13 Nov 2019 | Alteration of a building | $550k |
| 16 Oct 2019 | Proposed alterations to existing shop L2 | $15k |
| 19 Aug 2019 | Shop S001-S002 - Retail tenancy fitout | $70k |
| 14 June 2018 | Shops S003/S004 - Fitout of Vodafone shop | $750k |
| 02 Feb 2018 | Stage 2: To Permit External Works Including Level 4 Terrace and Ground Floor Lobby Works - Proposed Internal Fitout for WeWork | $9.0m |
| 01 Nov 2017 | Stage 2: To Permit External Works Including Level 4 Terrace and Ground Floor Lobby Works - Proposed Internal Fitout for WeWork | $9.0m |
| 25 Oct 2017 | Stage 3 - Balance of architecturals incorporating requirements of fire engineering report relating to base building works only | $6.9m |
| 13 Sept 2017 | Stage 2: To Permit External Works Including Level 4 Terrace and Ground Floor Lobby Works - Proposed Internal Fitout for WeWork | $9.0m |
| 07 Aug 2017 | Levels 4 to 9 - Proposed Internal Fitout fo WeWork | $9.0m |
| 05 July 2017 | Stage 2 - Base build (excluding fitout), including upgrade of stair ,services, rooftop plant and architectural elements subject to base building only | $5.0m |
| 06 Apr 2017 | London Stores base building refurbishment - Stage 1: Internal stripout of levels 4-9 only | $4.5m |
| 02 Mar 2017 | STAGE 1: INTERNAL STRIP OUT WORKS ONLY | $3.7m |
| 02 Mar 2017 | Stage 4 - Electrical, fire and architectural works to completion (excludes fitouts) | $3.7m |
| 19 Apr 2016 | Stage 5 - Amendment to Facade | $3.7m |
| 12 Apr 2016 | Ground Floor - Proposed Internal Tenancy Fitout for Optus | $245k |
| 11 Apr 2016 | Stage 2 - Building works which includes External Works and Signage | $33k |
| 05 Apr 2016 | Stage 1 - Internal non-structural fitout | $1.5m |
| 16 Feb 2016 | Stage 1 - Internal works only | $220k |
| 01 Feb 2016 | Stage 2 - includes Shopfront works including installation of New entry, Glazing and Signage | $20k |
| 15 Jan 2016 | Tenancy B001 Fitout Amart Sports | $300k |
| 10 Dec 2015 | Shop 004 - Retail tenancy fitout | $180k |
| 03 Dec 2015 | Stage 3 - Facade and canopy demolition & associated structural works | $3.7m |
| 20 Nov 2015 | Stage 2 - construction of the Shopfront alterations and Business Signs shall be read in-conjunction with the existing building permit | $38k |
| 19 Nov 2015 | STAGE 2: DEMOLITION OF ROOF AND STRUCTURAL WORKS (EXCL FACADE) | $37.1m |
| 21 Oct 2015 | Shop 007 (Bevilles) Retail tenancy fit out - Stage 1, building works which includes Internal Works Only | $210k |
| 07 July 2015 | SHOP L102 - RETAIL TENANCY FIT OUT | $125k |
| 12 Sept 2014 | London stores basement (B001), International non structural demolition (de-fit) to basement Level B1. | $172k |
| 01 July 2014 | Proposed Internal Tenancy Fitout for Optus | $139k |
| 11 July 2013 | Installation of alarm signalling equipment | $190 |
| 16 Oct 2012 | Construction of internal shop alterations - Spendless Shoes (Shop 7) | $130k |
| 22 Aug 2012 | Alterations to an existing McDonald's restaurant | $100k |
| 28 Mar 2012 | Basement Shop 001, London Stores - Construction of restaurant fitout | $100k |
| 30 Nov 2011 | A tenancy fit out for Vodafone | $36k |
| 13 May 2011 | Construction of internal shop fitout to shop 14 | $2k |
| 19 Apr 2011 | Retail fitout of shop 10, level 1 | $3k |
| 11 Apr 2011 | Fitout Tenancy 8 Shop 102 | $4k |
| 21 Mar 2011 | Minor Internal alterations Shop 16 (Axonia Fashion) | $1k |
| 11 Mar 2011 | Construction of Retail fitout to tenancy T12 at S102. | $3k |
| 26 Nov 2010 | Construction of a base building fitout - Tokyo Nono | $165k |
| 29 June 2009 | Refurbishment Level 2 & 3 for Gymnasium | $552k |
| 10 June 2009 | Tenancy fitout Cotton on Body Ground Floor. Stage 2: Shop front alterations and signage | $24k |
| 05 May 2009 | Removal of BGA's at London Stores | $4k |
| 23 Apr 2009 | Tenancy fitout Cotton on Body Ground Floor. Internal Shop Fit-Out - Internal works only (Excluding external signage). | $24k |
| 01 Dec 2008 | Internal alterations and fitout Shop 1 General Pants. Ground Floor. | $40k |
| 17 Nov 2008 | EXTERNAL SIGNAGE AND SHOPFRONTALTERATIONS - GENERAL PANTS GROUND FLOOR, SHOP 1, 347 BOURKE STREET, MELBOURNE. VIC. 3000 | $10k |
| 08 Oct 2008 | Internal alterations and fitout Shop 1 General Pants. Stage 2: Internal fitout, Ground Floor. | $450k |
| 09 Apr 2008 | Academia tenancy fitout Level 9 | $330k |
| 28 Sept 2007 | Tenancy Change of Use Level 9 | $0 |
| 30 Aug 2007 | Change of Use to Tenancy Level 7 & 8 (Class 5 to 9b) | $0 |
| 02 Apr 2007 | Variation: To completion. London Stores Building - Change of use & refurbishment of levels 7, 8 & 9 for college faculty. | $230k |
| 21 Mar 2007 | Store fitout Shop 5 Dunklings Jewellers | $190k |
| 11 Sept 2006 | Alteration Levels 7 & 8 Stage 2 | $45k |
| 06 Sept 2006 | Construction of a floodlit major promotional sign in accordance with the endorsed town planning drawings. | $55k |
| 10 May 2006 | Office fitout-London stores building levels 7 & 8. Stage 1: architectural works only. | $90k |
| 22 June 2004 | Basement level Part Fire Door Alterations to the south west fire stair | $2k |
| 28 Nov 2002 | Stage 2 - Architectual and Structural Works - Part Level 1, Level 2, Part Level 3 (Fitness First - London Stores Building) to completion | $400k |
| 09 May 2002 | Stage 1 - Architectual and Structural Works - Part Level 1, Level 2, Part Level 3 (Fitness First - London Stores Building) | $350k |
| 06 Mar 2002 | Stage 2 - External Building Works (including sinage), fitout for Sportsgirl retail tenancy. Total cost of works $350,000.00 | $25k |
| 05 Mar 2002 | Stage 2 - External Building Works (New shop front and external signage). Total cost of work $150,000.00 | $35k |
| 08 Feb 2002 | Stage 1 - Internal Building Works, fitout for Sportsgirl retail tenancy. Total works $350,000.00 | $325k |
| 20 Dec 2001 | Stage 1 - Internal fitout building works. - Ground floor - Shop 5. Total cost of works $150,000.00 | $115k |
| 07 May 2001 | shop 2, internal alts - fitout for retail jeans clothing | $50k |
| 14 Nov 2000 | Restaurant fitout pizza hut | $140k |
| 09 Jan 1997 | Alterations to an existing building | $6k |
Is London Stores residential or commercial?
London Stores is a commercial building. The City of Melbourne lists its main use as office.
When was London Stores built?
London Stores was completed in 1925.
How many floors does London Stores have?
London Stores has 10 floors above ground.
What businesses are in London Stores?
The latest council census counted 5 businesses in London Stores, including Chemist Warehouse Melbourne, Cotton On and Optus.
Is there office or retail space for lease in London Stores?
See the commercial listings on this page, or search this address on realcommercial.com.au and commercialrealestate.com.au.
Who designed and built London Stores?
H W & F B Tompkins designed London Stores. The building team section has the sources.
How tall is London Stores?
About 47 metres, measured from the City of Melbourne's 3D building model. It's number 329 of 1596 buildings in Melbourne by height.
What public transport is near London Stores?
Town Hall Station is the nearest train station, about 4 minutes' walk. The nearest tram stop is Elizabeth St/Bourke St #5, about 1 minute's walk.
What is the planning zone for London Stores?
The site is in the Capital City Zone - Schedule 2 (CCZ2). It's also under a Heritage Overlay (HO509).
Has any work been done on London Stores recently?
The City of Melbourne has issued 55 building permits for London Stores since 1997. The most recent was in May 2024.
Sources: City of Melbourne building permits (CC BY 4.0); CLUE building information (CC BY 4.0); CLUE business establishments (CC BY 4.0); Geocoded National Address File (G-NAF) (Open G-NAF EULA (CC BY 4.0 based)). General information from public records, not legal, financial or building advice.