That's Built · Building report

333 Collins Street

327-343 Collins Street, Melbourne VIC 3000
Generated 8 November 2026
Commercial · Office
119 mheight
33floors
1992completed
44businesses
156permits

Development milestones

Completed1992333 Collins Street completed: 33 floors

Building team

Architect
Lloyd Tayler and Alfred Dunn
Developer
Becton Corporation
Architect
Nelsen Architects
Architect
Robert Peck von Hartel Trethowan

Planning & subdivision

Zone
CCZ1
Overlays
DDO1, DDO10, PO1
Scores
🚆 9 · ☕ 9 · 🌳 7 · ✨ 10

Timeline

20253 building permits and 2 certificates · about $14.6m of new works
Largest: Alterations to an Existing Building - 333 Collins Street Stage 1: Demolition/Internal Strip Out of Levels (Parts) 4, 5, 9, 11, 12, 13, and
20244 building permits and 1 certificate · about $971k of new works
Largest: Level 5 - Tenancy fitout
20234 building permits and 4 certificates · about $13.9m of new works
Largest: Stage 3 Level 22 Tenancy Alterations
20221 building permit and 2 certificates · about $1.3m of new works
Largest: Stage 2: Fitout Works including Services Works
20211 building permit and 1 certificate · about $350k of new works
Largest: Level 10, Proposed Minor Internal Alterations Within Existing Office
20203 building permits and 5 certificates · about $562k of new works
Largest: Stage 1: Male Facilities Works only, excluding Fire Services
20192 building permits and 2 certificates · about $133k of new works
Largest: Level 24 - Alterations to existing Office
20189 building permits and 7 certificates · about $1.2m of new works
Largest: Stage 2 - Balance of Works Excluding Fire Hydrants
20179 building permits and 7 certificates · about $7.2m of new works
Largest: Stage 4 - Installation of a smoke damper and repairs to existing smoke lobby walls above the ceiling
201613 building permits and 4 certificates · about $16.5m of new works
Largest: Stage 4 - Installation of a smoke damper and repairs to existing smoke lobby walls above the ceiling
20156 building permits and 2 certificates · about $1.5m of new works
Largest: Internal Alterations to Fan Facilities Space, Lot 1 333 Collins St, Melbourne
20145 building permits and 2 certificates · about $1.4m of new works
Largest: Level 8 office fitout
20135 building permits and 3 certificates · about $532k of new works
Largest: Alterations to Office Building - Level 19 - New Meeting Rooms
2012Council census records it as office, 29 floors
Name recorded: 333 Collins Street
20122 building permits and 3 certificates · about $2.8m of new works
Largest: Fitout Level 4 (BCA 2011)
20114 building permits and 4 certificates · about $10.2m of new works
Largest: Office fitout Levels 21 & 22 - Office Fitout
20107 building permits and 1 certificate · about $2.5m of new works
Largest: Level 2, 333 Collins St: Internal office fitout.
20094 building permits · about $156k of new works
Largest: Variation #3: Construction of a New Building - Fitout Works
20084 building permits and 2 certificates · about $25.4m of new works
Largest: Office fitout, Ground First and Fifth floors.
200712 building permits and 2 certificates · about $6.4m of new works
Largest: Office refurbishment to Level 23.
20065 building permits and 2 certificates · about $725k of new works
Largest: Clayton Utz Tenancy Fitout to Levels 16, 17, 18 and 19. Stage 3: Level 17 (part) - Variation works only.
200510 building permits and 2 certificates · about $7.1m of new works
Largest: Stage 1: Alterations to office building level 16 works only conditional. Clayton Utz tenancy fitout
20044 building permits and 2 certificates · about $2.1m of new works
Largest: stage 1 Alterations to building. Internal alterations to Level 20,21& 22
20035 building permits and 4 certificates · about $820k of new works
Largest: Internal alterations to levels 17, 18 & 19 (office) Clayton Utz tenancy.
20022 building permits and 2 certificates · about $684k of new works
Largest: Levels 16 & 17 - Office Alterations
2002First council census entry: office, 29 floors
20012 building permits and 2 certificates · about $679k of new works
Largest: Part level 20,21 & 22 office alterations for Arnold Block Leibler
20003 building permits and 4 certificates · about $1.3m of new works
Largest: LEVEL 3, Office fitout for Clayton Utz
19992 building permits · about $1.3m of new works
Largest: Internal alterations to parts of levels 17, 18 & 19
19984 building permits and 3 certificates · about $2.0m of new works
Largest: Office fitout level 4
19975 building permits and 1 certificate · about $2.7m of new works
Largest: Fitout to St George bank
19966 building permits and 2 certificates · about $6.4m of new works
Largest: Alterations to offices
19953 building permits and 2 certificates · about $13.1m of new works
Largest: Tenancy fitout
1992333 Collins Street completed: 33 floors
Derived from City of Melbourne

Building permits and certificates (229)

Each cost is the estimate on that record. Stages of a project often repeat its full value, so these don't add up to what was spent.

21 Dec 2025Office Non-Structural Fit-Out$50k
17 Nov 2025Alterations to an Existing Building - 333 Collins Street - Stage 3: Level 5 External Terrace, Structural Works, Lift Works, Smoke Seals, Fire/Smoke Dampers, and Floor Boxes$6.7m
22 Oct 2025Alterations to an Existing Building - 333 Collins Street Stage 2: Fitout Works to Level 4 North, 5, 9, 11 and 23 (exc. Level 5 External Terrace, Level 12, 13, Structural Works, Lift Works, Smoke Seals, Fire/Smoke Dampers, and Floor Boxes/Lift Rebate Works)$6.7m
22 Sept 2025Level 14 - Alterations to an existing building$10k
12 Sept 2025Alterations to an Existing Building - 333 Collins Street Stage 1: Demolition/Internal Strip Out of Levels (Parts) 4, 5, 9, 11, 12, 13, and 23 & Partition Wall for Tenancy Split on Level 5$7.9m
30 Oct 2024Level 5 - Tenancy fitout$519k
30 Sept 2024Level 5 - Tenancy fitout$519k
12 July 2024Level 5 - Internal alteration - Proposed Minor Internal Office Fitout$194k
05 July 2024Proposed Office Fitout - Internal alteration to existing building - Level 4 - project no: 2024320$228k
16 Jan 2024Level 26, 333 Collins St - Office fitout works$30k
14 Dec 2023Stage 3 Level 22 Tenancy Alterations$6.8m
27 Nov 2023Stage 4 Level 21 Separable Portion 2B, Tenancy Alterations$6.8m
27 Nov 2023Stage 5 Level 21 Separable Portion 2C, Tenancy Alterations$6.8m
16 Nov 2023Stage 2 Level 21 Tenancy Alterations$6.8m
19 Sept 2023Stage 1 Level 20 Tenancy Alterations$6.8m
19 Sept 2023Stage 2 Level 21 Tenancy Alterations$6.8m
26 May 2023Tenancy 4 (L27 only) - Internal Fitout to existing office & tenancy only - Internal Non-Load Bearing/Structural only$374k
08 Feb 2023Tenancy 4 (L27 only) - Internal Fitout to existing office & tenancy only - Internal Non-Load Bearing/Structural only$374k
11 Nov 2022Level 15 - Alterations to existing office tenancy$25k
16 May 2022Stage 2: Fitout Works including Services Works$1.2m
28 Mar 2022Level 28 - Alterations and Fit-out (Kelly & Partners Melbourne)$100k
15 Apr 2021Level 10, Proposed Minor Internal Alterations Within Existing Office$330k
01 Feb 2021Level 27 - Installation of proposed deck.$20k
23 Dec 2020Level 7 - Strategem Minor Works - Alterations to Existing Office Tenancy$11k
13 Nov 2020Levels 20-22 - Internal Alterations to Existing Offices for Arnold Bloch Leibler$459k
06 Oct 2020Level 7. Internal office alterations$7k
03 July 2020Level 7. Internal office alterations$7k
13 May 2020Stage 1: Male Facilities Works only, excluding Fire Services$708k
13 May 2020Stage 2: Male Facilities Fire Services only$708k
25 Feb 2020Part Level 26 - Mushan Office - Internal Office Alterations$85k
29 Jan 2020Levels 20-22 - Internal Alterations to Existing Offices for Arnold Bloch Leibler$459k
15 Aug 2019Level 10 - Slade Group - Office tenancy fit-out$30k
27 Mar 2019Level 4 - Office alteration$37k
20 Mar 2019Level 3 Office Partition Alteration$27k
14 Mar 2019Level 24 - Alterations to existing Office$39k
20 Dec 2018Level 11 - Stage 1 - All Works Excluding Services - Tenancy Fit-Out of Office (Noah Holdings)$180k
06 Dec 2018Proposed showroom fitout for "Aspect Furniture"$240k
20 Nov 2018Level 15 - Proposed alterations to existing office tenancy$610
15 Nov 2018Alterations to existing building$119
21 Sept 2018Level 5- Office fitout$180k
01 Aug 2018Level 15 - Alterations to existing building$41k
24 July 2018Stage 3 - Level 11 (Part) - Tenancy Fit-Out of Office$264k
20 July 2018Proposed Internal Office Fitout for Kelly & Partners$175k
02 July 2018Level 3 - Office Fitout$0
27 June 2018Level 6 - Fitout to office$22k
18 June 2018Proposed Internal Office Fitout for Kelly & Partners$175k
08 June 2018Level 11 - Proposed fitout of existing office$130k
07 June 2018Office fitout - Level 3$20k
13 Apr 2018Level 9 - Existing Office Tenancy Reception Area on Level 9 for GPPM International$48k
09 Apr 2018Stage 2 - Balance of Works Excluding Fire Hydrants$290k
05 Mar 2018Level 20 - Office Alterations$75k
14 Nov 2017Stage 2: Level 11 - Fire Services$1.3m
27 Oct 2017Level 11 - Custom Fleet & Architectural & Services works excluding Fire Services & Office Fit-Out$1.3m
16 Oct 2017Level 10 - Internal office alterations Mason Black Lawyers$150k
06 Oct 2017Level 4 - Recoveries Corp - Internal office alterations$200k
21 Sept 2017Level 20 - Office Fitout$87k
07 Sept 2017Level 5 - Tenancy fit out$2.7m
17 Aug 2017Alteration to Existing Office being Front of House Upgrade Works and Construction of Decking$842k
17 Aug 2017Level 5 Decking$81k
14 Aug 2017Level 14 - Proposed Internal Office Fitout for VCSO$450k
10 Aug 2017Stage 2: Male Facilities Fire Services only$708k
27 June 2017Level 9 OFFICE FITOUT$15k
06 June 2017Level 15 - Relocation of Wall and Sprinklers$7k
26 May 2017Level 7 - Proposed Internal Office Fit-out$660k
27 Mar 2017Stage 1 : Alterations to Levels 20 & 21 only, excluding Level 22 - Proposed alterations to existing office tenancy$204k
27 Mar 2017Stage 2: Alterations to Level 22$204k
19 Jan 2017Stage 4 - Installation of a smoke damper and repairs to existing smoke lobby walls above the ceiling$13.4m
22 Dec 2016Ground floor - Internal Office Fit-out for Sneakerboy HQ Permit Cancelled - refer DM #10903190$100k
09 Nov 2016Stage 2 - Proposed Internal Office Fitout for HSBC & Sublet Area (Base Building)$1.8m
27 Oct 2016Level 10 - Proposed office itout for HSBC$1.5m
19 Sept 2016Stage 1: All works excluding operable wall to Boardroom 3$469k
19 Sept 2016Stage 2 - Operable Wall to Boardroom 3$469k
24 Aug 2016Stage 4 - Installation of a smoke damper and repairs to existing smoke lobby walls above the ceiling$13.4m
21 July 2016Stage 2 - Operable Wall to Boardroom 3$469k
15 July 2016Stage 3 - Tenancy fitout and connection of 3 levels with stair. Structural Steel, Stair Penetration, Joinery, Stair Finish$11.4m
11 July 2016Stage 1: All works excluding operable wall to Boardroom 3$469k
21 June 2016Level 9, South Tenancy - Office tenancy fitout$30k
15 June 2016Stage 2: As shown on the approved plans$11.4m
09 June 2016Stage 2: Alterations to Level 22$204k
16 May 2016Levels 17,18 &19 - Tenancy fitout and connection of 3 levels with stair$9.0m
13 May 2016Level 9 - Office Fitout$15k
11 Feb 2016Level 22- ARNOLD BLOCH LEIBLER - OFFICE ALTERATIONS$158k
20 Jan 2016Level 20 - Office Alterations - Arnold Block Leibler$169k
12 Jan 2016Level 10 - Change of use to training school$153k
22 Dec 2015Level 26 - Fitout of office$244k
28 Oct 2015Level 28 - Proposed Internal Office Fitout for La Trobe Financial$277k
22 Sept 2015Level 7 (East) - Internal office fit out - partial$44k
03 Sept 2015Stage 1 - Level 26 - Alterations to an existing building$96k
17 June 2015Internal Alterations to Fan Facilities Space, Lot 1 333 Collins St, Melbourne$520k
12 June 2015Level 25 - Proposed Internal Office Fitout$147k
16 Apr 2015Installation of new ASE (Code Red) monitoring system$1k
13 Apr 2015Level 20 - Alterations to existing office tenancy$143k
30 Oct 2014Level 19 - Office Tenancy Establishment Works$30k
14 Oct 2014Level 4 alterations to existing office$76k
10 Sept 2014Level 20, Proposed alterations to existing office tenancy$190k
28 Aug 2014Level 7, Internal office fit out.$150k
19 Aug 2014Level 18 Office fit out$60k
08 Aug 2014Level 3, Office Fit Out$374k
05 Aug 2014Level 8 office fitout$519k
28 Oct 2013Office fit out Level 28$30k
10 Sept 2013OFFICE ALTERATIONS TO SHOWERS LEVEL 16$96k
06 Sept 2013Internal Alterations to an existing office - Level 13$7k
23 Aug 2013Office fitout Level 27$79k
15 July 2013Proposed Office Tenancy establishment works - Level 8$32k
06 May 2013Office Fit Out Level 19$17k
03 Apr 2013Alterations to Office Building - Level 19 - New Meeting Rooms$253k
17 Jan 2013Alterations to sprinkler system Level 6 (PART)$19k
04 Oct 2012Office fitout and alterations to Level 4$33k
25 Sept 2012Office Partitioning - Level 7$670k
27 July 2012Office fitout - Level 3$1.8m
01 June 2012Fitout Level 4 (BCA 2011)$2.8m
09 May 2012Internal alterations to Fitout of Offices - Ground, Level 6, Level 9$318k
10 Nov 2011Fitout Level 4 (BCA 2011)$55k
07 Oct 2011Tenancy Fitout Works Level 23$217k
30 Sept 2011Office fitout Levels 21 & 22 - Office Fitout$6.5m
09 Sept 2011Refurbishment Male & Female change rooms$75k
30 June 2011Proposed Alterations De-Fit to Level 3&4$340k
07 June 2011Internal office alterations Level 2$272k
16 Mar 2011Office partitioning on level 7, 333 Collins Street, Melbourne$15k
28 Jan 2011Level 11 - Office partition alterations to existing tenancy$39k
03 Dec 2010DEUTSCHE BANK MELBOURNE - MINOR ALTERATIONS$50k
12 Nov 2010Internal additions/Alterations to office - Level 7$7k
12 Aug 2010Alterations Level B2 W C's$50k
04 Aug 2010Proposed office alterations to level 10$9k
07 July 2010Internal Tenancy Fitout of an office on level 25$171k
03 May 2010Level 2, 333 Collins St: Internal office fitout.$2.2m
23 Apr 2010Level 2, 333 Collins St: Internal office fitout.$2.2m
12 Apr 2010333 Collins Street Lvl 2: Demolition of internal non-load-bearing partition walls (office)$50k
02 Dec 2009Office fitout alteration works to an existing building Level 7$70k
22 July 2009Variation #3: Construction of a New Building - Fitout Works$22.5m
29 Apr 2009Construction of minor alterations to the existing office tenancy - NOMURA, Level 25$41k
30 Mar 2009Proposed installation of new workstations to existing office tenancy Level 24.$45k
26 Sept 2008Level 10 office alterations Suite 1006$15k
24 July 2008Alteration to offices, tenancy fitout of offices, internal re-fit only, Level 3 Lot 3.$71k
24 June 2008Construction of a New Building - Fitout Works$21
24 Apr 2008Internal alterations to level 14$31k
04 Mar 2008Candle CT Talent Specialists. Office Fitout Alterations to an Existing Building Level 14 (Part).$32k
19 Feb 2008Office fitout, Ground First and Fifth floors.$2.8m
19 Dec 2007Office refurbishment to Level 23.$2.0m
07 Nov 2007Fitout to commercial offices on Level 4.$65k
07 Nov 2007Office fitout Mezzanine (Level 4).$60k
19 Oct 2007Additions/Alterations to existing building, Level 6 office fitout. Stage 1: Demolition only.$355k
21 Sept 2007Architectural and services works to office Level 23.$2.0m
10 Sept 2007Office fitout Level 24$1.5m
03 Aug 2007Demolition works to office Level 23.$2.0m
16 May 2007Alterations to Deutsche Bank office, Level 1.$186k
14 May 2007Office fitout to Level 5.$1.3m
27 Apr 2007Alterations to office building, tenancy fitout to Level 8, Lot 804.$20k
18 Apr 2007Alteration to offices, demolition of internal walls only, Level 3 Lot 3.$22k
13 Mar 2007Office Fitout on level 7$60k
28 Feb 2007Constructuion-Commercial offices for (Link Market Services) Level 9$760k
16 Jan 2007Office fitout to Level 9.$30k
19 Dec 2006Alterations to existing teaching facility, level 9.$9k
25 July 2006Internal alteration-Level 5$370k
15 June 2006Clayton Utz Tenancy Fitout to Levels 16, 17, 18 and 19. Stage 3: Level 17 (part) - Variation works only.$3.0m
09 June 2006Upgrade of EWIS$239k
01 June 2006Alterations - Fitout LEVEL 28$106k
18 May 2006Office fitout, alterations on Level 25.$60k
21 Apr 2006Stage 2 - Office building levels 17, 18 and 19 works only - conditional; Clayton Utz tenancy fitout. Office building level 16 & level 18 (part) (excluding eastern end meeting rooms)$3.0m
14 Dec 2005Stage 1: Alterations to office building level 16 works only conditional. Clayton Utz tenancy fitout$3.0m
08 Nov 2005office fitout$220k
21 Oct 2005Stage 2:Facade work- Level 16$76k
23 Sept 2005Stage 1: office fitout alterations to an existing building$2.6m
23 Aug 2005Variation - minor works to Area 2 Offices$30k
17 Aug 2005Level 8, 327/343 Collins St, Melb office fitout$6k
01 Aug 2005Office fitout alterations to an existing building$210k
08 July 2005(part) level 16 offices - stripout of shaded area as indicated on approved plans$98k
23 June 2005Ofice building infill slab/ level 16$76k
22 June 2005Stage 2: office fitout works$1.9m
10 June 2005Minor alterations Part Level 1$15k
14 Apr 2005proposed internal alterations to level 25 (part)$798k
19 Oct 2004Tenancy fitout of offices Level 2$15k
16 Aug 2004Tenancy fitout of offices$11k
10 Aug 2004Internal fitout works Ground floor$32k
31 May 2004Level 24, Office alterations to Deutsche Bank$40k
17 Mar 2004stage 1 Alterations to building. Internal alterations to Level 20,21& 22$2.0m
25 Feb 2004Alterations to internal office level 4$50k
01 Dec 2003Internal alterations to levels 17, 18 & 19 (office) Clayton Utz tenancy.$235k
19 Nov 2003Alteration to Sprinkler Heads for Minor Internal Building Works - Level 1$4k
30 Oct 2003Internal alterations on Level 26$200k
21 Oct 2003Office fitout alterations to an existing building - Level 7 (Part A)$8k
15 Aug 2003Tenancy fitout of offices and alterations to reception. Level 10$52k
07 Aug 2003Level 25- Reinstate Base Design$221k
12 Feb 2003Level 22- Office Alterations$12k
29 Jan 2003Alterations to existing office tenancy including new external deck.$89k
10 Jan 2003Office alterations to existing building. Level 23 - Deutsche Bank$20k
01 Aug 2002Level 24 - Office Fitout$9k
28 May 2002Office fitout level 7$15k
05 Apr 2002Levels 16 & 17 - Office Alterations$624k
22 Feb 2002Level 1 - Office Alterations.$25k
18 Sept 2001Level 24 Alteration to offices for Deutsche Bank$17k
11 July 2001Part level 20,21 & 22 office alterations for Arnold Block Leibler$500k
26 Mar 2001Office partition alterations level 6.$13k
20 Feb 2001lvl 23 office fit out$150k
08 Nov 2000Office fitout on level 20 Building known as 333 Collins Street$80k
25 Sept 2000non-structural alts & revised fit-out of existing restaurant.$50k
13 Sept 2000LEVEL 3, Office fitout for Clayton Utz$490k
13 Sept 2000lvl 6 dispensation to allow reduced width of path of travel$1k
20 June 2000Level 19 Clayton Utz Tenancy$200k
11 Apr 2000Alterations to tenancy and removal of existing hydrant hoses on ground level$60k
04 Apr 2000New Cable Risers throughout the building$437k
25 Aug 1999Internal alterations to parts of levels 17, 18 & 19$1.3m
20 July 1999Tenancy fitout on level 5 note cfi not dated$140k
28 Dec 1998Office fitout level 28$100k
29 Oct 1998Office fitout level 4$870k
22 Oct 1998Office alterations on level 4, 333 Collins Street, Melbourne for Coopers & Lybrand Telstra Float$9k
01 Sept 1998Fitout of office$350k
28 Aug 1998Office alterations on level 6 (north), 333 Collins Street, Melbourne$25k
20 July 1998Internal alterations to level 25$491k
13 Jan 1998partition fitout$187k
08 Dec 1997Office fitout on Level 5$210k
11 Nov 1997Alterations & additions$500k
09 Oct 1997Alterations on Level 6 North building, 333 Collins Street, Melbourne$20k
12 June 1997Alterations$300k
03 Apr 1997Creation of lift shift openings$13k
21 Mar 1997Fitout to St George bank$1.7m
12 Dec 1996Alterations to office partitions on Levels 21 & 22$100k
18 Nov 1996Internal office alterations$80k
24 Oct 1996Alterations to offices$3.8m
10 Oct 1996Alterations to Floors 1 & 5$140k
25 Sept 1996Level 7 office fitout$120k
03 July 1996Partition fitout$579k
25 Mar 1996Internal alterations$518k
25 Mar 1996Offices fitout Levels 9 & 10$1.1m
22 Dec 1995Office fitout Levels 5 & 6$750k
20 Dec 1995Alterations$539k
23 Oct 1995Part demolition of Levels 12, 13 and 15$20k
12 Oct 1995Tenancy fitout$1.8m
23 Feb 1995Tenancy fitout$10.0m

Questions and answers

Is 333 Collins Street residential or commercial?
333 Collins Street is a commercial building. The City of Melbourne lists its main use as office.

When was 333 Collins Street built?
333 Collins Street was completed in 1992.

How many floors does 333 Collins Street have?
333 Collins Street has 33 floors above ground.

What businesses are in 333 Collins Street?
The latest council census counted 44 businesses in 333 Collins Street, including Affinity Private Advisors Pty Ltd, Allfin and Altitude Recruitment.

Is there office or retail space for lease in 333 Collins Street?
See the commercial listings on this page, or search this address on realcommercial.com.au and commercialrealestate.com.au.

Who designed and built 333 Collins Street?
Becton Corporation developed 333 Collins Street and Robert Peck von Hartel Trethowan designed it. The building team section has the sources.

How tall is 333 Collins Street?
About 118 metres, measured from the City of Melbourne's 3D building model. It's number 92 of 1596 buildings in Melbourne by height.

What public transport is near 333 Collins Street?
Flinders Street Station is the nearest train station, about 4 minutes' walk. The nearest tram stop is Elizabeth St/Collins St #5, about 1 minute's walk.

What is the planning zone for 333 Collins Street?
The site is in the Capital City Zone - Schedule 1 (CCZ1).

Has any work been done on 333 Collins Street recently?
The City of Melbourne has issued 156 building permits for 333 Collins Street since 1995. The most recent was in November 2025.

Sources: City of Melbourne building permits (CC BY 4.0); CLUE building information (CC BY 4.0); CLUE business establishments (CC BY 4.0); Geocoded National Address File (G-NAF) (Open G-NAF EULA (CC BY 4.0 based)). General information from public records, not legal, financial or building advice.