The Urban Workshop

32-54 Lonsdale Street, Melbourne VIC 3000
Generated 8 November 2026
Commercial · Office
148 mheight
34floors
2005completed
17businesses
95permits

Development milestones

Construction startedMar 2003First major construction permit issued
First occupantsAug 2005First occupancy permit issued
Completed2005The Urban Workshop completed: 34 floors

Building team

Architect
John Wardle Architects
Architect
Hassell
Architect
NH Architecture
Developer
ISPT
Builder
Multiplex
Owner
IFM Investors

Planning & subdivision

Zone
CCZ1
Overlays
DDO1, DDO10, PO1
Strata plan
PS446765 · 1 lots
Scores
🚆 9 · ☕ 6 · 🌳 8 · ✨ 8

Timeline

20262 building permits and 2 certificates · about $993k of new works
Largest: Proposed Alterations to Existing Office Space Including Slab Cut-Out for a New Interconnecting Stairway & Office Fitout on Level 27 Only - S
20252 building permits · about $7.1m of new works
Largest: Proposed Alterations to Existing Office Space Including Slab Cut-Out for a New Interconnecting Stairway & Office Fitout on Level 27 Only - S
20245 building permits and 8 certificates · about $37.8m of new works
Largest: Stage 1 - Level 28 & 31-33 - Proposed Fitout to Existing Office Spaces on Level 28 & 31-33 Tenancies Only
20235 building permits and 2 certificates · about $5.4m of new works
Largest: Proposed refurbishment of lift lobbies and lift cars at existing office tower. Stage 1: Excluding sanitary services.
20223 building permits and 4 certificates · about $23.9m of new works
Largest: Stage 2 - To Completion of work
20201 certificate · about $150k of new works
Largest: Proposed alterations to existing office tenancy
20198 building permits and 3 certificates · about $1.4m of new works
Largest: Proposed Internal Alterations to Ground Floor Sanitary Facilities and Level 3 Staircase
20185 building permits · about $440k of new works
Largest: Ground Floor - Shop 17 - Office Fit-Out
20173 building permits and 4 certificates · about $2.1m of new works
Largest: Stage 3 - Fire services works to 25-27, 32 & 33 to completion
20162 building permits and 3 certificates · about $20.6m of new works
Largest: Stage 2 - Architectural and services works excluding fire services works
20156 building permits · about $2.3m of new works
Largest: Proposed Refurbishment of End of Trip Facility (Basement 1 and 2) and Ground Floor Foyer Entry
20147 building permits and 1 certificate · about $2.0m of new works
Largest: Lot (2) level 27, Additions & Alterations to Office
27 Jul 2013Open House Melbourne tour of the Urban Workshop
An Open House Melbourne 2013 write-up described a guided tour of the Urban Workshop's ground floor lobby and noted that the building became the new home of the Department of Human Services and AustralianSuper, among others.
20132 building permits · about $100k of new works
Largest: Alteration to Office (Lot 2) - Level 32
23 Oct 2012ISPT trust reports strong return; building valued at around $400 million
An Urban.com.au article reported that ISPT's 50 Lonsdale Street Property Trust was the best-performing unlisted property trust over the 12 months to September 2012, and that the building was valued at around $400 million as at 30 September 2012.
20122 building permits and 2 certificates · about $708k of new works
Largest: Alterations to Office
20111 building permit and 2 certificates · about $284k of new works
Largest: Proposed office fitout to existing tenancy Level 1 (Tenancy 19)
20101 certificate · about $4k of new works
Largest: Basement Level B4 - Proposed alterations to existing office building
20093 building permits and 2 certificates · about $384k of new works
Largest: Oddfellows pub fitout
20081 building permit and 1 certificate · about $41k of new works
Largest: Fitout Level 17
2008First council census entry: office, 34 floors
20079 building permits and 3 certificates · about $2.7m of new works
Largest: Alterations Tenancy 3 Building 7 Ground & First Floor
20069 building permits and 2 certificates · about $7.4m of new works
Largest: Attorney Generals Department. Proposed office fitout alterations to an existing building, Level 29&30. Stage 1: Internal stair.
2005The Urban Workshop completed: 34 floors
Derived from Structurae
Sep 2005Steel frame construction feature on the Urban Workshop tower
A Steel Australia feature published in September 2005 described the steel-framed office tower, stating it was built for the Industry Superannuation Property Trust with 54,000 square metres over 34 above-ground levels and five basement levels.
Aug 2005First occupancy permit issued
Derived from City of Melbourne building permits
20051 building permit and 4 certificates · about $193k of new works
Largest: Stage 17: Heritage building - structure, services and architecture tower level plant, upper plant structure and level 4 DHS store structure.
20045 building permits · about $18.5m of new works
Largest: Stage 15: Architectural and services for podiium levels. Commercial construction base building, ground - level 5 for office and retail purpo
Mar 2003First major construction permit issued
Derived from City of Melbourne building permits
20036 building permits · about $177.1m of new works
Largest: Stage 14: Basement core slabs B4-B1; Stairs 1, 2 and 5 and lifts 20 & 21, stairs ground to roof, core slab level ground to 15 and level 2 pa
20021 building permit and 2 certificates · about $420k of new works
Largest: Demolition to all of 45-94 Little Lonsdale Street & Rear of 38 - 44 Lonsdale Street.
20011 building permit and 2 certificates · about $224k of new works
Largest: First floor office refurbishment
20004 building permits and 4 certificates · about $662k of new works
Largest: Internal alterations to the ground floor
19992 certificates · about $325k of new works
Largest: office fitout lvl 30
19951 building permit · about $70k of new works
Largest: Alterations to building

Building permits and certificates (149)

Each cost is the estimate on that record. Stages of a project often repeat its full value, so these don't add up to what was spent.

16 Apr 2026Level 1 (Podium Building) - Office Spec Suite Fitout to existing tenancy$603k
02 Mar 2026Proposed Minor Alterations to Levels 28, 31 & 32$40k
27 Feb 2026Proposed Alterations to Existing Office Space Including Slab Cut-Out for a New Interconnecting Stairway & Office Fitout on Level 27 Only - Stage 1: To Permit Fitout Works Excluding the Structural Void, Interconnecting Staircase & Hydrant Coverage.$7.1m
12 Feb 2026Cafe Patricia fit out$350k
16 Dec 2025Proposed Alterations to Existing Office Space Including Slab Cut-Out for a New Interconnecting Stairway & Office Fitout on Level 27 Only - Stage Three Building Permit - To Permit Remainder of Proposed Works$7.1m
26 Nov 2025Proposed Alterations to Existing Office Space Including Slab Cut-Out for a New Interconnecting Stairway & Office Fitout on Level 27 Only - Stage 2: To Permit Structural Void & Staircase Construction Only$7.1m
18 Dec 2024Level 2 - Internal alteration - proposed office fitout$203k
10 Dec 2024Levels 2 & 3 - Spec Suites Office Fitouts, Amenities Upgrades & Stairwell Refurbishment$3.3m
06 Dec 2024Shop 1 - Internal Tenancy Fitout for Buddabah$348k
20 Nov 2024Shop 7 Crackle Bae - Proposed alteratiosn to existing retail - Stage 2: External works$7k
03 Oct 2024Shop 7 Crackle Bae - Proposed alteratiosn to existing retail$176k
30 Aug 2024Stage 1 - Level 28 & 31-33 - Proposed Fitout to Existing Office Spaces on Level 28 & 31-33 Tenancies Only$32.9m
30 Aug 2024Stage Three Building Permit - Level 28 & 31-33 - To Permit Remainder of Proposed Works Only.$32.9m
30 Aug 2024Stage Two Building Permit - To Permit Structural Void, Stair Construction & Services Excluding Hydrant Approval.$32.9m
05 Aug 2024Levels 28,30,31 & 33 - Proposed Upgrade to Single Unisex Sanitary$83k
25 July 2024Level 22 - Tenancy Alterations$156k
11 July 2024Leisure Building - Alterations to existing office tenancies on Levels 1, 2 & 3$414k
11 July 2024Stage 2 - Level 1 ameneties refurbishment and Levels 1 and 2 removal of existing fire hose reels$288k
04 July 2024Stage 2 - Level 1 ameneties refurbishment and Levels 1 and 2 removal of existing fire hose reels$288k
29 Nov 2023Alterations to an existing building$2.7m
28 Nov 2023Stage 2 - Shop 6 - Internal Non Structural Alterations to Parts of the Exsting Shop - Chilangos Mexican Cantina Fit out$215k
26 Oct 2023Level 31-33 Proposed Base Building Services Upgrade Works. (Interim Services works in Preparation for Future Fit out)$1.3m
23 Aug 2023Stage 1 - Shop 6 - Internal Alterations Excluding Fire & Mechanical Services.$215k
06 Mar 2023Proposed alterations to existing office$1.1m
23 Feb 2023Proposed refurbishment of lift lobbies and lift cars at existing office tower. Stage 1: Excluding sanitary services.$22.6m
10 Jan 2023Shop 8 - Construction of an internal shop fitout (Shuji Sushi)$160k
14 Nov 2022Stage 2 - To Completion of work$22.6m
07 Oct 2022Alterations of a building - Internal tenancy stripout. Ground Level, Shop 17 Only$132k
27 Sept 2022Stage 2 - To Completion of work$22.6m
11 Aug 2022Proposed base building tenancy upgrade - Level 28$1.0m
08 July 2022Tenancy 16 - Proposed alterations to existing retail tenancy (Lonsdale Larder)$124k
20 June 2022Stage 2 - To Completion of work$22.6m
30 May 2022Tenancy 16 - Proposed alterations to existing retail. Stage 2.$0
06 May 2020Proposed alterations to existing office tenancy$150k
19 Dec 2019Shop 14 - Proposed fitout and alterations to an existing cafe$300k
13 Dec 2019Proposed Internal Alterations to Ground Floor Sanitary Facilities and Level 3 Staircase$553k
29 July 2019ASE Replacement$2k
07 June 2019(Alteration to existing building, including change of use$884
28 May 2019Proposed alterations to existing office tenancy - Level 23$60k
01 May 2019Construction of new meeting room - Lot 2 - Level 33$321k
10 Apr 2019Proposed Single Door Leading into Fire Isolated Pathway on Levels 29 and 30$50k
14 Mar 2019Tenancy 10 - Tenancy Fitout of Restaurant$120k
13 Mar 2019Proposed Ground Floor Non – Structural Partition Wall Installation (Between Security Area LG-10 and LG-11)$8k
04 Feb 2019Basement Carpark emergency lighting replacement$40
22 Jan 2019Change of use of the exisiting cottage building from office to retail/production$500
12 Nov 2018Ground Floor - Shop 17 - Office Fit-Out$277k
12 Oct 2018Shop 10 - Internal strip out - non-structural$15k
07 Sept 2018Level 3 - Proposed alterations to existing office tenancy$4k
23 Aug 2018Levels 4 & 18- Proposed alterations to existing office tenancy$100k
17 Aug 2018Alterations to water supply infrastructure for connection to water supply tapping$45k
17 Nov 2017Fitout to Axil Coffee Shop$273k
19 Sept 2017Level 2 & 3 (Part) - Proposed Amenities Upgrade for Genesis Gym$428k
10 Aug 2017Level 29 & 30 - Office fitout$314k
08 May 2017Stage 1 - Internal demolition only to Levels 25-27, 32 & 33$19.0m
31 Mar 2017Stage 1 - Internal demolition only to Levels 25-27, 32 & 33$19.0m
16 Mar 2017Stage 3 - Fire services works to 25-27, 32 & 33 to completion$19.1m
13 Feb 2017Proposed Fitout Works to Levels 1, 4, 5, 6, 14, 21, 23 & 24 Medical Tenancy Fitout (Class 5) to Level 2$1.1m
19 Dec 2016Level 1- Alterations to the Existing Shop$49k
30 Nov 2016Stage 2 - Architectural and services works excluding fire services works$19.1m
12 July 2016Proposed Refurbishment of End of Trip Facility (Basement 1 and 2) and Ground Floor Foyer Entry$2.0m
06 July 2016Stage 2 - Fitout Works to Levels 7-10. 12-17, 19-21 & 23-24$1.4m
07 Mar 2016Proposed Office Fitout for Department of Health & Human Services$281k
10 Nov 2015Proposed Refurbishment of End of Trip Facility (Basement 1 and 2) and Ground Floor Foyer Entry$2.0m
14 Oct 2015Alteration to office$80k
03 June 2015Stage 2 - External Works Only$100k
08 Apr 2015Level 4 & 25 - Internal alterations to an existing office building$70k
07 Apr 2015Shop 8 - alterations to existing cafe$75k
23 Feb 2015Stage 1: Internal Tenancy Fit-Out, Excluding External Works$100k
08 Dec 2014Stage 2: Shop 11, Proposed fitout to existing shop tenancy - 'Madame Brussels Lane'$207k
13 Oct 2014Shop 1 - Tenancy fitout for cafe$75k
15 Sept 2014Shop 11, Proposed fitout to existing shop tenancy - 'Madame Brussels Lane'$200k
20 June 2014Levels 32 & 33 Alteration to Office$80k
14 Apr 2014Lot (2) level 27, Additions & Alterations to Office$800k
10 Apr 2014Level 2, 3, 4, 5 and 11 Alterations to existing building$800k
21 Mar 2014Levels 2, 8,10 & 11 alterations$80k
17 Feb 2014Lvl 22 Proposed Office fitout$8k
12 Dec 2013Office Fitout, Lot 2, Level 4.$20k
08 Apr 2013Alteration to Office (Lot 2) - Level 32$80k
03 Dec 2012Alterations to Office$350k
16 Nov 2012Australian Super - Fitout Works to Level 32$293k
19 Oct 2012Office Fitout - level 13$65k
12 Oct 2012Stage 2: Fire Services Only - Fitout Works to Level 32$293k
10 May 2011Proposed office fitout to existing tenancy Level 1 (Tenancy 19)$250k
06 May 2011Ausaid & tips inter tenancy walls relocation$10k
16 Mar 2011Tenancy alterations to level 32$24k
29 Jan 2010Basement Level B4 - Proposed alterations to existing office building$4k
24 Sept 2009Shop 9 - Internal Alterations to an existing shop$2k
31 May 2009Installation of an exit sign and Emergency Lighting$3k
04 May 2009Installation of an exit sign and emergency lighting$2k
25 Feb 2009Oddfellows pub fitout$350k
19 Jan 2009Levels 32 & 33, 50 Lonsdale Street, Melbourne Sprinkler Alterations$30k
15 Sept 2008Installation of A stair, Part Level 32 & 33$499
01 July 2008Fitout Level 17$41k
20 Dec 2007Proposed tenancy 13 fitout (retail).$100k
05 Dec 2007Alterations to a building. Fire services to Level 1 (Conference/Function Space).$483k
19 Nov 2007Alterations to a building. Architectural, electrical, mechanical and hydraulic services, office fitout to Level 1.$483k
11 Oct 2007Alterations Tenancy 3 Building 7 Ground & First Floor$720k
02 July 2007Excavations & footings balance of building works Level 1$200k
29 June 2007Alterations Office Tenancy 19 Level 1$330k
15 June 2007Shop 7 fitout$100k
01 June 2007Alterations to fitout Level 29$140k
03 May 2007Shop tenancy establishment works, Ground floor Tenancy 13A.$63k
23 Mar 2007Alterations-Ground floor amenities$327k
08 Jan 2007Office fitout to existing tenancy on Level 1 (Leisure Centre Building).$394k
02 Jan 2007Alterations to shop/Kiosk all parts, shop 10.$42k
13 Dec 2006Internal works Tenancy 9$150k
03 Oct 2006Internal Shop Fitout$200k
21 Sept 2006Office fitout alterations Level 31$920
01 Sept 2006Retail and associated office, internal fitout to shop T15-spoilt, ground and first floor.$50k
21 Aug 2006Internal Shop fitout Ground Level$50k
17 Aug 2006Relocation of office front on Level 27$15
16 Aug 2006Attorney Generals Department. Proposed office fitout alterations to an existing building, Level 29&30. Stage 3: All works to completion.$500k
04 Aug 2006Alterations-Tenancy 6$290k
13 July 2006Alterations-Level 2 & 3$950k
07 July 2006Attorney Generals Department. Proposed office fitout alterations to an existing building, Level 29&30. Stage 1: Internal stair.$5.6m
30 June 2006Alterations to retail shop, cafe fit-out, lot 2.$200k
22 Dec 2005Stage 1: Demolition, basement, excavation and retention works only; Commercial construction basement for carpark purpose; Occupancy permit - basement 1 to basement 5$136.2m
20 Sept 2005Minor internal alterations to level 21$100k
09 Aug 2005Stage 17: Heritage building - structure, services and architecture tower level plant, upper plant structure and level 4 DHS store structure. Commercial construction (lot 2) of a heritage building for office, retail and carpark purposes. Occupancy permit - level 27-33 for office purpose$175.0m
11 July 2005Stage 16: Structural L1, Pour 2,3,4,7; Structural L2, Pour 2,3,4,7; Structural L3, Pour 1,2,7; Structural L4, Pour 1,2,7; Levels 3 & 4 nonPT elements; facade works; ;eisure precinct building precast, insitu structure and L4 DHS store architecture and services$8.4m
07 Apr 2005Internal alterations Part Level 15$93k
01 Dec 2004architectural fitout works$18.5m
14 July 2004Miscellaneous works Services -fitout work; DHS office areas$9.5m
13 July 2004Stage 15: Architectural and services for podiium levels. Commercial construction base building, ground - level 5 for office and retail purposes$175.0m
17 Mar 2004Stage 12 Ground Floor Slab$975k
13 Feb 2004Stage 11: Structure-Levels 3-5 Reinforcement, Levels Ground to Roof Columns, Level 6-26 Tower Wall. Architectural & Services - Basement levels and levels 5 to Roof; Commercial construction, construction of a new building, basement levels, levels 5-33 inclusive for carpark, storage & office purposes$175.0m
17 Dec 2003Construction of new building. Stage 10 Level B4, Floor areas 2-8,Level B3 & B2 floor (areas 2-8)$4.1m
01 Dec 2003Podium Precast -Levels G to 5 Block & Mullions, Jump Start Floors 3,4 & 5$4.1m
07 Oct 2003Steelwork for Jump Columns & Precasts to Core$2.1m
22 Sept 2003Construction of a new building. Stage 5: Level Basement 4 Area 1 Concrete Slab$120k
26 Mar 2003Demolition part level 4$5k
17 Mar 2003Stage 14: Basement core slabs B4-B1; Stairs 1, 2 and 5 and lifts 20 & 21, stairs ground to roof, core slab level ground to 15 and level 2 part. Commercial construction (lot 2) base building, ground - level 5 for office and retail purposes. Occupancy permit - level 27-33 for office purpose$136.2m
06 Nov 2002Demolition to all of 45-94 Little Lonsdale Street & Rear of 38 - 44 Lonsdale Street.$250k
17 Sept 2002Level 12 - Office Alterations$20k
13 Mar 2002Levels 16, 17 and 19. Alterations to an existing building. - Office Fitout.$150k
23 Oct 2001Level 4, alterations to offices of existing building$25k
26 June 2001First floor office refurbishment$179k
26 June 2001Part Level 12 Casselden Place. Office fit out.( Sustainable Energy Authority Victoria)$20k
19 July 2000Tenancy fitout on level 26$50k
24 May 2000office alterations part lvl 11$33k
02 May 2000Level 15 - Partition and workstation alterations$67k
27 Apr 2000office alterations$50k
11 Apr 2000Internal alterations on level 5$90k
23 Mar 2000Demolition of an office$17k
10 Mar 2000Internal alterations to the ground floor$300k
21 Feb 2000Alterations to offices on level 32$55k
22 Sept 1999office fitout lvl 30$200k
04 Aug 1999Internal alterations on level 10$125k
28 July 1995Alterations to building$70k

Questions and answers

Is The Urban Workshop residential or commercial?
The Urban Workshop is a commercial building. The City of Melbourne lists its main use as office.

When was The Urban Workshop built?
The Urban Workshop was completed in 2005.

How many floors does The Urban Workshop have?
The Urban Workshop has 34 floors above ground.

What businesses are in The Urban Workshop?
The latest council census counted 17 businesses in The Urban Workshop, including Attorney-General's Department, Australiansuper Pty Ltd and Axil Coffee Roasters.

Is there office or retail space for lease in The Urban Workshop?
See the commercial listings on this page, or search this address on realcommercial.com.au and commercialrealestate.com.au.

Who designed and built The Urban Workshop?
ISPT developed The Urban Workshop, NH Architecture designed it and Multiplex built it. The building team section has the sources.

How tall is The Urban Workshop?
About 148 metres, measured from the City of Melbourne's 3D building model. It's number 61 of 1596 buildings in Melbourne by height.

What public transport is near The Urban Workshop?
Parliament Station is the nearest train station, about 3 minutes' walk. The nearest tram stop is Victoria St/La Trobe St #9, about 2 minutes' walk.

What is the planning zone for The Urban Workshop?
The site is in the Capital City Zone - Schedule 1 (CCZ1).

Does The Urban Workshop have an owners corporation?
Plan of subdivision PS446765 has 1 lot.

How was The Urban Workshop constructed?
The tower has a steel frame.

What was The Urban Workshop valued at?
A 2012 report valued the building at around $400 million.

Has any work been done on The Urban Workshop recently?
The City of Melbourne has issued 95 building permits for The Urban Workshop since 1995. The most recent was in April 2026.

Sources: City of Melbourne building permits (CC BY 4.0); CLUE building information (CC BY 4.0); CLUE business establishments (CC BY 4.0); Geocoded National Address File (G-NAF) (Open G-NAF EULA (CC BY 4.0 based)). General information from public records, not legal, financial or building advice.