| Construction started | Oct 2005 | First major construction permit issued |
| First occupants | May 2009 | First occupancy permit issued |
| Completed | 2010 | Myer completed: 9 floors |
Each cost is the estimate on that record. Stages of a project often repeat its full value, so these don't add up to what was spent.
| 23 Apr 2026 | Installation of new floor lining in an existing Myer tenancy | $433k |
| 20 Nov 2025 | Proposed alterations to existing retail tenancy | $77k |
| 01 Oct 2025 | Proposed alterations to existing retail tenancy | $124k |
| 19 Feb 2025 | YSL Kiosk - Proposed alterations to existing retail Kiosk | $68k |
| 18 Feb 2025 | Proposed alterations to existing building | $61k |
| 29 Nov 2024 | Armani, Concession Pad 3 - Proposed alterations to existing retail concession pad 3 | $324k |
| 19 June 2024 | Alteration to an existing Myer tenancy | $176k |
| 17 June 2024 | Alteration to an existing Myer tenancy | $424k |
| 18 July 2023 | Minor partitions alterations to level 1 and 4 | $69k |
| 23 Apr 2023 | Internal alterations to ground level - Myer Melbourne | $22k |
| 28 July 2022 | Re-glazing of west elevator panels on David Jones and Myer link bridges | $1.0m |
| 09 Oct 2020 | Exterior cladding replacement works. Myer Bourke Street store (Little Bourke Street end). | $465k |
| 17 Dec 2019 | Flooring works up to level 2 | $630k |
| 24 Oct 2019 | Retail Tenancy Fitout Level 1 | $160k |
| 11 Feb 2019 | RETAIL TENANCY FITOUT ON LEVEL 6 | $45k |
| 21 Feb 2018 | Internal Alterations To Department Store - Myer Mini Modular Melbourne | $2.4m |
| 27 Nov 2017 | Retail Tenancy Fitout to Ground Floor Joey Scandizzo at Myer | $4k |
| 03 Nov 2017 | Ground Level - Internal alterations to beauty room and pad - Myer Melbourne Joey Scandizzo | $42k |
| 01 June 2016 | Internal alterations to retail building - Mecca pads fitout, Myer Melbourne | $220k |
| 17 Feb 2016 | MYER (TSTM) - Internal Alterations To Tenancy | $20k |
| 07 Oct 2015 | INTERNAL ALTERATIONS TO RETAIL OUTLET, MYER | $300k |
| 01 July 2014 | Internal alterations to an existing building | $1.3m |
| 06 Nov 2013 | Internal Tenancy Fitout for Declic Tenancy 2-037A | $198k |
| 11 Feb 2013 | Internal Alterations Basement and Level 6 (Part) | $51k |
| 27 May 2011 | Alterations to an existing building | $3.4m |
| 23 Nov 2010 | Stage 5: Levels 6 & 7 fitout | $14.2m |
| 29 Oct 2010 | Stage 4: Levels 4-7 | $12.2m |
| 20 Oct 2010 | Myer Melbourne Bourke Street Redevelopment. Stage 1: Areas 1 and 3 piles and pile caps. | $700k |
| 16 Sept 2010 | Stage 3: Level 3 fitout | $9.7m |
| 18 Aug 2010 | Stage 2: Fitout of levels 1 & 2 | $4.5m |
| 29 July 2010 | Myer Melbourne Bourke Street Redevelopment. Stage 17: Mural Hall Restoration | $164.3m |
| 28 Apr 2010 | Myer Melbourne Bourke Street Redevelopment. Stage 16: Mural Hall Restoration | $164.3m |
| 29 Mar 2010 | Myer Melbourne Bourke Street Redevelopment. Stage 5: Area 4&5- Strengthening Works (carbon Fibre) Levels G to 6 | $158.0m |
| 02 Mar 2010 | Myer Melbourne Bourke Street Redevelopment. Stage 15: Roof Structure and associated finishes and services, including Lvl 9 Plant room | $164.3m |
| 27 Jan 2010 | Myer Melbourne Bourke Street Redevelopment. Stage 14: Levels 6 & 7 finishes and schedules | $164.3m |
| 12 Oct 2009 | Myer Melbourne Bourke Street Redevelopment. Stage 12: Finishes and services to levels Basement to Five inclusive. Includes void. Excludes Separable Portion 1 | $164.3m |
| 21 Sept 2009 | Myer Melbourne Bourke Street Redevelopment. Stage 12: Bourke Street Canopy, Bulkheads, Soffits and Display Window | $164.3m |
| 02 June 2009 | Myer Melbourne Bourke Street Redevelopment. Stage 9: Area 2 Demolition Works Basement to Level 4. | $158.0m |
| 12 May 2009 | Myer Melbourne Bourke Street Redevelopment. Stage 10: Area 1, 2 and 3 Levels 6 & 7 Slabs, Core Walls and Facade Precast (inc. Escalator Installation) | $164.3m |
| 11 May 2009 | Myer Melbourne Bourke Street Redevelopment. Stage 8: Ground Floor Finishes, Services and Façade (South west and North-west Entrances) - Separable Portion 1. | $158.0m |
| 25 Mar 2009 | Myer Melbourne Bourke Street Redevelopment Decanting Works (Stage 5 Works). Decanting Works Only. | $500k |
| 03 Mar 2009 | Myer Melbourne Bourke Street Redevelopment. Stage 7:Area 4 and 5 levels basement Level 8 structural works | $158.0m |
| 02 Feb 2009 | Myer Melbourne Bourke Street Redevelopment. Stage 6: Area 1, 2 & 3 Level 3-5 Suspended Slabs, Core Walls & Façade Precast - including Escalators Instaflation. | $158.0m |
| 10 Dec 2008 | Myer Melbourne Bourke Street Redevelopment. Stage 4: Area 1, 2, 3, Level 1 and 2 Slab and Precast and Block Work Walls and Columns | $158.0m |
| 14 Nov 2008 | Myer Melbourne Bourke Street Redevelopment. Stage 3: Area 1,2, 3 Lower Ground Level Columns and Precast and Block Walls; Suspended Ground Slab Including Escalator Installation. | $158.0m |
| 15 Sept 2008 | Myer Melbourne Bourke Street Redevelopment. Stage 2: Inground Services; Lift Bases and Pits; Basement Ground Slab. | $158.0m |
| 02 July 2008 | Myer Melbourne Bourke Street Redevelopment Hard Demolition Works. Demolition of an Existing Building. | $1.3m |
| 02 July 2008 | Myer Melbourne Bourke Street Redevelopment Soft Demolition Works. Alterations to an Existing Building. | $4.3m |
| 01 July 2008 | Demolition of former Telecom building and basement excavation and retention | $280k |
| 01 Apr 2008 | Myer Bourke Street Store Basement Level | $94k |
| 31 Mar 2008 | Alterations to an Existing Building. Myer Bourke Street | $100k |
| 11 Feb 2008 | Myer Melbourne Bourke Street Redevelopment Area 3 Demolition and Early Works. Alterations to an existing building, Basement to Level 6. | $4.2m |
| 21 Jan 2008 | Demolition of Telecom Building & Angelo Lane Canopies, Lot 1, 2 & 21. Stage 2: Balance of works including demolition of Telecom Building. | $1.4m |
| 05 Dec 2007 | Demolition of Telecom Building & Angelo Lane Canopies, Lot 1, 2 & 21. Stage 1: Demolition of Angelo Lane Canopies. | $1.4m |
| 10 Oct 2005 | Stage 1: Demolition and high walls to lower ground floor and knock-on project (excluding services) to Lonsdale and Bourke Street ground level and levels 1,2 & 3. Proposed internal alterations to Myer basement, ground level, levels 1, 2 & 3 | $2.5m |
| 06 Apr 2005 | Myer Bourke & Little Bourke Buildings - EWIS upgrade | $26k |
| 24 Nov 2004 | ASE MODIFICATION ( FIRE ALARM ) | $14k |
| 02 Sept 2002 | Decomissioning of emergency lights and & exit signs & installation of emergency lights & exit signs in the basement. 315 Little Bourke Street | $5k |
| 05 Oct 2001 | Alterations to level 1 of retail building - (Myer) De commisioning of No 5 door/shutters | $990 |
| 08 Aug 2000 | proposed installation of alarm signalling equipment | $190 |
| 12 Apr 1996 | Level 5, 6 & 7 - Office Alterations | $50k |
Is Myer residential or commercial?
Myer is a commercial building. The City of Melbourne lists its main use as retail - shop.
When was Myer built?
Myer was completed in 2010.
How many floors does Myer have?
Myer has 9 floors above ground.
What businesses are in Myer?
The latest council census counted 3 businesses in Myer, including Brunetti Myer Melbourne, Myer Melbourne and The Salon.
Is there office or retail space for lease in Myer?
See the commercial listings on this page, or search this address on realcommercial.com.au and commercialrealestate.com.au.
Who designed and built Myer?
Colonial First State Global Asset Management developed Myer, NH Architecture designed it and Probuild built it. The building team section has the sources.
How tall is Myer?
About 44 metres, measured from the City of Melbourne's 3D building model. It's number 372 of 1596 buildings in Melbourne by height.
What public transport is near Myer?
Town Hall Station is the nearest train station, about 5 minutes' walk. The nearest tram stop is Elizabeth St/Bourke St #5, about 1 minute's walk.
What is the planning zone for Myer?
The site is in the Capital City Zone - Schedule 2 (CCZ2). It's also under a Heritage Overlay (HO509).
Does Myer have an owners corporation?
Plan of subdivision TP844667 has 1 lot.
Is someone trying to take full ownership of the Myer Bourke Street store?
Forza Capital is said to be pursuing sole ownership of the Myer Bourke Street store, according to news from 16 March 2026.
Has any work been done on Myer recently?
The City of Melbourne has issued 42 building permits for Myer since 2001. The most recent was in April 2026.
Sources: City of Melbourne building permits (CC BY 4.0); CLUE building information (CC BY 4.0); CLUE business establishments (CC BY 4.0); Development Activity Monitor (CC BY 4.0); Geocoded National Address File (G-NAF) (Open G-NAF EULA (CC BY 4.0 based)). General information from public records, not legal, financial or building advice.