| Planning application | 2018 | Planning application TPMR-2018-10/A lodged |
| Approved | By 2021 | Planning permit granted (exact date not recorded) |
| Construction started | Apr 2021 | First major construction permit issued |
| First occupants | Jun 2025 | First occupancy permit issued |
| Completed | 2025 | Loading DOCK completed: 11 floors |
Each cost is the estimate on that record. Stages of a project often repeat its full value, so these don't add up to what was spent.
| 30 Jan 2026 | Internal Fitout Works To Class 6 Retail Tenancy Bake Stand (GF-19) | $150k |
| 22 Dec 2025 | Tenancy GF 12-13 - Stage 1: Proposed alterations to existing retail tenancy | $55k |
| 16 Dec 2025 | Proposed alterations to existing retail tenancy - Tenancy 14 & 15 Melbourne Walk - Proposed almalgamation of shops | $40k |
| 02 Oct 2025 | Tenancy 12 & 13 (Melbourne Walk) - Proposed amalgation of shops | $20k |
| 09 July 2025 | Stage 1 - GF-11 - The Walk - JD Fitout - All works excluding glazed shop fronts, back of house racking, shopfront bulkheads, escalator LED canopy, dumbwaiters, footwear slide, and services (to fit-out only) | $2.8m |
| 09 July 2025 | Stage 2 - Shopfronts design and F3P1 Weatherproffing Report | $2.8m |
| 07 July 2025 | Stage 3 - Back of House Racking, shopfront bulkheads, escalator LED Canopy, Dumbwaiter & Footwear Slide structural dccuments, Services (to Fit-out only) and Fire Engineering Report but excluding shopfronts and F3P1 Weatherproofing Report | $2.8m |
| 24 June 2025 | Stage 3 - Façade Glazing , Wet Fire Services, Mechanical & Hydraulic& Electrical, Fire Engineering Report, Architectural full package, ESD, Acoustics, DDA, Structure L7-L10, Facade, Test Reports | $165.0m |
| 24 June 2025 | Stage 4 - Façade Glazing (FS-03, 5, 6[Part], 7, 8, & 13), Glazing for Balustrades, Baffles, Screens, Bridge & Stairs, Structural Updates, Structural Steelwork, Box Gutter Performance Solutions, Town Planning Approvals, Stormwater Pit Re-Design, Structural Steel Stairs (B1 and Spiral). | $165.0m |
| 29 Apr 2025 | Shop GF-01 - Proposed shop fitout for "Popmart" | $470k |
| 13 Mar 2025 | Stage 4 - Façade Glazing (FS-03, 5, 6[Part], 7, 8, & 13), Glazing for Balustrades, Baffles, Screens, Bridge & Stairs, Structural Updates, Structural Steelwork, Box Gutter Performance Solutions, Town Planning Approvals, Stormwater Pit Re-Design, Structural Steel Stairs (B1 and Spiral). | $165.0m |
| 13 Mar 2025 | The Walk Arcade Redevelopment - Construction | $160.0m |
| 19 Nov 2024 | Stage 3 - Façade Glazing , Wet Fire Services, Mechanical & Hydraulic& Electrical, Fire Engineering Report, Architectural full package, ESD, Acoustics, DDA, Structure L7-L10, Facade, Test Reports | $165.0m |
| 15 Oct 2024 | Stage 4 - Façade Glazing (FS-03, 5, 6[Part], 7, 8, & 13), Glazing for Balustrades, Baffles, Screens, Bridge & Stairs, Structural Updates, Structural Steelwork, Box Gutter Performance Solutions, Town Planning Approvals, Stormwater Pit Re-Design, Structural Steel Stairs (B1 and Spiral). | $165.0m |
| 01 Aug 2023 | Stage 2 - The Walk Arcade Redevelopment - Construction | $165.0m |
| 11 May 2022 | Stage 3: Bulk Excavation, Anchors, Capping Beams, and Shotcrete Wallsdemolition of the following buildings: Diamond House, York Building, Sonora House, P.B Bootery Building | $24.0m |
| 07 July 2021 | Stage 2: Construction of retention piles & capping beams. Propping to support Heritage Façade & Elements. Remainder of demolition to West Side of the Walk Arcade, demolition of the following buildings: Diamond House, York Building, Sonora House, P.B Bootery Building | $13.5m |
| 20 Apr 2021 | Stage 1: Internal Demolition & Strip out works | $135.0m |
| 12 Sept 2014 | Ground floor, shop 16 Proposed alterations to existing shop | $150k |
| 12 Sept 2014 | Stage 2 Internal fitout works, excluding external shop front and awning works - Ground floor, shop 16 | $150k |
| 23 July 2014 | Stage 3: External shop front and awning works - shop 16 | $150k |
| 06 Aug 2013 | Office alterations Ground Floor | $48k |
| 26 July 2013 | Stage 2- External Works - Retail tenancy fitout Shop 2 Portmans | $8k |
| 02 July 2013 | Retail tenancy fitout Shop 2 Portmans | $280k |
| 15 Mar 2013 | New external canopy (Bourke st mall) and Retail tenancy refurbishment | $540k |
| 09 May 2011 | Construction of Alterations to the Visitors Information Booth Tourist Booth | $27k |
| 23 Sept 2009 | Proposed Removal of Fire Doors - Level 1 | $3k |
| 11 Aug 2008 | Sprinkler alterations to existing bank tenancy Ground Floor | $2k |
| 26 June 2007 | Change of use and fit-out for ANZ Bank Branch. Stage 1: All building works excluding fire and hydraulic services, Ground and Basement Level. | $1.0m |
| 23 May 2007 | Re construct Tourism & Shopping Information Kiosk | $171k |
| 15 Nov 2006 | internal refurbishment/fit-out works for Witchery Fashions, incorporating signage and shop front modifications | $100k |
| 03 Mar 2006 | Retail construction shop 17 fitout | $33k |
| 24 Jan 2006 | Shop fitout | $19k |
| 01 Sept 2005 | install security gate stair 8 - ground floor | $2k |
| 27 Oct 2004 | Install six new fire doors in fire isolated stair no. 3 - Basement | $13k |
| 18 Feb 2004 | Alterations Shop 3 | $154k |
| 14 Sept 2000 | Installation of alarm signalling equipment | $190 |
| 21 June 2000 | proposed alterations to retail shop. Shop 1b 309 - 325 bourke street, just jeans city walk bourke street mall. | $40k |
| 21 Feb 2000 | Refurbishment of Shop 33/34 The Walk Arcade | $14k |
| 22 Sept 1999 | Retail fitout | $100k |
| 10 Dec 1998 | Shop 4-7 Lot The Walk Arcade | $200k |
| 15 Sept 1998 | Office fitout for Sussan''s Clothing Shop, 309-325 Bourke Street, Melbourne - Stage 1 Conditional. | $100k |
| 14 Aug 1998 | Proposed Shop fitout, The Walk Arcade, 309-325 Bourke Street, Melbourne | $50k |
| 09 June 1998 | Tenancy fitout on levels 25 & 26 | $34k |
| 13 Oct 1997 | shop fit, fitout | $300k |
| 31 July 1997 | Fitout shops 1A, 2 and 3A | $130k |
| 25 Jan 1996 | New shop front and signage | $40k |
Is Loading DOCK residential or commercial?
Loading DOCK is a commercial building.
When was Loading DOCK built?
Loading DOCK was completed in 2025.
How many floors does Loading DOCK have?
Loading DOCK has 11 floors above ground.
Does Loading DOCK have hotel or student accommodation?
The City of Melbourne records 451 hotel rooms at Loading DOCK.
What businesses are in Loading DOCK?
The latest council census counted 0 businesses in Loading DOCK.
Is there office or retail space for lease in Loading DOCK?
See the commercial listings on this page, or search this address on realcommercial.com.au and commercialrealestate.com.au.
Who designed and built Loading DOCK?
Steadfast Capital developed Loading DOCK, The Buchan Group designed it and Hickory built it. The building team section has the sources.
How tall is Loading DOCK?
About 38 metres, measured from the City of Melbourne's 3D building model. It's number 432 of 1596 buildings in Melbourne by height.
What public transport is near Loading DOCK?
Town Hall Station is the nearest train station, about 3 minutes' walk. The nearest tram stop is Elizabeth St/Bourke St #5, about 1 minute's walk.
What is the planning zone for Loading DOCK?
The site is in the Capital City Zone - Schedule 2 (CCZ2). It's also under a Heritage Overlay (HO509).
Has any work been done on Loading DOCK recently?
The City of Melbourne has issued 31 building permits for Loading DOCK since 1996. The most recent was in January 2026.
Sources: City of Melbourne building permits (CC BY 4.0); CLUE building information (CC BY 4.0); Development Activity Monitor (CC BY 4.0); Geocoded National Address File (G-NAF) (Open G-NAF EULA (CC BY 4.0 based)). General information from public records, not legal, financial or building advice.