302-324 Russell Street, Melbourne VIC 3000
Generated 8 November 2026
Mixed use · Residential Apartment
189 mheight
57floors
2015completed
444homes
15permits

Development milestones

Construction startedMay 2013First major construction permit issued
First occupantsOct 2014First occupancy permit issued
Completed2015Abode 318 completed: 57 floors

Building team

Developer
PDG Corporation
Developer
Schiavello
Architect
Elenberg Fraser
Architect
Disegno Australia
Builder
Probuild
Structural engineer
Meinhardt Group

Planning & subdivision

Zone
CCZ1
Overlays
DDO1, DDO10, PO1
Strata plan
PS720256 · 605 lots
Scores
🚆 8 · ☕ 9 · 🌳 7 · ✨ 8

Timeline

20171 certificate · about $61k of new works
Largest: Tenancy 1 - Fitout works to existing office for Mortgage Choice
20163 building permits · about $12k of new works
Largest: Alterations - Fire Control Room. Minor works.
2015Abode 318 completed: 57 floors
Derived from City of Melbourne building census (CLUE) 2024
2015Council census records it as residential apartment, 58 floors
Name recorded: Adobe 318 Apartments
201519 certificates
Largest: Stage 25 - Miscellaneous variations. Facade (above level 53), architectural and services above level 53 (i.e. level 54 and level 55 sky loun
Oct 2014First occupancy permit issued
Derived from City of Melbourne building permits
20142 building permits and 6 certificates · about $6.0m of new works
Largest: Stage 18 - Services (levels 10-20).
May 2013First major construction permit issued
Derived from City of Melbourne building permits
20134 building permits · about $21.9m of new works
Largest: Stage 13 - Required fire hydrants and hose reels. Relative to clause E1.9 of BCA. Structural floor levels 11-54.
Mar 2011Council rejects 36-level Russell Street proposal; 55-level tower on the 318 Russell Street site to proceed
A March 2011 Real Estate Source report said the council had rejected a 36-level proposal nearby while the 55-level tower on the long-vacant 318 Russell Street site would proceed. It said PDG and Schiavello had bought the site from Barton Australia for $19.7 million the previous December.
20081 building permit · about $200k of new works
Largest: Barton Tower. Proposed Residential Complex, Ground, First and Second Floor. Stage 1: Demolition of existing buildings.
2006Council census records it as unoccupied - unused, 3 floors
20061 building permit · about $21k of new works
Largest: Alterations to existing building, internal office partition removal.
2002First council census entry: office, 3 floors
20002 building permits · about $52k of new works
Largest: RMIT bldg 21, lvl 3 fitout partition
19951 building permit · about $14k of new works
Largest: Office refurbishment/fitout

Building permits and certificates (40)

Each cost is the estimate on that record. Stages of a project often repeat its full value, so these don't add up to what was spent.

01 Nov 2017Tenancy 1 - Fitout works to existing office for Mortgage Choice$61k
22 July 2016L9 and L55 proposed alterations to smoke detectors$660
04 May 2016Alterations - Fire Control Room. Minor works.$7k
26 Feb 2016Level 43 lobby. Duel key entry.$5k
05 June 2015Stage 17 - Facade levels 1-36 (excluding level 9).$9.1m
05 June 2015Stage 19 - Services (levels 21-35).$9.0m
05 June 2015Stage 23 - Structural details. Core walls and precast walls above level 54 and floor level 55 to 57.$0
05 June 2015Stage 3 - Core piles. Piles P12-P13, P40-P41, P100-P123 located between grids C-G and 2-6.$200k
05 June 2015Stage 5 - Structural details, east and west capping beam.$300k
05 June 2015Stage 6 - Structural details, raft slab.$500k
05 June 2015Stage 7A - Core walls up to level 9 and columns up to ground floor, core slab and stairs, lower ground slab and column starter bars.$0
29 Apr 2015Stage 14 - LB- L8 architectural (excluding facade).$6.7m
29 Apr 2015Stage 17 - Facade levels 1-36 (excluding level 9).$9.1m
29 Apr 2015Stage 2 - Piling works. Piles P1 to P7, P9 to P11, RP4 and site retention work located between grids A-B.$350k
29 Apr 2015Stage 4 - Bulk excavations, site retention and piles.$300k
29 Apr 2015Stage 8 - Ground floor slab up to 3m from northern boundary.$0
11 Mar 2015Stage 17 - Facade levels 1-36 (excluding level 9).$9.1m
11 Mar 2015Stage 1 - New building. Commercial and apartment development. Piles P42 to P55 between grids H and G.$250k
11 Mar 2015Stage 20 - Architectural levels 21-35 (excluding facade).$9.2m
11 Mar 2015Stage 21 - Architectural and services level 36 to 54 (excluding facade).$0
11 Mar 2015Stage 22 - Architectural, services, facade and balustrades (level 9).$0
11 Mar 2015Stage 23 - Structural details. Core walls and precast walls above level 54 and floor level 55 to 57.$0
11 Mar 2015Stage 25 - Miscellaneous variations. Facade (above level 53), architectural and services above level 53 (i.e. level 54 and level 55 sky lounge), plant screen and air terminal.$10.3m
02 Dec 2014Stage 10 - Level 9 floor and vertical elements to level 10 and substation enclosure.$0
02 Dec 2014Stage 7 - Core walls up to level 9 and columns up to ground floor, core slab and stairs, colum starter bars.$3.5m
02 Dec 2014Stage 8 - Ground floor slab up to 3m from northern boundary.$0
28 Oct 2014Stage 12 - Tower walls level 10 to level 54.$6.0m
28 Oct 2014Stage 18 - Services (levels 10-20).$6.6m
28 Oct 2014Stage 9 - Structure to level 8 including remainder of ground floor slab.$0
11 Aug 2014Stage 24 - Facade (level 36-53).$3.3m
14 July 2014Stage 22 - Architectural, services, facade and balustrades (level 9).$0
26 Aug 2013Stage 16 - L10-L20 architectural, excluding facade.$6.7m
16 Aug 2013Stage 15 - LB-L8 services.$6.6m
01 May 2013Stage 13 - Required fire hydrants and hose reels. Relative to clause E1.9 of BCA. Structural floor levels 11-54.$12.7m
27 Feb 2013Stage 11 - Level 10 transfer slab and core walls level 10 and above.$10k
20 Aug 2008Barton Tower. Proposed Residential Complex, Ground, First and Second Floor. Stage 1: Demolition of existing buildings.$200k
11 Apr 2006Alterations to existing building, internal office partition removal.$21k
19 July 2000installation of alarm signalling equipment$190
12 May 2000RMIT bldg 21, lvl 3 fitout partition$51k
27 Nov 1995Office refurbishment/fitout$14k

Questions and answers

Is Abode 318 residential or commercial?
Abode 318 mixes homes and businesses under one roof. The City of Melbourne lists its main use as residential apartment.

When was Abode 318 built?
Abode 318 was completed in 2015.

How many floors does Abode 318 have?
Abode 318 has 57 floors above ground.

How many apartments are in Abode 318?
Abode 318 has 444 homes. The national address file lists 460 unit addresses here, and some of those can be shops or offices.

What size apartments are in Abode 318?
The City of Melbourne's development record lists 207 1 bed, 201 2 bed and 31 3+ bed apartments. The built numbers may differ a little.

Does Abode 318 have parking?
The City of Melbourne records 145 residential car spaces at this property. Which apartments have a space isn't recorded, so check the listing.

What do apartments cost near Abode 318?
The median unit price in Melbourne was $545,000 in 2025, from the Victorian Property Sales Report. That's for the whole suburb, not this building.

What businesses are in Abode 318?
The latest council census counted 2 businesses in Abode 318, including LUCKY REAL ESTATE GROUP PTY. LTD and Melcorp Real Estate Pty Ltd.

Are there apartments for sale or rent in Abode 318?
See the residential listings on this page, or use the shortcuts to search 302-324 Russell Street on realestate.com.au and Domain.

Is there office or retail space for lease in Abode 318?
See the commercial listings on this page, or search this address on realcommercial.com.au and commercialrealestate.com.au.

Who designed and built Abode 318?
Schiavello developed Abode 318, Disegno Australia designed it and Probuild built it. The building team section has the sources.

How tall is Abode 318?
About 188 metres, measured from the City of Melbourne's 3D building model. It's number 25 of 1596 buildings in Melbourne by height.

What public transport is near Abode 318?
State Library Railway Station is the nearest train station, about 4 minutes' walk. The nearest tram stop is Russell St/La Trobe St #7, about 1 minute's walk.

What is the planning zone for Abode 318?
The site is in the Capital City Zone - Schedule 1 (CCZ1).

Does Abode 318 have an owners corporation?
Plan of subdivision PS720256 has 605 lots.

Has any work been done on Abode 318 recently?
The City of Melbourne has issued 15 building permits for Abode 318 since 1995. The most recent was in July 2016.

Sources: City of Melbourne building permits (CC BY 4.0); CLUE building information (CC BY 4.0); CLUE business establishments (CC BY 4.0); CLUE residential dwellings (CC BY 4.0); Development Activity Monitor (CC BY 4.0); Geocoded National Address File (G-NAF) (Open G-NAF EULA (CC BY 4.0 based)). General information from public records, not legal, financial or building advice.