| Construction started | Apr 2013 | First major construction permit issued |
| First occupants | Mar 2019 | First occupancy permit issued |
| Completed | 2019 | River View House completed: 17 floors |
Each cost is the estimate on that record. Stages of a project often repeat its full value, so these don't add up to what was spent.
| 12 May 2026 | Level 11 - Internal Office Alterations | $127k |
| 02 Apr 2026 | Levels 8 and 12 - Internal Office Fitout | $60k |
| 16 Dec 2025 | Level 10 - Internal Office Fitout | $247k |
| 05 Dec 2025 | Tenancy 13A, 2-26 Elizabeth Street - Proposed shop fitout for "Wow Crepes" | $100k |
| 04 Dec 2025 | Shopfront Alterations & Fitout to Project Zero Cafe - Internal Fitout for Project Zero Cafe - Stage One - Completion of Internal Cafe Works Only | $156k |
| 02 July 2025 | Alterations to an Existing Building - Lobby, Ground Floor Installation of Security Roller Shutter, Removal of Fire Hose Reel in lobby and Minor Lobby Upgrade Works including Base Build Works to Cater for Future Café Kiosk | $56k |
| 20 June 2025 | Internal alteration to existing building | $35k |
| 27 May 2025 | Coles - Installation of smart gates | $65k |
| 24 Feb 2025 | Level 10 - Internal Defit & Tenancy Split | $86k |
| 02 Dec 2024 | Alterations to an Existing Building - Ground Floor Fire Wall | $27k |
| 15 Nov 2024 | Coles Melbourne CBD - Communication Room Upgrade | $55k |
| 01 Nov 2024 | level 15 - Change of use | $143k |
| 26 June 2023 | Level 7 - Suite 7.01 Proposed alterations to existing office | $50k |
| 16 Jan 2023 | Shop 6 - Proposed alterations to existing retail shop | $100k |
| 30 Nov 2022 | Shop 6 - Proposed alterations to existing retail shop | $100k |
| 29 June 2022 | Shop 1B - Proposed retail fitout for a cafe | $25k |
| 18 May 2022 | Level 12 - Internal Office Fitout for People 2 People | $48k |
| 01 Mar 2022 | Level 9 - Fit out of Offices | $196k |
| 01 Mar 2022 | Level 9 - Fit out of Offices - Stage 2: Mechanical Services Works | $0 |
| 07 Sept 2021 | Alterations to Existing Essential Services | $15k |
| 11 Mar 2021 | Level 8, 276 Flinders Street only - Proposed office fit out. Amended - To Include Revised Reflected Ceiling Plan in Regards to Fire Services Only. | $12k |
| 18 Dec 2020 | Level 8, 276 Flinders Street only - Proposed office fit out. Amended - To Include Revised Reflected Ceiling Plan in Regards to Fire Services Only. | $12k |
| 22 Oct 2020 | Installation of two sky signs | $80k |
| 02 Sept 2020 | ASE Replacement | $2k |
| 19 Aug 2020 | Tenancy T5, Z Curry Restaurant Partial demolition and alterations to Shopfront | $48k |
| 19 June 2020 | Level 2 - Installation of a security gate | $9k |
| 06 Apr 2020 | Fitout to Shop (Iscream) | $30k |
| 12 Mar 2020 | Level 11, Tenancy 2 - Proposed Office Fitout | $29k |
| 06 Feb 2020 | Level 7 - Partition Alterations to Office on Level 7 | $5k |
| 09 Dec 2019 | Tenancy T5 - Z Curry Restaurant fitout | $281k |
| 06 Dec 2019 | Level 1 - Proposed mechanical services alterations to existing tenancy | $12k |
| 20 Nov 2019 | Shop 12 - Proposed Alterations (Fly Wheel) | $80k |
| 19 Nov 2019 | Level 8 - Proposed Internal Partitions and Office Fitout for Railway Europe on Level Eight Only | $46k |
| 01 Nov 2019 | Proposed fitout to existing tenancy, including change of use from retail to education facility on Level 1 Tenancy 1 | $0 |
| 25 Oct 2019 | Construction of an internal restaurant fitout - Foo Dao Restaurant | $350k |
| 01 Oct 2019 | Proposed Fitout of Levels 5-9 for the Purpose of CoWorking Office Space - Stage 1 – To Permit Level 7 Architectural, Hydraulic, Electrical & Fire Services Only EXCLUDING room S07 017, Store Room 719 & Mother Room 718 | $2.9m |
| 01 Oct 2019 | Stage 2 - To Permit All Remaining Works EXCLUDING All Phone Booths | $2.9m |
| 01 Oct 2019 | Stage 3 – To Permit the Construction of Phone Booths Including DDA Access Report, Updated Partition Layout and Smoke Detection Layout | $2.9m |
| 01 Aug 2019 | Tenancy 2 - Level 14 - Proposed Internal Office Fitout for MKC | $35k |
| 27 July 2019 | Alterations to building detection and alarm system. | $5k |
| 15 July 2019 | Level 1 - Alterations to existing building | $175k |
| 15 July 2019 | Proposed Fitout of Levels 5-9 for the Purpose of CoWorking Office Space - Stage 1 – To Permit Level 7 Architectural, Hydraulic, Electrical & Fire Services Only EXCLUDING room S07 017, Store Room 719 & Mother Room 718 | $2.9m |
| 28 June 2019 | Retail Tenancy Fitout to Tenancy 2, Part 1 (Chemist Warehouse) | $150k |
| 28 June 2019 | Tenancy 1 - Proposed Internal Office Fitout | $250k |
| 25 June 2019 | Proposed Internal Partitions and Office Fitout to Tenancy (1) Only for Fivex Pty Limited | $172k |
| 21 June 2019 | Proposed Internal Partitions and Office Fitout to Tenancy (1) Only for Fivex Pty Limited | $60k |
| 12 June 2019 | Level 1 - ALTERATIONS & ADDITIONS INCLUDING PARTIAL CHANGE OF USE (CLASS 6 TO CLASS 9B) | $300k |
| 29 May 2019 | Upgrade of Existing Booster | $75k |
| 27 May 2019 | Stage 2 - External Fagade Works and Mechanical Ventilation | $334k |
| 03 May 2019 | Minor upgrade of existing smoke hazard management (Control) | $401k |
| 30 Apr 2019 | Shop 3B- ALTERATIONS TO EXISTING BUILDING, | $75k |
| 16 Apr 2019 | Shop 3a - Construction of internal shop fitout - La Vie Yogurt | $40k |
| 22 Mar 2019 | OFFICE PARTITION WORKS TO LEVEL 9 | $10k |
| 19 Mar 2019 | Internal Office Fitout To Level 13 & Demolition Of Internal Partitions To Level 14 | $817k |
| 08 Mar 2019 | Stage 1 - Internal structural strengthening works - New 5 level Office Tower Above Existing Podium | $22.8m |
| 08 Mar 2019 | Stage 2 - Preparation works for steel installation including internal demolition and services relocation excluding demolition works to the external wall adjacent to Rothsay Lane | $22.8m |
| 08 Mar 2019 | Stage 3 - Construction of five new office levels above existing retail podium | $23.4m |
| 21 Feb 2019 | Level 15 - Proposed Internal Partitions and Office Fitout | $180 |
| 18 Feb 2019 | Foodao Restaurant Fitout Stage 1 - All Internal Works excluding facade, external works and mechanical ventilation | $334k |
| 15 Feb 2019 | Shop 1-B - Retail Tenancy Fitout (Chunky Town) | $132 |
| 14 Feb 2019 | LEVELS 13, 14 & 15 INTERNAL DEMOLITION | $0 |
| 27 Jan 2019 | Stage 6 - Structural framing to level 4 Child Care Centre | $3.0m |
| 14 Dec 2018 | Tenancy 3 - Reinsurance Group of America Office Tenancy Fitout | $68 |
| 09 Dec 2018 | Shop 3A - Fit out and alter tenancy - Internal and External store works | $25k |
| 07 Dec 2018 | Shop 1-B - Retail Tenancy Fitout (Chunky Town) | $132 |
| 30 Nov 2018 | Shop 3A - Stage 2 - Rectification works to unauthorized and non-compliance building works – works to access point to shop including threshold ramp to comply with Building Code of Australia, and works to bring glazing and door generally to comply with AS2047-2014 and Building Code of Australia for area subject to flood event | $45 |
| 27 Nov 2018 | Stage 5 - Structural framing to level 4 Child Care Centre | $50k |
| 11 Oct 2018 | Level 1 - Alterations to existing building | $175k |
| 27 Sept 2018 | Tenancy 5 - Ground Floor - Proposed Tenancy Fitout for Wok to Walk | $400k |
| 24 Sept 2018 | Stage 2 - Mechanical Exhaust, Structural and external works | $100k |
| 18 Sept 2018 | Stage 4 - Installation of CLT flooring and plaster lining to tower, perimeter glazing and cladding, construction of roof excluding plant deck, construction of internal wall framing, all building services. | $12.2m |
| 03 Aug 2018 | Level 11- Proposed Partial Internal Partition and Office Fitout | $9k |
| 06 July 2018 | Stage 3 - Construction of five new office levels above existing retail podium | $23.4m |
| 16 June 2018 | Suite 601, Level 8 - Internal non-structural alterations to office tenancy | $12k |
| 16 May 2018 | Shop 13 - Stage 1 Internal works only (excludes kitchen exhaust) | $250k |
| 20 Apr 2018 | Tenancy 5 - Ground Floor - Proposed Tenancy Fitout for Wok to Walk | $400k |
| 26 Mar 2018 | Tenancy 7A - Internal Tenancy Fitout Works Only | $102k |
| 23 Jan 2018 | Tenancy 7A - Internal Tenancy Fitout Works Only | $102k |
| 11 Dec 2017 | Ground Floor tenancies 5,6,7, 7a - Alterations to retails tenancies | $100k |
| 24 Nov 2017 | Partition alterations to Level 5 | $11k |
| 09 Oct 2017 | Level 8 (Part) - Internal Non Structural Minor Alterations to - OLIKKA Office Tenancy | $7k |
| 06 Oct 2017 | Level 8 - Office partition fitout | $21k |
| 27 June 2017 | Podium Digital Billboard | $300k |
| 02 June 2017 | Level 11 - Internal office alterations | $60k |
| 30 May 2017 | Level 1 - Internal alterations to existing Daiso tenancy | $74k |
| 25 May 2017 | 7 Elizabeth St - Internal Fit-Out Works to Shop (Stalactites) | $130k |
| 17 Mar 2017 | Curved Horizontal Billboard | $300k |
| 13 Feb 2017 | Stage 2 - Demolition and installation of new shopfront - Sushi Hub - Shop 1A | $300k |
| 15 Dec 2016 | Stage 1 - Internal fitout only, excluding facade alrterations - Sushi Hub - Shop 1A | $300k |
| 01 Aug 2016 | Level 5: Alterations to Level 5, 10 & 11 - Spandrel removal | $68k |
| 14 July 2016 | Level 15 - Installation of Partitions within an Existing Training Facility Tenancy. | $27k |
| 01 June 2016 | Canopy replacement works | $1.6m |
| 25 May 2016 | Lot 6 - Proposed signage | $33k |
| 28 Apr 2016 | Level 15 - Installation of Partitions within an Existing Training Facility Tenancy. | $27k |
| 10 Feb 2016 | Suite 3, Level 5 - Office Fitout | $5k |
| 12 Aug 2015 | OFFICE FITOUT | $11k |
| 26 May 2015 | Level 2 - Proposed change of a smoke detector to a thermal detector type 'B' in a gymnasium | $2k |
| 24 Apr 2015 | Level 10 - Proposed office alterations | $5k |
| 24 Feb 2015 | LEVEL 8 - PROPOSED INTERNAL OFFICE PARTITIONS | $17k |
| 18 Dec 2014 | Level 15 - Alterations and change of use to existing office | $85k |
| 14 Oct 2014 | Shop 7 Retail Tenancy Fitout - Stage 2: External Advertising signs | $5k |
| 09 Oct 2014 | Levels: 13, 14, 15 - Change of use and fitout / alterations to 3 levels within an exisitng building. | $118k |
| 26 Sept 2014 | Retail Tenancy Fitout to Shop 7 (Yoli) | $66k |
| 28 Aug 2014 | Level 9 Internal alterations | $36k |
| 21 Aug 2014 | Level 8, Suite 804 Internal office fit out | $10k |
| 17 July 2014 | Lot 1A Fitout of Existing Class-6 Shop | $75k |
| 15 July 2014 | Level 8, Suite 804 Internal office fit out | $10k |
| 04 July 2014 | Shop 9A Retail Tenancy Fit Out | $18k |
| 04 July 2014 | Shop 9A Retail Tenancy Fit Out (Rocket Burger & Fries) | $27k |
| 26 June 2014 | Level 8 proposed new office fit-out | $51k |
| 12 June 2014 | CBA Alterations to existing bank tenancy | $138k |
| 05 June 2014 | Dental Fit Out Level 5 | $30k |
| 22 May 2014 | Tenancy 4, Level 6 Office Fitout | $39k |
| 09 May 2014 | Internal alterations to level 10 | $44k |
| 01 Apr 2014 | Levels 2-3 (Fitness First) - Stage 1 - Early Works; Breakthrough of slab only, including demolition | $5.6m |
| 24 Feb 2014 | Office fitout Tenancy 1 Level 5 | $19k |
| 06 Feb 2014 | Shop 9a Alterations to existing retail tenancy | $72k |
| 19 Dec 2013 | Alterations and additions to dwelling - Plaster partition walls (Level 7) | $75k |
| 09 Dec 2013 | Alterations to existing office space - Level 16 | $30k |
| 18 Nov 2013 | Conversion of an existing Offices to an Early Childhood Care Centre (Level 4) | $1.1m |
| 18 Nov 2013 | Internal office refurbishment to create Tenancy 5 on Level 6 | $17k |
| 08 Nov 2013 | Office fitout Tenancy 3 Level 11 | $3k |
| 15 Oct 2013 | Office Fitout - Tenancy 2 - Level 7 | $45k |
| 03 Oct 2013 | Refurbishment Base Building (Including New Stair) Ground floor lobby, Level 1, 2 & 3 | $660k |
| 12 Sept 2013 | LEVEL 4 .Proposed Partial Demolition of existing offices and construction and conversion to a Child Care Centre Office. | $0 |
| 09 Sept 2013 | Alterations Internal Non Structural Partition Level 6 Risk Advisory Services Office Partion | $8k |
| 04 Sept 2013 | Office fitout Tenancy 1 Level 6 | $12k |
| 03 Sept 2013 | Alterations to Level 14 and 15. | $491k |
| 03 Sept 2013 | Office Fitout - Tenancy 1 - Level 7, 276 Flinders Street | $36k |
| 26 Aug 2013 | Tenancy 3A Shop front replacement | $10k |
| 23 Aug 2013 | Retail Tenancy Fit out to Level 1 | $800k |
| 13 Aug 2013 | Renovations to Floors 6 ,7, 8 & 10 (part) | $983k |
| 19 July 2013 | Basement alterations | $555k |
| 03 May 2013 | Stage 3 - Remainder Extemal Works | $3.0m |
| 26 Apr 2013 | Stage 2 - Ground Level Lobbies & Level 1 - Intemal Works Only | $0 |
| 12 Apr 2013 | Construction of External Signage | $380k |
| 05 Apr 2013 | Ground Level Lobbies & Level 1 Intemal Alterations | $107k |
| 05 Apr 2013 | Intemal Demolition for Ground & Level 1 | $0 |
| 27 Mar 2013 | Alteration to Retail Tenancy - Internal Alterations - Tenancy 3A | $85k |
| 04 Feb 2013 | Office Fitout - Level 12 | $13k |
| 12 Nov 2012 | Minor alterations Tenancy 1 Level 5 | $60k |
| 11 Oct 2012 | Tenancy Fitout-T2-Level 12,2-26 Elizabeth street,melbourne | $68k |
| 02 Aug 2012 | Stage 2: Amendment - New Builder. Shop Fitout | $95k |
| 19 July 2012 | Tenancy 7a - Shop Fitout | $95k |
| 10 July 2012 | Stage 2: External works - final stage. New tenancy fitout of existing shop. | $100k |
| 13 June 2012 | Tenancy 7 & 7a - Alterations | $64k |
| 30 May 2012 | New tenancy fitout of existing shop. Stage 1 Internal Works | $100k |
| 08 Feb 2012 | Shop fitout to shop 6 | $45k |
| 30 Jan 2012 | Base building refurbishment Level 12 | $110k |
| 01 June 2011 | Level 13 - Internal office alterations | $149k |
| 30 Mar 2011 | Spandrel Panel Removal at Levels 4 - 15 | $112k |
| 17 Nov 2010 | Level 16 - Deletion of Fire Hydrant Hose | $1k |
| 18 Oct 2010 | PROPOSED TENANCY FITOUT OF SHOP - CAKE WORLD | $40k |
| 06 Oct 2010 | Tenancy fitout - CBA | $381k |
| 25 Mar 2010 | Level 11, 2-26 Elizabeth St: Office alterations. | $220k |
| 16 Dec 2009 | Walkers Doghnut Fit-out | $19k |
| 20 Nov 2009 | Alterations to existing tenancy | $59k |
| 03 July 2009 | Splitting one tenancy into two tenancies | $67k |
| 12 Feb 2009 | Alterations to Bank Level 4 | $80k |
| 02 Feb 2009 | Tenancy Fitout Shop 2 Ground | $80k |
| 23 May 2007 | Partial tenancy alterations to existing bank -CBA. | $36k |
| 08 Nov 2006 | Alterations to an office building, partition work, part of level 12. | $20k |
| 22 Aug 2006 | Commonwealth Bank level 1, fitout office call centre | $200k |
| 26 Apr 2006 | Alterations to a building, internal alterations to offices to levels 5 & 12. | $376k |
| 07 Apr 2006 | Refurbishment of call centre level 11. Internal alterations call centre part fitout. | $120k |
| 13 Oct 2005 | Internal works to Shop level 2 | $48k |
| 17 Aug 2005 | Alteration to shop (fitout). | $40k |
| 10 Aug 2005 | Shop 3a - Ground Level AKA 2-26 Elizabeth St. | $60k |
| 04 Mar 2005 | Alterations to building. Stage 3 - New kiosk tenancy fitout | $30k |
| 24 Jan 2005 | Retail food tenancy on ground floor | $81k |
| 09 Dec 2004 | restaurant fitout | $81k |
| 24 Nov 2004 | alterations to a building (internal) | $78k |
| 24 Sept 2004 | Additions and alterations to an existing bank. Stage 1- Internal fitout works only | $200k |
| 17 Sept 2004 | Proposed GNC shop Fitout. Shop 12 | $100k |
| 24 June 2004 | Tenancy 01 Basement ground & first | $170k |
| 10 June 2004 | Fitout to Shop 8 | $80k |
| 09 June 2004 | Shop fitout | $18k |
| 27 May 2004 | Fitout Levels 13,14 & 15 | $1.0m |
| 20 May 2004 | Alterations to a building. Stage of building works - re-cladding of the facade only. | $1.8m |
| 07 Apr 2004 | Alterations to building. Stage 2 - Ground floor - 3 corner tenancies. | $50k |
| 15 Mar 2004 | Alterations to building. Stage 1 - Ramp tenancy. | $101k |
| 06 Oct 2003 | Cloes Liquorland shop fitout | $150k |
| 27 Mar 2003 | Refurbishment of entrance lobby (Entrance lobby area only) | $243k |
| 07 Mar 2003 | Construction of partitions to an office on level 9 | $64k |
| 20 Dec 2002 | Tenancy establishment works on Level 10. (office) Stage 2 : Alterations to mechanical,electrical & sprinkler services | $69k |
| 06 Sept 2002 | Tenancy establishment works on Level 10. Stage 1: Construction of partitions | $69k |
| 13 Aug 2001 | Deletion of hoses from existing fire hydrants in building. | $1k |
| 18 May 2001 | lvl 3 office alts | $26k |
| 22 Sept 2000 | alts to building. | $250k |
| 30 June 2000 | proposed installation of alarm signalling equ8ipment | $190 |
| 28 Apr 2000 | Upgrade essential services | $1.0m |
| 13 Sept 1999 | Office fitout on level 1 | $1.2m |
| 02 Sept 1997 | Office alterations to Levels 2 & 3 | $206k |
| 11 June 1997 | Stage 1 - Level 5 Office Fitout - All works excluding mechanical spinkler and electrical services. | $318k |
| 04 Mar 1997 | Stage 2 - Level 5 Office Fitout - Mechanical spinkler and electrical services. | $318k |
| 03 Mar 1997 | Demolition of ground floor | $45k |
| 23 June 1996 | Office fitout to Levels 9 & 10 | $266k |
| 15 May 1996 | Bank fitout - Basement | $336k |
| 10 Oct 1994 | Level 3 alterations to office of existing building - tenancy fitout to Commonwealth Bank building | $1.3m |
Is River View House residential or commercial?
River View House is a commercial building. The City of Melbourne lists its main use as office.
When was River View House built?
River View House was completed in 2019.
How many floors does River View House have?
River View House has 17 floors above ground.
What businesses are in River View House?
The latest council census counted 38 businesses in River View House, including Ali's Jumbo Kebabs, Asia Pacific Education Consultants Pty Ltd and Central Australian College.
Is there office or retail space for lease in River View House?
See the commercial listings on this page, or search this address on realcommercial.com.au and commercialrealestate.com.au.
Who designed and built River View House?
Fivex developed River View House, Baldasso Cortese designed it and Multiplex built it. The building team section has the sources.
How tall is River View House?
About 69 metres, measured from the City of Melbourne's 3D building model. It's number 199 of 1596 buildings in Melbourne by height.
What public transport is near River View House?
Flinders Street Station is the nearest train station, about 1 minute's walk. The nearest tram stop is Flinders Street Station/Elizabeth St #1, about 1 minute's walk.
What is the planning zone for River View House?
The site is in the Capital City Zone - Schedule 2 (CCZ2).
Does River View House have an owners corporation?
Plan of subdivision PS503686 has 19 lots and common property, which means it is managed by an owners corporation.
Has any work been done on River View House recently?
The City of Melbourne has issued 156 building permits for River View House since 1994. The most recent was in May 2026.
Sources: City of Melbourne building permits (CC BY 4.0); CLUE building information (CC BY 4.0); CLUE business establishments (CC BY 4.0); Development Activity Monitor (CC BY 4.0); Geocoded National Address File (G-NAF) (Open G-NAF EULA (CC BY 4.0 based)). General information from public records, not legal, financial or building advice.