| Completed | 1977 | Double Tree by Hilton completed: 15 floors |
Each cost is the estimate on that record. Stages of a project often repeat its full value, so these don't add up to what was spent.
| 01 May 2019 | Stage 1, Level 14 - Double Tree Hotel change of use | $1.2m |
| 23 Nov 2018 | Final - Remainder of Works | $1.5m |
| 08 Mar 2016 | L14 and L15 - Double tree - lift extension | $308k |
| 12 Dec 2014 | Stage 5: External Work | $481k |
| 13 Oct 2014 | Stage 4 - Construction of Rooms 1301-1302 on Level 13 | $5.2m |
| 02 Sept 2014 | Stage 3 - Architectural & Services Works to Ground Floor Excluding External & Level 1 Works | $5.2m |
| 08 Aug 2014 | Stage 1: Internal Strip Out to levels 2-13 Only - Proposed Refurbishment | $170k |
| 30 May 2014 | Stage 2: Architectural & Services to guest rooms from level 2-13 Excluded the construction of rooms 1301-1302 on level 13 | $3.7m |
| 21 Nov 2013 | Internal Stripout - Refurbishment - Prototype Room, Level 1 | $80k |
| 10 Oct 2013 | Stage 2: Architectural, Electrical & Hydraulic Services - Refurbishment - Prototype Room, Level 1 | $80k |
| 06 Dec 2006 | Upgrade and installation of Code Red Fire Alarm Monitoring System - Citigate Hotel Melbourne. | $300 |
| 10 Oct 2005 | construction of sign (wall mounted, internal lumination) | $82k |
| 01 May 2003 | Construction of a Hotel - Basement Level 1 & 2 Ancillary Plant Equip - Ground Level Cafe/Kitchen - Ground Level Rear Carpark - Level 1 East Function Rooms - Level 1 Rear Office - Level 1 West Hotel Rooms - Level 14 Pentouse - Level 15 Ancillary Plant Equip - Level 2-13 - Hotel Rooms | $10.4m |
| 03 July 2000 | proposed installation of alarm signalling equipment | $190 |
Is Double Tree by Hilton residential or commercial?
Double Tree by Hilton is a hotel or serviced apartments. The City of Melbourne lists its main use as commercial accommodation.
When was Double Tree by Hilton built?
Double Tree by Hilton was completed in 1977.
How many floors does Double Tree by Hilton have?
Double Tree by Hilton has 15 floors above ground.
Who designed and built Double Tree by Hilton?
Woods Bagot designed Double Tree by Hilton. The building team section has the sources.
How tall is Double Tree by Hilton?
About 60 metres, measured from the City of Melbourne's 3D building model. It's number 240 of 1596 buildings in Melbourne by height.
What public transport is near Double Tree by Hilton?
Flinders Street Station is the nearest train station, about 1 minute's walk. The nearest tram stop is Flinders Street Station/Elizabeth St #1, about 1 minute's walk.
What is the planning zone for Double Tree by Hilton?
The site is in the Capital City Zone - Schedule 2 (CCZ2).
Does Double Tree by Hilton have an owners corporation?
Plan of subdivision TP547779 has 1 lot.
Was Double Tree by Hilton put up for sale?
In September 2010, Mirvac put the Citigate hotels in Melbourne and Perth up for sale. In October 2014, M&L Hospitality moved the Melbourne hotel into the Hilton brand as a DoubleTree.
Has any work been done on Double Tree by Hilton recently?
The City of Melbourne has issued 11 building permits for Double Tree by Hilton since 2000. The most recent was in November 2018.
Sources: City of Melbourne building permits (CC BY 4.0); CLUE building information (CC BY 4.0); CLUE business establishments (CC BY 4.0); Geocoded National Address File (G-NAF) (Open G-NAF EULA (CC BY 4.0 based)). General information from public records, not legal, financial or building advice.