🛎️ HotelCommercial AccommodationCompleted 2023🏛 Heritage overlay

Palace Theatre

20-30 Bourke Street, Melbourne VIC 3000

  • 12 m tall · #1012 in Melbourne
  • 12 floors
  • 235 hotel rooms
  • 24 car spaces

What's available here Add a listing link

Looking toIn this buildingArea guideSearch the building
Book a stay——

Each link opens a Google search limited to that site.

3 years standing

Built in 3 yrs 1 mth

  1. 2009Refurbished
  2. 2014Planning application
  3. Dec 2019Construction started
  4. 2023Completed
  5. TodayStill standing

15 building permits · 7 news storiesFull timeline ↓

About Palace Theatre

Palace Theatre is a 12-storey hotel on Bourke Street in Melbourne, which opened in the former theatre in 2023 as Le Méridien Melbourne. Jinshan Investment Group developed the building, with Peddle Thorp and Bates Smart as architects and L.U. Simon Builders as builder. Construction started in 1912, and the building reaches 51 m to the top.

At a glance

Key facts

Building type
🛎️ Hotel
Completed
2023
Construction started
1912 Unconfirmed We don't have data to 100% confirm this data point as yet.
Height
51 m Unconfirmed We don't have data to 100% confirm this data point as yet. to the top
12 m Unconfirmed We don't have data to 100% confirm this data point as yet. to the roof
#1012 of 1596 in Melbourne
Floors
12
Footprint
113 m²
Architect
Bates Smart
Builder
L. U. Simon Builders Unconfirmed We don't have data to 100% confirm this data point as yet.
Hotel rooms
235
Car spaces
24
Planning zone
CCZ1
Permits on record
15

Score cards

🚆 Transport10/10

Parliament Station 1 min walk · 11 tram stops within 400 m

☕ Everyday amenities7/10

94 cafés, 4 grocers, 32 medical within 250 m

🌳 Greenery7/10

71 street trees within 150 m · park 105 m away

✨ Activity10/10

5,835 people pass daily nearby · 82 licensed venues within 200 m

Calculated from PTV timetable stops, the City of Melbourne business census, street trees, pedestrian sensors and liquor licences.

The building team

The people and companies behind the design, construction and management of Palace Theatre.

🏗DeveloperJinshan Investment Groupsince 2012verifiedsince 2012 · Site owner and developerSource: Wikipedia ↗
📐ArchitectPeddle ThorpverifiedArchitect of the built 12-storey Le Méridien hotel behind the retained facadeSource: Journal des Palaces (press release) ↗
📐ArchitectBates Smart2013–2014verified2013-2014 · Early hotel design for the 2013-2014 W Hotel proposalSource: Hotel Management ↗
👷BuilderL.U. Simon Buildersto 2022reportedto 2022 · Main contractor for the hotel fit-out and constructionSource: CBD News (via The Melburnian) ↗
🏦OwnerJinshan Investmentssince 2012reportedCurrent · since 2012 · Owner of the site, per the 2015 articleSource: CBD News (via The Melburnian) ↗
+Were you involved?Builders, architects, developers and managers can claim their role

Location & neighbourhood

Getting around

🚆Parliament Station
Train station
1 min · 66 m
🚆Parliament Railway Station
Train station
1 min · 88 m
🚋Spring St/Bourke St #9
Tram stop
1 min · 42 m
🚋Bourke St #9
Tram stop
1 min · 95 m
🚋Bourke St/Spring St #0
Tram stop
1 min · 111 m

Straight-line walking estimate. Source: PTV GTFS, CC BY 4.0.

Within a 3-minute walk

94☕ Cafés & eateries
4🛒 Grocers
2🏋️ Gyms
32🩺 Medical
2💊 Pharmacies
0🧸 Childcare
23🍷 Pubs & bars

Who lives in Melbourne (CBD)

Residents37,341
Median age26
Households renting70%
Households without a car75%
Walk to work40%
Public transport to work43%

ABS Census 2016 via City of Melbourne (CC BY).

Being built nearby

No major projects in the pipeline within 600 m.

Timeline

Everything that has happened at Palace Theatre: listings, news, works, planning and history.

2024🔄
Use change
Council census records it as commercial accommodation, 3 floors
Name recorded: Palace Theatre
2024🛠
Works
1 building permit · about $2k of new works
Largest: ALTERATION TO 3 SMOKE DETECTORS AND AN EXIT SIGN IN BASEMENT 1 & 2
2023🎉
Milestone · Completed
Palace Theatre completed: 12 floors
Derived from City of Melbourne Development Activity Monitor
20 Sep 2023📰
News
L. U. Simon Builders named Master Builder of the Year for Le Méridien project
L. U. Simon Builders won Master Builders Victoria's 2023 Excellence in Construction Awards for the $100 million Bourke Street project, which it completed in October 2022.
16 Mar 2023📰
News
Le Méridien Melbourne opens in former Palace Theatre
The 235-room Le Méridien Melbourne opened in March 2023 behind the retained Art Deco facade, the brand's debut in Australia. A press release on 20 March 2023 described the 12-storey hotel by Peddle Thorp.
Covered by 2 outlets
Feb 2023🔑
Milestone · First occupants
First occupancy permit issued
Derived from City of Melbourne building permits
2023🛠
Works
3 certificates
Largest: Stage 2 - Retention system, bulk excavation, protection works, inground services civil and superstructure, excluding works along west lanewa
2021🔄
Use change
Council census records it as unoccupied - under construction, 3 floors
Name recorded: Palace Theatre
Feb 2020📰
News
Internal demolition of Palace Theatre begins, facade retained
The Palace Theatre was demolished in 2020 except for its Bourke Street facade, after much community opposition, to be replaced by a Le Méridien hotel.
2020🛠
Works
1 building permit · about $79.7m of new works
Largest: Stage 5 - Recladding works as per the agreed protection works.
By 2019✅
Milestone · Approved
Planning permit granted (exact date not recorded)
Derived from City of Melbourne Development Activity Monitor
Dec 2019🏗
Milestone · Construction started
First major construction permit issued
Derived from City of Melbourne building permits
2019🛠
Works
1 building permit · about $79.6m of new works
Largest: Stage 1 - New 16 storey hotel development. Demolition of existing building including heritage facade retention.
2017🛠
Works
1 certificate
Largest: Alterations to existing nightclub
22 Apr 2016📰
News
VCAT grants permit to demolish Palace Theatre for hotel
The Victorian Civil and Administrative Tribunal granted the permit for the hotel and demolition, rejecting final pleas from heritage groups and the live music industry. The developer, Jinshan Investment Group, was allowed to proceed.
Covered by 2 outlets
29 Jan 2015📰
News
City of Melbourne refuses permit to demolish Palace Theatre
Councillors voted to refuse a permit to demolish the Palace Theatre and build a hotel. The owner then applied to VCAT for permission to demolish the building.
2015🔄
Use change
Council census records it as unoccupied - unused, 3 floors
Name recorded: Palace Theatre
2015🛠
Works
1 building permit · about $205k of new works
Largest: Stage 2 - Non-structural partial internal strip out of existing ceiling and cornice
2014📝
Milestone · Planning application
Planning application TP-2014-64 lodged
Derived from City of Melbourne Development Activity Monitor
5 May 2014📰
News
Revised hotel scheme for Palace Theatre site
Plans for a third revision of the development scheme by Bates Smart were published by the City of Melbourne. The revised scheme was described as 50.65 metres high with 193 hotel rooms across 12 hotel floors.
10 Jul 2013📰
News
Jinshan proposes 30-storey W Hotel to replace Palace Theatre
The developer, Jinshan Investments, proposed a 30-storey W Hotel designed by Bates Smart on the Palace Theatre site, which would have required demolishing the theatre. Coverage notes opposition from the Melbourne Heritage Action Group.
Covered by 2 outlets
2012🛠
Works
2 building permits
Largest: Stage 2: Architectural and services stage - Air conditioning shelf. The Palace Theatre
2011🔄
Use change
Council census records it as entertainment/recreation - indoor, 3 floors
Name recorded: Palace Theatre
2009🛠
Works
3 building permits · about $58k of new works
Largest: The Palace Theatre - alterations to existing building. Air conditioning shelf
2008🛠
Works
3 building permits · about $85k of new works
Largest: Alterations to Canopy and Facade
2003🛠
Works
1 certificate
Largest: Internal alterations to the metro night club (int doors)
2002📋
First census
First council census entry: entertainment/recreation - indoor, 3 floors
2001🛠
Works
2 building permits · about $2k of new works
Largest: stage 2 final :grnd fl cafe & internal nightclub alts to metro nightclub.
2000🛠
Works
1 building permit · about $800k of new works
Largest: stage 1: alts to metro nightclub.

Planning & heritage

Planning controls

ZoneCAPITAL CITY ZONE - SCHEDULE 1 (CCZ1)
DDO1Design and Development Overlay: limits on building height, setbacks and design
DDO62Design and Development Overlay: limits on building height, setbacks and design
DDO62-B3Design and Development Overlay: limits on building height, setbacks and design
HO500Heritage Overlay: a permit is needed to demolish or change the outside of heritage places
PO1Parking Overlay: controls on how much car parking new development can provide

Vicmap Planning, © State of Victoria (Department of Transport and Planning), CC BY 4.0. Plain-English summaries are ours. Check the planning scheme for exact controls.

Subdivision & permits

Building permits on record
15
Estimated cost of works
About $160.4m
2000New works by year (estimated)2024

Costs are estimates declared on permits, not amounts spent. Stages of a project repeat its value, so we group them and count each project once. A value can cover a project spanning several buildings. Our calculation from City of Melbourne building permits, CC BY 4.0.

History of the site

How it's been recorded over time

2002Entertainment/Recreation - Indoor · 3 floors
2011Entertainment/Recreation - Indoor · 3 floors · "Palace Theatre"
2015Unoccupied - Unused · 3 floors · "Palace Theatre"
2021Unoccupied - Under Construction · 3 floors · "Palace Theatre"
2024Commercial Accommodation · 3 floors · "Palace Theatre"

City of Melbourne Census of Land Use and Employment, since 2002.

Community

What people say about Palace Theatre in public forums and groups, and reviews left here.

No public discussion found yet. Know a thread or group about Palace Theatre? .

Guest reviews

No reviews of Palace Theatre yet. Be the first to tell future tenants what it's like.

Reviews are checked before they're published. No one is named without permission.

Rate and review Palace Theatre

Your rating

By posting, you agree to the contributor terms. See how we handle your details in the privacy policy.

Frequently asked questions

Is Palace Theatre residential or commercial?

Palace Theatre is a hotel or serviced apartments. The City of Melbourne lists its main use as commercial accommodation.

When was Palace Theatre built?

Palace Theatre was completed in 2023.

How many floors does Palace Theatre have?

Palace Theatre has 12 floors above ground.

Does Palace Theatre have hotel or student accommodation?

The City of Melbourne records 235 hotel rooms at Palace Theatre.

Who designed and built Palace Theatre?

Jinshan Investment Group developed Palace Theatre, Bates Smart designed it and L.U. Simon Builders built it. The building team section has the sources.

How tall is Palace Theatre?

About 12 metres, measured from the City of Melbourne's 3D building model. It's number 1012 of 1596 buildings in Melbourne by height.

What public transport is near Palace Theatre?

Parliament Station is the nearest train station, about 1 minute's walk. The nearest tram stop is Spring St/Bourke St #9, about 1 minute's walk.

What is the planning zone for Palace Theatre?

The site is in the Capital City Zone - Schedule 1 (CCZ1). It's also under a Heritage Overlay (HO500).

Has any work been done on Palace Theatre recently?

The City of Melbourne has issued 15 building permits for Palace Theatre since 2000. The most recent was in May 2024.

Compare with nearby buildings

BuildingTypeDistanceFloorsCompleted
Palace TheatreHotel—122023
16 Liverpool StreetMixed use54 m122005
Park TowerMixed use116 m181969
State TrusteesCommercial130 m111972

That's Built compiles information from public records, research and contributions. Details are checked against multiple sources where possible but may contain errors and aren't professional advice. Sources: City of Melbourne building permits (CC BY 4.0), CLUE building information (CC BY 4.0), CLUE business establishments (CC BY 4.0), Development Activity Monitor (CC BY 4.0), Geocoded National Address File (G-NAF) (Open G-NAF EULA (CC BY 4.0 based)). Street View and business details © Google Maps.

Palace TheatreNo listings linked yetFind listings

Suggest a correction

Something wrong or missing? Tell us what it should say. We check every suggestion before changing anything.

By sending, you agree to the contributor terms. See how we handle your details in the privacy policy.