| Completed | 1992 | Casselden completed: 43 floors |
Each cost is the estimate on that record. Stages of a project often repeat its full value, so these don't add up to what was spent.
| 09 July 2026 | Level 35 - Office fitout to existing tenancy | $1.7m |
| 06 May 2026 | Internal Fit-out of DITRDSCA Melbourne Office | $2.4m |
| 17 Feb 2026 | Base building refurbishment works to existing office tenancies | $5.3m |
| 27 Jan 2026 | Levels 2 & 8 - Spec Suite Office fitout to existing office tenancy | $7.2m |
| 22 Jan 2026 | Level 1 - Internal alterations to office | $25k |
| 05 Dec 2025 | Tenancy fitout on levels 3 and 4 | $14.3m |
| 01 Dec 2025 | Base building refurbishment works to existing office tenancies - Stage 2 - amenities refurbishment works | $0 |
| 15 Sept 2025 | Installation of Lockers for HESTA Tenancy | $251k |
| 01 July 2025 | Base building refurbishment works to existing office floor | $980k |
| 11 June 2025 | Stage 1 - Level 28 - Phillips Ormonde Fitzpatrick Fit Out - Internal demolition | $3.5m |
| 11 June 2025 | Stage 2 - Remaining fitout works | $3.5m |
| 04 June 2025 | Tenancy Fitout of Office Level 26 | $50k |
| 07 Apr 2025 | Levels 23 & 24 - New office fit out | $3.6m |
| 21 Mar 2025 | Level 27 - Alterations to an existing office building | $207k |
| 21 Mar 2025 | Stage 2 – Remaining tenancy, lift lobby and amenities alterations to Levels 8, 26, 28, 29, 30 & 31 | $8.4m |
| 28 Nov 2024 | Levels 22, 26, 27, 28, 29, 30 & 31 - Base building upgrade works to existing office building | $9.5m |
| 19 Nov 2024 | Alterations to an existing office tenancy | $2.2m |
| 11 Sept 2024 | Level 8 - Alterations to existing office tenancy – strip out & make good works | $1.1m |
| 26 June 2024 | Level 37, 2 Lonsdale St - Tenancy alterations | $131k |
| 18 June 2024 | Pilot programme for the installation of EV charging at ISPT sites | $211k |
| 15 May 2024 | Tenancy TL03 - Internal Tenancy fitout for Sargon | $310k |
| 22 Jan 2024 | Level 15 - Tenancy establishment works and office fitout to existing office building | $3.0m |
| 13 Dec 2023 | Interior Refurbishment to Lifts | $695k |
| 30 Oct 2023 | Level 7 and 8 - Partial fit-out of an existing building | $1.1m |
| 29 Aug 2023 | Levels 2,4, 6, 15, 23 & 27 - Base Building upgrade works to existing building office | $8.7m |
| 29 Aug 2023 | Stage 2 – DDA Amenities fitout works | $458k |
| 08 Aug 2023 | Level 4 - Tenancy Alterations | $255k |
| 30 June 2023 | Stage 4 – Architectural & Façade Works - Revised ground floor plan layout – including changes to NW & SW bathrooms | $8.4m |
| 24 Apr 2023 | Stage 3 – Services alterations | $0 |
| 18 Apr 2023 | Stage 2 – Structural demolition & construction works | $683k |
| 10 Feb 2023 | Ground floor foyer, levels 1 & 2 refurbishment to existing office building | $495k |
| 21 Sept 2022 | Proposed Upgrade to Level 3 Tenancy & Amenities | $2.0m |
| 11 Aug 2022 | Stage Two - Level 3 -To Include Instillation of Toilet Partitions, Fire Engineering Report & Revised Fire Services Design. | $2.0m |
| 10 June 2022 | Hesta Upgrade Works. Stage 1 - (Level 24 - 25 Part) Lobby and Amenities Strip Out | $7.1m |
| 10 June 2022 | Stage 3 - Level 24-25 - Balance of Works. | $7.1m |
| 10 June 2022 | Stage 4 - Balance of Works | $7.2m |
| 02 June 2022 | Level 20 - Proposed fitout of a new CEO waiting area | $197k |
| 14 Apr 2022 | Levels 37 and 38 - Tenancy alterations | $2.1m |
| 12 Apr 2022 | Stage 4 - Balance of Works | $7.2m |
| 08 Feb 2022 | Level 40 Balcony - Proposed Removal of Two Sky Signs & Make Good | $38k |
| 20 Jan 2022 | Stage 3 - Level 24-25 - Balance of Works. | $7.1m |
| 07 Dec 2021 | The Construction and Installation of New Signage | $193k |
| 15 Nov 2021 | Stage 2 - Tenancy strip out and Stair cutout | $0 |
| 11 Nov 2021 | Level 1 - Internal Tenancy Alterations | $176k |
| 22 Apr 2021 | Proposed Upgrade to Base Building Mechanical Services Switchboard to Level Ground - 39 Only. . | $151k |
| 22 Apr 2021 | Proposed upgrade to building fire indicator panel and upgrade to fire protection services to levels ground, 3, 5, 7, 8, 12, 14, 16, 20, 21, 23, 24, 26, 28, 32, 36 and 39 Only. | $617k |
| 12 Apr 2021 | Levels 35 & 36. Tenancy alterations. | $1.5m |
| 09 Feb 2021 | Part Level 32 - Tenancy alterations on level 32. | $390k |
| 08 Feb 2021 | Stage 2 - To Permit Services & Fire Rating of Infill Floor | $61k |
| 29 Jan 2021 | Level 27 - Alterations to an existing building | $373k |
| 29 Jan 2021 | Proposed Slab Infill On Level 28 | $0 |
| 17 Dec 2020 | Level 1 - Tenancy alterations | $0 |
| 18 Nov 2020 | Level 30 & 31. Office Fit Out | $106k |
| 09 Nov 2020 | Stage 1 - Proposed amenities upgrade to level 20 and 21. All works excluding accessible toilet upgrade on both levels. | $539k |
| 05 Nov 2020 | Proposed upgrade to building fire indicator panel and upgrade to fire protection services to levels ground, 3, 5, 7, 8, 12, 14, 16, 20, 21, 23, 24, 26, 28, 32, 36 and 39 Only. | $617k |
| 25 Mar 2020 | Level 31. Internal tenancy alterations. | $104k |
| 22 Jan 2020 | Stage 1 - Proposed amenities upgrade to level 20 and 21. All works excluding accessible toilet upgrade on both levels. | $539k |
| 22 Jan 2020 | Stage Two - To Permit the Accessible Sanitary Facility Works | $0 |
| 13 Nov 2019 | Proposed Passage Way Connection between Level 2, 2 Lonsdale Street & Level 3, 50 Lonsdale Street Melbourne | $90k |
| 11 Nov 2019 | Level 34 - Alterations to existing office tenancy entry door | $24k |
| 01 Nov 2019 | Level 20 - Reinstatement of a Glass Partition and Associate Door - HESTA | $10k |
| 29 July 2019 | ASE Replacement | $2k |
| 08 May 2019 | Levels 20 & 21 - Internal Minor Office Refurbishment for HESTA | $13k |
| 16 Apr 2019 | Level 20 & 21 - Minor Internal Alterations | $100k |
| 01 Apr 2019 | Level 3 - Internal Alterations for Department of Social Services | $70k |
| 08 Nov 2018 | Part Level 8 - Proposed fitout to existing office tenancy | $447k |
| 26 Oct 2018 | Level 29, 30 & 31 - IFM Office Fitout | $400k |
| 09 Oct 2018 | Level 7 - Proposed alterations to existing office tenancy | $170k |
| 05 Oct 2018 | Level 5- New Construction of Office | $222k |
| 21 Sept 2018 | Level 2 (part) Office Fit-Out | $623k |
| 05 Sept 2018 | Level 2 & Level 6 - Proposed alterations to offices | $453k |
| 24 July 2018 | Level 3 - DSS State office fit out | $600k |
| 16 July 2018 | Level 39 Losdale Street Fitout | $285k |
| 04 June 2018 | Levels 1, 9-12 & 14 - Proposed Upgrade to Base Building Services (includes ceiling tiles, mechanical, electrical and sprinkler alterations) | $4.8m |
| 26 Apr 2018 | Level 8 - Proposed Base Building Upgrade for ISPT Casseldon Place | $311k |
| 06 Apr 2018 | Level 39 Losdale Street Fitout | $278k |
| 20 Feb 2018 | Proposed Base Building Upgrade to Part Level 2 | $339k |
| 15 Dec 2017 | Levels 37 & 38 - Minor alterations to workstations | $30k |
| 01 Dec 2017 | Basement Cleaners Office | $73k |
| 27 Oct 2017 | Stage 2 - Level 5 - Balance of Works (Alterations to existing office) | $2.8m |
| 17 Oct 2017 | Level 37 - Alterations to existing office tenancy | $23k |
| 10 Oct 2017 | Level 5 - Flex By ISPT Fitout - Stage 1: Internal Architectural & Services Building Works | $2.8m |
| 25 Sept 2017 | Level 20 - Proposed Office Fitout | $370k |
| 25 Sept 2017 | Stage 1 - Non-Structural demolion works only - Level 31 - Internal Tenancy Fitout for IFM Investors | $3.0m |
| 25 Sept 2017 | Stage 2 - Internal Tenancy Fit-out for IFM Investors - Level 31 | $3.0m |
| 25 Sept 2017 | Stage 4 – Fitout Works to Level 30 and Stair Construction (Balance of Works) | $3.0m |
| 20 Sept 2017 | Level 27 - Minor internal alterations | $50k |
| 20 Sept 2017 | Stage 2 - Remainder of Works - CBUS Office Level 26 | $100k |
| 08 Sept 2017 | Levels 16-19 - Proposed office fitout | $3.6m |
| 29 Aug 2017 | Stage 2 - Proposed Construction of Internal Ground Floor to First Floor Stair & Alternations to Existing Courtyard - To Permit All Remining Works | $630k |
| 15 Aug 2017 | Lifts 20 & 23 - Proposed Upgrade Works to Lift Car Interiors | $429k |
| 04 Aug 2017 | Stage 3 - Internal Tenancy Fit-out for IFM Investors - Level 31 | $3.0m |
| 02 Aug 2017 | Level 4 - Proposed new office to existing tenancy | $30k |
| 21 July 2017 | DELWP - Multi Level Tenancy Fitout | $5.7m |
| 19 July 2017 | Level 8 - Internal office fit out | $38k |
| 30 June 2017 | Level 34 - Proposed alterations to existing office tenancy | $20k |
| 21 June 2017 | Stage 3: Revised Level 16 partition & services layout to include whole floor | $4.1m |
| 06 June 2017 | Level 13 - Casselden Place - Upgrade to Level 13 Base Building (Ceiling tiles, carpet, lighting, mechanical, sprinkler replacement & make good of tea, cleaners room & amenities | $900k |
| 06 June 2017 | Stage 2: Levels 16-19 - Office fitout - Partition works to level 16 only, excluding level 16 services | $3.6m |
| 30 May 2017 | DELWP - Multi Level Tenancy Fitout | $5.7m |
| 11 May 2017 | Level 22 - IFS Office Fitout | $162k |
| 11 May 2017 | Stage 2 - Slab Demolition, Architectural & Services Works (Excluding Stair Structure and Install) | $2.5m |
| 08 May 2017 | Proposed Internal Office Fitout ( Typical Floor Building Permits) | $5.2m |
| 08 May 2017 | Stage 2 - Proposed Construction of Internal Ground Floor to First Floor Stair & Alternations to Existing Courtyard - To Permit All Remining Works | $630k |
| 05 May 2017 | Level 22 - Proposed Office Fitout | $900k |
| 04 May 2017 | Level 20 and 21 - Proposed Alterations and Internal Office Fit-Out Works - Stage One: Soft Demolition | $2.8m |
| 12 Apr 2017 | Basement Level 3 - STORAGE ROOM ALTERATIONS | $72k |
| 12 Apr 2017 | Stage 1 - To permit internal non-structural demolion works only - Installation of Staircase and Courtyard | $630k |
| 01 Mar 2017 | CBUS Office Level 26 | $120k |
| 01 Mar 2017 | Proposed Fitout Works to Basement | $2.1m |
| 23 Feb 2017 | Level 35 - DELWP meeting rooms. Alteration. | $36k |
| 06 Feb 2017 | Stage 1: Demolition | $92k |
| 23 Dec 2016 | Tenancy RCL 27 - Proposed internal tenancy fitout for Little Sichuan | $556k |
| 22 Dec 2016 | Proposed Internal Office Fitout ( Typical Floor Building Permits) | $5.2m |
| 28 Oct 2016 | Stage Two – To Include Fire Services | $556k |
| 24 Oct 2016 | Stage 2 - Remainder of Works - CBUS Office Level 26 | $100k |
| 07 Oct 2016 | Stage 1 - Demolition of Existing Non Structural Partitions - CBUS Office Level 26 | $30k |
| 03 Oct 2016 | Tenancy Fit-out of Part Ground Floor Offices - Stage 2: Remainder of Works | $1.9m |
| 20 Sept 2016 | Basement 1, Ground Floor, Level 1 & 2 - Proposed Upgrade to Vertical Access for Department of Immigration and Border Protection Tenancy | $456k |
| 30 Aug 2016 | Proposed Alteration to Offices Levels 23 & 25 - Department Immigration & Border Protection | $531k |
| 18 Aug 2016 | Proposed Installation of Speed Stiles on Ground Floor and Associated Security Works | $860k |
| 28 June 2016 | Level 32 - Internal office alterations | $132k |
| 16 May 2016 | Proposed Internal Fitout for Casselden Display Suite Level 14, | $484k |
| 28 Sept 2015 | Shop ACL - Alteration to Shop | $39k |
| 23 Sept 2015 | Level 35 Alteration | $39k |
| 18 Sept 2015 | Stage 1 - Levels 13-14 - Proposed Base Building Tenancy Upgrade | $263k |
| 15 Sept 2015 | Level 3 - Proposed Internal Office Fit-out | $200k |
| 28 Aug 2015 | Levels 27 & 28 - Minor Internal Office Alterations | $185k |
| 01 July 2015 | Level 26 - Fitout | $338k |
| 26 June 2015 | Level 20 HESTA office fitout - Stage 1 internal demolition works only | $2.0m |
| 12 May 2015 | Levels 1 & 32: Proposed installation of automatic door openers to existing entry doors | $21k |
| 16 Mar 2015 | Level 20 HESTA office fitout - Stage 1 internal demolition works only | $2.0m |
| 12 Dec 2014 | Level 30, Internal Alterations to Existing Office Tenancy for IFM Investors | $750k |
| 09 Dec 2014 | Level 15 Proposed Office Fitout | $95k |
| 07 Aug 2014 | Level 3 - Office fitout to existing tenancy | $400k |
| 15 July 2014 | Level 27 & 28 Internal Office Alterations for CBUS | $42k |
| 11 July 2014 | Internal Office Fitout for Levels 8, 10, 39 | $1.1m |
| 03 July 2014 | Level 30 (Part) - Office Alterations | $12k |
| 03 July 2014 | LVL 30 Alterations to an existing building | $12k |
| 28 Apr 2014 | Fit out of Existing Office - Level 36 | $1.0m |
| 16 Apr 2014 | Minor Alterations to Entry Foyer - Ground | $51k |
| 28 Mar 2014 | Office fitout Level 34 | $275k |
| 31 Jan 2014 | Lvl 11 - Office Fit Out | $103k |
| 03 Dec 2013 | Proposed Internal Office Fitout - Level 35 | $192k |
| 21 Oct 2013 | Office alterations Level 1 | $9k |
| 18 Oct 2013 | Refurbishment of Lift Lobbies Levels 1-39 | $5.6m |
| 02 Oct 2013 | Internal Office Fitout Level 39 | $276k |
| 02 Oct 2013 | Proposed alterations to existing office tenancy : Level 33 | $10k |
| 02 Oct 2013 | Tenancy Split Level 39 | $100k |
| 12 Sept 2013 | Tenancy Split Level 39 - Stage 2: Including Services | $100k |
| 20 Aug 2013 | Alterations to existing office tenancy - Level 10 | $70k |
| 02 Aug 2013 | Internal fitout works Levels 4, 6, 10 & 25 | $145k |
| 16 May 2013 | Superpartners Accommodation Projects - Office Fitout, Levels 1 & 26 | $333k |
| 15 Apr 2013 | Alterations - level 35 | $187k |
| 15 Apr 2013 | Proposed Minor Internal Office Alterations - Level 23 | $20k |
| 22 Mar 2013 | Office of Living Victoria Part Level 35 | $19k |
| 29 Jan 2013 | Office Alterations - Level 19 | $67k |
| 21 Dec 2012 | Office Fitout - Level 2 for Superpartners | $222k |
| 11 Dec 2012 | Stage 1: Fitout works on Levels 4, 33 & 36 - Alterations to existing office tenancy | $1.0m |
| 22 Nov 2012 | CBUS Fit-Out (Stage 2 - Internal Office Fit-out & Associated Building Works) Level 27 & 28, Casseldon Place | $2.4m |
| 14 Nov 2012 | CBUS Fit-Out (Stage 1 - Internal Demolition of Existing Office) Level 27 & 28 | $2.4m |
| 13 Nov 2012 | Construction of Office Partitions - Level 9 | $123k |
| 09 Nov 2012 | Internal Alterations to an Existing Office Building-Level 38 & 39 | $408k |
| 19 Oct 2012 | Proposed Internal Demolition & Make Good - Level 1 | $15k |
| 15 Oct 2012 | Stage 2: Fitout works on Levels 1, 32, 34, 35, 37, & 38 - Alterations to existing office tenancy | $0 |
| 23 July 2012 | Office alterations | $40k |
| 29 June 2012 | Stage 5: Cyclists facility at Basement 2. Installation of temp. external reamped access & egress to the southern facade only | $8.1m |
| 05 June 2012 | Office fitout level 31 | $575k |
| 24 May 2012 | Fitout on levels 3 & 7 | $500k |
| 16 Feb 2012 | ALTERATIONS TO EXISTING BUILDING - LEVEL 2 | $348k |
| 09 Feb 2012 | Minor Office alterations Level 3 | $5k |
| 25 Nov 2011 | Alterations | $35k |
| 07 Oct 2011 | Internal & partial external facade demolition at Gnd Flr level & partial internal demolition at Levels 1 & 2 balconies. Installation of temp. external reamped access & egress to the southern facade only - Stage 2 | $8.1m |
| 09 Sept 2011 | Stage 4: Alterations to the existing office building comprising the entrance foyer refurbishment and part DIAC tenancy with associated external works at ground floor level, cyclist facilities at basement level and blackwater treatment facility | $8.1m |
| 08 Sept 2011 | Office partitioning Level 3 | $37k |
| 18 Aug 2011 | Stage 3: Internal & partial external facade demolition at Gnd Flr level & partial internal demolition at Levels 1 & 2 balconies. Installation of temp. external reamped access & egress to the southern facade only - Stage 2 | $10.8m |
| 20 July 2011 | Office fitout - IFCC fitout | $1.3m |
| 11 July 2011 | Alterations and additions to existing building | $10.8m |
| 27 June 2011 | Amendment: Alterations to the existing office building comprising the entrance foyer refurbishment and part DIAC tenancy with associated external worksat ground floor level, cyclist facilities at basement level and Blackwater treatment facility | $301k |
| 02 Dec 2010 | Level 3: Proposed office tenancy establishment works | $70k |
| 15 Oct 2010 | OFFICE FITOUT - IFCC FITOUT | $220k |
| 17 May 2010 | Superpartners Tenancy Alterations | $10k |
| 25 Mar 2010 | Office fitout on level 39 | $56k |
| 25 Sept 2009 | Proposed alterations to existing tenancy Level 20 | $405k |
| 15 Sept 2009 | Refurbishment of existing toilets on all floors. Stage 2: Toilet refurbishment works only on all remaining floors. | $8.6m |
| 09 July 2009 | CBUS Office Fitout - Level 28 | $1.4m |
| 10 June 2009 | Alterations to an existing building fitout on level 35 - Computer room upgrade | $750k |
| 29 May 2009 | Upgrade Fire Detection System | $328k |
| 06 May 2009 | Internal office alterations - DIAC, Level 23 & 25 | $1.7m |
| 15 Apr 2009 | Alterations Level 14 (Media Super) | $60k |
| 12 Mar 2009 | Proposed toilet refurbishment on Level 26 (Toilets) @ Casselden Place . | $174k |
| 10 Mar 2009 | Internal office refurbishment Level 15 | $1.1m |
| 19 Feb 2009 | Office fitout | $393k |
| 05 Feb 2009 | Upgrade Fire Detection System | $328k |
| 09 Dec 2008 | Fitout alterations for a New Office Level 36 - SES Office fitout | $30k |
| 03 Dec 2008 | Alteration to Office Level 27 | $19k |
| 02 Dec 2008 | Office fitout Level 13 (Australia Passport) | $750k |
| 01 Oct 2008 | Alterations to office Level 16 Superpartners | $900k |
| 01 Oct 2008 | Internal alterations Level 12 | $390k |
| 12 Sept 2008 | Tenancy alterations Level 11 | $444k |
| 20 Aug 2008 | IFM fitout works. Alterations to office Level 29 (part). | $200k |
| 15 Aug 2008 | E P P Upgrade. Alterations to office Basement Level. | $811k |
| 21 July 2008 | Internal alterations to existing office tenancy Level 20 | $69k |
| 17 July 2008 | Level 10; PROPOSED TENANCY ALTERATIONS TO AN EXISTING OFFICE AT CASSELDON PLACE OFFICES | $80k |
| 16 June 2008 | Superpartners. Alterations to office Level 26 (part). | $1.7m |
| 02 June 2008 | Fitout to Superpartners (office) Level 17. | $800k |
| 24 Apr 2008 | Refurbishment of existing office, Level 3 (FACSIA Tenancy). Stage 2: All building works. | $2.5m |
| 18 Feb 2008 | Industry Funds Management. Office fitout alterations to an existing building, Level 31 (part). | $316k |
| 21 Dec 2007 | Office fitout to Level 18. | $900k |
| 11 Sept 2007 | Alterations-Tenancy fitout Level 22 | $700k |
| 17 Aug 2007 | Office fitout Part Level 35 | $330k |
| 08 Aug 2007 | Office fitout Level 33 | $28k |
| 24 July 2007 | Office internal fitout, Level 7 & 9. | $1.2m |
| 13 July 2007 | Industry Funds Management Pty Ltd. Alterations to an existing building, office fitout to Level 29. | $641k |
| 29 June 2007 | Internal alterations & refurbishment Ground Level | $880k |
| 31 May 2007 | Office fitout alterations Level 34 | $31k |
| 25 May 2007 | Relocation of EWIS panel Ground Floor | $85k |
| 22 May 2007 | Demolish internal partitions Level 3 Stage 1 | $2.5m |
| 16 Apr 2007 | Office fitout & refurbishment Make good & stripout Levels 3,7 & 9 Stage 1 | $481 |
| 30 Mar 2007 | Proposed office fitout to Level 8. | $700k |
| 15 Feb 2007 | Internal office alterations Part Level 10 | $30k |
| 16 Jan 2007 | Office partition alterations to existing tenancy, Level 20. | $165k |
| 12 Jan 2007 | Refurbishment of level 8 & basement, Casseldon Place. Offices and carpark, Level 8 and basement. To completion. | $608k |
| 20 Dec 2006 | New opening link between Casselden Place and 50 Lonsdale Street buildings, level 1. | $50k |
| 18 Sept 2006 | Office Fitout Ground Floor | $410 |
| 22 Aug 2006 | Alterations Level 6, 12 & 16 | $297k |
| 26 June 2006 | Office fitout Level 25 - DIMA | $45k |
| 07 June 2006 | Alterations Level 1 & 35 | $60k |
| 15 May 2006 | Stage 2: Services alterations, alterations to existing office building on Level 4. | $154k |
| 11 May 2006 | Proposed office fitout alterations to an existing building, level 32(part) SNC rooms. | $60k |
| 07 Apr 2006 | Office partition alterations to existing tenancy level 2 | $9k |
| 31 Mar 2006 | Stage 1: All building work excluding services, alterations to existing office building on Level 4 | $154k |
| 16 Mar 2006 | Alterations to existing office tenancy | $30k |
| 10 Jan 2006 | Office partition alterations to existing tenancy on level 17 | $3k |
| 12 Oct 2005 | Office fitout & alterations Level 9 | $300k |
| 11 Oct 2005 | Demolition of internal walls & new workstations- Level 4 & 5 | $25k |
| 19 Sept 2005 | Office fitout alterations to an existing building - Level 2 | $700k |
| 28 July 2005 | Office partition alterations Level 2 & 6 | $40k |
| 27 July 2005 | New directory board in ground floor foyer - ground floor | $35k |
| 21 Apr 2005 | Office partition alterations to existing tenancy on level 8 no. 2 | $174k |
| 11 Apr 2005 | office alterations, level 3, casselden place | $15k |
| 22 Mar 2005 | Strip out of existing Tenancy Fitout and New Office tenancy Fitout. | $655k |
| 21 Mar 2005 | Office alterations Part- Level 8 | $172k |
| 08 Feb 2005 | Replacement of defective fire indicator panel on all floors in no. 2 | $163k |
| 10 Jan 2005 | Fitout Ground level foyer kiosk | $50k |
| 17 Nov 2004 | Office Partition fitout to part of level 8. Stage 1: All building work excluding alterations to mechanical and sprinkler services. | $165k |
| 22 Oct 2004 | Office tenancy alterations Level 29 | $25k |
| 18 Oct 2004 | Refit shop- Level 2 | $39k |
| 24 Sept 2004 | Tenancy alterations level 3 & 7 | $70k |
| 05 July 2004 | Office partition alterations Levels 3 & 4 | $168k |
| 01 July 2004 | Office partition alterations Level 28 | $28k |
| 03 June 2004 | Minor alterations to Level 13 | $15k |
| 27 May 2004 | Ofice fitout Level 24 | $500k |
| 27 Apr 2004 | Level 4 & 5 Internal office alterations. | $60k |
| 17 Mar 2004 | Internal alterations Ground Floor | $44k |
| 04 Mar 2004 | Removal of Canvas Fire Hydrant Hoses | $2k |
| 02 Dec 2003 | Partitions alterations to Level 13 | $8k |
| 29 Nov 2003 | Office partition alterations Level 33 & 34 | $42k |
| 26 Nov 2003 | Partition alterations Part level 27 | $21k |
| 24 Nov 2003 | Partition alterations to Level 32 | $14k |
| 19 Nov 2003 | Office partitions alterations to Level 19 | $5k |
| 21 Oct 2003 | Construction of a new building. Stage 7: Level B3 Floor Area 1 | $115k |
| 08 Oct 2003 | Variation to Permit 18065/2003/0440/1. Internal Alterations to Level 10 office building | $16k |
| 03 Oct 2003 | Internal Alterations to Level 10 office building | $16k |
| 29 Sept 2003 | Fitout of Office Level 31 (Part of existing wall removal) | $162k |
| 22 Aug 2003 | Refurbishment Level 5 | $119k |
| 13 Aug 2003 | Level 5 office fitout | $29k |
| 22 May 2003 | Construction of internal alterations to level 4 office - tenancy subdivision works | $31k |
| 29 Apr 2003 | Proposed partition alterations to Levels 27 & 39, 2 Lonsdale Street, Melbourne | $826k |
| 09 Apr 2003 | Alterations to an existing office building. Level 4 (Part) | $150k |
| 09 Apr 2003 | Office partition fiout to existing tenancy on level 20. | $300k |
| 22 Nov 2002 | Fitout to Office Level 9 | $130k |
| 13 Sept 2002 | Level 14 - Office Partitions and Associated Works | $282k |
| 04 Sept 2002 | Proposed partition alterations - Office. Part Level 28, 2 Lonsdale Street, Melbourne | $40k |
| 29 July 2002 | Level 5 - Office fitout | $400k |
| 13 Mar 2002 | Level 2 - Internal alterations to office. | $20k |
| 28 Feb 2002 | Level 6 - Tenancy Fitout (part) | $150k |
| 07 Dec 2001 | Level 21 - Alterations to an existing building. | $21k |
| 04 Dec 2001 | Alterations to level 6 of existing office | $300k |
| 20 Aug 2001 | level 9, office fitout alterations to an existing building - office | $200k |
| 20 Apr 2001 | Alterations to a building level 3, office internal fitout part level 3 small/minor works. | $25k |
| 07 Mar 2001 | lvl 27 office fit out | $6k |
| 31 Jan 2001 | lvl 38 & 39 lift lobby refurbishment at 2 Casseldon Place for Industry Superation Property Trust | $255k |
| 25 Jan 2001 | level 27. Office alteration. | $7k |
| 19 Jan 2001 | lvl 16,17,18,19 office alts | $264k |
| 17 Jan 2001 | lvl 27 office alterations for bathroom renovations | $7k |
| 04 Oct 2000 | alts to partitions l6 | $52k |
| 26 Sept 2000 | office fitout alteration to an exisiting building, to level 30 ALT Casseldon Place | $170k |
| 25 Sept 2000 | fitout of office level 4. | $1.0m |
| 31 July 2000 | installation of fire monitoring equipment | $2k |
| 21 July 2000 | Alterations to level 5 Centenary of Federation Victoria | $24k |
| 14 July 2000 | stage 2 office alts part lvl 11 | $310 |
| 07 July 2000 | office partition alts to lvl 10 (casselden place). | $200k |
| 26 Apr 2000 | L39 stage 2 office fit out | $800k |
| 26 Apr 2000 | STAGE 1, OFFICE ALTERATIONS | $142k |
| 20 Mar 2000 | Casselden Place Level 38 Parapet Wall | $215k |
| 22 Feb 2000 | Level 24 South west corner Casseldon Place DIMA office fitout | $80k |
| 08 Feb 2000 | Office fitout for STA, IFS, C + Bus & ISPT on level 28, 2 Lonsdale Street, Melbourne. Stage 1 Fitout for Levels 28 & 29. | $897k |
| 27 Oct 1999 | Office fitout to level 32 | $1.5m |
| 01 Oct 1999 | Level 37, office fitout alterations to an existing building | $200k |
| 23 Aug 1999 | Office alterations to level 5 | $63k |
| 06 Apr 1999 | Stage 1 of 1 - fitout for Dwyer and Co - 2 Lonsdale St, Melbourne level 20 | $153k |
| 31 Mar 1999 | All - internal alterations to level 16,17, 18 and 19 - 2 lonsdale st, Melbourne | $1.0m |
| 17 Feb 1999 | Tenancy fitout for Global Property Solutions on level 14, 2 Lonsdale Street, Melbourne | $60k |
| 18 Sept 1998 | level 20 Alterations of a building - stage 1 of 1 - fitout for Hesta super fund - 2 Lonsdale St, Melbourne | $144k |
| 24 Aug 1998 | Office alterations on level 5 | $180k |
| 28 May 1998 | Office alterations on level 20 | $143k |
| 11 May 1998 | Office fitout on level 9 | $38k |
| 26 Apr 1998 | Internal office partitions on the ground floor | $61k |
| 26 June 1997 | Office fitout Level 4 | $6k |
| 25 Oct 1996 | Fitout Level 27 Office | $420k |
| 13 Nov 1995 | Office fitout | $2.6m |
Is Casselden residential or commercial?
Casselden is a commercial building. The City of Melbourne lists its main use as office.
When was Casselden built?
Casselden was completed in 1992.
How many floors does Casselden have?
Casselden has 43 floors above ground.
What businesses are in Casselden?
The latest council census counted 9 businesses in Casselden, including Australian Competition & Consumer Commission, Commissioner For Better Regulation and Department of Environment Land Water & Planning.
Is there office or retail space for lease in Casselden?
See the commercial listings on this page, or search this address on realcommercial.com.au and commercialrealestate.com.au.
Who designed and built Casselden?
Hassell designed Casselden and Built built it. The building team section has the sources.
How tall is Casselden?
About 165 metres, measured from the City of Melbourne's 3D building model. It's number 41 of 1596 buildings in Melbourne by height.
What public transport is near Casselden?
Parliament Station is the nearest train station, about 3 minutes' walk. The nearest tram stop is Albert St/Nicholson St #10, about 2 minutes' walk.
What is the planning zone for Casselden?
The site is in the Capital City Zone - Schedule 1 (CCZ1).
Does Casselden have an owners corporation?
Plan of subdivision PS446765 has 1 lot.
Has any work been done on Casselden recently?
The City of Melbourne has issued 183 building permits for Casselden since 1995. The most recent was in January 2026.
Sources: City of Melbourne building permits (CC BY 4.0); CLUE building information (CC BY 4.0); CLUE business establishments (CC BY 4.0); Geocoded National Address File (G-NAF) (Open G-NAF EULA (CC BY 4.0 based)). General information from public records, not legal, financial or building advice.