🏒 CommercialPerformances, Conferences, CeremoniesCompleted 1884πŸ› Heritage overlay

Supreme Court

192-228 William Street, Melbourne VIC 3000

  • 2 floors
  • 1 businesses
  • 24 car spaces

What's available here Add a listing link

Looking toIn this buildingArea guideSearch the building
Lease spaceβ€”β€”

Each link opens a Google search limited to that site.

142 years standing

  1. 1884Completed
  2. 1995Refurbished
  3. TodayStill standing

29 building permits Β· 2 news storiesFull timeline ↓

About Supreme Court

Supreme Court is a two-storey commercial building, mainly used for performances, conferences and ceremonies. Smith & Johnson designed it, and it was completed in 1884 after construction began in 1874. The Billard Leece Partnership designed its refurbishment.

At a glance

Key facts

Building type
🏒 Commercial
Completed
1884
Construction started
1874 Unconfirmed We don't have data to 100% confirm this data point as yet.
Height
β€”
Floors
2
Footprint
7,227 mΒ²
Architect
Smith & Johnson
Businesses
1
Car spaces
24
Strata plan
PP5514C Β· 1 lots
Planning zone
CCZ1
Permits on record
29

Score cards

πŸš† Transport8/10

Flagstaff Station 4 min walk Β· 7 tram stops within 400 m

β˜• Everyday amenities6/10

89 cafΓ©s, 3 grocers, 10 medical within 250 m

🌳 Greenery7/10

73 street trees within 150 m Β· park 241 m away

✨ Activity9/10

10,606 people pass daily nearby Β· 45 licensed venues within 200 m

Calculated from PTV timetable stops, the City of Melbourne business census, street trees, pedestrian sensors and liquor licences.

The building team

The people and companies behind the design, construction and management of Supreme Court.

πŸ“ArchitectSmith & Johnson1874–1884verified1874-1884 Β· Design competition winners and architects of the Courts and LibrarySource: Wikipedia β†—
πŸ“‹Project managerJ. J. Clark and Peter Kerr (Public Works Department)1874–1884reported1874-1884 Β· Public Works DepartmentSource: Wikipedia β†—
πŸ“ArchitectBillard Leece Partnership2009verifiedRefurbishment Β· 2009 Β· Main Trial Division upgrade of six historic courtrooms, with two new courtroomsSource: Billard Leece Partnership β†—
+Were you involved?Builders, architects, developers and managers can claim their role

Location & neighbourhood

Getting around

πŸš†Flagstaff Station
Train station
4 min Β· 320 m
πŸš†Flagstaff Railway Station
Train station
4 min Β· 323 m
πŸš‹Bourke St/William St #5
Tram stop
2 min Β· 126 m
πŸš‹William St/Bourke St #3
Tram stop
2 min Β· 189 m
πŸš‹Queen St/Bourke St #4
Tram stop
2 min Β· 191 m

Straight-line walking estimate. Source: PTV GTFS, CC BY 4.0.

Within a 3-minute walk

89β˜• CafΓ©s & eateries
3πŸ›’ Grocers
6πŸ‹οΈ Gyms
10🩺 Medical
0πŸ’Š Pharmacies
0🧸 Childcare
7🍷 Pubs & bars

Who lives in Melbourne (CBD)

Residents37,341
Median age26
Households renting70%
Households without a car75%
Walk to work40%
Public transport to work43%

ABS Census 2016 via City of Melbourne (CC BY).

Businesses in Supreme Court

1 businesses recorded in the City of Melbourne's latest business census.

The Supreme Court

Justice

Looking for space in Supreme Court?

We'll try to put you in touch with an agent, though we can't promise a reply.
Source: City of Melbourne Census of Land Use and Employment, CC BY 4.0.

Timeline

Everything that has happened at Supreme Court: listings, news, works, planning and history.

2025πŸ› 
Works
1 certificate Β· about $4k of new works
Largest: Alterations to Supreme Court of Victoria - Manual Call Point & Fire Extinguisher Rationalisation
2024πŸ› 
Works
1 building permit Β· about $746k of new works
Largest: Stage 2 - Lift upgrade works
2023πŸ“°
News
Laneway security gate upgrade wins Master Builders Victoria award
Stokes Rousseau's listing for the Master Builders Victoria awards says it won Excellence in Civil Construction under $10M for upgrades to the heritage-listed laneway at the Supreme Court of Victoria. The works removed the original cast iron gates and refurbished the heritage entrances and roadway.
2023πŸ› 
Works
3 building permits Β· about $3.9m of new works
Largest: Upgrade of lifts
2021πŸ› 
Works
1 building permit Β· about $120k of new works
Largest: Internal Alterations and Additions
2017πŸ› 
Works
1 certificate Β· about $457k of new works
Largest: Alteration to roof access and safety works - Supreme Court Complex
2010πŸ”„
Use change
Council census records it as performances, conferences, ceremonies, 2 floors
Name recorded: Supreme Court
2010πŸ› 
Works
1 building permit Β· about $32k of new works
Largest: Alterations to existing building installation
2009πŸ“°
News
Supreme Court of Victoria upgrade wins Illuminating Engineers Society Excellence Award
Billard Leece Partnership reported that its Supreme Court of Victoria project won the 2009 Excellence Award from the Illuminating Engineers Society. The works involved restoration, conservation and upgrading of the historic building to meet present-day expectations of technology.
2009πŸ› 
Works
2 building permits and 1 certificate Β· about $1.2m of new works
Largest: Supreme Court Upgrade - Stage 3, 4 & 5. Variation to Fire Protection Services, Ground & First Floor (Part) & Ground & First Floor (Part).
2008πŸ› 
Works
2 building permits Β· about $8.8m of new works
Largest: Supreme Court Upgrade - Stage 3, 4 & 5. Variation - First Floor East, Ground & First Floor (Part) & Ground & First Floor (Part).
2007πŸ› 
Works
6 building permits Β· about $757k of new works
Largest: Variation: Variation to exit signage & deletion of tactile ground surface indicator. Supreme Court upgrade. Alterations to office/assembly
2006πŸ› 
Works
1 building permit Β· about $6.0m of new works
Largest: Supreme Court upgrade. Alterations to office/assembly building, ground floor (northwest & southwest corner), first floor (northwest & southw
2004πŸ› 
Works
1 building permit Β· about $1k of new works
Largest: Basement emergency escape
2002πŸ› 
Works
1 building permit Β· about $770k of new works
Largest: Alterations to existing building (Fire and mechanical upgrade including sprinklers,fire hydrants,fire detection,ewis and vesda systems) AKA
2002πŸ“‹
First census
First council census entry: performances, conferences, ceremonies, 2 floors
2000πŸ› 
Works
1 building permit Β· about $150k of new works
Largest: stage 1 Construct new enclosed pedestrian bridge from Supreme Court to former High Court building
1999πŸ› 
Works
2 building permits Β· about $768k of new works
Largest: Alterations to existing court rooms variation issued jan 01 for change of builder
1998πŸ› 
Works
1 building permit and 1 certificate Β· about $2.0m of new works
Largest: Refurbishment and expansion of the Supreme Court Library
1997πŸ› 
Works
2 building permits Β· about $605k of new works
Largest: Partial refurbishment/upgrade of facilities to Supreme Court
1996πŸ› 
Works
1 building permit Β· about $430k of new works
Largest: Fitout of Supreme Courts 7 & 14. Court Building
1884πŸŽ‰
Milestone Β· Completed
Supreme Court completed: 2 floors
Derived from Open House Melbourne

Planning & heritage

Planning controls

ZoneCAPITAL CITY ZONE - SCHEDULE 1 (CCZ1)
DDO1Design and Development Overlay: limits on building height, setbacks and design
DDO10Design and Development Overlay: limits on building height, setbacks and design
HO757Heritage Overlay: a permit is needed to demolish or change the outside of heritage places
PO1Parking Overlay: controls on how much car parking new development can provide

Vicmap Planning, Β© State of Victoria (Department of Transport and Planning), CC BY 4.0. Plain-English summaries are ours. Check the planning scheme for exact controls.

Subdivision & permits

Plan of subdivision
PP5514C
Lots on the plan
1
Owners corporation
Not recorded
Building permits on record
29
Estimated cost of works
About $26.7m
1996New works by year (estimated)2025

Costs are estimates declared on permits, not amounts spent. Stages of a project repeat its value, so we group them and count each project once. A value can cover a project spanning several buildings. Our calculation from City of Melbourne building permits, CC BY 4.0.

History of the site

How it's been recorded over time

2002Performances, Conferences, Ceremonies Β· 2 floors Β· "SUPREME COURT"
2010Performances, Conferences, Ceremonies Β· 2 floors Β· "Supreme Court"

City of Melbourne Census of Land Use and Employment, since 2002.

Community

What people say about Supreme Court in public forums and groups, and reviews left here.

No public discussion found yet. Know a thread or group about Supreme Court? .

Tenant reviews

No reviews of Supreme Court yet. Be the first to tell future tenants what it's like.

Reviews are checked before they're published. No one is named without permission.

Rate and review Supreme Court

Your rating

By posting, you agree to the contributor terms. See how we handle your details in the privacy policy.

Frequently asked questions

Is Supreme Court residential or commercial?

Supreme Court is a commercial building. The City of Melbourne lists its main use as performances, conferences, ceremonies.

When was Supreme Court built?

Supreme Court was completed in 1884.

How many floors does Supreme Court have?

Supreme Court has 2 floors above ground.

What businesses are in Supreme Court?

The latest council census counted 1 business in Supreme Court, including The Supreme Court.

Is there office or retail space for lease in Supreme Court?

See the commercial listings on this page, or search this address on realcommercial.com.au and commercialrealestate.com.au.

Who designed and built Supreme Court?

Smith & Johnson designed Supreme Court. The building team section has the sources.

What public transport is near Supreme Court?

Flagstaff Station is the nearest train station, about 4 minutes' walk. The nearest tram stop is Bourke St/William St #5, about 2 minutes' walk.

What is the planning zone for Supreme Court?

The site is in the Capital City Zone - Schedule 1 (CCZ1). It's also under a Heritage Overlay (HO757).

Does Supreme Court have an owners corporation?

Plan of subdivision PP5514C has 1 lot.

Has Supreme Court won any awards?

Yes. An upgrade to the Supreme Court of Victoria won an Illuminating Engineers Society Excellence Award in 2009. In 2023, a laneway security gate upgrade won a Master Builders Victoria award.

Has any work been done on Supreme Court recently?

The City of Melbourne has issued 29 building permits for Supreme Court since 1996. The most recent was in January 2024.

Compare with nearby buildings

BuildingTypeDistanceFloorsCompleted
Supreme CourtCommercialβ€”21884
Douglas Menzies ChambersCommercial81 m131973
Quest on WilliamHotel97 m161967
Castan ChambersCommercial111 m192002
National Bank HouseCommercial110 m411978
Clarence ChambersCommercial123 m131975

That's Built compiles information from public records, research and contributions. Details are checked against multiple sources where possible but may contain errors and aren't professional advice. Sources: City of Melbourne building permits (CC BY 4.0), CLUE building information (CC BY 4.0), CLUE business establishments (CC BY 4.0), Geocoded National Address File (G-NAF) (Open G-NAF EULA (CC BY 4.0 based)). Street View and business details Β© Google Maps.

Supreme CourtNo listings linked yetFind listings

Suggest a correction

Something wrong or missing? Tell us what it should say. We check every suggestion before changing anything.

By sending, you agree to the contributor terms. See how we handle your details in the privacy policy.