πŸŽ“ Student accommodationStudent AccommodationCompleted 2023

The Switch

192-204 A'Beckett Street, Melbourne VIC 3000

  • 88 m tall Β· #145 in Melbourne
  • 28 floors
  • 665 student beds

What's available here Add a listing link

Looking toIn this buildingArea guideSearch the building
Rent a student roomβ€”β€”

Each link opens a Google search limited to that site.

3 years standing

Built in 1 yr 9 mths

  1. 2020Planning application
  2. Apr 2021Construction started
  3. 2023Completed
  4. TodayStill standing

8 building permits Β· 1 news storyFull timeline ↓

About The Switch

The Switch is a student accommodation tower with 28 floors above ground on A'Beckett Street in Melbourne. Developed by Accord Properties, designed by Hayball and built by Crema, it was completed in 2023.

At a glance

Key facts

Building type
πŸŽ“ Student accommodation
Completed
2023
Height
88 m Unconfirmed We don't have data to 100% confirm this data point as yet.
#145 of 1596 in Melbourne
Floors
28
Footprint
826 mΒ²
Architect
Hayball Unconfirmed We don't have data to 100% confirm this data point as yet.
Builder
Crema
Student beds
665
Car spaces
β€”
Planning zone
CCZ1
Permits on record
8

Score cards

πŸš† Transport9/10

Flagstaff Railway Station 3 min walk Β· 6 tram stops within 400 m

β˜• Everyday amenities5/10

41 cafΓ©s, 2 grocers, 0 medical within 250 m

🌳 Greenery8/10

100 street trees within 150 m Β· park 147 m away

✨ Activity6/10

2,648 people pass daily nearby Β· 24 licensed venues within 200 m

Calculated from PTV timetable stops, the City of Melbourne business census, street trees, pedestrian sensors and liquor licences.

The building team

The people and companies behind the design, construction and management of The Switch.

πŸ‘·BuilderCremaverifiedBuilder / head contractorSource: Prime β†—
πŸ“ArchitectHayballreportedArchitect for the student accommodationSource: Hayball β†—
πŸ—DeveloperAccord PropertiesverifiedClientSource: Hayball β†—
πŸ”‘Building managerThe Switch2022–2026verifiedCurrent Β· 2022-2026 Β· Operator of the student accommodation, trading as The Switch / Switch LivingSource: The Switch β†—
+Were you involved?Builders, architects, developers and managers can claim their role

Location & neighbourhood

Getting around

πŸš†Flagstaff Railway Station
Train station
3 min Β· 269 m
πŸš†Flagstaff Station
Train station
3 min Β· 269 m
πŸš‹Franklin St/Peel St #8
Tram stop
2 min Β· 182 m
πŸš‹Flagstaff Station/La Trobe St #3
Tram stop
2 min Β· 192 m
πŸš‹Flagstaff Station/William St #7
Tram stop
3 min Β· 240 m

Straight-line walking estimate. Source: PTV GTFS, CC BY 4.0.

Within a 3-minute walk

41β˜• CafΓ©s & eateries
2πŸ›’ Grocers
0πŸ‹οΈ Gyms
0🩺 Medical
1πŸ’Š Pharmacies
0🧸 Childcare
3🍷 Pubs & bars

Who lives in Melbourne (CBD)

Residents37,341
Median age26
Households renting70%
Households without a car75%
Walk to work40%
Public transport to work43%

ABS Census 2016 via City of Melbourne (CC BY).

Timeline

Everything that has happened at The Switch: listings, news, works, planning and history.

2024πŸ”„
Use change
Council census records it as student accommodation, 28 floors
Name recorded: The Switch
2023πŸŽ‰
Milestone Β· Completed
The Switch completed: 28 floors
Derived from Hayball
8 Mar 2023πŸ“°
News
The Switch backers prepare 641-student A'Beckett Street tower for February opening
Business News Australia reported that The Switch's Melbourne student project had opened on 6 February and was fully booked to students. The article said the operator planned to double its student and build-to-rent portfolio to $900 million over three years.
Feb 2023πŸ”‘
Milestone Β· First occupants
First occupancy permit issued
Derived from City of Melbourne building permits
2023πŸ› 
Works
5 certificates Β· about $100k of new works
Largest: Stage 2: Construction of a Student Accommodation Building
2022πŸ› 
Works
1 building permit
Largest: Stage 8 - Balustrade Structural works
By 2021βœ…
Milestone Β· Approved
Planning permit granted (exact date not recorded)
Derived from City of Melbourne Development Activity Monitor
Apr 2021πŸ—
Milestone Β· Construction started
First major construction permit issued
Derived from City of Melbourne building permits
2021πŸ”„
Use change
Council census records it as unoccupied - under construction, 1 floors
2021πŸ› 
Works
4 building permits Β· about $84.1m of new works
Largest: Stage 4 - Structural works (excluding Electric Place faΓ§ade columns, balustrades & curtain wall / window wall faΓ§ade structure)
2020πŸ“
Milestone Β· Planning application
Planning application TP-2020-578 lodged
Derived from City of Melbourne Development Activity Monitor
2013πŸ”„
Use change
Council census records it as commercial accommodation, 6 floors
Name recorded: Nomads Melbourne
2011πŸ› 
Works
1 certificate Β· about $3k of new works
Largest: Installation of a Sign
2006πŸ”„
Use change
Council census records it as commercial accommodation, 6 floors
Name recorded: KINGSWAY HOUSE
2005πŸ› 
Works
1 certificate
Largest: Stage 1- All works to Ground Floor & Levels 1-5
2004πŸ› 
Works
1 building permit Β· about $1.0m of new works
Largest: Stage 2- Cafe lounge area fitout, excluding all external works. (new window openings on western elevation, front canopy & new front rear win
2002πŸ“‹
First census
First council census entry: unoccupied - unused, 6 floors
2000πŸ› 
Works
1 building permit Β· about $100k of new works
Largest: stage 1: all works to levels 4 & 5, excluding mechanical ventilation. change of use from office to student accomodation.
1999πŸ› 
Works
1 building permit Β· about $25k of new works
Largest: Demolition of office partitions

Planning & heritage

Planning controls

ZoneCAPITAL CITY ZONE - SCHEDULE 1 (CCZ1)
DDO1Design and Development Overlay: limits on building height, setbacks and design
DDO10Design and Development Overlay: limits on building height, setbacks and design
PO1Parking Overlay: controls on how much car parking new development can provide

Vicmap Planning, Β© State of Victoria (Department of Transport and Planning), CC BY 4.0. Plain-English summaries are ours. Check the planning scheme for exact controls.

Subdivision & permits

Building permits on record
8
Estimated cost of works
About $85.4m
1999New works by year (estimated)2023

Costs are estimates declared on permits, not amounts spent. Stages of a project repeat its value, so we group them and count each project once. A value can cover a project spanning several buildings. Our calculation from City of Melbourne building permits, CC BY 4.0.

History of the site

How it's been recorded over time

2002Unoccupied - Unused Β· 6 floors Β· "KINGSWAY HOUSE"
2006Commercial Accommodation Β· 6 floors Β· "KINGSWAY HOUSE"
2013Commercial Accommodation Β· 6 floors Β· "Nomads Melbourne"
2021Unoccupied - Under Construction Β· 1 floors
2024Student Accommodation Β· 28 floors Β· "The Switch"

City of Melbourne Census of Land Use and Employment, since 2002.

Community

What people say about The Switch in public forums and groups, and reviews left here.

No public discussion found yet. Know a thread or group about The Switch? .

Resident reviews

No reviews of The Switch yet. Be the first to tell future tenants what it's like.

Reviews are checked before they're published. No one is named without permission.

Rate and review The Switch

Your rating

By posting, you agree to the contributor terms. See how we handle your details in the privacy policy.

Frequently asked questions

Is The Switch residential or commercial?

The Switch is student accommodation. The City of Melbourne lists its main use as student accommodation.

When was The Switch built?

The Switch was completed in 2023.

How many floors does The Switch have?

The Switch has 28 floors above ground.

Does The Switch have hotel or student accommodation?

The City of Melbourne records 665 student beds at The Switch.

Who designed and built The Switch?

Accord Properties developed The Switch, Hayball designed it and Crema built it. The building team section has the sources.

How tall is The Switch?

About 88 metres, measured from the City of Melbourne's 3D building model. It's number 145 of 1596 buildings in Melbourne by height.

What public transport is near The Switch?

Flagstaff Railway Station is the nearest train station, about 3 minutes' walk. The nearest tram stop is Franklin St/Peel St #8, about 2 minutes' walk.

What is the planning zone for The Switch?

The site is in the Capital City Zone - Schedule 1 (CCZ1).

Has any work been done on The Switch recently?

The City of Melbourne has issued 8 building permits for The Switch since 1999. The most recent was in December 2022.

Compare with nearby buildings

BuildingTypeDistanceFloorsCompleted
The SwitchStudent accommodationβ€”282023
Pegasus Apartment HotelHotel30 m252012
IgluStudent accommodation43 m242018
Wills CourtMixed use83 m262002
Wills TowerResidential83 m272002

That's Built compiles information from public records, research and contributions. Details are checked against multiple sources where possible but may contain errors and aren't professional advice. Sources: City of Melbourne building permits (CC BY 4.0), CLUE building information (CC BY 4.0), CLUE business establishments (CC BY 4.0), Development Activity Monitor (CC BY 4.0), Geocoded National Address File (G-NAF) (Open G-NAF EULA (CC BY 4.0 based)). Street View and business details Β© Google Maps.

The SwitchNo listings linked yetFind listings

Suggest a correction

Something wrong or missing? Tell us what it should say. We check every suggestion before changing anything.

By sending, you agree to the contributor terms. See how we handle your details in the privacy policy.