| Completed | 1989 | Hotel Swanston completed: 15 floors |
Each cost is the estimate on that record. Stages of a project often repeat its full value, so these don't add up to what was spent.
| 19 Mar 2026 | Tenancy Fitout of Shop (Commonwealth Bank) | $70k |
| 20 Feb 2026 | CBA - ATM and facade alterations | $292k |
| 14 May 2024 | Alterations to an existing awning - Pullman Hotel | $151k |
| 26 Oct 2023 | Alterations to existing lift door openings | $200k |
| 10 Feb 2023 | Level 14 - Alterations to an existing building | $635k |
| 08 Feb 2023 | Replacement of cladding to existing CBA façade portion | $120k |
| 24 Jan 2023 | Stage 2 - Level 14 - remainder of works | $815k |
| 21 Oct 2022 | Stage 2 - Compleation of all works to Internal Fitout for Soul Café | $188k |
| 07 Sept 2022 | Internal Tenancy Fitout for Soul Café (Stage One - To Completion of Internal Structural Works Only) | $188k |
| 07 July 2022 | Replacement of cladding to existing CBA façade portion | $120k |
| 15 Nov 2021 | Proposed alterations to existing retail tenancy - CBA Tenancy | $88k |
| 28 Aug 2020 | Stage 1 - Bupa - Shop 1 and 2- Proposed alterations to existing retail shop. | $0 |
| 14 Feb 2020 | Stage 12: Gymnasium Works - Internal alterations to ground level and Mezzanine | $15.8m |
| 01 Oct 2019 | Stage 8 - Roofing Works Level 14 | $179k |
| 18 Sept 2019 | Stage 11: Ground Floor Lobby Works Mercure Welcome and Swanston | $15.7m |
| 30 Aug 2019 | Stage 6: Level 13 Alterations | $1.2m |
| 26 Aug 2019 | Stage 10: Level 15 Fitout Works | $14.1m |
| 26 July 2019 | Stage 9: Construction of infill floor to the existing swimming pool floor and the removal of existing staircase to level 14 and its infill slab | $100k |
| 16 July 2019 | Stage 2: Balance of Works) | $495k |
| 11 June 2019 | Refurbishment of Swanston Hotel Cocoon Bar (Eva's) | $132k |
| 07 June 2019 | Stage 7 - Internal Demolition works Ground Floor and Mezzanine Stage 1 | $132k |
| 15 May 2019 | Stage 5: Levels 14 & 15 Infill Slab Works) | $119k |
| 02 Apr 2019 | Stage 2 - Alterations to Level 6 & 12 | $12.0m |
| 22 Mar 2019 | Stage 4 - Alterations to existing Hotel Rooms Levels 2-5 | $3.6m |
| 26 Feb 2019 | Stage 3: Internal Demolition Works Levels 14 & 15, Excluding Pool, Plant Areas & Fire Services | $66k |
| 25 Oct 2018 | Alterations to an existing building - Stage 1: Internal Demolition) | $25k |
| 25 Oct 2018 | Stage 2: Remainder of Works | $325k |
| 23 Aug 2018 | Alterations to an existing building - Stage 1: Internal Demolition) | $25k |
| 11 May 2018 | Stage 2 - Alterations to Level 6 & 12 | $12.0m |
| 20 Apr 2018 | Stage 1: Level 11 & 12 - Internal Demolition Works to Hotel Rooms, Excluding Fire Services | $12.0m |
| 21 Feb 2017 | Level 2 - Proposed two new rooms (Pullman Prototype) on level 2 & storeroom | $100k |
| 24 May 2016 | Shop 7 - Tenancy fitout of skin care tenancy Origani Intrnal tenancy Works | $40k |
| 17 Feb 2016 | Signage of the fascia of the hotel | $28k |
| 25 Nov 2015 | Stage One - To Permit Internal Tenancy Fitout (Excluding External Works) | $668k |
| 12 Nov 2015 | Stage 2 - To Permit External Works | $668k |
| 02 Feb 2015 | Stage 2: Alteration to an existing building | $1.5m |
| 30 July 2013 | Alteration to Building-Internal Works Stage 1 | $1.5m |
| 02 Sept 2009 | Retail Fitout - Haigh's Chocolate - Shops 5 & 6 | $250k |
| 15 Sept 2008 | Stage 2 - Alterations to existing bank (external works only) - CBA. | $765k |
| 29 July 2008 | Alterations to existing bank (internal works only) - CBA | $765k |
| 07 Aug 1997 | Alter an existing shop front | $9k |
| 16 Aug 1996 | Construction of shop front and signage | $15k |
| 17 Jan 1996 | Alterations to existing stair and new bar area to cafe | $100k |
| 17 Jan 1996 | Revised configuration to the existing internal stair | $100k |
Is Hotel Swanston residential or commercial?
Hotel Swanston is a hotel or serviced apartments. The City of Melbourne lists its main use as commercial accommodation.
When was Hotel Swanston built?
Hotel Swanston was completed in 1989.
How many floors does Hotel Swanston have?
Hotel Swanston has 15 floors above ground.
Who designed and built Hotel Swanston?
Erdigroup developed Hotel Swanston. The building team section has the sources.
How tall is Hotel Swanston?
About 52 metres, measured from the City of Melbourne's 3D building model. It's number 274 of 1596 buildings in Melbourne by height.
What public transport is near Hotel Swanston?
Town Hall Station is the nearest train station, about 5 minutes' walk. The nearest tram stop is Bourke Street Mall/Swanston St #10, about 1 minute's walk.
What is the planning zone for Hotel Swanston?
The site is in the Capital City Zone - Schedule 2 (CCZ2).
Has any work been done on Hotel Swanston recently?
The City of Melbourne has issued 33 building permits for Hotel Swanston since 1996. The most recent was in January 2023.
Sources: City of Melbourne building permits (CC BY 4.0); CLUE building information (CC BY 4.0); CLUE business establishments (CC BY 4.0); Geocoded National Address File (G-NAF) (Open G-NAF EULA (CC BY 4.0 based)). General information from public records, not legal, financial or building advice.