| Completed | 1991 | Ovolo completed: 6 floors |
Each cost is the estimate on that record. Stages of a project often repeat its full value, so these don't add up to what was spent.
| 13 Apr 2023 | Stage 4 - to permit internal fitout of lobby space | $1.0m |
| 12 Apr 2023 | Stage 3 - To Permit the Instillation of External Light Boxes Only. | $146k |
| 10 Feb 2023 | Stage 2 - To permit restaurant door shroud & Building Identification Signage, excluding Lightbox Signage | $146k |
| 30 Jan 2023 | Proposed Ground Level Facade Works Only | $146k |
| 16 Dec 2022 | Stage 4 - to permit internal fitout of lobby space | $1.0m |
| 03 Nov 2022 | Stage 3 - Building Permit - To Permit Mechanical Works, DDA Report & Fire Engineering Report Within the Restaurant Only | $1.0m |
| 21 Oct 2022 | Stage 2 - To Permit Internal Alterations to Existing Restaurant Space Excluding Mechanical Services, Associated Accessibility & Fire Engineering Performance Solutions | $1.0m |
| 04 Aug 2022 | Stage 1 - Proposed ground floor within the existing entrance & lift lobby and the occupation of an existing restaurant / bar space adjacent | $80k |
| 17 July 2019 | Proposed smoke detection alterations to existing hotel | $8k |
| 19 Sept 2018 | New Construction of External Signage | $2k |
| 19 Sept 2012 | Stage 4: External works, spa & pool fence - Alterations to existing hotel | $1.9m |
| 01 Aug 2012 | Stage 3: Fire services/sprinkler alterations | $1.9m |
| 30 Apr 2012 | Refurbishment of Ovolo Hotel Internal stripout & non structural demolition & fitout of display Suite 207 Stage 1 | $1.9m |
| 18 May 2007 | Change of use and entry alterations (ramp entry), first to fifth Levels, Lot 51. | $290k |
| 21 Dec 2006 | Alteration - Fire safety upgrade | $321k |
| 14 Sept 2000 | Installation of alarm signalling equipment | $190 |
| 25 Sept 1996 | Change of use of a building - Level 1-4 to Residential Units | $1.5m |
Is Ovolo residential or commercial?
Ovolo is a hotel or serviced apartments. The City of Melbourne lists its main use as commercial accommodation.
When was Ovolo built?
Ovolo was completed in 1991.
How many floors does Ovolo have?
Ovolo has 6 floors above ground.
Who built Ovolo?
The building team section lists who's known so far. Builders, architects and developers can claim their role on this page.
How tall is Ovolo?
About 22 metres, measured from the City of Melbourne's 3D building model. It's number 669 of 1596 buildings in Melbourne by height.
What public transport is near Ovolo?
Parliament Station is the nearest train station, about 1 minute's walk. The nearest tram stop is Spring St/Bourke St #9, about 1 minute's walk.
What is the planning zone for Ovolo?
The site is in the Capital City Zone - Schedule 1 (CCZ1). It's also under a Heritage Overlay (HO500).
Does Ovolo have an owners corporation?
Plan of subdivision SP36657 has 1 lot.
Has any work been done on Ovolo recently?
The City of Melbourne has issued 14 building permits for Ovolo since 1996. The most recent was in April 2023.