| Construction started | Aug 2005 | First major construction permit issued |
| First occupants | Dec 2007 | First occupancy permit issued |
| Completed | 2007 | NEO 200 Apartment completed: 43 floors |
Each cost is the estimate on that record. Stages of a project often repeat its full value, so these don't add up to what was spent.
| 28 May 2021 | Neo200 Detector Upgrade Works | $1k |
| 12 Nov 2020 | Cladding replacement works. | $1.2m |
| 28 July 2020 | Level 19-26 - Reinstatement of 14 fire damaged apartments | $1.9m |
| 14 Feb 2020 | Level 19-26 - Reinstatement of 14 fire damaged apartments | $1.9m |
| 06 May 2019 | Shop 8 - Internal shop alterations | $39k |
| 09 Sept 2016 | Shop 9 - internal alterations to retail outlet | $3k |
| 05 May 2016 | Installation of a sprinkler to existing canopy | $3k |
| 08 Jan 2016 | Shop Fitout - Tenancy 5 | $20k |
| 08 Oct 2014 | Construction of concierge desk | $46k |
| 16 Dec 2011 | Internal fitout to Dental Surgery Shop 3 Lot 3R | $70k |
| 26 Mar 2010 | Shop 1 HiRize Bakery Cafe - Tenancy Fitout | $150k |
| 20 Apr 2009 | Alterations to building for tenancy subdivision - Stage 2 - Alterations to Façade. | $350k |
| 20 Mar 2009 | Alterations to building for tenancy subdivision Ground Level retail - Stage 1: Internal Works | $350k |
| 12 Dec 2007 | Stage 2: Piling, ground works, boundary protection works, basement walls and basement slabs | $750k |
| 16 Apr 2007 | Stage 6: Balustrade design and structural items pertaining to Levels 41 and 42. | $75.0m |
| 01 June 2006 | Stage 6: Post tension slabs to levels 8, 18 to 41 (inclusive) Lot 1. Residential apartments, retail, carpark. | $11.8m |
| 02 Mar 2006 | Stage 5 - Architectural and PT slabs to L7, L9 to L17 | $75.0m |
| 20 Dec 2005 | Construction of a new building. Stage 4 - All services and post tension slabs (Level LG - L6 inclusive) | $17.0m |
| 03 Aug 2005 | Stage 3: Piling, retention, pad footings and ground slabs and remaining structure across entire site (excluding PT slabs) | $5.0m |
| 30 June 2005 | demolition/removal of external canopy, shed and roller door | $15k |
| 26 May 2005 | Piling and retention | $500k |
| 08 May 1996 | Emergency lighting and exit signs | $18k |
Is NEO 200 Apartment residential or commercial?
NEO 200 Apartment mixes homes and businesses under one roof. The City of Melbourne lists its main use as residential apartment.
When was NEO 200 Apartment built?
NEO 200 Apartment was completed in 2007.
How many floors does NEO 200 Apartment have?
NEO 200 Apartment has 43 floors above ground.
How many apartments are in NEO 200 Apartment?
NEO 200 Apartment has 371 homes. The national address file lists 417 unit addresses here, and some of those can be shops or offices.
Does NEO 200 Apartment have parking?
The City of Melbourne records 367 residential car spaces at this property. Which apartments have a space isn't recorded, so check the listing.
What do apartments cost near NEO 200 Apartment?
The median unit price in Melbourne was $545,000 in 2025, from the Victorian Property Sales Report. That's for the whole suburb, not this building.
What businesses are in NEO 200 Apartment?
The latest council census counted 6 businesses in NEO 200 Apartment, including Ali's Jumbo Kebab, Be My Guest Bnb Concierge and City Dental Care.
Are there apartments for sale or rent in NEO 200 Apartment?
See the residential listings on this page, or use the shortcuts to search 182-200 Spencer Street on realestate.com.au and Domain.
Is there office or retail space for lease in NEO 200 Apartment?
See the commercial listings on this page, or search this address on realcommercial.com.au and commercialrealestate.com.au.
Who designed and built NEO 200 Apartment?
Becton Group developed NEO 200 Apartment, Hayball designed it and LU Simon built it. The building team section has the sources.
How tall is NEO 200 Apartment?
About 128 metres, measured from the City of Melbourne's 3D building model. It's number 79 of 1596 buildings in Melbourne by height.
What public transport is near NEO 200 Apartment?
Southern Cross Station is the nearest train station, about 2 minutes' walk. The nearest tram stop is Bourke St/Spencer St #121, about 1 minute's walk.
What is the planning zone for NEO 200 Apartment?
The site is in the Capital City Zone - Schedule 1 (CCZ1).
Does NEO 200 Apartment have an owners corporation?
Plan of subdivision PS532365 has 503 lots.
Has any work been done on NEO 200 Apartment recently?
The City of Melbourne has issued 14 building permits for NEO 200 Apartment since 1996. The most recent was in May 2021.
Sources: City of Melbourne building permits (CC BY 4.0); CLUE building information (CC BY 4.0); CLUE business establishments (CC BY 4.0); CLUE residential dwellings (CC BY 4.0); Development Activity Monitor (CC BY 4.0); Geocoded National Address File (G-NAF) (Open G-NAF EULA (CC BY 4.0 based)). General information from public records, not legal, financial or building advice.