← Back to CGU Tower
That's Built · Building report

CGU Tower

181 William Street, Melbourne VIC 3000
Generated 8 November 2026
Commercial · Office
122 mheight
27floors
2008completed
21businesses
88permits

Development milestones

Construction startedJan 2006First major construction permit issued
First occupantsApr 2008First occupancy permit issued
Completed2008CGU Tower completed: 27 floors

Building team

Owner
Cbus Property
Architect
Bates Smart
Architect
SJB Architects
Architect
NH Architecture
Builder
Brookfield Multiplex
Structural engineer
Winward Structures
Services engineer
Norman Disney & Young
Project manager
Project Planning and Management
Architect
BVN
Builder
Buildcorp
Project manager
CBRE
Quantity surveyor
Slattery
Interior designer
Citizen Group
Interior designer
Guymer Bailey
Owner
GPT Group
Co-owner or investor
GPT Wholesale Office Fund
Sales agent
Cushman & Wakefield

Planning & subdivision

Zone
CCZ1
Overlays
DDO1, DDO10, PO1
Strata plan
PS617351 · 1 lots
Scores
🚆 8 · ☕ 7 · 🌳 8 · ✨ 8

Timeline

20263 building permits and 1 certificate · about $1.6m of new works
Largest: Demolition of Level 7 and 8 fitouts back to cold shell layout
17 Apr 2025Engineers Australia and Flybuys sign leases at 181 William Street
Real Estate Source reported that GPT had secured Engineers Australia, taking the 26th floor of 181 William Street, and Flybuys, which leased 1,041 sqm on level nine, as tenants of the CBW complex.
20253 building permits and 2 certificates · about $5.4m of new works
Largest: Tenancy alterations Level 21
20245 building permits and 2 certificates · about $21.8m of new works
Largest: Stage 4 - Balance of Works
20233 building permits and 7 certificates · about $8.7m of new works
Largest: Level 23 - Office fit-out
20223 building permits and 6 certificates · about $29.9m of new works
Largest: Stage 2 – Remainder of Works Excluding Fire Services
20213 building permits and 1 certificate · about $1.8m of new works
Largest: Level 25 - Internal Alterations to Level 25 and Refurbishment Lobby and Amenities
20201 building permit and 1 certificate · about $6.9m of new works
Largest: Stage 1 - Proposed alterations to basement 1 and ground floor lobby.
20192 building permits and 3 certificates · about $4.1m of new works
Largest: Stage Two Building Permit – To Permit Fire Services Relating to Fire Engineering Report, Automatic Smoke Detection, Sprinklers, Fire Hydrant
20171 building permit and 2 certificates · about $229k of new works
Largest: Level 24 - Alterations to existing office tenancy
20162 building permits and 2 certificates · about $289k of new works
Largest: Tenancy fitout for CBW Express Convenience Store
20154 building permits · about $44k of new works
Largest: Level 1 & 2 Office Fit Out
4 Sep 2014GPT Group and GPT Wholesale Office Fund buy CBW from Cbus Property for $608.1 million
GPT Group, together with its GPT Wholesale Office Fund, bought the CBW complex from Cbus Property for $608.1 million, each taking a 50 per cent interest. GPT said it would fund its part of the purchase with debt.
20146 building permits and 2 certificates · about $3.4m of new works
Largest: Level 1 & 2 Office Fit Out
20131 certificate · about $1.0m of new works
Largest: Level 20 Office Fitout
20122 certificates · about $247k of new works
Largest: CGU Internal Signage
20111 building permit and 1 certificate · about $103k of new works
Largest: Shop fitout Tenancy TG19 (Cubec Store)
2010Council census records it as office, 28 floors
Name recorded: CGU Tower
20105 building permits and 2 certificates · about $431k of new works
Largest: Proposed partition fitout - Room TM06
20099 building permits and 8 certificates · about $9.3m of new works
Largest: Alterations to a building, Office fitout works level 17, 18 & 19.
2008CGU Tower completed: 27 floors
Derived from Cbus Property
Apr 2008First occupancy permit issued
Derived from City of Melbourne building permits
200821 building permits and 4 certificates · about $1.3m of new works
Largest: Construction of a new building, 538 Bourke Street office building commercial development lot 1 & 2. Stage 22: 550 Bour Street: Levet 1 Modif
2008First council census entry: unoccupied - under construction, 28 floors
20074 building permits · about $12.1m of new works
Largest: Construction of a new building, 538 Bourke Street office building commercial development lot 1 & 2. Stage 14: 550 ground floor slabs and bea
Jan 2006First major construction permit issued
Derived from City of Melbourne building permits
20067 building permits and 1 certificate · about $242.6m of new works
Largest: Construction of a new building, 538 Bourke Street office building commercial development lot 1 & 2. Stage 6: Structure, levels 4 to 26 (incl
4 Oct 2005IAG to take space in planned 27-storey CBW tower at Bourke and William streets
Insurance News reported that the insurer IAG would occupy about 27,000 sqm of a 43,000 sqm, 27-storey building at the Grand Central development on the corner of Bourke and William streets. The article said the building would eventually be named CGU Tower and was expected to be completed by the end of 2008.
20051 building permit · about $240k of new works
Largest: Level 22, 535 Bourke St, office partition fitout to existing tenancy on level 22.
20041 building permit · about $10k of new works
Largest: Alterations to Carpark Level
20002 building permits · about $190 of new works
Largest: proposed installation of alarm signalling equipment
19981 building permit · about $500 of new works
Largest: Removal of fire hydrant
19971 certificate · about $3k of new works
Largest: Sign

Building permits and certificates (137)

Each cost is the estimate on that record. Stages of a project often repeat its full value, so these don't add up to what was spent.

07 May 2026Level 1 and 5 - Alterations to existing building – Amenities refresh$551k
03 Feb 2026Demolition of Level 7 and 8 fitouts back to cold shell layout$700k
02 Feb 2026Refurbishment of Level 3 amenities$300k
01 Feb 2026Demolition of café fitout and return to cold shell$50k
30 Oct 2025Levels 1-3 and 5-6, Internal Office Alterations for IAG$386k
24 Oct 2025Replacement of EWIS Panel$236k
04 June 2025Tenancy alterations Level 21$2.5m
28 Apr 2025Level 25 (part) - Alterations to existing building - fitout works$2.3m
18 Mar 2025Alteration to an Existing Building - Stage 2 - balance of works$2.3m
11 Dec 2024Alteration to an Existing Building - Stage 2 - balance of works$2.3m
19 Nov 2024Stage 2: Cladding Rectification$7.7m
26 Sept 2024Stage 4 - Balance of Works$10.3m
19 Sept 2024Lot 1, Shop TG05 - Fitout to Hair Salon (S. Parlor) 6(3)$80k
19 July 2024Stage 4 - Balance of Works$10.3m
11 July 2024Alterations to mechanical services on Level 2$483k
08 July 2024Internal Office Alterations for Baker & McKenzie$899k
20 Sept 2023Level 23 - Office fit-out$3.4m
28 July 2023Level 13 - Internal alterations to office$66k
26 July 2023HELLO CHICKEN TENANCY FITOUT AT GOLDSBOROUGH VILLAGE$150k
03 July 2023Internal Non Structural Alterations to Offices (5) - TPG Fit out$1.2m
16 June 2023Level 9 - Alterations to an existing office$1.9m
22 May 2023Tenancy TG11, - Stage 1: internal alteration only$400k
16 May 2023HELLO CHICKEN TENANCY FITOUT AT GOLDSBOROUGH VILLAGE$150k
19 Apr 2023Basement 3 - UPS rooms alterations.$20k
29 Mar 2023Level 9 and 17 - Lobby and Amenity Upgrade Works$1.5m
16 Mar 2023Level 9 and 17 - Lobby and Amenity Upgrade Works$1.5m
19 Dec 2022Stage 2: Balance of Works - Level 17 - GPT Premium Suites$1.5m
26 Oct 2022Level 13 - Internal Office Alterations$29k
16 Aug 2022Level 17 - GPT Premium Suites$1.5m
10 Aug 2022Level 22 - Partial fitout$2.2m
12 July 2022Level 10 - Office fitout$2.1m
29 Apr 2022Stage 2 – Remainder of Works Excluding Fire Services$18.8m
29 Apr 2022Stage 3 – Remainder of Works$18.8m
12 Apr 2022Level 22 - Partial fitout$2.2m
18 Mar 2022Stage 2 - To Permit Completion of Lobby Works$5.3m
01 Dec 2021Level 25 - Internal Alterations to Level 25 and Refurbishment Lobby and Amenities$974k
26 Oct 2021Level 22 - Internal alterations to an existing office$87k
11 Oct 2021Internal Alterations to L24 and Refurbishment Lobby & Amenities$752k
02 Sept 2021ASE Replacement$2k
13 Oct 2020Stage 1 - Proposed alterations to basement 1 and ground floor lobby.$6.9m
11 Feb 2020Stage 4 - To permit external facade demolition works, external structural works, electrical, mechanical, hydraulic, fire services works and MFB approval,$6.9m
04 Dec 2019Level 14 Proposed Internal Structural Office Fitout for CDPP$3
14 Oct 2019STAGE 2 – BALANCE OF WORKS (INCLUDING FIRE SERVICES WORKS)$473k
14 Oct 2019Stage Two Building Permit – To Permit Fire Services Relating to Fire Engineering Report, Automatic Smoke Detection, Sprinklers, Fire Hydrants, Fire Hose Reels, Portable Fire Extinguishers, Sound System and Intercom System & Smoke Exhaust System$3.2m
07 June 2019Level 17,18 & 19 - Baker McKenzie Fitout$328k
09 May 2019Level 17 - Alterations to Existing Building$60k
26 June 2017Level 17 - Office alterations$20k
27 Mar 2017Level 24 - Alterations to existing office tenancy$150k
21 Mar 2017Level 14 & 15 - Office Fitout$59k
06 Dec 2016L17 Minor Tenancy Alteration$15k
08 July 2016Internal fitout of a Restaurant$94k
17 June 2016L17 Minor Tenancy Alteration$15k
18 May 2016Tenancy fitout for CBW Express Convenience Store$180k
20 Mar 2015TG07 - Mamma Mia - Goldsbrough Lane - Proposed construction of a Internal alterations$33k
05 Mar 2015Level 23 - Alterations to existing tenancy$6k
23 Feb 2015TG15 ' Ninewest; at CBW - Construction of an Installation of Signage to Tenancy$5k
09 Feb 2015Level 1 & 2 Office Fit Out$2.9m
29 Oct 2014Level 1 & 2 Office Fit Out$2.9m
08 Oct 2014Tenancy TG09 Internal Tenancy Fitout for Bread & Meat Company$80k
04 Sept 2014Level 1 & 2 Office Fit Out$2.9m
09 July 2014Level 24 Proposed office alterations$160k
02 July 2014Level 17 Fit Out$29k
20 June 2014Proposed Alterations to an existing building$12k
24 Apr 2014TG03 Fitout of offices - all parts$35k
21 Mar 2014Ground Floor Tenancy Alterations$147k
08 Nov 2013Level 20 Office Fitout$1.0m
20 Sept 2012CGU Internal Signage$193k
07 May 2012Internal shop fitout TG10 (Roll'd)$54k
24 Oct 2011Lobby works Level B1 Lift K$33k
11 Oct 2011Shop fitout Tenancy TG19 (Cubec Store)$70k
05 Oct 2010INTERNAL SHOP FITOUT - SHOP TG 02$170k
02 Aug 2010Proposed partition fitout - Room TM06$225k
25 June 2010Level 16 and 17 - Fitout- Tenancy alterations excluding fire services$0
11 May 2010Alterations to an existing tenancy TM01$90k
07 May 2010TG 21 - Hair Dressing Salon Fitout to existing tenancy$36k
13 Apr 2010Stage 2: Level 16 and 17 - Remainder of Works - Fire Services$0
28 Jan 2010Stage 2 - Shopfront signage for TG19$50k
19 Nov 2009Restaurant fitout - Stage 3: External work to shop front and balcony and MFESB approval$805k
18 Nov 2009A tenancy fitout for Exodus - Shop TG19$50k
21 Oct 2009Tenancy G14 - New shop tenancy fitout$200k
13 Oct 2009STEP AMENDMENTS AT 181 WILLIAM STREET MELBOURNE$31k
18 Sept 2009Level 21 Alterations, 181 William Street, Melbourne - Stage 2: Fire Services$0
17 Sept 2009Stage Two: Retail tenancies 2, 6, 21 and level 17 only. Alterations - Revised documentation$106k
11 Aug 2009Fitout to Cafe Shop TG 25$228k
17 June 2009Services Alterations - Tenancies 2, 6 & 21$106k
12 June 2009Alterations - Tenancy TG06$120k
04 June 2009Restaurant fitout - Slate. Demolition work only for core holes, excluding dumb waiter, Shop TM09. Stage 2: Internal Works Only$800k
28 Apr 2009Shop T(G18 Goldsburgh Lane shopping centre) fitout$110k
17 Apr 2009Restaurant fitout - Slate. Demolition work only for core holes, excluding dumb waiter, Shop TM09.$800k
08 Apr 2009Alterations to a building, Office fitout works level 17, 18 & 19.$6.4m
24 Feb 2009Alterations to tenancy TG-05 at 181 William Street Melbourne$14k
27 Jan 2009Alterations to Nine West tenancy - TG15. Alterations to Services (Retail).$18k
27 Jan 2009Variation: Internal Shop fitout - 'Laurent' Ground Level (TG04).$100k
23 Jan 2009Proposed Office Fitout to Existing Tenancy Level 22 (West Tenancy)$1.2m
09 Dec 2008Construction of an internal shop fitout - Sires$100k
03 Dec 2008Alterations - Tenancy TG 09 Cnr Bourke & William Streets, MELBOURNE$47k
03 Dec 2008Alterations to a building - Tenancy TG 22 Chocolate Box Cnr Bourke & William Streets MELB$35k
27 Nov 2008Alteration to a building Tenancy TG13, Cnr Bourke St & William St MELB$46k
20 Nov 2008Alterations to a building - Tenancy TG12 Cnr Bourke & William Streets, MELB$13k
20 Nov 2008Alterations to a building - Tenancy TG24 Cnr Bourke & William Streets MELB$24k
19 Nov 2008Alterations to a building - Tenancy TG01 only Cnr Bourke & William Streets MELB$39k
19 Nov 2008Alterations to tenancy TG-11 at 181 William Street Melbourne$13k
18 Nov 2008Internal fitout for creation of retail shop Tenancy TG15, Cnr Bourke & William Street MELB$190k
16 Oct 2008Shop fitout - TG05$83k
07 Oct 2008Retail tenancy fitout to shop TG01. CBW Retails$65k
26 Sept 2008Internal Fitout Cafe Tenancy TG03, Cnr Bourke & William Streets MELB$60k
18 Sept 2008EWIS Tones Alterations$5k
18 Sept 2008Stage 1: Internal fitout for Cafe Blu, Shop TG09.$180k
17 Sept 2008Proposed Shop Fitout TG12$90k
27 Aug 2008Alterations to a retail shop$90k
20 Aug 2008Construction of External Signage (Office) Eastern, Western and Southern Facade.$193k
04 July 2008Construction of a new building, 538 Bourke Street office building commercial development lot 1 & 2. Stage 13: Architectural - 181 William.$150.0m
30 June 2008Construction of a new building, 538 Bourke Street office building commercial development lot 1 & 2. Stage 22: 550 Bour Street: Levet 1 Modification.$203.0m
13 June 2008Internal Alterations Levels 1 to 3, 5 to 8, 10 to 15$379
15 May 2008Variation: Variation to building permit documentation$33.3m
29 Apr 2008Construction of a new building, 538 Bourke Street office building commercial development lot 1 & 2. Stage 21: Sign to Goldsbrough Lane.$203.0m
17 Apr 2008Construction of a new building, 538 Bourke Street office building commercial development lot 1 & 2. Stage 15: Retail architectural & structural 181 William Facade Levels 27-28 550 Bourke Levels 1-11 slabs and beams (excluding canopy over Goldsbrough Lane and Little Bourke Street).$197.4m
21 Mar 2008Construction of a new building, 538 Bourke Street office building commercial development lot 1 & 2. Stage 11: Basement B2 and B3 floors, core walls and precast walls, reinforced concrete columns and basement B1.$150.0m
22 Feb 2008Construction of a new building, 538 Bourke Street office building commercial development lot 1 & 2. Stage 10: Facade, Level 1 to 3$150.0m
17 Dec 2007Office building fitout on Levels 22-26, revised documentation to Levels 22 to 26.$12.1m
16 May 2007Construction of a new building, 538 Bourke Street office building commercial development lot 1 & 2. Stage 14: 550 ground floor slabs and beams.$150.0m
27 Mar 2007Construction of a new building, 538 Bourke Street office building commercial development lot 1 & 2. Stage 12: Facade, Levels 4-26.$150.0m
16 Jan 2007Construction of a new building, 538 Bourke Street office building commercial development lot 1 & 2. Stage 8: Pad footings. Office building, foundations.$150.0m
20 Dec 2006Alterations to an office building, fitout of a new building levels 1-3, 5-15.$33.3m
19 Dec 2006Stage 2 - Demolition of 550 Bourke St.; Demolition of existing office building$6.3m
15 Nov 2006Construction of a new building, 538 Bourke Street office building commercial development lot 1 & 2. Stage 6: Structure, levels 4 to 26 (incl.)$150.0m
03 Oct 2006Construction of a new building, 538 Bourke Street office building commercial development lot 1 & 2. Stage 5: Structure, ground to level 3 and all building services.$150.0m
25 Aug 2006Construction of a new building, 538 Bourke Street office building commercial development lot 1 & 2. Stage 4: Columns and stairs.$150.0m
07 July 2006Construction of a new building, 538 Bourke Street office building commercial development lot 1 & 2. Stage 3: Basement structure, footings, core walls and inground services.$150.0m
01 Mar 2006Construction of a new building, 538 Bourke Street office building commercial development lot 1 & 2. Stage 1: Site retention (538 Bourke Street).$150.0m
18 Jan 2006Demolition of existing office building$2.1m
19 July 2005Level 22, 535 Bourke St, office partition fitout to existing tenancy on level 22.$240k
19 Mar 2004Alterations to Carpark Level$10k
07 July 2000proposed installation of alarm signalling equipment$190
06 July 2000proposed installation of alarm signalling equipment$190
28 Aug 1998Removal of fire hydrant$500
15 Mar 1997Sign$3k

Questions and answers

Is CGU Tower residential or commercial?
CGU Tower is a commercial building. The City of Melbourne lists its main use as office.

When was CGU Tower built?
CGU Tower was completed in 2008.

How many floors does CGU Tower have?
CGU Tower has 27 floors above ground.

What businesses are in CGU Tower?
The latest council census counted 21 businesses in CGU Tower, including Abacus CBD, Amie Bakery and AUSTRALIAN GAS INFRASTRUCTURE HOLDINGS PTY LIMITED.

Is there office or retail space for lease in CGU Tower?
See the commercial listings on this page, or search this address on realcommercial.com.au and commercialrealestate.com.au.

Who designed and built CGU Tower?
NH Architecture designed CGU Tower and Brookfield Multiplex built it. The building team section has the sources.

How tall is CGU Tower?
About 122 metres, measured from the City of Melbourne's 3D building model. It's number 89 of 1596 buildings in Melbourne by height.

What public transport is near CGU Tower?
Flagstaff Station is the nearest train station, about 5 minutes' walk. The nearest tram stop is Bourke St/William St #5, about 1 minute's walk.

What is the planning zone for CGU Tower?
The site is in the Capital City Zone - Schedule 1 (CCZ1).

Does CGU Tower have an owners corporation?
Plan of subdivision PS617351 has 1 lot.

How much did CGU Tower sell for?
In 2014, GPT Group and GPT Wholesale Office Fund bought the CBW complex from Cbus Property for $608.1 million.

Has any work been done on CGU Tower recently?
The City of Melbourne has issued 88 building permits for CGU Tower since 1998. The most recent was in May 2026.

Sources: City of Melbourne building permits (CC BY 4.0); CLUE building information (CC BY 4.0); CLUE business establishments (CC BY 4.0); Geocoded National Address File (G-NAF) (Open G-NAF EULA (CC BY 4.0 based)). General information from public records, not legal, financial or building advice.