| Completed | 1972 | 140 William Street completed: 41 floors |
Each cost is the estimate on that record. Stages of a project often repeat its full value, so these don't add up to what was spent.
| 08 Sept 2026 | Stage 2 - Primary structural works | $3.0m |
| 01 July 2026 | Internal Office Fit-Out https://www.dropbox.com/scl/fo/h7q4v1z7s1o3yovfbeqw8/AJEDSbdPutDfshaDBCsv22E?rlkey=k5p2jcx8imtr5d0ig4dguncjm&st=9l8demvb&dl=0 | $1.1m |
| 16 Feb 2026 | Levels 23 & 41 - Alterations to existing building | $727k |
| 12 Feb 2026 | Level 31 - Internal Office Fitout | $1.7m |
| 18 Dec 2025 | Office fitout works to level 19 | $250k |
| 06 Nov 2025 | Internal Office Alterations (Levels 28 & 30) - Stage 1: Completion of Level 30 Only | $272k |
| 19 Sept 2025 | Stage 3 - Architectural and services works | $12.6m |
| 10 Sept 2025 | Level 40 - Minor internal alteration | $8k |
| 31 July 2025 | Alterations to existing office tenancy | $3.0m |
| 22 July 2025 | Stage 4 – Façade, Civil, Waterproofing & Secondary steel works | $0 |
| 20 June 2025 | Level 27 - Internal Fitout Works to an Existing Office Tenancy | $220k |
| 09 Apr 2025 | Level 27 - Internal Fitout Works to an Existing Office Tenancy | $220k |
| 07 Apr 2025 | Stage 2 - Primary structural works | $3.0m |
| 19 Mar 2025 | Level 38 & 39 - Proposed Internal Fit out & Construction of Interconnecting Stairway - Stage 3: To Include the Interconnecting Stairway & Service Penetrations | $1.8m |
| 13 Mar 2025 | Level 29 - Internal Office Fitout | $1.8m |
| 27 Feb 2025 | Lot 1 & 2, Level 11 - Office Fitout works | $361k |
| 13 Feb 2025 | Part level 9 - Fit out of Offices | $258k |
| 16 Jan 2025 | Level 39 - Proposed alterations to existing office suite 3912 | $175k |
| 19 Dec 2024 | Level 38 & 39 - Proposed Internal Fit out & Construction of Interconnecting Stairway | $1.8m |
| 19 Dec 2024 | Stage Two - To Permit Architectural and Services on Levels 38 and 39 (Excluding the Interconnecting Stairway, Service Penetrations & Associated Structural Works) | $1.8m |
| 18 Dec 2024 | Stage 2 - Change of use from plant room to office & fitout works | $3.9m |
| 17 Dec 2024 | Level 5, formally L4 - Alterations to lift core openings on level 4 | $231k |
| 10 Dec 2024 | Proposed Refurbishment of Existing Office Space | $772k |
| 29 Nov 2024 | Alterations and additions to existing office and café building | $307k |
| 19 Nov 2024 | Suite 26.03, Level 26 - Internal Office Alterations | $43k |
| 07 Nov 2024 | Level 27 - Internal Office Alterations for Alexander Funds | $26k |
| 31 Oct 2024 | Level 29 - Office Fit-Out | $100k |
| 31 Oct 2024 | Stage 2 - Fit-out | $1.7m |
| 20 Sept 2024 | Level 42 - Office Fitout Works | $150k |
| 29 July 2024 | Level 20 - Office Fitout Works | $380k |
| 29 July 2024 | Level 42 - Office Fitout Works | $150k |
| 30 May 2024 | Internal Office Fitout | $109k |
| 19 Apr 2024 | Level 39, 140 William Street - Alterations to existing building, Defit and Refit | $100k |
| 19 Apr 2024 | Stage 2 - Level 39, 140 William Street - Alterations to existing building, Defit and Refit | $1.7m |
| 15 Dec 2023 | Lot 2 No - Alterations to existing Office - A/C Installation Server Room | $43k |
| 11 Dec 2023 | Level 32 NTI Fitout - Office tenancy works | $1.6m |
| 30 Nov 2023 | Level 36 - Internal Office Fitout | $652k |
| 29 Nov 2023 | Level 2 - Internal Office Fitout and Tenancy Split (Stage One - To Completion of Internal Defit Works Only) | $777k |
| 29 Nov 2023 | Stage Two - To Completion of Partial Fitout Works Only | $777k |
| 26 Sept 2023 | Level 19 - Partition works | $760k |
| 11 Sept 2023 | Stage Three - Internal alterations to an existing building. | $777k |
| 21 July 2023 | Level 32 - Internal Office Fitout for HN Laws | $898k |
| 18 July 2023 | Alterations to existing office building - defit and refit | $1.9m |
| 04 July 2023 | Basement 2, Level 23, Level 42) - Alterations to existing building, fitting of HV Cables. | $783k |
| 15 June 2023 | Level 36 - Internal alterations to existing building | $128k |
| 01 June 2023 | Stage 2 - Change of use from plant room to office & fitout works | $3.9m |
| 13 Apr 2023 | Proposed Internal Office Fitout for Clyde & Co | $40k |
| 11 Apr 2023 | Level 41 Office Fitout - Alterations to existing building | $900k |
| 11 Apr 2023 | Office and plant room alterations to level 43 | $991k |
| 30 Mar 2023 | Alterations to existing office building - defit and refit | $1.9m |
| 16 Mar 2023 | Level 14 - Alterations to existing building. | $602k |
| 08 Nov 2022 | Level 20 - Alterations to existing building - office fitout | $1.1m |
| 17 Aug 2022 | Level 14 & 15 - Proposed make good of L14 and modification of L15 balustrade and office space. Stage One: To permit the non-structural demolition of existing stair & associated services relating to the stair only | $295k |
| 10 Aug 2022 | Level 36 - Nodco office tenancy fit out | $0 |
| 25 July 2022 | Level 17 - Office fitout - Alterations to existing building | $630k |
| 04 July 2022 | Level 18 - Alterations to exisiting building | $1.5m |
| 22 June 2022 | Level 14 & 15 - Stage Two Building Permit - To Permit Remainder of Proposed Works Including structural Floor Slab. | $295k |
| 20 June 2022 | Level 36 - Internal tenancy split | $157k |
| 31 May 2022 | Level 34 (2x Tenancies) - Alterations to existing building | $1.4m |
| 25 May 2022 | Alterations to existing building, Office fitout | $1.1m |
| 16 May 2022 | Level 14 - Minor Internal Office Alterations | $27k |
| 25 Mar 2022 | Level 19 Office Fitout | $1.1m |
| 14 Dec 2021 | Level 17 - OFFICE FITOUT | $1.1m |
| 09 Dec 2021 | Alterations to an existing building | $417k |
| 03 Dec 2021 | Level 17 - Alterations to existing building | $700k |
| 25 Nov 2021 | Level 21 - Office Fitout. Stage 1: Demolition of existing fitout & construction of DDA toilet | $799k |
| 03 Nov 2021 | Level 34 - Parition fitout | $972k |
| 17 Sept 2021 | Level 34 - Alteration to existing building | $98k |
| 17 Aug 2021 | Stage 1 - Internal demolition only | $416k |
| 24 July 2021 | Level 41 Office Fitout - Alterations to existing building | $900k |
| 24 July 2021 | Level 42 Office Fitout - Alterations to existing building | $1.1m |
| 14 July 2021 | Stage 2 - Level 22 Office Fitout | $527k |
| 01 July 2021 | Tenancy 2, Level 22 - Internal office fit out (Excluding Mechanical and Fire Services) | $125k |
| 25 June 2021 | Level 19 Office Fitout | $1.1m |
| 25 June 2021 | Level 21 - Alterations to existing building, office fitout | $739k |
| 01 June 2021 | Level 21 - Alterations to existing building, office fitout | $450k |
| 14 May 2021 | Level 34 - ALTERATION TO AN EXISTING BUILDING | $47k |
| 12 May 2021 | Level 9 - OFFICE FITOUT | $45k |
| 07 Apr 2021 | Level 22. Office Fitout | $352k |
| 13 Jan 2021 | Level 1 & 2. Partial Demolition & Refurbishment Works to the Existing Carpark Only | $265k |
| 01 Oct 2020 | Tenancy 2, Level 22 - Internal office fit out. To permit proposed completion of lapsed permit works being to permit construction of fire services and include MFB approval. | $5k |
| 25 Aug 2020 | Level 38 - Proposed Alterations to existing office tenancy - Installation of Security Door | $16k |
| 28 May 2020 | Internal Alterations for Legal Super | $0 |
| 21 May 2020 | Level 36 and Level 41 - Office fit out. | $200k |
| 12 May 2020 | Level 9. Alterations to an Existing Oracle Office | $0 |
| 09 Apr 2020 | Alterations to an existing Oracle office. | $0 |
| 30 Mar 2020 | Basement Level 2 -Alterations | $65k |
| 23 Mar 2020 | Unit level 34. Internal alterations to smoke detection | $14k |
| 13 Mar 2020 | Alteration of Office Space | $0 |
| 10 Feb 2020 | Office internal strip out and fitout works | $2.2m |
| 06 Jan 2020 | Level 9, 26 & 35 ALTERATIONS TO EXISTING BUILDING, at 140 William Street Melbourne - 3000 | $789k |
| 16 Dec 2019 | Level 12 & 13 - Service alterations | $16k |
| 29 Nov 2019 | Level 30 - Office fitout | $50k |
| 08 Nov 2019 | (Level 30) ALTERATIONS TO EXISTING BUILDING 140 William Street, MELBOURNE | $64k |
| 23 Oct 2019 | Level 35 - Proposed Internal alterations to an existing office | $125k |
| 14 Oct 2019 | LB1 - Proposed Alterations to Existing Shop | $33k |
| 14 Aug 2019 | Levels 9 & 10 - Internal Office Fitout for Oracle | $2.5m |
| 06 Aug 2019 | Level 8 - Proposed Internal Office Fitout for ASG Melbourne | $946k |
| 03 Aug 2019 | Level 27 Office Fitout | $25k |
| 16 July 2019 | Level 9 - Alterations to Existing Building | $92k |
| 05 July 2019 | Level 35 - ALTERATIONS TO EXISTING BUILDING | $65k |
| 11 June 2019 | Level 9 & 10 - Office Fitout | $2 |
| 07 June 2019 | Level 33 - Office fitout | $27k |
| 20 May 2019 | Installation of sprinklers to Lift Pits | $26k |
| 03 May 2019 | Level 35 - Fitout to existing office | $0 |
| 03 May 2019 | Level 35 - Fitout to existing office | $1.2m |
| 24 Apr 2019 | Level 31 - Alterations to an existing building | $192k |
| 18 Apr 2019 | Level 27 - Office fitout | $29 |
| 11 Apr 2019 | Level 39 - Proposed Additions & Alterations to Existing Office Space | $106k |
| 28 Mar 2019 | Level 30 - Office Partition Walls | $40k |
| 26 Mar 2019 | Suite 1.03 - Tenancy Fit-out | $195 |
| 14 Feb 2019 | Stage 2 – Make Good - Level 9 & 10 - Office Fitout | $2.0m |
| 08 Jan 2019 | Level 37 - Marble Group Office Fitout | $26k |
| 20 Dec 2018 | Law Institute Fit-out - Stage 1 - Internal demolition only | $4.4m |
| 20 Dec 2018 | Law Institute Fit-out - Stage 2 - New fit-out works | $4.4m |
| 03 Dec 2018 | Level 8 - Japara Healthcare - Demolition / Make Good Works. Internal Strip-out of an existing office tenancy. | $909k |
| 19 Oct 2018 | Level 25, 26, 27 & 33 - Spec Office fitout | $1.9m |
| 08 Oct 2018 | Level 14- Tenancy Split | $122k |
| 20 Sept 2018 | Level 13–14 - Stair Infill | $74k |
| 20 Sept 2018 | Stage 2 – Stair Infill works | $74k |
| 03 Sept 2018 | Stage 1 - Strip-out/Demolition - Level 12-14 - Back to Base & Amenitiy Refurbishment | $2.3m |
| 31 Aug 2018 | Ground floor - Proposed installation of new door | $41k |
| 29 Aug 2018 | Level 14 - Office Fitout | $155k |
| 22 Aug 2018 | Lift Motor Rooms - Alterations to Existing Sprinklers | $56k |
| 12 July 2018 | Level 4 - Alterations for new MDF & Telehouse Room | $199k |
| 20 June 2018 | Level 30 - King & Whittle Office Fitout | $552k |
| 23 May 2018 | Stage 2 - Fitout works to Level 40 | $202k |
| 11 May 2018 | Level 25 - Internal Non Structural Alterations to existing office | $300k |
| 09 May 2018 | Basement Level 2 -Alterations | $65k |
| 23 Apr 2018 | Ground floor - Proposed installation of new door | $41k |
| 19 Apr 2018 | Stage 2 - Fitout works | $2.3m |
| 17 Apr 2018 | Level 18 Office Fit-Out | $1.0m |
| 06 Apr 2018 | Level 25 - Tenancy Fitout NOPTA 730M2 | $1.3m |
| 06 Apr 2018 | Stage 1 - Demolition works within an existing fitout - Level 40 - Servcorp - Office Alterations | $202k |
| 23 Feb 2018 | Level 30 - Kidman Resourse Office Fit Out - Internal Non Structural Alterations to Parts of Exisiting Office | $240k |
| 15 Feb 2018 | Level 25 & 30 - Internal Alterations | $300k |
| 15 Feb 2018 | Stage 2: Level 18 Office Fit-Out - Remaining works | $1.0m |
| 07 Feb 2018 | Level 14 - Relocate fire doors | $22k |
| 01 Feb 2018 | Level 28 - Proposed alterations to existing office tenancy | $10k |
| 17 Nov 2017 | Level 33 - Proposed office fitout to existing tenancy | $650k |
| 16 Nov 2017 | Stage 2 - To Permit Internal Demolition & Partition Installations Only | $4.7m |
| 16 Nov 2017 | Stage 3 - To Include All Services | $4.7m |
| 26 Oct 2017 | Stage 2 - Level 33 Including All Services - Proposed Office Fitout for Bank of Montreal | $520k |
| 21 Oct 2017 | To allow the alterations to occur to the existing lift cars in Basement B1/B2 and Level 4 only | $400k |
| 12 Sept 2017 | Level 33 - Proposed Office Fitout for Bank of Montreal | $520k |
| 05 Sept 2017 | Stage 3 - To Include All Services | $4.7m |
| 05 Sept 2017 | Tenancy condenser water upgrade - South Fire Stair Dispensation | $6k |
| 31 Aug 2017 | Stage Two – To Permit the Completion of All Remaining Work i.e. Construction of Partition Walls, Installation of Electrical, Mechanical, Fire & Hydraulic Services, construction of Accessible Sanitary Compartment and Alterations to Existing Lift Lobby Only | $2.9m |
| 07 Aug 2017 | Stage 1 - Level 13 & 14 - Minor internal office fit out works | $4.7m |
| 30 June 2017 | Level 37 - Internal office alterations | $110k |
| 19 June 2017 | Level 37 - Internal non-structural alterations to existing office tenancy (Wonder Property Office) | $150k |
| 18 May 2017 | Stage One – To Permit Internal Non-Structural Demolition Only - Levels 25, 27, 30 & 33 - Proposed Four Tenancy Division And Lift Lobby Alterations And Disabled Toilet Installation Only | $2.9m |
| 07 Apr 2017 | Level 35 - Proposed Minor Fitout Works | $7k |
| 28 Mar 2017 | Level 40 - Removal of an Office Non Load- Bearing Partion Wall | $5k |
| 21 Dec 2016 | Level 6 & 7 - Alteration and Additions to existing dwelling | $821k |
| 09 Dec 2016 | Level 34 - Proposed Internal Office Fitout | $12k |
| 30 Nov 2016 | Fitout to Level 8, demolition of stair to Level 11 and make good works | $434k |
| 30 Nov 2016 | Stage 2 - Alteration to Level 11 and make good works | $497k |
| 24 Nov 2016 | Stage 2 - Level 9 Only - Internal partial demolition and modifications to workstation layouts | $142k |
| 23 Nov 2016 | Stage 1 - Level 10 Only - alterations to workstations and extension to meeting room 10.47 | $222k |
| 21 Nov 2016 | Stage 2 - To Permit the Completion of all Remaining Building Work i.e. Construction of Partition Walls, Installation of Electrical, Mechanical, Fire & Hydraulic Services, Construction of Accessible Sanitary Compartment and Alterations to Existing Lift Lobby Only | $945k |
| 16 Nov 2016 | Level 40 (Part) - Installation of a Non Loadbearing Partition Wall - Servcorp Offices | $3k |
| 04 Nov 2016 | Level 41 - Additions and Alterations to Existing Office | $0 |
| 21 Oct 2016 | Stage One – Proposed Alterations & Additions to Existing Building – End of Trip Level B1 Amenities, Excluding Fire Hydrants | $1.9m |
| 21 Oct 2016 | Stage Two Building Permit – To Permit Fire Hydrants | $2.0m |
| 20 Oct 2016 | Level 39 - Proposed office fitout and alterations to an existing building | $0 |
| 14 Oct 2016 | Level 17 - Proposed internal office fitout of existing office | $50k |
| 06 Oct 2016 | Level 37 - Proposed Make Good and Upgrade Works | $0 |
| 15 Sept 2016 | Level 40 - Installation of an office - Non structural partition wall - SERCORP Tenancy offices | $4k |
| 01 Aug 2016 | Suite 39.01, Level 39 - Proposed Office Fitout for Protiviti | $361k |
| 07 July 2016 | Level 39 - Internal alterations to Existing Building | $132k |
| 21 Apr 2016 | Level 26 - Proposed office fitout | $1.2m |
| 27 Nov 2015 | Stage 1: Internal demolition / strip-out works only - Level 32 | $969k |
| 27 Nov 2015 | Stage 2: Fitout works | $935k |
| 20 Nov 2015 | Lvl 30 Alteration to office space | $94k |
| 26 Oct 2015 | Proposed office fit-out | $480k |
| 15 Oct 2015 | Level 40 - Fitout | $365k |
| 06 Oct 2015 | New office partition with relocated/new sprinkler heads | $8k |
| 01 Sept 2015 | Level 26 - Internal partitions to an office | $12k |
| 31 July 2015 | Level 26 - Alterations to an Existing Tenancy | $112k |
| 16 June 2015 | Level 27 - Minor internal alterations | $10k |
| 11 May 2015 | Level 22 - Alterations to Existing Tenancy | $70k |
| 04 Mar 2015 | Level 35 Alterations to Existing Tenancy | $40k |
| 12 Dec 2014 | Level 28 - internal alterations to an existing office building | $500 |
| 09 Dec 2014 | Level 31 alterations to office | $1.1m |
| 08 July 2014 | Office Refurbishment Level 21 | $2.6m |
| 30 June 2014 | LVL 22 Alterations | $50k |
| 04 June 2014 | Alterations to Level 31 | $164k |
| 20 Jan 2014 | LVL39 Alterations to existing building, includes tenancy entry door | $29k |
| 13 Dec 2013 | Internal alterations to an existing office Level 28 | $370k |
| 23 Oct 2013 | Alterations to basement - level 2 | $500 |
| 29 Aug 2013 | Fitout to existing office tenancy | $330k |
| 22 Aug 2013 | Office fitout Level 36 | $100k |
| 23 July 2013 | Austrac Part Fitout Level 30 | $283k |
| 10 July 2013 | Removal of internal partitions to Level 29 | $108k |
| 28 May 2013 | OFFICE FITOUT TO LEVEL 34 | $18k |
| 04 Feb 2013 | Proposed alterations to existing office tenancy on level 39. | $116k |
| 15 Aug 2012 | Internal alterations to partition wall Level 26 | $10k |
| 17 July 2012 | Level 29 - Proposed fitout to existing office tenancy | $970k |
| 11 May 2012 | Removal of Internal partitions Level 29 | $100k |
| 14 Feb 2012 | Office fitout Level 39 | $450k |
| 19 Dec 2011 | Office fitout Level 25 | $120k |
| 29 July 2011 | PROPOSED OFFICE FITOUT TO EXISTING TENANCY - LEVEL 38 | $1.3m |
| 01 July 2011 | INCREASE OF BIKE PARKING FACILITIES TO AN EXISTING BUILDING | $50k |
| 28 June 2011 | Office alterations Level 37 | $50k |
| 20 May 2011 | Office alterations - Level 30 | $31k |
| 09 May 2011 | Installation of a wire balustrade at 130-148 William Street, Melbourne | $123k |
| 08 Dec 2010 | STAGE 2: INTERNAL HYDRANT UPGRADE | $56k |
| 06 Dec 2010 | INTERNAL OFFICE FITOUT - LEVEL 35 | $30k |
| 17 Nov 2010 | MADDOCK LAWYERS ALTERATIONS | $135k |
| 12 Nov 2010 | ALTERATIONS TO EXISTING BUILDING - OFFICE FITOUT | $940k |
| 09 Nov 2010 | INTERNAL HYDRANT UPGRADE | $56k |
| 03 Nov 2010 | Level 9 - Alterations to an existing building | $84k |
| 19 Oct 2010 | Alterations to Level 4 | $130k |
| 19 Oct 2010 | Tenancy fitout Level 26 | $60k |
| 15 Oct 2010 | DEMOLITION FITOUT | $90k |
| 01 Oct 2010 | Cafe Area - (Cocoa Bean) New Ramped Access - Alterations to an existing building | $50k |
| 06 July 2010 | 140 William St - Alterations. | $110k |
| 03 June 2010 | Stage 2: services alterations. Level 25: proposed office fitout, including tenancy establishment works. | $400k |
| 28 May 2010 | Level 25: proposed office fitout, including tenancy establishment works. | $400k |
| 14 May 2010 | Installation of gas suppression system - Level 36 | $41k |
| 04 Mar 2010 | Level 26 - Partition fitout | $130k |
| 18 Feb 2010 | Level 29 Office fitout | $65k |
| 12 Feb 2010 | Partition fitout to Level 34 | $15k |
| 14 Dec 2009 | Level 26 - Office Fitout Alterations to an existing building | $300k |
| 07 Sept 2009 | Proposed office fitout to existing tenancy - Level 35 | $100k |
| 13 Aug 2009 | Proposed office partition alterations to existing tenancy Level 25 | $41k |
| 17 July 2009 | Alterations to an existing building - Partition Fitout Removal Level 26 | $48k |
| 14 May 2009 | Office Alterations for FM Global | $20k |
| 07 May 2009 | Office internal alterations to Level 38 | $121k |
| 23 Feb 2009 | Stage 2: To completion of the cooling tower alterations - Roof (part). | $1.9m |
| 09 Dec 2008 | Maddocks Office Alterations. Stage 2: Final, Conditional. | $984k |
| 10 Nov 2008 | Internal fitout to office as per plans Level 35 | $50k |
| 27 Oct 2008 | Alterations to a building - Level 40 140 William Street MELB | $60k |
| 13 Oct 2008 | Office alterations Level 31 | $70k |
| 02 July 2008 | Demolition of Fitout Works, Level 32 & Part Level 26 Only | $255 |
| 16 May 2008 | Alterations to an existing building-office fitout, level 39. | $227k |
| 09 May 2008 | Full internal stripout - level 29 & 30 | $300k |
| 09 May 2008 | Internal alterations to office Level 12 | $10k |
| 02 May 2008 | Maddocks Office Alterations. Stage1: Internal stripout (Non loadbearing walls only) Level 11. | $15k |
| 29 Jan 2008 | New Inter tenancy wall to office Level 35 | $5k |
| 22 Jan 2008 | Office partition alterations to existing tenancy - Level 36 | $30k |
| 11 Dec 2007 | Office partition fitout to Level 25. | $180k |
| 19 Nov 2007 | Cocoa Bean Cafe Restaurant. Proposed conversion of pavillion to Cafe. Stage 2: Base building (Ground Floor Part). | $200k |
| 13 Nov 2007 | Heidrick and Struggles. Alterations to an existing building, office fitout to Level 35. | $640k |
| 18 Oct 2007 | Cocoa Bean Cafe Restaurant. Proposed conversion of pavillion to Cafe. Stage 1: Fitout works. | $200k |
| 02 Oct 2007 | SMS Management & Technology to Level 41, 42 & 43. | $1.6m |
| 12 Sept 2007 | Office fitout Level 36 (Austrac) | $340k |
| 18 May 2007 | New external revolving door to existing office building. | $100k |
| 18 May 2007 | Office fitout Level 42 | $70k |
| 15 May 2007 | Office fitout Level 39 | $22k |
| 18 Apr 2007 | Alterations to Office Level 28 | $120k |
| 02 Apr 2007 | Alterations to an office building, demolition works only, Levels 12, 13 & 14. | $2.4m |
| 26 Mar 2007 | Alterations to a building, Level 38. Internal alterations to office. | $130k |
| 23 Mar 2007 | Fire services replacement Level 11 | $485k |
| 20 Mar 2007 | Office fitout Level 25 | $600k |
| 12 Feb 2007 | Ofiice fitout Level 41 | $150k |
| 19 Jan 2007 | Austrac Fitout. Office fitout Level 30. | $1.2m |
| 06 Nov 2006 | Variation: Deletion of escape passage and revised security arrangement, level 39 (East Tenancy). Office fitout to exisitng tenancy. | $340k |
| 12 Oct 2006 | Alteration to office, stairwell infill level 29/30. | $16k |
| 06 Oct 2006 | Alterations to a building, office alterations level 26. | $50k |
| 27 Sept 2006 | Refurbishment of Office Level 29 | $800 |
| 15 Aug 2006 | Pan urban office fitout level 39(part). To completion of fitout works. | $175k |
| 31 May 2006 | Office partition alterations to existing tenancy, levels 27 & 33. | $203k |
| 17 Feb 2006 | Office partition fitout on level 13 | $200k |
| 21 Dec 2005 | Proposed internal office alterations level 21 | $16k |
| 19 Oct 2005 | Internal office fitout Level 11 | $28k |
| 30 Sept 2005 | Alteration works Levels 6-10 | $4.3m |
| 01 Sept 2005 | partition alterations - level 17 only | $281k |
| 14 July 2005 | alterations to existing office - level 27 only | $34k |
| 17 May 2005 | Alterations to an existing building | $78k |
| 26 Apr 2005 | Office alterations to levels 17,18,19,20,21,22 | $6.2m |
| 04 Apr 2005 | Partition alterations - Level 26 office | $10k |
| 16 Dec 2004 | Internal office partition - boardroom, no. 140 | $11k |
| 19 Aug 2004 | alterations to existing building. Basement (part) for carpark | $60k |
| 13 Aug 2004 | Alterations. New compactus room. Office alterations. | $10k |
| 10 Aug 2004 | Alterations to Offices Level 10 | $10k |
| 29 June 2004 | Alterations to an existing building - partition alterations - Level 35 | $28k |
| 24 June 2004 | Level 31 (part), Internal office alterations. | $35k |
| 28 May 2004 | Office partition alterations Levels 34 & 35 | $12k |
| 28 May 2004 | Office partition alterations on level 34 | $8k |
| 28 Apr 2004 | Office alterations - Level 29 | $91k |
| 23 Feb 2004 | Alterations to building. Level 31 Office alterations. | $606k |
| 03 Feb 2004 | Office fitout & alterations to an existing building. Level 38 | $150k |
| 05 Nov 2003 | Internal alterations to levels 29-30 | $20k |
| 01 Oct 2003 | Internal alterations to level 9 | $83k |
| 18 July 2003 | Internal fitout to level 36 only (office) | $48k |
| 03 June 2003 | Level 26 - Office Fitout | $35k |
| 10 Apr 2003 | Office partition alterations on level 39. | $605k |
| 06 Mar 2003 | Internal Alterations/Fitout to Level 12 for office building (HSBC). 140 William Street, Melbourne 3000 | $385k |
| 05 Mar 2003 | Alterations to Sparke Helmore Tenancy- Internal partitions, work stations and associated services | $200k |
| 31 Jan 2003 | Internal Alterations/Fitout to Level 12 & 29. for office building (HSBC). 140 William Street, Melbourne 3000. Stage 2: Alterations to Level 29 | $385k |
| 15 Jan 2003 | Internal Alterations/Fitout to Level 12 & 29. for office building (HSBC). 140 William Street, Melbourne 3000. Stage 2: Alterations to Level 29 | $385k |
| 27 Nov 2002 | Internal alterations to level 9 | $83k |
| 16 Sept 2002 | Full Office Alterations Level 16 | $39k |
| 06 May 2002 | Level 38 (part) - Internal office alterations - Rest Superannuation Fitout | $28k |
| 17 Apr 2002 | Stage 1 - Alterations to an existing building. Interior fitout only. | $60k |
| 05 Apr 2002 | Level 27 - Alteration to office fit out. | $7k |
| 02 Oct 2001 | Level 10 office alterations to existing building | $47k |
| 27 Apr 2001 | LVL 26 OFFICE ALTS | $10k |
| 04 Apr 2001 | lvl 6 office fit out | $30k |
| 20 Mar 2001 | Office alteration to level 39, class 5. | $350k |
| 26 Feb 2001 | stage 1 Level 38 Office Fitout | $700k |
| 14 Nov 2000 | Office alterations levels 26 & 32 | $500k |
| 04 Oct 2000 | Lvl 21 office partition alts | $224k |
| 02 Oct 2000 | Office partition alterations on level 34, 35 & 36 | $500k |
| 08 Aug 2000 | stage 1 lvl 9 office fit out | $300k |
| 28 June 2000 | Office fitout on level 26 | $30k |
| 24 June 2000 | INSTALLATION OF ALARM SIGNALLING EQUIPMENT | $190 |
| 10 Apr 2000 | office fitout to an existing bldg | $500k |
| 22 Mar 2000 | Office partition alterations on lvl 13 | $150k |
| 24 Feb 2000 | Office fitout on level 36 | $150k |
| 14 Feb 2000 | Tenancy fitout on level 36 | $750k |
| 10 Feb 2000 | Office alterations to level 31 | $13k |
| 16 Dec 1999 | Tenancy fitout on level 37 | $400k |
| 03 Nov 1999 | Removal of canvas hoses from 140 William Street Melbourne | $500 |
| 29 July 1999 | Fitout for levels 41 & 42 and the mezzanine foor on level 42 | $1.8m |
| 11 May 1999 | Office fitout on level 35 | $200k |
| 05 May 1999 | Office fitout alterations to an existing building | $150k |
| 14 Apr 1999 | Alterations to an existing building - Loading dock ramp | $150k |
| 24 Mar 1999 | Tenancy fitout on level 33 | $226k |
| 16 Feb 1999 | Alteration of an existing building level 27 | $230k |
| 10 Feb 1999 | Office fitouts on levels 34 & 35 | $1.5m |
| 25 Nov 1998 | office fitout - level 31, 140 William St, Melbourne | $200k |
| 21 Oct 1998 | Alteration and fitout - lvls 38 and lvl 39 - 140 William St, Melbourne | $3.0m |
| 16 Oct 1998 | Tenancy fitout for Lend Lease on Level 32, 140 William Street, Melbourne | $95k |
| 25 Sept 1998 | All - fitout for Sparke Helmore level 33 | $700k |
| 25 Sept 1998 | Internal office alterations on level 10 | $10k |
| 08 May 1998 | tenancy fitout | $250k |
| 05 Jan 1998 | all - tenancy fitout for ferrier hodgson | $60k |
| 13 Oct 1997 | Office fitout on Level 28 | $50k |
| 09 Sept 1997 | Alterations Major refurbishment of levels 33 -41 - | $10.2m |
| 04 Sept 1997 | Office fitout on Levels 13 & 14, 414 La Trobe Street, Melbourne | $1.2m |
| 05 Aug 1997 | Tenancy fitout | $977k |
| 13 Dec 1996 | Fitouts to levels 9, 10, 11 & 12 | $1.8m |
| 22 July 1996 | Office fitout | $150k |
| 26 Feb 1996 | Fitout for Levels 6, 7 and 8 | $1.1m |
| 21 Sept 1995 | Office refurbishment | $16.0m |
| 06 June 1995 | Internal alterations to Levels 15-22 | $4.0m |
| 04 Nov 1994 | Major refurbishment to existing building - (office) base building work mid rise, ground floor, basement, B1, B2 & plant room levels 4,5, 23 & 24. | $12.5m |
| 03 Nov 1994 | Office fitout | $550k |
Is 140 William Street residential or commercial?
140 William Street is a commercial building. The City of Melbourne lists its main use as office.
When was 140 William Street built?
140 William Street was completed in 1972.
How many floors does 140 William Street have?
140 William Street has 41 floors above ground.
What businesses are in 140 William Street?
The latest council census counted 51 businesses in 140 William Street, including Aitken Partners, ALEXANDER FUNDS MANAGEMENT PTY LTD and Andersen.
Is there office or retail space for lease in 140 William Street?
See the commercial listings on this page, or search this address on realcommercial.com.au and commercialrealestate.com.au.
Who designed and built 140 William Street?
BHP (Broken Hill Proprietary Company) developed 140 William Street and Yuncken Freeman designed it. The building team section has the sources.
How tall is 140 William Street?
About 153 metres, measured from the City of Melbourne's 3D building model. It's number 53 of 1596 buildings in Melbourne by height.
What public transport is near 140 William Street?
Flagstaff Station is the nearest train station, about 7 minutes' walk. The nearest tram stop is William St/Bourke St #3, about 1 minute's walk.
What is the planning zone for 140 William Street?
The site is in the Capital City Zone - Schedule 1 (CCZ1). It's also under a Heritage Overlay (HO767).
Does 140 William Street have an owners corporation?
Plan of subdivision TP802071 has 1 lot.
Has any work been done on 140 William Street recently?
The City of Melbourne has issued 207 building permits for 140 William Street since 1994. The most recent was in February 2026.
Sources: City of Melbourne building permits (CC BY 4.0); CLUE building information (CC BY 4.0); CLUE business establishments (CC BY 4.0); Geocoded National Address File (G-NAF) (Open G-NAF EULA (CC BY 4.0 based)). General information from public records, not legal, financial or building advice.