← Back to Capitol Arcade
That's Built · Building report

Capitol Arcade

109-117 Swanston Street, Melbourne VIC 3000
Generated 8 November 2026
Mixed use · Residential Apartment
—height
11floors
1924completed
61homes
38permits

Development milestones

Completed1924Capitol Arcade completed: 11 floors

Building team

Builder
Reinforced Concrete and Monier Pipe Construction Company
Architect
Walter Burley Griffin and Marion Mahony Griffin
Architect
Peck and Kempter
Architect
Six Degrees Architects
Builder
Hutchinson Builders
Owners corporation manager
DG Strata

Planning & subdivision

Zone
CCZ2
Overlays
DDO1, DDO2, DDO2-A1, DDO70, HO502, HO747, PO2
Strata plan
PS317597 · 89 lots
Scores
🚆 10 · ☕ 7 · 🌳 7 · ✨ 10

Timeline

20261 building permit and 1 certificate · about $142k of new works
Largest: Alterations to existing building - fire services works
20251 building permit and 1 certificate · about $1.4m of new works
Largest: Shop 1 & 2, Ground Level and Basement Level - Proposed Alterations for Grill'd
20241 building permit · about $15k of new works
Largest: Shop 4 - Internal non-structural rearrangment within an existing shop
3 Jun 2019Capitol Theatre reopens after restoration
The Capitol Theatre reopened in early June 2019 after being closed for over five years. Later reporting said the $24.5 million restoration was completed by Hutchinson Builders and Six Degrees Architects, with $2.5 million from the state government.
20194 building permits and 2 certificates · about $1.3m of new works
Largest: Stage 2: Architectural & Services
20184 building permits · about $19.2m of new works
Largest: Stage 3: Theatre seats & timber wall linings
21 Nov 2017RMIT appoints Six Degrees Architects to restore Capitol Theatre
RMIT University appointed Six Degrees Architects to lead the restoration of the Capitol Theatre, part of the Capitol House complex. The article reported a Victorian government commitment of $2.5 million and a fundraising target of $18.5 million.
20172 building permits and 1 certificate · about $271k of new works
Largest: Stage 2 - Fit-out work
20152 building permits and 1 certificate · about $321k of new works
Largest: Proposed Alterations to an existing shop
20121 building permit · about $30k of new works
Largest: Alteration to Shop 2A - Shop front
2009Council census records it as residential apartment, 11 floors
Name recorded: Capitol Arcade
20092 building permits · about $40k of new works
Largest: New security door / screen to entry
20081 building permit · about $18k of new works
Largest: Alteration to basement walls & windows -Capitol Arcade
20073 building permits · about $98k of new works
Largest: RMIT Building 113 "Capitol Theatre". Installation of mechanical roof plant.
20062 building permits · about $125k of new works
Largest: RMIT capitol theatre. Replacement of theatre seats, theatre seats installation
20051 certificate · about $38k of new works
Largest: Alterations to RMIT building 113. Capital Theatre. Internal alterations to foyer levels. Levels 2 and 3.
20031 building permit and 1 certificate · about $43k of new works
Largest: Replacement of cooling tower
2002First council census entry: residential apartment, 11 floors
20013 building permits and 1 certificate · about $6.6m of new works
Largest: Stage 1 - Alterations - architectural and structural.
20004 building permits · about $1.3m of new works
Largest: Capitol Theatre - Stage 1 - Internal alterations to theatre. Internal demolition only.
19991 building permit and 2 certificates · about $836k of new works
Largest: Stage 1 - Capitol theatre fire safety
19981 building permit · about $80k of new works
Largest: Shop 9 and 10 fitout and signage, 109-111 Swanston Street, Melbourne
19971 building permit · about $20k of new works
Largest: Alterations to an existing shop
1924Capitol Arcade completed: 11 floors
Derived from Melbourne Harcourts

Building permits and certificates (46)

Each cost is the estimate on that record. Stages of a project often repeat its full value, so these don't add up to what was spent.

27 Mar 2026Basement - Replacement of smoke detectors with thermal detectors$3k
09 Feb 2026Alterations to existing building - fire services works$139k
23 Dec 2025Shop 1 & 2, Ground Level and Basement Level - Proposed Alterations for Grill'd$1.4m
05 Aug 2025Shop 1 & 2, Ground Level and Basement Level - Proposed Alterations for Grill'd$1.4m
19 July 2024Shop 4 - Internal non-structural rearrangment within an existing shop$15k
03 Oct 2019Tenancy Fitout of Shop$95k
18 Sept 2019Stage 3: New DDA platform lift and deletion of existing timber gantry between level 4 and 5$5.4m
14 June 2019Relocation of the existing main switchboard$645k
30 May 2019Stage 2: Architectural & Services$12.6m
18 Apr 2019Proposed retail fitout Lot 1 & 2$550k
05 Mar 2019Stage 2: Architectural and Services (excludes the DDA platform Lift)$5
08 Nov 2018RMIT Capitol Theatre - Flytower - Stage 1: Internal demolition work and structural flytower, rigging loft, plant room and maintenance platforms$5.5m
22 Oct 2018Refurbishment of Arcade$1.1m
30 July 2018Stage 3: Theatre seats & timber wall linings$12.6m
23 Mar 2018Building 113, RMIT - Stage 1: Demolition and Structural works - Refurbishment of The Capitol Theatre$11.0m
30 Oct 2017Shop 1 - Proposed Restaurant Fitout for Kim Sing Restaurant$82k
06 Sept 2017Stage 2 - Fit-out work$180k
26 June 2017Starbucks, 117 Swanstone St - Stage 1 - Building works which includes demolition permit$9k
09 Nov 2015Internal apartment alterations$99k
22 June 2015Proposed Alterations to an existing shop$200k
15 June 2015Proposed change of use to a Gallery$22k
27 July 2012Alteration to Shop 2A - Shop front$30k
23 Sept 2009New security door / screen to entry$29k
30 June 2009Alterations to balustrade of entry to building (RMIT Capitol Theatre)$11k
26 Aug 2008Alteration to basement walls & windows -Capitol Arcade$18k
12 Nov 2007Alterations to an existing storage facility - Units 59-63.$5k
09 Nov 2007RMIT Building 113 "Capitol Theatre". Installation of mechanical roof plant.$88k
10 Sept 2007Alterations to Fire Extinguishers Building 113$5k
11 Apr 2006RMIT capitol theatre. Replacement of theatre seats, theatre seats installation$115k
25 Jan 2006Internal alterations to storage units 61, 62 and 63; Internal alterations to basement level units 59, 60, 61, 62 and 63$10k
08 Mar 2005Alterations to RMIT building 113. Capital Theatre. Internal alterations to foyer levels. Levels 2 and 3.$38k
07 May 2003New Shopfront & Signage to an existing retail outlet$20k
26 Mar 2003Replacement of cooling tower$23k
04 Sept 2001Stage 1 - Alterations - architectural and structural.$6.4m
20 Mar 2001Internal demolition/removal - Capitol Apartments.$180k
13 Mar 2001Stage2 - Architectural, structural and services, Capitol Theatre.$500k
08 Mar 2001Installation of alarm signalling equipment$190
14 Dec 2000Capitol Theatre - Stage 1 - Internal alterations to theatre. Internal demolition only.$500k
14 Dec 2000Stage 1 - Install stair hoist to ground floor stage Capitol Chinese Theatre Lot 15 RMIT$500k
29 Mar 2000Stage 2 - Capitol theatre fire safety$280k
29 Mar 2000Stage 2 - Fire safety upgrade works. Variation to original building permit (stage access, south corridor teatuTe stair alterations, sprinklers below trophy shop)$280k
05 Nov 1999Stage 1 - Capitol theatre fire safety$720k
13 Aug 1999Alterations to an existing building$107k
04 Aug 1999Shop 12 fitout - Capitol Arcade, 109-117 Swanston Street, Melbourne$9k
29 Sept 1998Shop 9 and 10 fitout and signage, 109-111 Swanston Street, Melbourne$80k
14 Nov 1997Alterations to an existing shop$20k

Questions and answers

Is Capitol Arcade residential or commercial?
Capitol Arcade mixes homes and businesses under one roof. The City of Melbourne lists its main use as residential apartment.

When was Capitol Arcade built?
Capitol Arcade was completed in 1924.

How many floors does Capitol Arcade have?
Capitol Arcade has 11 floors above ground.

How many apartments are in Capitol Arcade?
Capitol Arcade has 61 homes. The national address file lists 87 unit addresses here, and some of those can be shops or offices.

What do apartments cost near Capitol Arcade?
The median unit price in Melbourne was $545,000 in 2025, from the Victorian Property Sales Report. That's for the whole suburb, not this building.

What businesses are in Capitol Arcade?
The latest council census counted 10 businesses in Capitol Arcade, including Express Clothing Alterations, Femme Connection and In Shop.

Are there apartments for sale or rent in Capitol Arcade?
See the residential listings on this page, or use the shortcuts to search 109-117 Swanston Street on realestate.com.au and Domain.

Is there office or retail space for lease in Capitol Arcade?
See the commercial listings on this page, or search this address on realcommercial.com.au and commercialrealestate.com.au.

Who designed and built Capitol Arcade?
Peck and Kempter designed Capitol Arcade and Reinforced Concrete and Monier Pipe Construction Company built it. The building team section has the sources.

What public transport is near Capitol Arcade?
Town Hall Station is the nearest train station, about 2 minutes' walk. The nearest tram stop is Melbourne Town Hall/Collins St #6, about 1 minute's walk.

What is the planning zone for Capitol Arcade?
The site is in the Capital City Zone - Schedule 2 (CCZ2). It's also under a Heritage Overlay (HO502).

Does Capitol Arcade have an owners corporation?
Plan of subdivision PS317597 has 89 lots.

Has any work been done on Capitol Arcade recently?
The City of Melbourne has issued 38 building permits for Capitol Arcade since 1997. The most recent was in March 2026.

Sources: City of Melbourne building permits (CC BY 4.0); CLUE building information (CC BY 4.0); CLUE business establishments (CC BY 4.0); CLUE residential dwellings (CC BY 4.0); Development Activity Monitor (CC BY 4.0); Geocoded National Address File (G-NAF) (Open G-NAF EULA (CC BY 4.0 based)). General information from public records, not legal, financial or building advice.