| Completed | By Aug 1991 | 120 Collins Street completed: 52 floors |
Each cost is the estimate on that record. Stages of a project often repeat its full value, so these don't add up to what was spent.
| 05 Feb 2026 | Stage 2 - Internal refurbishment (with exclusions) | $7.0m |
| 19 Dec 2025 | Level 29 - Proposed fitout | $1.4m |
| 17 Dec 2025 | Proposed Office Fit Out of Part Floor Template On Level 32 | $833k |
| 15 Dec 2025 | Proposed Office Tenancy Demolition, Atrium Stair and Fitout at Levels 14 to 18 - Early Works (Stair construction,Bathroom upgrades, Lobby upgrades, Access floor) | $33.4m |
| 13 Nov 2025 | Proposed Landlord Works on Levels 14 to 18 | $2.1m |
| 13 Nov 2025 | Proposed Warm Shell, Lobby, Bathroom, DDA & Switchboards | $2.2m |
| 30 Oct 2025 | Stage 1: Strip-out of current tenancy fit outs and structural works for the installation of a stair void and dumbwaiter void. | $53.1m |
| 30 Oct 2025 | Stage 2 - Level 39-42, 44-46, & 49 (Part) - Balance of works | $57.1m |
| 14 Oct 2025 | Proposed Office Tenancy Demolition, Atrium Stair and Fitout at Levels 14 to 18 | $48.8m |
| 07 Oct 2025 | Proposed Gas Replacement | $97k |
| 02 Oct 2025 | Level 48 - Proposed Fire Indicator Panel Replacement | $20k |
| 05 Sept 2025 | Proposed works to Existing Kitchen Exhaust Riser at L38 | $77k |
| 07 Aug 2025 | Proposed Cold Shell Landlord Works to 120 Collins Ground Floor 2x Courtyard Tenancies - Stage 1: Internal Landlord Demolition Works | $1.5m |
| 26 July 2025 | Level 25 - Tenancy Fitout | $4.9m |
| 19 June 2025 | Ground floor - Proposed Cold Shell Landlord Works to 120 Collins Ground Floor 2x Courtyard Tenancies | $1.5m |
| 18 June 2025 | Proposed Plant Screen to Professional Chambers | $159k |
| 15 May 2025 | Internal fit-out (bar/restaurant) | $2.2m |
| 06 May 2025 | Stage 2 - Level 39-42, 44-46, & 49 (Part) - Balance of works | $57.1m |
| 29 Apr 2025 | Level 10 and 11 - Proposed Make Good Works | $4.9m |
| 18 Mar 2025 | Levels 41 & 42 - Proposed Installation of Façade Louvres for Future Tenant Mech Works | $185k |
| 17 Jan 2025 | Proposed Cold Shell Landlord Works to 120 Collins Ground Floor 2x Courtyard Tenancies - Stage 1: Internal Landlord Demolition Works | $1.5m |
| 20 Dec 2024 | Stage 1: Strip-out of current tenancy fit outs and structural works for the installation of a stair void and dumbwaiter void. | $53.1m |
| 27 Nov 2024 | Proposed replacement of existing FIP and data gathering panel | $588k |
| 15 Nov 2024 | Level 26 - Office Fit-Out Works for REI Super | $858k |
| 09 Sept 2024 | Shop 1 - Proposed alterations to existing retail shop | $50k |
| 08 Aug 2024 | Proposed New End Of Trip | $7.8m |
| 18 July 2024 | Stage 2 - Internal refurbishment (with exclusions) | $7.0m |
| 11 June 2024 | Level 35 - Proposed Deutsche Bank Office Fit out | $2.2m |
| 07 June 2024 | Stage 3 - Main Works (Excluding D&C Façade and associated FP1.4) | $30.3m |
| 07 June 2024 | Stage 4 - D&C Façade and associated FP1.4 | $30.3m |
| 02 May 2024 | Stage 1 - Ground to Level 2 Proffesional Chambers Fitout work | $7.0m |
| 01 May 2024 | Tenancy 1 - Retail fitout | $200k |
| 26 Apr 2024 | Level 13 120 Collins St - Proposed Alterations to Existing Office | $30k |
| 23 Feb 2024 | Level 25-28 - Proposed RSM 3 Level Office Fitout | $6.9m |
| 01 Feb 2024 | Office fitout **Cheque for payment posted to council** | $319k |
| 08 Jan 2024 | Ground and 1st floor. Shop fitout to existing retail tenancy | $1.7m |
| 01 Nov 2023 | Level 26-28 - Stage Two Building Permit - To Permit Remainder of Proposed Works Including Operable Wall & Fire Engineering Report Endorsement | $6.9m |
| 06 Oct 2023 | Level 33 - Internal Office Alterations for ETHAN | $54k |
| 19 Sept 2023 | Level 25-28 - Proposed RSM 3 Level Office Fitout | $6.9m |
| 13 Sept 2023 | Level 26. Proposed Alterations and Additions to Existing Office to Demise Walls, Lobby Extensions, Make Good and Services Works. | $851k |
| 15 Aug 2023 | Proposed tenancy, lobby and bathroom alterations on Levels 41, 45 & 46 | $4.7m |
| 21 June 2023 | Proposed Fit Out Works to Woodside Tenancy on Level 34 | $850k |
| 08 June 2023 | Internal Office Fitout for Becketts Lawyers | $824k |
| 09 May 2023 | Level 33 - Fitout of Lonsec Office | $1.3m |
| 14 Apr 2023 | Stage 2 - Level 33 - Stage 2: Operable Walls, Seismic, Floor Boxes, Woven Image Groove Lining | $1.3m |
| 21 Mar 2023 | Internal office fitout | $120k |
| 17 Mar 2023 | Internal Office Fitout for Becketts Lawyers | $824k |
| 16 Nov 2022 | Level 12 & Part Level 13 - Internal Office Alterations for Northern Trust | $1.6m |
| 12 Oct 2022 | Level 26-28 - Office Demolition and make good | $1.6m |
| 12 Oct 2022 | Level 35, 39 & 45 - Proposed alterations and demise wall extensions | $2.3m |
| 12 Oct 2022 | Stage 2 - To completion of proposed works only | $4.6m |
| 27 Sept 2022 | Internal Office Fitout for State Street | $1.2m |
| 29 July 2022 | Internal Office Alterations for Qualitas - Level 38 | $208k |
| 28 July 2022 | Level 43 - Stage 2 - Balance of works. Internal fitout of Level 43. | $6.6m |
| 22 June 2022 | Level 25 - Sportsbet / Beteasy Fitout | $578k |
| 27 May 2022 | Level 5 - Proposed FIP Sub-board replacement | $4k |
| 21 Apr 2022 | Podium Level 3 - Proposed Office fit-out | $80k |
| 09 Feb 2022 | Level 43 - Proposed Fitout of Existing Office | $9.0m |
| 02 Feb 2022 | Proposed Office Tenancy Base Building Works - Demo levels 42 to 43, stair infill and level 43 cold-shell | $240k |
| 17 Jan 2022 | Level 3 - Proposed Office Fit-Out | $700k |
| 19 Nov 2021 | Proposed Alterations to Level 47 and 48 | $2.4m |
| 03 Nov 2021 | Proposed Ground Floor Plane Revitalization & Skydeck. Stage 1 - Partial Demo (Internal non-structural demolition and enabling works) | $30.3m |
| 03 Nov 2021 | Stage 2 - Completion of ground floor demolition (Excluding works within 3m of Western Façade | $30.3m |
| 13 Oct 2021 | (Basement L2) - Alterations to existing Office - replacements of the FDCIE panel and two smoke detectors at Verizon POP Room (Basement L2) | $4k |
| 30 Sept 2021 | Level 48 Computer Room - Proposed smoke detectors replacement | $5k |
| 15 July 2021 | Stage 0 - Facade Alterations to the Eastern Elevation | $4.6m |
| 03 May 2021 | Proposed Office Fit-Out | $155k |
| 27 Apr 2021 | Level 32 - Proposed Office Fit-Out | $713k |
| 19 Mar 2021 | Level 13 - Alterations to Offices - Stage 1: Comms Room Only | $1.2m |
| 10 Mar 2021 | Stage 2 - Alterations to 2x Individual offices | $0 |
| 18 Feb 2021 | Stage 3 - To completion of alterations to 2 x individual offices on level 12 | $1.2m |
| 01 Feb 2021 | Level 3 & 4 and Plantroom. Proposed HWS replacement including riser shaft alterations. | $30k |
| 13 Jan 2021 | Level 36. Proposed office fitout. To completion of proposed works only. | $1.3m |
| 28 Oct 2020 | Base build works to level 23 and 24 including creation of slab opening to allow for stair installation and demise wall alterations | $250k |
| 24 Sept 2020 | Level 39 - Golden Age Tenancy - Internal Strip Out of an Existing Office Tenancy | $43k |
| 26 June 2020 | Level 32 - Proposed Office Fit-Out | $713k |
| 15 June 2020 | Level 6-9 - Proposed office fitout and alterations for "ASIC" | $1.7m |
| 01 May 2020 | Proposed Construction of Demise Wall to Level 24 | $100k |
| 08 Apr 2020 | Level 6-9 - Proposed office fitout and alterations for "ASIC" | $1.7m |
| 17 Mar 2020 | Partial Demolition of Existing Office Tenancy - Level 32 | $0 |
| 28 Feb 2020 | Level 18 - Proposed Internal Office Fitout for Crestone Wealth Management | $249 |
| 21 Jan 2020 | Level 50 - Internal alterations ot existing offices | $25k |
| 10 Jan 2020 | Level 16 - Capping off sprinkler head | $3 |
| 04 Dec 2019 | Proposed upgrade works (toilets) | $0 |
| 04 Nov 2019 | Level 6-9 - Proposed office fitout and alterations for "ASIC" | $1.7m |
| 11 Oct 2019 | Level 17 - Minor Alterations to an Existing Office | $67k |
| 12 Sept 2019 | Level Twenty-One (21) Proposed Internal Office Fitout for Bank of China | $2 |
| 11 Sept 2019 | Level 33 (Part Only) - Kirkland Lake Gold Offices - Internal Non Structural Alterations to the Existing Office | $731k |
| 17 June 2019 | Level 33 (Part Only) - Kirkland Lake Gold Offices - Internal Non Structural Alterations to the Existing Office | $731k |
| 18 Apr 2019 | Level 37 and Level 38 (Part) - Office fit-out with new non-fire isolated stairway. | $2 |
| 22 Mar 2019 | Level 23 - Proposed Office Fitout for Reserve Bank of Australia | $851 |
| 26 Feb 2019 | Level 23 - Proposed Construction of Demise Wall (South End) | $150k |
| 13 Feb 2019 | Internal Alterations for State Street | $67 |
| 01 Feb 2019 | Level 46 - Office alteration | $15 |
| 25 Jan 2019 | Level 5 - Citi Gold Lounge Tenancy - Construction of a tenancy fitout | $600k |
| 28 Nov 2018 | Level 32 - Alterations to an existing office tenancy | $102 |
| 24 Oct 2018 | Level 14 - Proposed Upgrades to Electrical, Mechanical and Fire Services @ Morgan Stanley | $463k |
| 22 Oct 2018 | Proposed Emergency Egress Stairs and Carpark Entry Lighting Upgrades | $400k |
| 10 Sept 2018 | Suite 2301, Level 23 - Proposed Construction of Demise Wall (South End) | $130k |
| 31 July 2018 | Tenancy Fitout | $1.1m |
| 04 May 2018 | Level 21 - Base Building Alterations to Tenancy, Toilets and Lobby | $1.5m |
| 19 Apr 2018 | Level 52, Proposed Upgrade of Cooling Towers | $800k |
| 17 Apr 2018 | Level 41 -Proposed Upgrades to Toilets And Lobby | $600k |
| 28 Mar 2018 | Level 47 - Minor Internal Office Alterations for Legg Mason Australia | $50k |
| 23 Mar 2018 | Proposed Office Tenancy Fitout | $54k |
| 09 Mar 2018 | Level 23 - Proposed base building alterations to tenancy, toilets and lobby | $900k |
| 08 Mar 2018 | Level 6 - Proposed office fiout | $618k |
| 23 Feb 2018 | Level 43 - Proposed alterations to existing office tenancy | $45k |
| 09 Feb 2018 | Level 41 - Proposed office fitout to existing tenancy | $660k |
| 24 Jan 2018 | Level 41 -Proposed Upgrades to Toilets And Lobby | $600k |
| 12 Jan 2018 | Level 41 Stage 2: Fitout works - Proposed office fitout to existing tenancy | $617k |
| 12 Jan 2018 | Stage 2 - Remainder of Works (Proposed Office Tenancy Fitout) | $1.1m |
| 13 Dec 2017 | Level 49 - Office alterations, Bank of Queensland | $625k |
| 04 Dec 2017 | Level 35 (Part) & Level 36 - Proposed office fitout to existing tenancy, including staircase removal and slab infill | $741k |
| 26 Oct 2017 | Level 26 - Office fit out | $250k |
| 09 Oct 2017 | Level 20, Office fitout - demolition works | $5k |
| 15 Sept 2017 | Level 17 - Proposed office fit out | $800k |
| 14 Sept 2017 | Level 31 - Internal alterations to an existing building (Tenancy) | $5k |
| 01 Sept 2017 | Level 6 - Proposed alterations to lobby and inter-tenancy wall | $350k |
| 04 Aug 2017 | Stage 2 - Level 20, Office fitout - All work associated with office fit-out | $2.8m |
| 13 July 2017 | Level 29 - VC Room Alterations | $105k |
| 29 June 2017 | Level 10 - Proposed Office Fitout for Newgate Communications | $440k |
| 15 June 2017 | Level 17 - Intertenancy wall and base build shell | $500k |
| 14 June 2017 | Level 32 - Internal alterations to existing tenancy | $17k |
| 25 May 2017 | Level 50 - Internal alterations to an existing building (Tenancy) | $9k |
| 09 May 2017 | Level 16 - Refurbishment and Fit-out | $45k |
| 09 May 2017 | Stage 2 - Level 16 Refurbishment Works Only (Excluding New Ambulant Toilets) | $650k |
| 11 Apr 2017 | Stage One - Level 20 Only (Levels 19-21 - Proposed Tenancy Alterations and Consolidation) | $42k |
| 11 Apr 2017 | Stage Three - To completion of proposed stage three works only | $2.0m |
| 24 Mar 2017 | Level 14 - Office Fitout | $400k |
| 10 Mar 2017 | Level 50 - Internal alterations to an existing building (Tenancy) | $5k |
| 01 Mar 2017 | Level 27 & 28 - Alterations to existing building | $138k |
| 22 Feb 2017 | Stage 3 -Level 16 refurbishment works to rooms 16.13, 16.12, 16.48, 16.29 & New ambulant toilets | $679k |
| 21 Feb 2017 | Office alterations Level 15 & 16 | $77k |
| 21 Dec 2016 | Level 50 Proposed Internal Office Fitout | $39k |
| 16 Dec 2016 | Proposed upgrades to Lobby, Toilets and Tenancy | $1.4m |
| 07 Dec 2016 | Stage Two – Demolition Works to Level 19 | $2.0m |
| 28 Nov 2016 | Lobby and toilet and core electric upgrades to levels 31, 50 and 19 | $1.4m |
| 10 Nov 2016 | Level 5 - Proposed Chiller and Cooling Tower replacement | $1.6m |
| 06 Oct 2016 | Level 45, Cornerstone office fitout | $600k |
| 19 Sept 2016 | Level 17 - Proposed Alterations & Fitout to Existing Office Tenancy | $253k |
| 26 Aug 2016 | Level 10 - Proposed Office Tenancy Fitout | $1.2m |
| 05 Aug 2016 | Levels 42,43 & 44 - Proposed office tenancy to existing tenancy, including extension of inter-connecting stair | $1.8m |
| 01 Aug 2016 | Level 17 - Proposed Alterations & Fitout to Existing Office Tenancy | $253k |
| 21 July 2016 | L40 - Replacing the Ga Suppression System with Sprinkler System within the Communication Room. | $7k |
| 21 July 2016 | Level 27 - CrownBet Fitout | $176k |
| 01 July 2016 | Level 10 - Proposed Office Tenancy Fitout | $1.2m |
| 20 May 2016 | L38-TCI CAPITAL MANAGEMENT OFFICE ALTERATIONS | $50k |
| 11 May 2016 | Stage Two Building Permit - Intertenancy Stair | $620k |
| 02 May 2016 | Proposed EWIS Upgrades | $150k |
| 28 Apr 2016 | Stage 2 - All Works to Completion | $700k |
| 26 Apr 2016 | Levels 42,43 & 44 - Proposed office tenancy to existing tenancy, including extension of inter-connecting stair | $1.8m |
| 01 Apr 2016 | Demolition of an existing fitout | $700k |
| 30 Mar 2016 | Level 29 & 30 (part) - Proposed Office fitout | $1.2m |
| 23 Mar 2016 | Level 17 - Office tenancy fitout | $513k |
| 04 Mar 2016 | Level 26 & 28 Proposed alterations to existing office tenancies | $2.1m |
| 26 Feb 2016 | Level 30: Office Alterations | $387k |
| 22 Feb 2016 | Level 47 - Proposed Upgrade to Public Sanitary Facilities | $450k |
| 18 Feb 2016 | Level 5: Proposed office fitout to existing tenancy | $1.1m |
| 25 Jan 2016 | Level 8 - Refurbishment Works to an Existing Tenancy | $158k |
| 22 Dec 2015 | Alterations - Level 20, 120 Collins Street, Melbourne | $1.4m |
| 22 Dec 2015 | Level 18, Office Fit-out | $2.6m |
| 21 Oct 2015 | Level 45 & 46, Proposed consolidation of tenancies and refurbishment including inter-tenancy stair | $2.5m |
| 16 Oct 2015 | Proposed Tenancy Split | $120k |
| 05 Oct 2015 | Level 30, Proposed Northern Tenancy Split | $170k |
| 16 Sept 2015 | 120 Collins Street - Internal Office Fitout for Dimensional Melbourne | $746k |
| 17 Aug 2015 | Level 45 & 46, Proposed consolidation of tenancies and refurbishment including inter-tenancy stair | $620k |
| 06 Aug 2015 | Level 34 - Internal Fit out of Existing Office Tenancy | $300k |
| 30 July 2015 | Level 17 - Proposed Viridian Tenancy Fitout | $470k |
| 29 July 2015 | Levels 47 & 48, Proposed Core Upgrades | $250k |
| 28 July 2015 | Stage Three Building Permit - Eastern Tenancy Demise Wall | $650k |
| 23 July 2015 | Level 17 - Proposed Level 17 Tenancy Split | $75k |
| 17 July 2015 | Level 13: Proposed Office Fitout | $200k |
| 10 July 2015 | Level 43 & 44, 120 Collins Street - Office fitout to existing tenancy | $1.1m |
| 30 June 2015 | Level 24, Red Hat Melbourne Office fit out | $533k |
| 26 June 2015 | Stage Four - Changes to Fire Sprinkler System Design - Levels 24-30 | $8k |
| 25 June 2015 | Level 13, Proposed Office Fitout for Linkeo | $80k |
| 24 June 2015 | Level 13 - Proposed Tenancy Split | $110k |
| 10 June 2015 | Alterations Fitout Mason Legg Level 47, 120 Collins Street Melbourne | $30k |
| 02 June 2015 | Level 13: Proposed Office Fitout | $200k |
| 28 May 2015 | Level 35 Office fit-out | $463k |
| 15 May 2015 | Level 24: Extension to Lobbies and Demise Wall Construction | $200k |
| 15 May 2015 | Level 38 - Qualitas office alterations | $280k |
| 20 Apr 2015 | Level 38 - Qualitas office alterations | $280k |
| 13 Apr 2015 | Level 32- Internal fitout | $230k |
| 09 Apr 2015 | Stage 2 - Internal Demolition & Make Good Works - Base Building Make Good Works | $1.5m |
| 25 Mar 2015 | Level 44 - Proposed Minor Amenity Upgrades | $55k |
| 20 Mar 2015 | Levels 25, 26 & 27: Alterations to existing building | $5.7m |
| 16 Mar 2015 | Stage 2 - Level 24-30 Refurbishment of Toilets and Lobby | $8.0m |
| 23 Feb 2015 | Stage 1: Internal Demolition and Make Good Works Exluding Sanitary Facilities | $1.5m |
| 20 Feb 2015 | Level 21 Office fitout | $210k |
| 13 Feb 2015 | Level 36 - Proposed alterations to existing building | $420k |
| 10 Feb 2015 | Level 43 - Proposed alterations to existing tenancy | $330k |
| 08 Dec 2014 | Stage Three - Level 30 Extension to E/W Lobby and Demise Wall Construction | $8.5m |
| 05 Dec 2014 | Alterations - Level 32, 120 Collins Street Melbourne | $800k |
| 03 Dec 2014 | Level 13: Extension to Comdor, Construction of Demise Wall and Base Building Upgrades | $300k |
| 03 Dec 2014 | Level 32: Proposed office tenancy fitout | $175k |
| 25 Nov 2014 | Level 32 - Proposed Tenancy Alterations | $300k |
| 21 Nov 2014 | Level 34 - Proposed Tenancy Alterations | $100k |
| 18 Nov 2014 | Proposed fitout Existing Office Tenancy | $320k |
| 27 Aug 2014 | Stage 2: Level 52 Proposed Works Only | $819k |
| 21 Aug 2014 | Alterations to temporary wall - L15, Citigroup | $10k |
| 21 Aug 2014 | Level 34 (part) - Construction of office fitout | $426k |
| 24 July 2014 | Stage 3: Upgrade of base building. Internal Demolition of existing finishes | $3.6m |
| 22 July 2014 | Lobbies Toilets & Tenancy upgrade Level 35 | $390k |
| 15 June 2014 | Lvl 2 Internal Non Structural Alterations to the Existing Offices (5) | $59k |
| 02 June 2014 | Fitout - Level 5 | $250k |
| 02 June 2014 | Level 41 Alterations to existing building | $88k |
| 02 June 2014 | Stage 1: Removal of BHPP Domestic Hot Water Pipework & Control Office - Level 22 & 52, Proposed chiller upgrade & heat exchanger augmentation | $819k |
| 02 June 2014 | Stage 2: Removal of Stair and Make Good Works. Fitout of office | $13.6m |
| 23 May 2014 | Lvl 6,7,8 & 9 Intemal Aiterations & Tenancy Fit-Out | $5.4m |
| 30 Apr 2014 | New Lobby Partition & Door - Level 16 | $15k |
| 28 Apr 2014 | PARTIAL OFFICE FIT-OUT AT LEVEL 39 | $70k |
| 14 Mar 2014 | Part level Fitout - level 21 | $150k |
| 28 Feb 2014 | Proposed fitout Existing Office Tenancy | $8k |
| 19 Dec 2013 | Internal Demolition Levels 6-9 | $300k |
| 12 Dec 2013 | Base Building Upgrade Works of Level 32 & 34 | $1.9m |
| 22 Nov 2013 | Fund Fitout - Print Room & Utilities Alterations Level 44 | $41k |
| 15 Oct 2013 | Office fitout Level 42 | $130k |
| 04 Sept 2013 | Base Building Upgrade. Upgrade works to level 10, 32 & 34 (excluding toilets) | $18.6m |
| 03 Sept 2013 | Internal Demolition of existing finishes - Stage 2: Upgrade works excluding alterations to services in Levels 6 Southern Tenancy area | $3.2m |
| 28 Aug 2013 | Alterations to existing tenancy Levels 35 & 36 - Stage 3: Fitout to Levels 35 & 36 | $1.8m |
| 19 Aug 2013 | Alterations to existing tenancy Levels 35 & 36 - Stage 2: Services alterations Level 36 | $200k |
| 19 Aug 2013 | Refurbishment & Alterations - Levels 18, 19 & 20 Bank of America. | $154k |
| 08 Aug 2013 | Stage 2: Staircase, balustrade, ceiling, finishes & services (remaining works) - Proposed new stair between levels 35 & 36 | $140k |
| 02 Aug 2013 | Removal of Stair and Infilling Slab linking Levels 18 & 19 excluding architectural & services works to ceiling of Level 18. | $55k |
| 23 July 2013 | Stage 2: Demolition of interconnecting stair and new slab infills to Level 14-16 | $2.4m |
| 23 July 2013 | Stage 3: Internal alterations - Lift Lobby and Amenities | $3.7m |
| 15 July 2013 | Internal Demolition of existing finishes Stage 1 Levels 6, 7 & 9 | $90k |
| 05 July 2013 | REFURBISHMENT OF SECONDARY TENANCY LEVEL 35 | $330k |
| 28 June 2013 | Alterations to existing tenancy Levels 35 & 36 | $260k |
| 24 June 2013 | Alterations to existing office tenancy Level 33 | $317k |
| 31 May 2013 | Alterations to Level 15 - Mitsui | $2.3m |
| 24 May 2013 | Proposed new stair between levels 35 & 36 | $140k |
| 01 May 2013 | Stage 2 - Alaterations & Refurbishment - Levels 6-9 | $2.5m |
| 12 Apr 2013 | Alterations Part Ground (Pinnacle Health Care) | $45k |
| 21 Feb 2013 | Stage 4: Alterations to level 17 tenancy and deletion of tenant's smoke detection systems and associated FIP - Base Building Refurbishment | $4.3m |
| 19 Feb 2013 | Morgan Stanley Office Alterations Part Level 14 | $110k |
| 05 Feb 2013 | Internal (Part) fitout alterations within the existing building Level 41 | $140k |
| 30 Jan 2013 | Internal alterations Part Level 15 | $24k |
| 25 Jan 2013 | Proposed Alterations Level 50 | $22k |
| 18 Dec 2012 | Stage 3: Fitout of Level 12 and all asociated works | $0 |
| 17 Dec 2012 | Demolish existing stair, make good - Level 32-35 | $400k |
| 15 Nov 2012 | Alteration Office Level 44 (Future Fund) | $320k |
| 19 Oct 2012 | Installation of CRAC mechanical services units to Levels 24-26 and 28-30 | $247k |
| 21 Sept 2012 | Stage 2: Fitout of Level 12 and all asociated works | $2.2m |
| 20 Sept 2012 | Office fitout Levels 12 & 13 (Urbis) | $50k |
| 06 Aug 2012 | Stage 1: Works to level 13 Excluding External Deck Area and Facade - Office fitout Levels 12 & 13 (Urbis) | $2.2m |
| 26 July 2012 | Final- Variation- Exclusion of Accessible Sanoitary Facility and Kitchen from Building Permit and Minor Design Changes Including Alterations to Lift Lobby | $1.9m |
| 07 June 2012 | Stage 2 Variation - Fitout works - Level 5 (variation) | $1.9m |
| 31 May 2012 | Stage 3: Alterations | $1.8m |
| 23 May 2012 | Internal alterations to office tenancy Level 31 | $8k |
| 18 May 2012 | Stage 2: Fitout works | $1.8m |
| 15 May 2012 | Tenancy Alterations Level 39 (Mitsui) | $200k |
| 07 May 2012 | Ground and first floor alterations | $1.2m |
| 01 May 2012 | Tenancy alterations-Internal stripout works Level 5 & 16 (Citibank) | $30k |
| 18 Apr 2012 | Office fitout Level 49 | $260k |
| 05 Apr 2012 | Refurbishment to Lift Lobby, Toilets, DDA Toilets, Basement Showers - Level 12-27 and Basement | $2.3m |
| 29 Mar 2012 | Stage 3: Final - construction of stair. Ground and first floor alterations | $1.2m |
| 07 Feb 2012 | Stage 2: Architectural works excluding construction of stair. Ground and first floor alterations | $1.2m |
| 16 June 2011 | Office fitout Level 14 | $39k |
| 16 June 2011 | Part fitout Level 48 | $50k |
| 26 May 2011 | Stage 2: Remainder of works. Office fitout Level 48 | $158k |
| 04 Mar 2011 | PROPOSED OFFICE FITOUT TO EXISTING TENANCY - LEVEL 37 | $1.4m |
| 01 Mar 2011 | Internal alterations to level 14 | $105k |
| 04 Feb 2011 | Alterations Level 31 | $780k |
| 12 Jan 2011 | Tenancy fitout - Various levels | $915k |
| 21 Dec 2010 | Office alterations to office on level 16. | $33k |
| 09 Dec 2010 | Level 18 - alterations to office | $9k |
| 23 Nov 2010 | Stage 2: Fire hydrant coverage. Proposed office fitout to existing tenancy - Level 37 | $1.4m |
| 11 Nov 2010 | PROPOSED INSTALLATION OF EXHAUST FAN AND DUCTWORK TO PODIUM | $27k |
| 15 Oct 2010 | Level 39 proposed tenancy fitout of existing office space | $168k |
| 15 Oct 2010 | Tenancy fitout of existing office space on level 39. Stage 2: Services Alterations | $168k |
| 24 Aug 2010 | BUILDING SURVEYING SERVICES & TRANSMITTAL FORM | $13k |
| 13 Aug 2010 | TENANCY REINSTATEMENT - LITTLE COLLINS ST TENANCIES ALL PARTS | $150k |
| 23 July 2010 | Fitout works to ground floor foyer | $90k |
| 30 June 2010 | Reception Alterations - Level 14 | $400k |
| 17 June 2010 | Stage 2/final permit. Citi Level 17, tenancy alterations | $88k |
| 28 May 2010 | Nomura Fitout Level 42 | $1.7m |
| 07 May 2010 | Stage 2: Reception Alterations - Level 14 | $400k |
| 27 Apr 2010 | Internal Tenancy alterations and fitout of offices on Level 45 & 46 | $45k |
| 16 Apr 2010 | Additions and alterations to office | $50k |
| 26 Mar 2010 | Rio Tinto Office Alterations - Level 31 & 32 | $180k |
| 25 Mar 2010 | Alterations to Office Tenancy (Internal fit-out) Unit 5 | $75k |
| 18 Mar 2010 | Office Alterations Lvl 17 | $55k |
| 16 Feb 2010 | Alterations - ASIC Melbourne Commission Refurbishment Level 30 (Part) | $180k |
| 16 Feb 2010 | Alterations Level 13 | $307k |
| 15 Dec 2009 | Proposed office fitout to existing tenancy, including new inter-connecting stair. Levels 43 & 44, 120 Collins Street. | $15.0m |
| 19 Nov 2009 | An office fitout for Infrastructure Capital Group Ltd on level 38 | $180k |
| 26 Oct 2009 | Level 8 - proposed office partition alterations to existing tenancy | $290k |
| 03 Sept 2009 | Level 43 Tenancy Alterations | $140k |
| 16 July 2009 | Citi Level 17, tenancy alterations | $88k |
| 18 June 2009 | Citi - Alterations to Level 15 & 16 Stage 2: Services Alterations | $55k |
| 04 June 2009 | Alterations to office level 18 | $16k |
| 21 May 2009 | Citi - Alterations to Level 15 & 16 | $55k |
| 19 Mar 2009 | ASIC office enancy fitout works to Level 25, 26,28 & 29 | $318k |
| 17 Feb 2009 | Construct Rainwater Harvesting Systems | $75k |
| 02 Feb 2009 | Office fitout Level 8 | $34k |
| 20 Jan 2009 | Office tenancy fitout Level 42, 120 Collins Street | $15k |
| 20 Nov 2008 | Office fitout to existing tenancy (The Next Step office fitout) Level 3, 120 Collins Street MELB | $285k |
| 15 Oct 2008 | Proposed Office Fitout Including Tenancy Establishment Works Level 39, 120 Collins Street | $145 |
| 09 Oct 2008 | Variation: New automatic opening door to breakout area | $145k |
| 25 Sept 2008 | Fitout to cafe - Aromatic (Non Structural) Shop No. 3 & 4 Ground Floor | $400k |
| 22 Aug 2008 | Joe Black Fitout (Retail). Stage 1 - Mechanical Services and Plasterboard Ceiling Works Only, Ground (part). | $537k |
| 23 July 2008 | Joe Black Fitout (Retail). Stage 2- Balance of Tenancy Fitout - Internal & External. | $537k |
| 18 June 2008 | Alterations on Level 38 | $145 |
| 29 May 2008 | Tenancy fitout on level 4, 120 Collins Street | $15k |
| 27 May 2008 | Replacement of the Fire Indicator Panel | $304k |
| 28 Mar 2008 | Office tenancy fitout Levels 45 & 46 | $1.8m |
| 25 Mar 2008 | Office tenancy alterations to Level 13. | $5k |
| 04 Mar 2008 | Tenancy fitout of office to Level 3. | $180k |
| 18 Feb 2008 | Internal alterations to reinstate tenancy. Tenancy fitout of office Level 38. | $250k |
| 21 Jan 2008 | Office fitout to Levels 7, 8 & 9. | $510k |
| 17 Dec 2007 | Bluescope Steel. Fitout to office Level 11 (part). | $76k |
| 17 Dec 2007 | Davis Langdon. Internal office alterations for CCMP capital asia, Level 41. | $849k |
| 15 Nov 2007 | Office fitout to existing tenancy on Level 23. | $838k |
| 19 Oct 2007 | Alterations to existing office tenancy on Level 12. Stage 2: Internal alterations to part Level 12 Urbis JHD tenancy including services building works. | $846k |
| 19 Oct 2007 | Office fitout Level 6 | $69k |
| 09 Oct 2007 | Alterations to existing office tenancy on Level 12. Stage 1: Internal alterations to part Level 12 Urbis JHD tenancy excluding services building works. | $846k |
| 10 Aug 2007 | Tenancy fitout to Bank of Montreal Level 23 | $240k |
| 02 Aug 2007 | Construct intertenancy walls Level 41 | $70k |
| 25 July 2007 | Internal alterations to office Level 40 & 41 | $500k |
| 18 June 2007 | Alterations Levels 15 & 17 | $320k |
| 25 May 2007 | West asset/Legg Tenancy. Tenancy fitout Levels 47 & 48. | $4.0m |
| 22 May 2007 | Variation: Partition layout, finishes & comms room. West asset/Legg Tenancy. Tenancy fitout Levels 47 & 48. | $4.0m |
| 10 May 2007 | Alterations to existing office, Level 3 (Podium Building). Stage 2: All remaining building works, including tenancy establishment and services. | $50k |
| 19 Apr 2007 | Office fitout alterations to ground floor & levels 24-30 | $9.0m |
| 18 Apr 2007 | Construct partitions to Office Level 3 Stage 1 | $50k |
| 29 Mar 2007 | Alteration to existing building to Level 49, office fitout. Stage 2: Internal fitout works. | $750k |
| 27 Feb 2007 | Bluescope Steel Fitout. Internal alterations to office, Level 10. | $592k |
| 15 Feb 2007 | Removal of Code Red monitoring equipment & replace with new ASE | $260 |
| 30 Jan 2007 | Office fitout to existing tenancy. Stage 2: External deck works, level 4. | $500k |
| 22 Dec 2006 | Office fitout Level 44 | $1.2m |
| 30 Nov 2006 | Internal Subdividing Partition Walls-Part Level 10 | $27k |
| 29 Nov 2006 | Variation: URBIS JHD - part level 10 internal office fitout. Internal subdividing partition walls to part level 10. Revised workstation layout. | $280k |
| 23 Nov 2006 | Alterations to office building. New bike enclosure in basement level RS. | $570k |
| 17 Nov 2006 | Alteration to an existing building level 10, toilet refurbishment works. | $219k |
| 14 Nov 2006 | Upgrade and installation of code red fire alarm monitoring system. | $300 |
| 12 Oct 2006 | URBIS JHD - part level 10 internal office fitout. Internal subdividing partition walls to part level 10. | $280k |
| 29 Sept 2006 | Internal subdividing partition walls Part Level 10 | $36k |
| 21 Sept 2006 | Demolition Level 40 (Make Good) | $125 |
| 14 Aug 2006 | Office Partition Level 13 | $40k |
| 11 Aug 2006 | Office internal demolition/stripout works levels 23-30 | $2.1m |
| 07 Aug 2006 | Variation: Re-design of comms room and commercial kitchen on level 33. Stage 2: Services alterations; Office fitout to levels 32 to 35 (inclusive), including new internal stairway. | $8.1m |
| 10 July 2006 | Office fitout Stage 1 Level 4 | $500k |
| 08 June 2006 | Ofiice Fitout Level 31 | $1.6m |
| 06 June 2006 | Level 17 office fitout | $640k |
| 12 May 2006 | Stage 2: Fire hydrant and hose reel coverage. Office partition fitout on level 43. | $90k |
| 05 May 2006 | Stage 3(final): Internal alteration works to levels 20, 21(part) and 22(part). Merrill Lynch office fitout. | $7.6m |
| 02 May 2006 | Alterations to an existing building, office fitout to level 39. | $650k |
| 02 May 2006 | Stage 1: All building work excluding fire hydrant and hose reel coverage. Office partition fitout on level 43 (Accel tenancy). | $90k |
| 26 Apr 2006 | Office building, tenancy fitout of level 21 (in part) for Rothschild. | $440k |
| 20 Mar 2006 | Stage 1: All building work excluding services; Office fitout to levels 32 to 35, including new internal stairway | $7.9m |
| 07 Mar 2006 | Stage 1 - Alterations to existing building ground floor foyer excluding facade and wall cladding as heritage listed building. | $2.0m |
| 27 Feb 2006 | Stage 2 - Internal alteration works to Level 19; Office alterations | $4.1m |
| 23 Feb 2006 | Office fitout alterations to an existing building; Stage 2 - Services reinstatement & structural infill works to level 40 | $540k |
| 22 Feb 2006 | Internal Stripout Works to levels 32, 33, 34 and 35; Office level 34 only | $380k |
| 25 Jan 2006 | Alterations Level 12 | $54k |
| 12 Dec 2005 | Office fitout alterations to an existing building levels 39 & 40. Stage 1: demolition works | $540k |
| 08 Dec 2005 | Office fitout-bluescope steel level 11 (part). | $121k |
| 18 Oct 2005 | Stage 1: Internal alterations works to level 18. | $4.1m |
| 16 Aug 2005 | Alterations to office tenancy fitout level 5 | $850k |
| 05 July 2005 | Stage 2: alterations to existing guilding ground floor, glazed panels fixed to Professionsal Chambers Building | $2.0m |
| 20 June 2005 | Alteration Level 6 | $10k |
| 15 Mar 2005 | Installation of new government telecommunications facility | $119k |
| 13 Oct 2004 | Removal of partitions Level 41 | $26k |
| 06 Oct 2004 | New intertenancy walls Level 43 | $42k |
| 02 Sept 2004 | Office alterations level 43 | $230k |
| 05 July 2004 | office fitout level 36 | $614k |
| 28 June 2004 | Office partition alterations Level 37 | $200k |
| 23 June 2004 | Office fitout Level 17 | $45k |
| 19 May 2004 | Office fitout alterations to an existing builing. Level 43. Stage 1 - Partitions only. | $150k |
| 27 Feb 2004 | Tenancy fitout Level 20 | $631k |
| 13 Feb 2004 | Office partition alterations on Level 42 | $160k |
| 10 Dec 2003 | Tenancy establishment works on level 42 | $15k |
| 05 Nov 2003 | Installation of partitions on level 42 | $10k |
| 31 Oct 2003 | Office Alterations to Level 8 - AXA | $6k |
| 31 Oct 2003 | Office partition alterations to levels 20 & 21. Stage 2: New slab infill and tenancy refurbishment works | $80k |
| 28 Oct 2003 | Alterations Level 6 | $70k |
| 16 Oct 2003 | Alterations Level 12 | $32k |
| 03 Oct 2003 | Office partition alterations to levels 20 & 21. Stage 1: Demolition of internal partitions and removel of open internal stair | $15k |
| 24 Sept 2003 | Office partition alterations to level 38 | $250k |
| 28 Aug 2003 | Office partition alterations Level 42 to ''Acumen Alliance'' tenancy | $30k |
| 02 June 2003 | Level 15 - Internal Alterations | $44k |
| 20 May 2003 | Office partitioning on to Level 12. Stage 2: Services Component. Total Cost of building work: $250,000. | $150k |
| 24 Apr 2003 | Tenancy fitout of cafe all parts. Shop 1 & 2 Lot 120 Collins Street, Melbourne 3000 | $120k |
| 28 Mar 2003 | Tenancy Fitout to Level 40, 120 Collins Street, Melbourne. Phillips Fox Fitout | $357k |
| 03 Mar 2003 | Office alterations to Level 12. Stage 1: Stripout & Architectural Component. Total Cost: $250,000. | $100k |
| 16 Jan 2003 | Alterations to an office building, Level 15 | $48k |
| 19 Dec 2002 | Alterations to an existing building office, Level 37 | $367k |
| 10 Dec 2002 | Alterations to Level 37. Office Building | $71k |
| 01 Nov 2002 | Tenancy works to level 40 | $30k |
| 07 Oct 2002 | Office alterations to Level 40 South East Corner | $20k |
| 30 Aug 2002 | Level 41 - Office Partition Alterations | $200k |
| 27 Aug 2002 | Alterations to plantroom | $22k |
| 02 July 2002 | Level 5 - Tenancy Reinstatement | $670k |
| 19 June 2002 | Level 13 - Alterations to an existing building. | $750k |
| 03 May 2002 | Level 39 - Office Partition Alterations | $200k |
| 28 Feb 2002 | Level 11 - Office Fitout | $2.0m |
| 19 Feb 2002 | Level 49 (Part) - Alterations. Full - Tenancy Fitout. | $500k |
| 12 Nov 2001 | Removal of partitions on level 36 of office building | $3k |
| 09 Nov 2001 | Level 23 - Alterations to office fitout. | $5k |
| 08 Nov 2001 | Alterations to offices on level 23 of existing building | $35k |
| 03 Oct 2001 | Installation of a door, to level 23 | $2k |
| 27 Sept 2001 | level 14 office alterations for Citigroup | $85k |
| 21 Sept 2001 | office fit out & alterations to existing building to levels 20 & 21 | $200.5m |
| 13 Sept 2001 | Alterations to partitions on level 38 of existing building | $160k |
| 04 Sept 2001 | stair enclosure ground floor - professional chambers to existing building | $5k |
| 01 Aug 2001 | Internal fitout to existing office building | $5.6m |
| 24 July 2001 | Lvls 39-43 Merril Lynch tenancy office fit out | $1.0m |
| 05 July 2001 | lvl 12 Avenade office fit out | $2.0m |
| 04 June 2001 | Level 17 Alterations. Siebal sysytems tenancy fitout. | $500k |
| 23 Apr 2001 | Alterations to all level 17 | $80k |
| 04 Apr 2001 | Level 39-43 office fit out | $164k |
| 29 Mar 2001 | Level 2 office fit out | $90k |
| 09 Feb 2001 | stage 1 lvl 11 & 12 office stairs demolition ;reinstate slab & make good | $35k |
| 31 Jan 2001 | Install code red fire monitoring equipment - | $2k |
| 31 Jan 2001 | lvl 18 &19 alts to offices | $3.0m |
| 29 Jan 2001 | level 5 fitout | $100k |
| 13 Dec 2000 | level 37 office alterations of existing building | $17k |
| 17 Nov 2000 | Installation of fire monitoring equipment | $2k |
| 02 Nov 2000 | Alterations to tenancy on level 38. Offices. | $134k |
| 24 Oct 2000 | stage 1 comms room fit out lvl 16 (office fit out lvls 13,14,15,16) | $393k |
| 25 Sept 2000 | Tenancy alterations on levels 7, 8, 9 & 10 | $90k |
| 11 Aug 2000 | Internal dstripout of ground floor & lvls 10 to 13 inclusive | $375k |
| 07 Aug 2000 | office partition alterations to lvl 40 STAGE 2 | $20k |
| 07 Aug 2000 | Tenancy fitouts on levels 45, 46 and 48 | $716k |
| 29 June 2000 | office partition alterations to lvl 40 | $20k |
| 14 June 2000 | office partition alterations to level 49 | $279k |
| 08 June 2000 | Tenancy Alterations Level 3 Professional Chamber | $20k |
| 30 May 2000 | Fitout of tenancy at level 50 | $650k |
| 16 Feb 2000 | Alterations to offices and meeting room on level 47 | $955k |
| 25 Mar 1999 | Partition alterations on level 37 | $23k |
| 23 Mar 1999 | Alterations to St Michaels Chapel and garden - part ground floor | $150k |
| 14 Aug 1998 | Alterations to levels 6, 8, 9, 12, 17, 19 & 20 | $257k |
| 26 June 1998 | Alterations on level 2 (Backstage tenancy Russell Street level) | $7k |
| 19 Feb 1998 | Office partition alterations on levels 39, 41 & 42, 120 Collins Street, Melbourne | $6.5m |
| 06 Feb 1998 | Fitout to level 7 for BHP Petroleum | $225k |
| 27 Nov 1997 | Tenancy alterations for BHP on levels 6-20, 120 Collins Street, Melbourne | $4.5m |
| 19 June 1997 | Tenancy alterations Level 29 | $175k |
| 26 Feb 1997 | Alterations to Wine bar | $5k |
| 13 Dec 1996 | Office fitout to Level 23 | $375k |
| 06 Sept 1996 | alterations | $50k |
| 03 Sept 1996 | Office fitout | $109k |
| 15 Mar 1996 | Removal of the fire hydrant lay flat fire hose basement, podium and the tower levels | $300 |
| 23 Jan 1996 | Partition alterations | $2k |
| 16 May 1995 | Tenancy fitout | $170k |
| 21 Apr 1995 | Alterations to existing building | $180k |
| 20 Apr 1995 | Alterations | $500k |
| 20 Jan 1995 | Alterations and additions | $88k |
| 07 Dec 1994 | Office fitout | $125k |
| 12 Aug 1994 | Office partitions Level 38 | $189k |
Is 120 Collins Street residential or commercial?
120 Collins Street is a commercial building. The City of Melbourne lists its main use as office.
When was 120 Collins Street built?
120 Collins Street was completed in 1991.
How many floors does 120 Collins Street have?
120 Collins Street has 52 floors above ground.
What businesses are in 120 Collins Street?
The latest council census counted 39 businesses in 120 Collins Street, including Abacus Collins, ASIC and Bain & Company.
Is there office or retail space for lease in 120 Collins Street?
See the commercial listings on this page, or search this address on realcommercial.com.au and commercialrealestate.com.au.
Who designed and built 120 Collins Street?
Hassell designed 120 Collins Street and Grocon built it. The building team section has the sources.
How tall is 120 Collins Street?
About 217 metres, measured from the City of Melbourne's 3D building model. It's number 16 of 1596 buildings in Melbourne by height.
What public transport is near 120 Collins Street?
Town Hall Station is the nearest train station, about 4 minutes' walk. The nearest tram stop is 101 Collins St/Collins St #7, about 1 minute's walk.
What is the planning zone for 120 Collins Street?
The site is in the Capital City Zone - Schedule 1 (CCZ1).
Has 120 Collins Street been sold?
In December 2011, Investa Commercial Property Fund was set to buy a 50% share of 120 Collins Street for about $255 million.
Has any work been done on 120 Collins Street recently?
The City of Melbourne has issued 277 building permits for 120 Collins Street since 1994. The most recent was in December 2025.
Sources: City of Melbourne building permits (CC BY 4.0); CLUE building information (CC BY 4.0); CLUE business establishments (CC BY 4.0); Geocoded National Address File (G-NAF) (Open G-NAF EULA (CC BY 4.0 based)). General information from public records, not legal, financial or building advice.