| Construction started | May 2006 | First major construction permit issued |
| First occupants | Dec 2007 | First occupancy permit issued |
| Completed | 2007 | Ericsson completed: 10 floors |
Each cost is the estimate on that record. Stages of a project often repeat its full value, so these don't add up to what was spent.
| 28 Apr 2026 | removal of Fire Brigade Phones and Phone Jacks - Interconnected Smoke Alarms for Occupant Warning Systems, installation of Warden Intercom Points (WIP) shall be installed within the Emergency and Good Lift. | $3k |
| 17 Feb 2026 | Tenancy Make Good Works - Level 4 | $39k |
| 16 Sept 2025 | Internal alteration - office fitouts to Tenancy 3, Level 7 | $547k |
| 11 Sept 2025 | Stage 2.2 - Balance of Works (Fire Services) | $7.0m |
| 11 Sept 2025 | Tenancy 1, Level 7 - Proposed (Reset Data) IT split works fitout - Stage 1 - Architectural and services excluding fire services | $7.0m |
| 18 June 2025 | Stage 2 - Fitout works | $2.3m |
| 03 June 2025 | Internal strip-out | $2.3m |
| 27 May 2025 | Internal ground floor lobby alterations | $400k |
| 09 Apr 2025 | Stage 2 - Remainder of works excluding stair enclosure | $718k |
| 07 Mar 2025 | Part Level 7 (Tenancy 3) - Internal alteration to existing building - Proposed Fitout Works | $50k |
| 10 Jan 2025 | Minor alterations within the prayer room on level 2 | $40k |
| 20 Dec 2024 | Stage 2 - Fitout Works | $180k |
| 18 Dec 2024 | Level 7 - Proposed inter-tenancy split | $120k |
| 29 Oct 2024 | Stage 1 - Proposed Internal Office Strip-Out | $60k |
| 09 Aug 2024 | Stage 4: Level 6 Balance of work | $4.3m |
| 02 Feb 2024 | Level 8 - Proposed internal alteration to existing building - Proposed Office Fitout | $1.7m |
| 25 Aug 2023 | Internal alteration - proposed office fitout Level 5, 818 Bourke St, Docklands Stage 0 | $4.0m |
| 29 June 2023 | Level 4 - Proposed Minor Alterations Consisting of Two New Walls and Doors in Lift Lobby | $307k |
| 17 May 2023 | Stage Two - To Permit All Remaining Cladding Replacement Works. | $2.5m |
| 17 Apr 2023 | Stage One - To Permit the Cladding Replacement to the Underside of the Existing Canopies within the Title Boundaries Only | $2.5m |
| 11 Oct 2022 | Alterations to a Roof Top. | $1.6m |
| 08 Sept 2022 | Level 6 - Internal Office Fitout for AFG | $847k |
| 06 May 2022 | Relocation of Existing Signage for Ericsson | $30k |
| 23 Feb 2022 | Stage 3: Level 4 and 5 fitout. | $4.3m |
| 11 Nov 2021 | Stage 2: Level 5 internal demolition and removal of interconnecting stair between level 6 and 7 | $4.8m |
| 29 June 2021 | Stage 1: Internal demolition to level 4 and 6 | $4.8m |
| 07 May 2021 | Stage 2: Internal fitout (architectural and service fit off) | $400k |
| 01 Apr 2021 | Change of use and alterations to tenancy 7 within existing building - Stage 1: Internal demolition, structural works and services rough in | $400k |
| 24 Jan 2019 | Internal Office Alterations for CTM Professional Services | $21 |
| 27 Sept 2018 | Level 5 - Alterations to existing Office | $48k |
| 26 Sept 2018 | Part Level 3 - Proposed Internal Partitions and Minor Office Fitout for CPT Global | $77k |
| 22 Aug 2018 | Partition Fitout Ground Floor, 818 Bourke Street | $12 |
| 08 Sept 2017 | Levels 7 and 8 - Internal fit-out alterations only | $4.8m |
| 05 Apr 2017 | Level 3 - Proposed fitout to existing office tenancy | $23k |
| 10 June 2016 | Level 3 Proposed tenancy split | $29k |
| 10 June 2016 | Stage 2 - Level 3 Office tenancy establishment works | $152k |
| 27 May 2016 | Level 3 - Proposed fitout to existing office tenancy | $0 |
| 27 May 2016 | Stage 2: Fire hydrant & hose reel coverage | $2.2m |
| 29 Jan 2016 | Ground Floor - Store room relocation & new door opening in existing tenancy | $50k |
| 19 Jan 2016 | Proposed Alteration to Office Building. Foyer Upgrade and EOT Facility | $837k |
| 12 Jan 2016 | Tenancy 9 Make Good & Inter-Tenancy Separation Works | $121k |
| 10 Nov 2015 | Lot 1 Alteration of Offices | $40k |
| 09 Nov 2015 | Beared Blend internal tenancy vacancy | $105k |
| 07 Sept 2015 | Stage 2 - Tenancy 9 Make Good & Inter-Tenancy Separation Works - Including External works | $125k |
| 24 Aug 2015 | Alterations to existing office | $140k |
| 10 Sept 2012 | Internal office fitout to level 5 (Part Level) Infosys Technologies Australia Office 818 Bourke Street, Docklands | $56k |
| 15 Apr 2012 | 7 - Commercial | $150k |
| 03 Oct 2011 | Ericsson Building - Atrium Alterations to Office levels 4 & 5 | $416k |
| 01 Sept 2011 | Shop 2 - Internal Alterations to an existing Retail Building | $120k |
| 01 Nov 2010 | OFFICE FITOUT ALTERATIONS TO AN EXISTING BUILDING - LEVELS 7 & 8 | $560k |
| 27 Jan 2010 | Shop fitout - tenancy 6 | $110k |
| 13 Jan 2010 | Construction of a fire rated Generator Room | $35k |
| 04 Dec 2009 | Alteration to offices part | $150k |
| 10 Sept 2009 | Level 8 - Office fitout alterations to existing building | $45k |
| 11 May 2009 | Proposed kitchen refurbishment for InfoSys | $10k |
| 31 Oct 2008 | Restaurant fitout to existing tenancy. Stage 2: Fire services, Ground level (Shop tenancy 1). | $330k |
| 20 Oct 2008 | Office fitout Part Levels 4 & 5 | $2.9m |
| 10 July 2008 | Restaurant fitout to existing tenancy. Stage 1: All building works excluding fire services Ground level (Shop tenancy 1). | $330k |
| 29 Apr 2008 | Internal alterations to energy physiotherapy shop 5 | $240k |
| 07 Dec 2007 | Ericsson Commercial Building. Stage 4: Concrete structure, levels 1-9 inclusive. Construction of a new building, commercial office tenancies with ground floor retail and carparking lot 2. | $65.0m |
| 07 Dec 2007 | Ericsson Commercial Building. Stage 5: Facade works. Construction of a new building, commercial office tenancies with ground floor retail and carparking lot 2. | $65.0m |
| 07 Dec 2007 | Ericsson Commercial Building. Stage 6: services, ground to Level 9. Construction of a new building, commercial office tenancies with ground floor retail and carparking lot 2. | $65.0m |
| 07 Dec 2007 | Ericsson Commercial Building. Stage 8: All works to completion | $73.1m |
| 28 Mar 2007 | Ericsson Commercial Building. Stage 1: Architectural. Construction of a new building, commercial office tenancies with ground floor retail and carparking lot 2. | $65.0m |
| 23 June 2006 | Ericsson Commercial Building. Stage 3: Ground slab. Construction of a new building, commercial office tenancies with ground floor retail and carparking lot 2. | $65.0m |
| 01 June 2006 | Stage 2: Inground services. Ericsson Commercial Building. Construction of a new building, commercial office tenancies with ground floor retail and carparking, lot 2 (site V2). | $65.0m |
| 05 May 2006 | Ericsson Commercial Building. Stage 1: Structure up underside of ground slab, early works package. Construction of a new building, commercial office tenancies with ground floor retail and carparking lot 2. | $65.0m |
Is Ericsson residential or commercial?
Ericsson is a commercial building. The City of Melbourne lists its main use as unoccupied - unused.
When was Ericsson built?
Ericsson was completed in 2007.
How many floors does Ericsson have?
Ericsson has 10 floors above ground.
What businesses are in Ericsson?
The latest council census counted 10 businesses in Ericsson, including Australian Bureau Of Statistics, Barry Plant and Blended Beard.
Is there office or retail space for lease in Ericsson?
See the commercial listings on this page, or search this address on realcommercial.com.au and commercialrealestate.com.au.
Who designed and built Ericsson?
GPT Group developed Ericsson. The building team section has the sources.
How tall is Ericsson?
About 40 metres, measured from the City of Melbourne's 3D building model. It's number 73 of 286 buildings in Docklands by height.
What public transport is near Ericsson?
Southern Cross Station is the nearest train station, about 8 minutes' walk. The nearest tram stop is Victoria Harbour Docklands/Collins St #D18, about 3 minutes' walk.
What is the planning zone for Ericsson?
The site is in the Docklands Zone - Schedule 2 (DZ2).
Does Ericsson have an owners corporation?
Plan of subdivision PS545349 has 1 lot.
Has any work been done on Ericsson recently?
The City of Melbourne has issued 44 building permits for Ericsson since 2006. The most recent was in September 2025.
Sources: City of Melbourne building permits (CC BY 4.0); CLUE building information (CC BY 4.0); CLUE business establishments (CC BY 4.0); Development Activity Monitor (CC BY 4.0); Geocoded National Address File (G-NAF) (Open G-NAF EULA (CC BY 4.0 based)). General information from public records, not legal, financial or building advice.