| Construction started | Mar 2007 | First major construction permit issued |
| First occupants | Dec 2009 | First occupancy permit issued |
| Completed | 2009 | ANZ completed: 10 floors |
Each cost is the estimate on that record. Stages of a project often repeat its full value, so these don't add up to what was spent.
| 01 May 2026 | ANZ 833 CSM Masterplan - Stage 1 - Alterations to Level 1 Workplace, UPS Works & Co-gen Decommissioning) | $110.1m |
| 26 Mar 2026 | Level 10 - Internal Alterations | $97k |
| 12 Sept 2025 | (Upper Ground & Level 10), Internal Office Alterations | $596k |
| 12 May 2025 | Partition alterations on Level 10, 833 Collins Street, Docklands, 3008. Change of 2 offices into 1 larger office. | $110k |
| 23 Apr 2025 | Level 3 - Tenancy alterations on level 3 | $134k |
| 15 Dec 2024 | Stage 4 - Refurbishment of Level 2 Toilets and Lift Lobby | $2.0m |
| 27 Nov 2024 | Stage 4 - Refurbishment of Level 2 Toilets and Lift Lobby | $2.0m |
| 11 Oct 2024 | Stage 3 - Installation of Meeting Pods on Levels 1 to 9 | $4.7m |
| 31 July 2024 | Refurbishment works on Levels 1 to 9 - Stage 2 - Satellite bay furniture, compactus conversions ceilings and level 2 kitchens | $4.7m |
| 11 July 2024 | Refurbishment works on Levels 1 to 9 - Stage 1 Demolition works on level 1 to 9 | $4.7m |
| 24 Apr 2024 | ANZ fire curtains | $371k |
| 07 Sept 2023 | Levels 1 to 6, 8 & 9 - Installation of Framery Booths | $68k |
| 25 Aug 2023 | Levels 1, 5 and 7 - Tenancy Alterations | $242k |
| 29 May 2023 | Stage 2 - ANZ Refurbishment (external signage and fire services) | $150k |
| 28 Apr 2023 | Stage 1 - ANZ Refurbishment (excluding external signage and fire services) | $1.6m |
| 08 Nov 2022 | Alterations to an existing building - ground floor office consulting suites | $33k |
| 07 Oct 2022 | Shop 4P-6P - Tenancy Alterations on levels 2 and 5 | $30k |
| 22 June 2022 | Alterations on upper ground floor | $350k |
| 21 June 2022 | Alterations to office - CP1 Level | $110k |
| 31 May 2022 | Level 4 - Alterations | $380k |
| 20 May 2022 | Tenancy Alterations - Levels 1, 2, 4, 5, & 6 | $127k |
| 09 May 2022 | Alterations - CP1 Level | $1.1m |
| 05 May 2022 | Stage 1 – All Works Excluding Fire Services - Level 10 - Fitout of an Art Gallery | $1.3m |
| 04 Apr 2022 | Stage 2 – Balance of Works | $1.3m |
| 03 Aug 2021 | Construction of a New Acoustic Partition Wall at the Tech Bar | $88k |
| 25 May 2021 | Proposed restaurant fitout for "Ichi Maki" | $200k |
| 15 Oct 2020 | Security upgrades to perimeter doors | $71k |
| 03 July 2020 | ANZ Level 10 Phase 3 Works | $2.0m |
| 28 May 2020 | Level 10 - ANZ Open House Fit-out | $0 |
| 26 Feb 2020 | Tenancy 8P- Alterations to existing building and change of use to Class 5 | $886k |
| 24 Feb 2020 | Alterations to an existing building - ground floor office consulting suites | $33k |
| 20 Dec 2019 | Stage 2 - Balance of phase 1 works. | $7.8m |
| 09 Oct 2019 | Shop 1P - Alterations to Existing Cafe - Glass Screen and Planter Box Install | $54k |
| 24 Sept 2019 | Condenser Water System Upgrade - Alterations to existing office | $1.1m |
| 27 Aug 2019 | Stage 1 – Level 10, ANZ Open House Fit-out. Demolition and enabling works to Tamar Room. | $7.8m |
| 29 July 2019 | Internal alterations and make good of existing 8P tenancy | $267k |
| 23 May 2019 | Stage 2 - Balance of works | $942k |
| 16 May 2019 | Alterations to existing Office - Level 3 | $310k |
| 10 Apr 2019 | Alterations - Fire Indicator Panel Upgrade Work | $399k |
| 03 Apr 2019 | Level CP1 - 017A - Alterations Make good works to Koji tenancy | $97k |
| 18 Jan 2019 | Stage 1 – Demolition and services decommissioning to commercial tenancies | $942k |
| 21 Dec 2018 | Level 4B - Alterations to existing office | $1.4m |
| 17 Oct 2018 | Upper Ground Lift Lobby Ceiling Replacement | $38k |
| 19 Sept 2018 | L2C - Alterations to existing Office | $2.4m |
| 01 Aug 2018 | Level 5 - Alterations to existing Office | $120k |
| 02 Oct 2017 | Ground Floor Lobby - Stage 1 - Installation of LED media wall and services alterations excluding installation of illuminated signage at all B1-10 stair door entries - Alterations to existing building | $200k |
| 18 July 2017 | Upgrade of existing Emergency Warning and Intercommunication System | $279k |
| 05 July 2017 | Alterations to existing building including installation of new Smart ATM | $48k |
| 11 May 2017 | Internal fitout to an existing takeaway cafe | $180k |
| 15 Feb 2017 | Level 10 - Proposed Internal Office fitout | $163k |
| 13 Jan 2017 | Tenancy 10P, Level CP01 - Replacement of floor of retail tenancy | $47k |
| 09 Dec 2016 | ANZ Building. Construction of a new building, offices/retail/carpark/childcare/storage/plant/Loading Bay/BOH. Stage 10: Services (part). | $342.6m |
| 09 Dec 2016 | ANZ Building. Construction of a new building, offices/retail/carpark/childcare/storage/plant/Loading Bay/BOH. Stage 15: All blockwork, cores and core stairs to all Levels. | $342.6m |
| 09 Dec 2016 | ANZ Building. Construction of a new building, offices/retail/carpark/childcare/storage/plant/Loading Bay/BOH. Stage 17: All Electrical, Mechanical & Fire Services Rough-ins | $342.6m |
| 09 Dec 2016 | ANZ Building. Construction of a new building, offices/retail/carpark/childcare/storage/plant/Loading Bay/BOH. Stage 1: Piling works, Lot S6. | $342.6m |
| 09 Dec 2016 | ANZ Building. Construction of a new building, offices/retail/carpark/childcare/storage/plant/Loading Bay/BOH. Stage 20: Electrical and Mechanical Services. | $214.4m |
| 09 Dec 2016 | ANZ Building. Construction of a new building, offices/retail/carpark/childcare/storage/plant/Loading Bay/BOH. Stage 22: Levels 10 & 11 Structure. | $342.6m |
| 09 Dec 2016 | ANZ Building. Construction of a new building, offices/retail/carpark/childcare/storage/plant/Loading Bay/BOH. Stage 3: Pile caps & column starter bars. | $342.6m |
| 09 Dec 2016 | ANZ Building. Construction of a new building, offices/retail/carpark/childcare/storage/plant/Loading Bay/BOH. Stage 4: Pile caps, core rafts & core wall starter bars, RC column details and inground hydraulic services, Lot S6. | $342.6m |
| 09 Dec 2016 | ANZ Building. Construction of a new building, offices/retail/carpark/childcare/storage/plant/Loading Bay/BOH. Stage 6: Structural cores 1, 2 & 3, Lot S6. | $342.6m |
| 09 Dec 2016 | ANZ Building. Construction of a new building, offices/retail/carpark/childcare/storage/plant/Loading Bay/BOH. Stage 8: Upper Ground Floor Structure. | $342.6m |
| 09 Dec 2016 | ANZ Building. Construction of a new building, offices/retail/carpark/childcare/storage/plant/Loading Bay/BOH. Stage 9: Level one structure. | $343.6m |
| 09 Dec 2016 | ANZ Building. Construction of a new building. Stage 26: Signage and landscaping Works | $345.6m |
| 07 Nov 2016 | Level 7 - Installation of ceiling and alterations to services | $78k |
| 11 Oct 2016 | Level 10 Alterations - New Meeting Room | $411k |
| 02 Sept 2016 | Level 10 - Alterations to Existing Building | $135k |
| 12 Aug 2016 | L10 - Proposed Internal Office Fitout | $231k |
| 22 July 2016 | L10 - Proposed Internal Office Fitout | $231k |
| 27 Apr 2016 | Stage 2, Including Fire Services - SHOP 11P, Internal Fitout for In a Rush Kitchen | $300k |
| 22 Apr 2016 | SHOP 11P, Internal Fitout for In a Rush Kitchen | $300k |
| 06 Apr 2016 | Upper Ground Floor - Proposed Minor Tenancy Fitout to Existing Volume Cafe | $66k |
| 18 Dec 2015 | No. 883 - Internal Fit-Out | $1.1m |
| 04 Sept 2015 | No. 883 - Internal Fit-Out | $50k |
| 10 Oct 2014 | Proposed Minor Refurbishment to Existing ANZ Branch | $150k |
| 26 June 2014 | Demolition of Single storey detached canteen & associated shed | $132k |
| 01 May 2014 | Level 2 Installation of 5 air conditioning units | $673k |
| 01 Aug 2013 | Alterations to CP2 change rooms | $328k |
| 23 Jan 2013 | Alterations to smoke detector to thermal detector Groove Train | $5k |
| 23 Nov 2012 | Office fitout alterations to an existing building - Level 10 (part) | $385k |
| 06 Dec 2011 | Carpark (CPI) Alterations - Installation of gates to the bike area and new double doors to the goods lift lobby | $54k |
| 24 Oct 2011 | Construction of a new Auditorium Stair | $1.4m |
| 30 Sept 2011 | Alterations Tenancy 3P Level 1 Carpark | $452k |
| 26 July 2011 | Proposed Installation of External Structual Awning Shop 1P | $28k |
| 10 June 2011 | Proposed Internal tenancy Fit-out for Degani - Tenancy 6P | $260k |
| 16 May 2011 | Removal of Smoke Detector and replacement with Heat Detector at CPL 1 , 791-847 Collins Street, Melbourne 3000 | $150k |
| 23 Mar 2011 | Office fitout to level 9 | $110k |
| 17 Mar 2011 | OFFICE FITOUT ALTERATIONS TO AN EXISTING BUILDING | $330k |
| 09 Nov 2010 | INSTALLATION TO EWIS PANEL | $130k |
| 18 Oct 2010 | ALTERATION TO AN EXISTING BUILDING | $80k |
| 18 Oct 2010 | INSTALLATION TO EWIS PANEL | $153k |
| 18 May 2010 | Tenancy 17C - Cafe Fitout alterations to an existing building | $800k |
| 11 May 2010 | Upper Ground Floor: fitout of catering office. | $137k |
| 25 Mar 2010 | YMCA - Anz Building - Gym fitout to an existing building - Tenancies 2P, 4P and 5P-(Amended to include propsed mechanical mezzanine structure services and installation of ladder) | $0 |
| 12 Mar 2010 | YMCA - Anz Building - Gym fitout to an existing building - Tenancies 2P, 4P and 5P | $1.6m |
| 22 Feb 2010 | YMCA - Anz Building - Gym fitout to an existing building - Tenancies 2P, 4P and 5P | $1.6m |
| 22 Dec 2009 | Retail Tenancy Fitout to Shop 3P | $150k |
| 11 Dec 2009 | 13P - Fitout of cafe (all parts) | $111k |
| 09 Dec 2009 | Tenancy Fitout - Shop 18C (Elements Cafe) | $733k |
| 27 Nov 2009 | Internal fitout to Shop 6P | $150k |
| 13 Nov 2009 | Tenancy fitout - Groove Train Internal (non-structural) works only | $900k |
| 06 Nov 2009 | Proposed Internal Tenancy Fitout for Cafe to the ANZ tower | $400k |
| 23 Oct 2009 | Fitout alterations to an existing building - Tenancy C1 | $430k |
| 15 Oct 2009 | Stage 2 - All remaining works, excluding fire services | $220k |
| 12 Oct 2009 | Proposed bank tenancy fitout, Ground floor, Shop 14P | $715k |
| 23 Sept 2009 | Fitout-Shop 11P | $220k |
| 08 Sept 2009 | P2 ANZ Building Refurbishing Area | $63k |
| 04 Aug 2009 | Stage 8: Level 10 Fitout - Services | $193.5m |
| 03 July 2009 | Stage 7: Office Fitout Alterations to an Existing Building | $189.6m |
| 04 May 2009 | Stage 6: Alterations to an existing building Levels 1 - 4 (Excluding Services) 791-847 Collins Street, Docklands 3008 | $175.9m |
| 25 Feb 2009 | Stage 5: Services Fitout Upper Ground Floor | $175.9m |
| 19 Feb 2009 | Stage 4: Services Fitout (Levels 5-9) (FS2). | $175.9m |
| 03 Feb 2009 | ANZ Building. Construction of a new building, offices/retail/carpark/childcare/storage/plant/Loading Bay/BOH. Stage 25: Ground Plane, Collins Street Entry Steel, Glazing, Canopies and Upper Ground Floor Façade Glazing. | $342.6m |
| 27 Jan 2009 | Alterations to an Existing Building. Stage 2: Services Fitout (Levels 1-4). | $175.9m |
| 25 Nov 2008 | ANZ Building. Construction of a new building, offices/retail/carpark/childcare/storage/plant/Loading Bay/BOH. Stage 24: Atrium Finishes, Waterproofing, Atrium Steel & Roof Cladding, Level Sand 10, Level 11 and substation steel. | $342.6m |
| 11 Oct 2008 | ANZ Building-833 Collins Street, Docklands. Alterations to an Existing Building. Stage 1: Architectural Fitout Levels 1-4 (Excluding Services). | $175.9m |
| 29 July 2008 | ANZ Building. Construction of a new building, offices/retail/carpark/childcare/storage/plant/Loading Bay/BOH. Stage 23: All Ceilings and Access Floors. | $342.6m |
| 23 July 2008 | ANZ Building. Construction of a new building, offices/retail/carpark/childcare/storage/plant/Loading Bay/BOH. Stage 21: Fire Services. | $342.6m |
| 19 June 2008 | ANZ Building. Construction of a new building, offices/retail/carpark/childcare/storage/plant/Loading Bay/BOH. Stage 19: Vertical Transportation. | $171.2m |
| 19 Mar 2008 | ANZ Building. Construction of a new building, offices/retail/carpark/childcare/storage/plant/Loading Bay/BOH. Stage 16: Levels 5, 6, 7, 8 & 9 structure Lot S6. | $342.6m |
| 19 Feb 2008 | ANZ Building. Construction of a new building, offices/retail/carpark/childcare/storage/plant/Loading Bay/BOH. Stage 13: Level 3 structure. | $342.6m |
| 19 Feb 2008 | ANZ Building. Construction of a new building, offices/retail/carpark/childcare/storage/plant/Loading Bay/BOH. Stage 14: Level 4 structure. | $342.6m |
| 18 Jan 2008 | ANZ Building. Construction of a new building, offices/retail/carpark/childcare/storage/plant/Loading Bay/BOH. Stage 12: Level 2 structure. | $342.6m |
| 07 Dec 2007 | ANZ Building. Construction of a new building, offices/retail/carpark/childcare/storage/plant/Loading Bay/BOH. Stage 11: Security services. | $342.6m |
| 18 Sept 2007 | ANZ Building. Construction of a new building, offices/retail/carpark/childcare/storage/plant/Loading Bay/BOH. Stage 7: Structural (stair cores 7&8, entry promenade & child care lifts plus carpark level 2 slab), Lot S6. | $342.6m |
| 17 July 2007 | ANZ Building. Construction of a new building, offices/retail/carpark/childcare/storage/plant/Loading Bay/BOH. Stage 5: Structural works, carpark Level 1, Lot S6. | $342.6m |
| 01 Mar 2007 | ANZ Building. Construction of a new building, offices/retail/carpark/childcare/storage/plant/Loading Bay/BOH. Stage 1: Demolition works, Lot S6. | $342.6m |
| 01 Mar 2007 | ANZ Building. Construction of a new building, offices/retail/carpark/childcare/storage/plant/Loading Bay/BOH. Stage 1: Piling works, Lot S6. | $342.6m |
Is ANZ residential or commercial?
ANZ is a commercial building. The City of Melbourne lists its main use as office.
When was ANZ built?
ANZ was completed in 2009.
How many floors does ANZ have?
ANZ has 10 floors above ground.
What businesses are in ANZ?
The latest council census counted 9 businesses in ANZ, including ANZ Branch, Australia And New Zealand Banking Group Limited and Caffe Esc.
Is there office or retail space for lease in ANZ?
See the commercial listings on this page, or search this address on realcommercial.com.au and commercialrealestate.com.au.
Who designed and built ANZ?
Lend Lease developed ANZ, Lend Lease Design designed it and Bovis Lend Lease built it. The building team section has the sources.
How tall is ANZ?
About 58 metres, measured from the City of Melbourne's 3D building model. It's number 58 of 286 buildings in Docklands by height.
What public transport is near ANZ?
Southern Cross Station is the nearest train station, about 8 minutes' walk. The nearest tram stop is Collins Landing/Collins St #D17, about 1 minute's walk.
What is the planning zone for ANZ?
The site is in the Docklands Zone - Schedule 2 (DZ2).
Does ANZ have an owners corporation?
Plan of subdivision PS602173 has 1 lot.
Has the ANZ office fitout received a green rating?
Yes. In 2012 the office fitout received a 6 Star Green Star Office Interiors rating.
Has any work been done on ANZ recently?
The City of Melbourne has issued 83 building permits for ANZ since 2007. The most recent was in May 2026.
Sources: City of Melbourne building permits (CC BY 4.0); CLUE building information (CC BY 4.0); CLUE business establishments (CC BY 4.0); Development Activity Monitor (CC BY 4.0); Geocoded National Address File (G-NAF) (Open G-NAF EULA (CC BY 4.0 based)). General information from public records, not legal, financial or building advice.