791-833 Collins Street, Docklands VIC 3008
Generated 8 November 2026
Commercial · Office
59 mheight
10floors
2009completed
9businesses
83permits

Development milestones

Construction startedMar 2007First major construction permit issued
First occupantsDec 2009First occupancy permit issued
Completed2009ANZ completed: 10 floors

Building team

Architect
Hassell
Architect
Lend Lease Design
Developer
Lend Lease
Builder
Bovis Lend Lease
Owner
ANZ

Planning & subdivision

Zone
DZ2
Overlays
DDO12, DDO50, DDO50-A4, DPO3, LSIO3, PO6
Strata plan
PS602173 · 1 lots
Scores
🚆 7 · ☕ 5 · 🌳 10 · ✨ 4

Timeline

20262 building permits · about $110.2m of new works
Largest: ANZ 833 CSM Masterplan - Stage 1 - Alterations to Level 1 Workplace, UPS Works & Co-gen Decommissioning)
20252 building permits and 1 certificate · about $839k of new works
Largest: (Upper Ground & Level 10), Internal Office Alterations
20244 building permits and 2 certificates · about $7.1m of new works
Largest: Stage 3 - Installation of Meeting Pods on Levels 1 to 9
20234 building permits · about $2.1m of new works
Largest: Stage 1 - ANZ Refurbishment (excluding external signage and fire services)
20223 building permits and 6 certificates · about $3.3m of new works
Largest: Stage 1 – All Works Excluding Fire Services - Level 10 - Fitout of an Art Gallery
20211 building permit and 1 certificate · about $288k of new works
Largest: Proposed restaurant fitout for "Ichi Maki"
20203 building permits and 2 certificates · about $3.0m of new works
Largest: ANZ Level 10 Phase 3 Works
20196 building permits and 4 certificates · about $11.0m of new works
Largest: Stage 2 - Balance of phase 1 works.
20182 building permits and 2 certificates · about $3.9m of new works
Largest: L2C - Alterations to existing Office
20174 building permits and 2 certificates · about $918k of new works
Largest: Upgrade of existing Emergency Warning and Intercommunication System
20166 building permits and 14 certificates · about $1.2m of new works
Largest: ANZ Building. Construction of a new building. Stage 26: Signage and landscaping Works
20151 building permit and 1 certificate · about $1.1m of new works
Largest: No. 883 - Internal Fit-Out
20142 building permits and 1 certificate · about $955k of new works
Largest: Level 2 Installation of 5 air conditioning units
20132 building permits · about $333k of new works
Largest: Alterations to CP2 change rooms
2012ANZ Centre office fitout receives 6 Star Green Star Office Interiors rating
The office fitout at ANZ's Melbourne headquarters achieved a 6 Star Green Star Office Interiors v1.1 certification in July 2012, which the Green Building Council of Australia described as the largest single-tenanted 6 Star Green Star rated office fitout in Australia.
20121 certificate · about $385k of new works
Largest: Office fitout alterations to an existing building - Level 10 (part)
20114 building permits and 4 certificates · about $2.8m of new works
Largest: Construction of a new Auditorium Stair
20107 building permits and 1 certificate · about $2.9m of new works
Largest: YMCA - Anz Building - Gym fitout to an existing building - Tenancies 2P, 4P and 5P
2009ANZ completed: 10 floors
Derived from City of Melbourne Development Activity Monitor
Dec 2009First occupancy permit issued
Derived from City of Melbourne building permits
6 Nov 2009ANZ officially opens ANZ Centre global headquarters in Docklands
ANZ officially opened its global headquarters, ANZ Centre, in Docklands, which the bank said had achieved a 6 Star Green Star Office Design v2 rating from the Green Building Council of Australia. The release said the building would house about 6,500 ANZ staff and described on-site tri-generation and black water recycling.
2 Apr 2009ANZ announces Docklands headquarters at 833 Collins Street to be known as ANZ Centre
ANZ announced it would move its group head office into a new building at 833 Collins Street, Docklands, to be known as ANZ Centre, with practical completion expected in September 2009 and about 6,500 staff by January 2010. The release named Lend Lease Design and HASSELL as designers and Bovis Lend Lease as project manager and builder.
2009Council census records it as office, 13 floors
Name recorded: ANZ
200915 building permits and 3 certificates · about $3.9m of new works
Largest: ANZ Building. Construction of a new building, offices/retail/carpark/childcare/storage/plant/Loading Bay/BOH. Stage 25: Ground Plane, Collin
20089 building permits
Largest: ANZ Building. Construction of a new building, offices/retail/carpark/childcare/storage/plant/Loading Bay/BOH. Stage 24: Atrium Finishes, Wat
Mar 2007First major construction permit issued
Derived from City of Melbourne building permits
20075 building permits · about $345.6m of new works
Largest: ANZ Building. Construction of a new building, offices/retail/carpark/childcare/storage/plant/Loading Bay/BOH. Stage 11: Security services.
2007First council census entry: unoccupied - under construction, 1 floors

Building permits and certificates (127)

Each cost is the estimate on that record. Stages of a project often repeat its full value, so these don't add up to what was spent.

01 May 2026ANZ 833 CSM Masterplan - Stage 1 - Alterations to Level 1 Workplace, UPS Works & Co-gen Decommissioning)$110.1m
26 Mar 2026Level 10 - Internal Alterations$97k
12 Sept 2025(Upper Ground & Level 10), Internal Office Alterations$596k
12 May 2025Partition alterations on Level 10, 833 Collins Street, Docklands, 3008. Change of 2 offices into 1 larger office.$110k
23 Apr 2025Level 3 - Tenancy alterations on level 3$134k
15 Dec 2024Stage 4 - Refurbishment of Level 2 Toilets and Lift Lobby$2.0m
27 Nov 2024Stage 4 - Refurbishment of Level 2 Toilets and Lift Lobby$2.0m
11 Oct 2024Stage 3 - Installation of Meeting Pods on Levels 1 to 9$4.7m
31 July 2024Refurbishment works on Levels 1 to 9 - Stage 2 - Satellite bay furniture, compactus conversions ceilings and level 2 kitchens$4.7m
11 July 2024Refurbishment works on Levels 1 to 9 - Stage 1 Demolition works on level 1 to 9$4.7m
24 Apr 2024ANZ fire curtains$371k
07 Sept 2023Levels 1 to 6, 8 & 9 - Installation of Framery Booths$68k
25 Aug 2023Levels 1, 5 and 7 - Tenancy Alterations$242k
29 May 2023Stage 2 - ANZ Refurbishment (external signage and fire services)$150k
28 Apr 2023Stage 1 - ANZ Refurbishment (excluding external signage and fire services)$1.6m
08 Nov 2022Alterations to an existing building - ground floor office consulting suites$33k
07 Oct 2022Shop 4P-6P - Tenancy Alterations on levels 2 and 5$30k
22 June 2022Alterations on upper ground floor$350k
21 June 2022Alterations to office - CP1 Level$110k
31 May 2022Level 4 - Alterations$380k
20 May 2022Tenancy Alterations - Levels 1, 2, 4, 5, & 6$127k
09 May 2022Alterations - CP1 Level$1.1m
05 May 2022Stage 1 – All Works Excluding Fire Services - Level 10 - Fitout of an Art Gallery$1.3m
04 Apr 2022Stage 2 – Balance of Works$1.3m
03 Aug 2021Construction of a New Acoustic Partition Wall at the Tech Bar$88k
25 May 2021Proposed restaurant fitout for "Ichi Maki"$200k
15 Oct 2020Security upgrades to perimeter doors$71k
03 July 2020ANZ Level 10 Phase 3 Works$2.0m
28 May 2020Level 10 - ANZ Open House Fit-out$0
26 Feb 2020Tenancy 8P- Alterations to existing building and change of use to Class 5$886k
24 Feb 2020Alterations to an existing building - ground floor office consulting suites$33k
20 Dec 2019Stage 2 - Balance of phase 1 works.$7.8m
09 Oct 2019Shop 1P - Alterations to Existing Cafe - Glass Screen and Planter Box Install$54k
24 Sept 2019Condenser Water System Upgrade - Alterations to existing office$1.1m
27 Aug 2019Stage 1 – Level 10, ANZ Open House Fit-out. Demolition and enabling works to Tamar Room.$7.8m
29 July 2019Internal alterations and make good of existing 8P tenancy$267k
23 May 2019Stage 2 - Balance of works$942k
16 May 2019Alterations to existing Office - Level 3$310k
10 Apr 2019Alterations - Fire Indicator Panel Upgrade Work$399k
03 Apr 2019Level CP1 - 017A - Alterations Make good works to Koji tenancy$97k
18 Jan 2019Stage 1 – Demolition and services decommissioning to commercial tenancies$942k
21 Dec 2018Level 4B - Alterations to existing office$1.4m
17 Oct 2018Upper Ground Lift Lobby Ceiling Replacement$38k
19 Sept 2018L2C - Alterations to existing Office$2.4m
01 Aug 2018Level 5 - Alterations to existing Office$120k
02 Oct 2017Ground Floor Lobby - Stage 1 - Installation of LED media wall and services alterations excluding installation of illuminated signage at all B1-10 stair door entries - Alterations to existing building$200k
18 July 2017Upgrade of existing Emergency Warning and Intercommunication System$279k
05 July 2017Alterations to existing building including installation of new Smart ATM$48k
11 May 2017Internal fitout to an existing takeaway cafe$180k
15 Feb 2017Level 10 - Proposed Internal Office fitout$163k
13 Jan 2017Tenancy 10P, Level CP01 - Replacement of floor of retail tenancy$47k
09 Dec 2016ANZ Building. Construction of a new building, offices/retail/carpark/childcare/storage/plant/Loading Bay/BOH. Stage 10: Services (part).$342.6m
09 Dec 2016ANZ Building. Construction of a new building, offices/retail/carpark/childcare/storage/plant/Loading Bay/BOH. Stage 15: All blockwork, cores and core stairs to all Levels.$342.6m
09 Dec 2016ANZ Building. Construction of a new building, offices/retail/carpark/childcare/storage/plant/Loading Bay/BOH. Stage 17: All Electrical, Mechanical & Fire Services Rough-ins$342.6m
09 Dec 2016ANZ Building. Construction of a new building, offices/retail/carpark/childcare/storage/plant/Loading Bay/BOH. Stage 1: Piling works, Lot S6.$342.6m
09 Dec 2016ANZ Building. Construction of a new building, offices/retail/carpark/childcare/storage/plant/Loading Bay/BOH. Stage 20: Electrical and Mechanical Services.$214.4m
09 Dec 2016ANZ Building. Construction of a new building, offices/retail/carpark/childcare/storage/plant/Loading Bay/BOH. Stage 22: Levels 10 & 11 Structure.$342.6m
09 Dec 2016ANZ Building. Construction of a new building, offices/retail/carpark/childcare/storage/plant/Loading Bay/BOH. Stage 3: Pile caps & column starter bars.$342.6m
09 Dec 2016ANZ Building. Construction of a new building, offices/retail/carpark/childcare/storage/plant/Loading Bay/BOH. Stage 4: Pile caps, core rafts & core wall starter bars, RC column details and inground hydraulic services, Lot S6.$342.6m
09 Dec 2016ANZ Building. Construction of a new building, offices/retail/carpark/childcare/storage/plant/Loading Bay/BOH. Stage 6: Structural cores 1, 2 & 3, Lot S6.$342.6m
09 Dec 2016ANZ Building. Construction of a new building, offices/retail/carpark/childcare/storage/plant/Loading Bay/BOH. Stage 8: Upper Ground Floor Structure.$342.6m
09 Dec 2016ANZ Building. Construction of a new building, offices/retail/carpark/childcare/storage/plant/Loading Bay/BOH. Stage 9: Level one structure.$343.6m
09 Dec 2016ANZ Building. Construction of a new building. Stage 26: Signage and landscaping Works$345.6m
07 Nov 2016Level 7 - Installation of ceiling and alterations to services$78k
11 Oct 2016Level 10 Alterations - New Meeting Room$411k
02 Sept 2016Level 10 - Alterations to Existing Building$135k
12 Aug 2016L10 - Proposed Internal Office Fitout$231k
22 July 2016L10 - Proposed Internal Office Fitout$231k
27 Apr 2016Stage 2, Including Fire Services - SHOP 11P, Internal Fitout for In a Rush Kitchen$300k
22 Apr 2016SHOP 11P, Internal Fitout for In a Rush Kitchen$300k
06 Apr 2016Upper Ground Floor - Proposed Minor Tenancy Fitout to Existing Volume Cafe$66k
18 Dec 2015No. 883 - Internal Fit-Out$1.1m
04 Sept 2015No. 883 - Internal Fit-Out$50k
10 Oct 2014Proposed Minor Refurbishment to Existing ANZ Branch$150k
26 June 2014Demolition of Single storey detached canteen & associated shed$132k
01 May 2014Level 2 Installation of 5 air conditioning units$673k
01 Aug 2013Alterations to CP2 change rooms$328k
23 Jan 2013Alterations to smoke detector to thermal detector Groove Train$5k
23 Nov 2012Office fitout alterations to an existing building - Level 10 (part)$385k
06 Dec 2011Carpark (CPI) Alterations - Installation of gates to the bike area and new double doors to the goods lift lobby$54k
24 Oct 2011Construction of a new Auditorium Stair$1.4m
30 Sept 2011Alterations Tenancy 3P Level 1 Carpark$452k
26 July 2011Proposed Installation of External Structual Awning Shop 1P$28k
10 June 2011Proposed Internal tenancy Fit-out for Degani - Tenancy 6P$260k
16 May 2011Removal of Smoke Detector and replacement with Heat Detector at CPL 1 , 791-847 Collins Street, Melbourne 3000$150k
23 Mar 2011Office fitout to level 9$110k
17 Mar 2011OFFICE FITOUT ALTERATIONS TO AN EXISTING BUILDING$330k
09 Nov 2010INSTALLATION TO EWIS PANEL$130k
18 Oct 2010ALTERATION TO AN EXISTING BUILDING$80k
18 Oct 2010INSTALLATION TO EWIS PANEL$153k
18 May 2010Tenancy 17C - Cafe Fitout alterations to an existing building$800k
11 May 2010Upper Ground Floor: fitout of catering office.$137k
25 Mar 2010YMCA - Anz Building - Gym fitout to an existing building - Tenancies 2P, 4P and 5P-(Amended to include propsed mechanical mezzanine structure services and installation of ladder)$0
12 Mar 2010YMCA - Anz Building - Gym fitout to an existing building - Tenancies 2P, 4P and 5P$1.6m
22 Feb 2010YMCA - Anz Building - Gym fitout to an existing building - Tenancies 2P, 4P and 5P$1.6m
22 Dec 2009Retail Tenancy Fitout to Shop 3P$150k
11 Dec 200913P - Fitout of cafe (all parts)$111k
09 Dec 2009Tenancy Fitout - Shop 18C (Elements Cafe)$733k
27 Nov 2009Internal fitout to Shop 6P$150k
13 Nov 2009Tenancy fitout - Groove Train Internal (non-structural) works only$900k
06 Nov 2009Proposed Internal Tenancy Fitout for Cafe to the ANZ tower$400k
23 Oct 2009Fitout alterations to an existing building - Tenancy C1$430k
15 Oct 2009Stage 2 - All remaining works, excluding fire services$220k
12 Oct 2009Proposed bank tenancy fitout, Ground floor, Shop 14P$715k
23 Sept 2009Fitout-Shop 11P$220k
08 Sept 2009P2 ANZ Building Refurbishing Area$63k
04 Aug 2009Stage 8: Level 10 Fitout - Services$193.5m
03 July 2009Stage 7: Office Fitout Alterations to an Existing Building$189.6m
04 May 2009Stage 6: Alterations to an existing building Levels 1 - 4 (Excluding Services) 791-847 Collins Street, Docklands 3008$175.9m
25 Feb 2009Stage 5: Services Fitout Upper Ground Floor$175.9m
19 Feb 2009Stage 4: Services Fitout (Levels 5-9) (FS2).$175.9m
03 Feb 2009ANZ Building. Construction of a new building, offices/retail/carpark/childcare/storage/plant/Loading Bay/BOH. Stage 25: Ground Plane, Collins Street Entry Steel, Glazing, Canopies and Upper Ground Floor Façade Glazing.$342.6m
27 Jan 2009Alterations to an Existing Building. Stage 2: Services Fitout (Levels 1-4).$175.9m
25 Nov 2008ANZ Building. Construction of a new building, offices/retail/carpark/childcare/storage/plant/Loading Bay/BOH. Stage 24: Atrium Finishes, Waterproofing, Atrium Steel & Roof Cladding, Level Sand 10, Level 11 and substation steel.$342.6m
11 Oct 2008ANZ Building-833 Collins Street, Docklands. Alterations to an Existing Building. Stage 1: Architectural Fitout Levels 1-4 (Excluding Services).$175.9m
29 July 2008ANZ Building. Construction of a new building, offices/retail/carpark/childcare/storage/plant/Loading Bay/BOH. Stage 23: All Ceilings and Access Floors.$342.6m
23 July 2008ANZ Building. Construction of a new building, offices/retail/carpark/childcare/storage/plant/Loading Bay/BOH. Stage 21: Fire Services.$342.6m
19 June 2008ANZ Building. Construction of a new building, offices/retail/carpark/childcare/storage/plant/Loading Bay/BOH. Stage 19: Vertical Transportation.$171.2m
19 Mar 2008ANZ Building. Construction of a new building, offices/retail/carpark/childcare/storage/plant/Loading Bay/BOH. Stage 16: Levels 5, 6, 7, 8 & 9 structure Lot S6.$342.6m
19 Feb 2008ANZ Building. Construction of a new building, offices/retail/carpark/childcare/storage/plant/Loading Bay/BOH. Stage 13: Level 3 structure.$342.6m
19 Feb 2008ANZ Building. Construction of a new building, offices/retail/carpark/childcare/storage/plant/Loading Bay/BOH. Stage 14: Level 4 structure.$342.6m
18 Jan 2008ANZ Building. Construction of a new building, offices/retail/carpark/childcare/storage/plant/Loading Bay/BOH. Stage 12: Level 2 structure.$342.6m
07 Dec 2007ANZ Building. Construction of a new building, offices/retail/carpark/childcare/storage/plant/Loading Bay/BOH. Stage 11: Security services.$342.6m
18 Sept 2007ANZ Building. Construction of a new building, offices/retail/carpark/childcare/storage/plant/Loading Bay/BOH. Stage 7: Structural (stair cores 7&8, entry promenade & child care lifts plus carpark level 2 slab), Lot S6.$342.6m
17 July 2007ANZ Building. Construction of a new building, offices/retail/carpark/childcare/storage/plant/Loading Bay/BOH. Stage 5: Structural works, carpark Level 1, Lot S6.$342.6m
01 Mar 2007ANZ Building. Construction of a new building, offices/retail/carpark/childcare/storage/plant/Loading Bay/BOH. Stage 1: Demolition works, Lot S6.$342.6m
01 Mar 2007ANZ Building. Construction of a new building, offices/retail/carpark/childcare/storage/plant/Loading Bay/BOH. Stage 1: Piling works, Lot S6.$342.6m

Questions and answers

Is ANZ residential or commercial?
ANZ is a commercial building. The City of Melbourne lists its main use as office.

When was ANZ built?
ANZ was completed in 2009.

How many floors does ANZ have?
ANZ has 10 floors above ground.

What businesses are in ANZ?
The latest council census counted 9 businesses in ANZ, including ANZ Branch, Australia And New Zealand Banking Group Limited and Caffe Esc.

Is there office or retail space for lease in ANZ?
See the commercial listings on this page, or search this address on realcommercial.com.au and commercialrealestate.com.au.

Who designed and built ANZ?
Lend Lease developed ANZ, Lend Lease Design designed it and Bovis Lend Lease built it. The building team section has the sources.

How tall is ANZ?
About 58 metres, measured from the City of Melbourne's 3D building model. It's number 58 of 286 buildings in Docklands by height.

What public transport is near ANZ?
Southern Cross Station is the nearest train station, about 8 minutes' walk. The nearest tram stop is Collins Landing/Collins St #D17, about 1 minute's walk.

What is the planning zone for ANZ?
The site is in the Docklands Zone - Schedule 2 (DZ2).

Does ANZ have an owners corporation?
Plan of subdivision PS602173 has 1 lot.

Has the ANZ office fitout received a green rating?
Yes. In 2012 the office fitout received a 6 Star Green Star Office Interiors rating.

Has any work been done on ANZ recently?
The City of Melbourne has issued 83 building permits for ANZ since 2007. The most recent was in May 2026.

Sources: City of Melbourne building permits (CC BY 4.0); CLUE building information (CC BY 4.0); CLUE business establishments (CC BY 4.0); Development Activity Monitor (CC BY 4.0); Geocoded National Address File (G-NAF) (Open G-NAF EULA (CC BY 4.0 based)). General information from public records, not legal, financial or building advice.

Suggest a correction

Something wrong or missing? Tell us what it should say. We check every suggestion before changing anything.

By sending, you agree to the contributor terms. See how we handle your details in the privacy policy.