| Construction started | Dec 2011 | First major construction permit issued |
| First occupants | Nov 2012 | First occupancy permit issued |
| Completed | 2012 | Collins Square Tower A 3 completed: 16 floors |
Each cost is the estimate on that record. Stages of a project often repeat its full value, so these don't add up to what was spent.
| 19 May 2025 | Lot S14, 9B - Fitout works to an existing gymnasium - Anytime Fitness | $242k |
| 04 Mar 2024 | Level 9 ATO - Internal Alterations | $136k |
| 29 Feb 2024 | Stage 0: Mechanical Ventilation Alterations to Level 15 | $150k |
| 18 Sept 2023 | Level 2 - Office fitout | $50k |
| 08 Aug 2023 | Level 15 - Office alterations | $268k |
| 16 June 2023 | Level 9 - Proposed Internal Stair Enclosure to Level 9 Intertenancy Stair | $85k |
| 17 May 2023 | Alteration to level 10 | $50k |
| 17 Apr 2023 | Internal fitout | $777k |
| 12 Apr 2022 | Alterations to fitout level 15 - Collins Square Tower 4 | $54k |
| 20 Apr 2021 | Level 17 (Tower 1) - Proposed alterations to existing office tenancy | $1.2m |
| 05 Feb 2021 | Level 13, Internal Reconfiguration of Office. | $200k |
| 27 Jan 2021 | Proposed internal non-structural fit out for ATO only. | $1.0m |
| 06 July 2020 | Tower 5, Level 2 - Removal of Good Lift Door Lobby | $300 |
| 11 June 2020 | Minor alterations to Levels 8 & 16 | $0 |
| 06 Mar 2020 | Alteration to Existing Restaurant (Ngon) | $131k |
| 31 Jan 2020 | Level 11 - Proposed supplementary AC upgrade to an existing office | $69k |
| 25 July 2019 | "UPSTANDING CITIZENS" - INTERNAL SHOP FIT OUT | $200k |
| 04 July 2019 | Level 8 - Internal Office Alterations | $56k |
| 08 May 2019 | Internal Alterations of Security Systems to Existing Egress Doors | $6k |
| 19 Mar 2019 | Level 15 - Alterations to existing building | $17k |
| 01 Mar 2019 | Tenancy T14 - Umma Kutchen internal restaurant fitout | $271k |
| 19 Feb 2019 | Shop 9C - Internal Tenancy Fitout for Optometrist | $140k |
| 22 Nov 2018 | Defit to Tenancy T14 | $42k |
| 11 Apr 2018 | Tower 3 Level 9 - Installation of partition wall & door as per plans | $18k |
| 05 July 2017 | Level 16 - Internal minor office fit out | $15k |
| 09 June 2017 | Level 8 - ATO Future Workspace - Minor office alterations | $110k |
| 24 May 2017 | Shop T36B - Retail tenancy fit out | $195k |
| 22 Sept 2016 | (Part Level 13) ATO - Refurbishment of Melbourne Design Centre (MDC) Level 13, 747 Collins Street Melbourne | $65k |
| 04 Aug 2016 | Unit 9B - To allow the change of use from a previous tenancy into a gymnasium | $300k |
| 30 Mar 2016 | Level 1 - Alterations | $50k |
| 04 Mar 2016 | Stage 1 - Internal demolition works only | $2.1m |
| 04 Mar 2016 | Stage Two - Internal demolition works only | $2.7m |
| 03 Feb 2015 | Shops 26 & 27 - Retail Tenancy Fit Out | $140k |
| 09 July 2014 | Level 2, Proposed office fitout for passport office | $1 |
| 29 Apr 2014 | Office Fitout OF TOWER 4B. | $6.4m |
| 15 Apr 2014 | Construction of Temporary Commercial Kitchen | $1k |
| 29 Nov 2013 | Retail tenancy fitout to Shop 13 | $40k |
| 13 Nov 2013 | Stage 23: Construction of Stair for Walker Corp. Building 4B and Integrated Fitout | $161.1m |
| 16 Oct 2013 | Proposed internal tenancy fitout to tenancy T12, Collins Square | $1.3m |
| 10 Oct 2013 | Stage 22: Internal Tenancy Fit-Out for Walker Corp Excluding Stair Construction - Building 4B and Integrated Fitout | $161.1m |
| 03 Oct 2013 | Structural Alterations to Levels 22 & 23. Collins Square, Tower 4B | $1.1m |
| 16 Aug 2013 | DMMI Fitout @ Collins Square - Tenancy T04 | $80k |
| 30 July 2013 | lnternal Tenancy Fitout for @eSpace Tenancy 21 | $120k |
| 29 July 2013 | lnternal Tenancy Fitout for Juice Bar Outlet Tenancy 25 | $150k |
| 25 July 2013 | Retail Canopy excluding Canopy | $3.2m |
| 25 July 2013 | Stage 3: Fire Services | $4.2m |
| 09 July 2013 | Proposed internal tenancy fitout to tenancy T12, Collins Square | $1.3m |
| 17 June 2013 | Stage 21: Building 4B and Integrated Fitout | $161.1m |
| 07 June 2013 | Internal Fitout for Japanese Food - Tenancy 23 | $150k |
| 29 May 2013 | Stage 20: CBA Loading Dock Mezzanine | $142.8m |
| 17 May 2013 | Stage 2: Amended Structural Details of Ground Floor & Canopy Extensions | $4.2m |
| 15 May 2013 | lnternal Tenancy Fitout for Malaysian and Indian Food Outlet Tenancies T17 & T18 | $280k |
| 22 Mar 2013 | Stage 19: Amended MMCo fitout Level 7 omitting Level 17 - Integrated fitout to building 4B | $140.0m |
| 08 Jan 2013 | Stage 18: Top Wing Panels - Type 1 Facades - Integrated fitout to building 4B | $140.0m |
| 19 Dec 2012 | Minor alterations to existing office tenancy - Level 1, Building 4A | $297k |
| 07 Nov 2012 | Stage 17: Retail Shopfronts/Facade - BUilding 4B & integrated fitout | $140.0m |
| 05 Nov 2012 | Internal fitout Level 1 & 2 | $3.0m |
| 02 Nov 2012 | Alterations to Shop 1 & 2 (De Mad Hatter Cafe) | $360k |
| 02 Nov 2012 | Stage 16: Retail Kitchen Exhaust - Integrated fitout to building 4B, 735 Collins Street | $220k |
| 17 Sept 2012 | Mechanical Systems Alterations | $250k |
| 20 June 2012 | Tenancy fitout of OF SUBWAY STORE SHOP 3 | $90k |
| 05 June 2012 | Stage 13: Bridge works | $151.8m |
| 19 Dec 2011 | Stage 5: Base building services excluding fire hydrants /fire hose reels. Integrated fitout to building 4B, | $150.0m |
| 29 Aug 2003 | Demolition of Shed 4 & Part demolition of Shed 3 | $70k |
Is Collins Square Tower A 3 residential or commercial?
Collins Square Tower A 3 is a commercial building. The City of Melbourne lists its main use as office.
When was Collins Square Tower A 3 built?
Collins Square Tower A 3 was completed in 2012.
How many floors does Collins Square Tower A 3 have?
Collins Square Tower A 3 has 16 floors above ground.
What businesses are in Collins Square Tower A 3?
The latest council census counted 10 businesses in Collins Square Tower A 3, including Anytime Fitness Docklands, Australian Passport Office and Australian Taxation Office.
Is there office or retail space for lease in Collins Square Tower A 3?
See the commercial listings on this page, or search this address on realcommercial.com.au and commercialrealestate.com.au.
Who designed and built Collins Square Tower A 3?
Walker Corporation developed Collins Square Tower A 3, Bates Smart designed it and Built built it. The building team section has the sources.
How tall is Collins Square Tower A 3?
About 74 metres, measured from the City of Melbourne's 3D building model. It's number 37 of 286 buildings in Docklands by height.
What public transport is near Collins Square Tower A 3?
Southern Cross Station is the nearest train station, about 4 minutes' walk. The nearest tram stop is Batman's Hill/Collins St #D15, about 1 minute's walk.
What is the planning zone for Collins Square Tower A 3?
The site is in the Docklands Zone - Schedule 3 (DZ3).
Does Collins Square Tower A 3 have an owners corporation?
Plan of subdivision PS638829 has 1 lot.
Has any work been done on Collins Square Tower A 3 recently?
The City of Melbourne has issued 40 building permits for Collins Square Tower A 3 since 2003. The most recent was in May 2025.
Sources: City of Melbourne building permits (CC BY 4.0); CLUE building information (CC BY 4.0); CLUE business establishments (CC BY 4.0); Development Activity Monitor (CC BY 4.0); Geocoded National Address File (G-NAF) (Open G-NAF EULA (CC BY 4.0 based)). General information from public records, not legal, financial or building advice.