| Construction started | Oct 2012 | First major construction permit issued |
| Completed | 2013 | Collins Square Tower B 1 completed: 23 floors |
Each cost is the estimate on that record. Stages of a project often repeat its full value, so these don't add up to what was spent.
| 05 May 2026 | Lot D, Tower 5, Level 17 - Fitout of office space | $928k |
| 28 Apr 2026 | Stage 1 - Ground Floor & Level 1 - Fitout & upgrade of works | $4.1m |
| 09 Apr 2026 | Removal of sky signs (Commonwealth bank) | $231k |
| 02 Apr 2026 | Tower 2 Level 22 - Make-good of exiting tenancy at south end to base building warm-shell configuration, addition of new spiral inter-tenancy stair continuing from level 23 above. | $2.0m |
| 05 Mar 2026 | Tower 5, Level 17 & 22 - split tenancy fitout including removal of intertenancy stair | $4.3m |
| 19 Feb 2026 | Level A,B and C - Office Fitout Works | $2.0m |
| 02 Feb 2026 | Alterations and additions of an existing office fit out | $786k |
| 09 Dec 2025 | Alterations to Existing Offices on Levels 12 & 13 Only within Existing Tower 2 at Deakin Downtown Corporate Centre | $20k |
| 26 Nov 2025 | Level A,B and C - Office Fitout Works - Stage 2- Office fitout works including demolition and services to Level A | $0 |
| 13 Nov 2025 | Levels 18 - 21 - Removal of inter-tenancy spiral stairs on levels 18-19 & levels 20-21 and Slab infill to levels 19 & 21 | $1.0m |
| 27 Oct 2025 | Internal Office Alterations | $70k |
| 13 Oct 2025 | The proposed project is for Zone 3 and 4 security upgrade works including a new secure room located at Level 27, Tower 2, 727 Collins Street, Docklands (Collins Square) for AUSTRAC. Stage 2: installation of phone booths | $871k |
| 01 Oct 2025 | Tower 1 Level 16 - Amenity and Lobby upgrade & replacement of ceiling lights | $1.0m |
| 18 Sept 2025 | The proposed project is for Zone 3 and 4 security upgrade works including a new secure room located at Level 27, Tower 2, 727 Collins Street, Docklands (Collins Square) for AUSTRAC. | $871k |
| 12 Sept 2025 | Shop T25 - Alterations to existing retail. Boost. | $266k |
| 15 July 2025 | HARVEST TENANCY DEFIT WORKS | $56k |
| 09 July 2025 | Level A,B and C - Office Fitout Works | $2.0m |
| 01 May 2025 | Lot D, Level 10 & 11 - Office fitout works | $953k |
| 15 Apr 2025 | Tower 4, level 17 - Proposed Minor Internal Office Fitout for Figari | $243k |
| 04 Apr 2025 | Tower 2 - Level 37 - 727 Collins Street - New door within the printer room. | $10k |
| 24 Mar 2025 | Ground - Modifications and alterations to an internal Woolworths supermarket. | $72k |
| 06 Mar 2025 | Lot D, Level 10 & 11 - Office fitout works | $953k |
| 31 Jan 2025 | Lot D - Tower 1 - Internal demolition and make-good works | $466k |
| 19 Dec 2024 | Level 22 & 23 - Project is for replacement of entrance doors and DDA toilet door | $81k |
| 24 Oct 2024 | Tower 1, Collins Square - Alterations to existing building | $1.4m |
| 03 Oct 2024 | Minor Alterations to Existing Office on Level 21 | $147k |
| 20 Aug 2024 | Levels 19, 20 and 21, 727 Collins Street - Tenancy alterations | $730k |
| 15 Aug 2024 | Tower 2, Level 7 - Internal alterations | $82k |
| 08 May 2024 | Levels 19, 20 and 21, 727 Collins Street - Tenancy alterations | $730k |
| 20 Mar 2024 | Level 16 - Alterations to existing building - Office fit-out | $367k |
| 05 Mar 2024 | Alterations to existing building - Entry doors upgrade | $31k |
| 22 Feb 2024 | Alterations to sprinklers and smoke dectectin - Quiet Booths - Level 12 Tower 2 | $19k |
| 12 Feb 2024 | Ground - 727 Collins Street - Internal office alterations, ATO Melbourne | $22k |
| 22 Jan 2024 | Level 19 (Part)- Alterations to an existing building | $801 |
| 23 Oct 2023 | Level 17, Tower 2 - Alterations to existing building. | $2.8m |
| 13 Oct 2023 | Level 11 - Alterations to an Existing Building | $220k |
| 04 Oct 2023 | 727, External Sky Signage - Installation of External Signage | $174k |
| 10 Aug 2023 | (Tower 4, Tenancy T33A - Ena) - Alterations to an Existing Building - Fire Damage Rectification Works | $54k |
| 14 July 2023 | Stage 2 - Balance of works | $6.6m |
| 10 July 2023 | Level 18/19, Tower 5 - Removal of internal stair and new concrete infill | $403k |
| 25 May 2023 | Alterations to existing office tenancy | $150k |
| 17 May 2023 | Stage 2 - fitout works | $130k |
| 01 May 2023 | Stage 2 - Balance of works | $6.6m |
| 03 Apr 2023 | Stage 2 - Level 16 - to capture phone booths and fire engineering report. | $380k |
| 16 Mar 2023 | Levels 11 - 14, Tower 4 -Optus Melbourne Office Consolidation Project | $7.4m |
| 09 Mar 2023 | Alterations on level 21 - Stage 2, Day 3 Works, Level 21 Construction of Glass Wall at Stair Void | $319k |
| 02 Mar 2023 | Level 21 Demolition Works - Stage 1, Day 3 Works, | $51k |
| 07 Feb 2023 | Level 16 - Proposed Fit out for PEXA Office | $409k |
| 23 Dec 2022 | Proposed office fitout for "Maddocks Lawyers Melbourne" | $600k |
| 22 Dec 2022 | L17/18, Tower Two, Collins Square - Alterations to an existing building | $1.0m |
| 21 Dec 2022 | Level 9 & 10 - Alterations to Existing Building | $3.2m |
| 20 Dec 2022 | Lot D - Level 11 - Internal fitout works | $776k |
| 05 Dec 2022 | Level 22 - Tower Two, - Make Good Works | $368k |
| 28 Oct 2022 | Stage 2 - Tenancy Alterations on Levels 19 and 21 | $0 |
| 18 Aug 2022 | Tenancy Alterations to Existing Commonwealth Bank Office Space (Levels 19 to 21 only) | $2.2m |
| 15 Aug 2022 | Proposed office tenancy split for KPMG - Level 32 | $406k |
| 05 Aug 2022 | Tenancy 2, Level 11, Tower 2 - Alterations to existing building. | $25k |
| 27 July 2022 | Stage 2 - Tenancy Alterations on Levels 19 and 21 | $0 |
| 22 June 2022 | Proposed office tenancy split for KPMG - Level 32 - Stage Two Building Permit - To Permit Remainder of Proposed Works Only. | $406k |
| 31 May 2022 | Tenancy Alterations on Levels 19 and 21 | $150k |
| 12 May 2022 | Tenancy Alterations on Levels 19 and 21 | $150k |
| 02 Mar 2022 | Stage 2 - Level 15 - Tenancy Office Alterations. | $128k |
| 04 Feb 2022 | Level 15 - Tenancy Office Alterations. | $353k |
| 10 Jan 2022 | Level 21 - Tenancy Alterations | $150k |
| 28 July 2021 | Stage 3 - Fitout works to stage 3 and stage 4 area. Level 16, Tower 1. | $324k |
| 26 May 2021 | Level 22 - Tower 2 - Collins Square - Alteration to exisiting building | $1.1m |
| 18 May 2021 | Internal Fitout & Alterations | $70k |
| 28 Apr 2021 | Stage 2 - Fitout works to stage 2 area. Level 16, Tower 1. | $455k |
| 04 Mar 2021 | Alterations to existing Office | $13k |
| 01 Mar 2021 | Proposed Office Fitout | $219k |
| 16 Nov 2020 | Proposed Internal Office Fitout on Level 28 Onl | $75k |
| 14 Sept 2020 | Level 17 - Alterations to existing building | $650k |
| 11 Mar 2020 | New work station internal alteration | $119k |
| 03 Mar 2020 | Level 18 & 21 - Minor Alterations to Existing Office on Level 18 and 21 | $100k |
| 18 Feb 2020 | Fitout | $517k |
| 18 Feb 2020 | Level 9,10 & 11 - Internal Demolition works | $517k |
| 30 Jan 2020 | 727, 4B Tower 1, lower Ground Collins Street Melbourne Alterations to existing amenities | $462k |
| 29 Jan 2020 | Stage 2 - Level 7 and Level 14 fitout works | $4.3m |
| 20 Dec 2019 | Janitors Lunchroom - Alterations to Existing Building | $29k |
| 04 Dec 2019 | Tower 1 Collins Square,Level 16 - alterations to create a media room | $60k |
| 27 Nov 2019 | Tower 2, Levels 12 and 13 - Alteration | $1k |
| 27 Nov 2019 | Tower 5, Level 11 - Additional works to NBN levels | $470k |
| 01 Nov 2019 | Reconfiguration of the fire systems to separate the common Retail / Podium levels from the main Office Towers in line with the new and approved Fire Engineering Report | $136k |
| 31 Oct 2019 | Stage 2 - Level 7 and Level 14 fitout works | $4.3m |
| 07 Oct 2019 | Collins Square T2 - LIFT 23 Lift Shaft Air Transfer Duct | $8k |
| 02 Oct 2019 | Alterations to existing building - Loading Dock Office | $35k |
| 01 Oct 2019 | Internal Studio Alterations for Wellineux, Tenancy 45 | $293k |
| 17 Sept 2019 | Fitout | $517k |
| 16 Sept 2019 | Tower 5, Level 11 - Additional works to NBN levels | $470k |
| 22 Aug 2019 | Stage 1 - Minor fitout works to part of Level 8 and part of Level 15 - Tower 1 Collins Square - Marsh McLennan & Companies Fit Out | $4.3m |
| 14 Aug 2019 | Level 28 Proposed Internal Minor Office Fitout | $100k |
| 14 Aug 2019 | West Pod Internal Alterations - Level 1 - Alterations to an existing building | $117k |
| 31 July 2019 | Stage 3 - Fitout works to levels 8-11, 13 and 15. | $3.3m |
| 16 July 2019 | Level 23 - The Executive Centre - Wall Removal Works - Removal of partition wall between suite C 23.51 and C 23.50 | $13k |
| 28 June 2019 | Ground floor - Tenancy 1 - Fitout | $30k |
| 07 June 2019 | Internal Tenancy Fitout for Lily Li @ Collins Square | $270 |
| 30 Jan 2019 | Tower 1 - Proposed Office Fit out of Existing Building | $400k |
| 15 Jan 2019 | T7, Tower 2- Proposed Office Fitout | $20k |
| 26 Nov 2018 | Tower 4 - Level 17 Proposed Minor Internal Office Alterations for VCSO | $56 |
| 01 Nov 2018 | Collins Square T1 Podium - Internal Alterations | $1.4m |
| 26 Oct 2018 | Stage 1 - To Permit Internal Partitions and Tenancy Fitout Works (Excluding Mechanical Works) | $350k |
| 26 Oct 2018 | Stage 2 - To Completion of Proposed Office Fitout Works Only | $350k |
| 05 Oct 2018 | Level 22 & 23 - Alterations to Existing Office | $828k |
| 30 Aug 2018 | Levels 9-19, Tower 5, Collins Square - Internal fit-out works including architectural and services works | $26.1m |
| 15 Aug 2018 | Tenancy Fitout Levels 19 & 20 - Tower 4 - Collins Square | $357k |
| 28 June 2018 | Tower 5, Level 20-22 - Grant Thornton Office Fit-out | $7.3m |
| 25 June 2018 | Levels 9-19, Tower 5, Collins Square - Internal fit-out works including architectural and services works | $26.1m |
| 12 June 2018 | Stage 2 - Alterations to Existing Fagade / Entry - including New sliding door | $90k |
| 18 May 2018 | Alterations to Existing Below Ground Tank Room | $1k |
| 08 May 2018 | Tenancy 7, Tower 2 - Modification | $70k |
| 18 Apr 2018 | T09C - Facade Alterations | $217k |
| 09 Feb 2018 | Shop T33A - Alterations to sprinklers only | $3k |
| 05 Feb 2018 | Alterations to Tenancies - Tower 4, Hightail Grill and Belles Hot Chicken | $16k |
| 11 Jan 2018 | Shop T37B - Proposed shop fitout and alterations for Famous Fish | $268k |
| 15 Sept 2017 | Stage 3 - The creation of an opening between Levels 18 and 19 to create a single five storey interconnected tenancy, including the installation of a new spiral stair and associated smoke lobby | $684k |
| 23 Aug 2017 | T37A - Fitout of a Cafe | $110k |
| 21 Aug 2017 | Kiosk K01 - Retail tenancy fit out | $120k |
| 10 Aug 2017 | Stage 2 - All works not approved under the Stage 1 Building Permit - excluding the installation of the spiral stair and associated opening, and excluding the alterations to the building façade associated with the creation of the Level 19 Terrace - Levels 17 to 21 | $6.6m |
| 03 Aug 2017 | Levels 17 to 21 -Internal alterations to Levels 17 to 21 to create single tenancy | $11.9m |
| 31 July 2017 | Level 19, Tower 2 - New winter garden including alterations to facade | $75k |
| 26 July 2017 | Shop T33A - Alteration to Shop | $45k |
| 13 July 2017 | Stage 2 - Fit-out works to construct new food retail tenancy Belle's Chicken and T05 Coolroom | $2.3m |
| 13 July 2017 | Tenancy 39 - 40 Tower 4 - Food Tenancy | $2.0m |
| 28 June 2017 | Tenancy 41B Collins Square - Mens Biz | $140k |
| 20 June 2017 | Level 17, Tower 4 - Proposed Internal Office Fitout for VCSO | $1.8m |
| 19 June 2017 | Level 19, Tower 2 - New winter garden including alterations to facade | $75k |
| 16 June 2017 | Level 23 - Proposed minor internal office fit out for Maddocks | $80k |
| 03 May 2017 | T42C - Collins Square - Retail Food Court / Podium | $60k |
| 01 May 2017 | Podium T38 & T34 - Tower 4, Fit-out works to construct new food retail tenancy | $510k |
| 18 Apr 2017 | Collins Square Tower 4 - Level 19 & 20 - fit out | $7.5m |
| 12 Apr 2017 | EOT alterations | $150k |
| 11 Apr 2017 | T10 Level 1 - Capsule pharmacy - fit out of tenancy 10 | $200k |
| 10 Apr 2017 | Tower 2, Level 27 - Construction of Corridors into Tenancies | $400k |
| 24 Mar 2017 | T42C - Collins Square - Retail Food Court / Podium | $60k |
| 21 Mar 2017 | Tower 4 - Level 20 & 21 New Stair | $900k |
| 20 Mar 2017 | Retail tenancy fit out for shop T36A | $280k |
| 10 Mar 2017 | Tower 4, Tenancy 30 Fit-out | $1.2m |
| 07 Mar 2017 | Tower 4 Market - Relocation of FHR's, Construction of new partition, downlight modification, additional exit & emergency lighting | $339k |
| 02 Mar 2017 | Podium T38 & T34 - Tower 4, Fit-out works to construct new food retail tenancy | $510k |
| 28 Feb 2017 | Level 01 Tower 4 Podium - Stage 2 Ratil Modifications | $800k |
| 27 Feb 2017 | Level 1, Tower 4 - Woolworths Fit Out works - Architectural & Services | $100k |
| 23 Feb 2017 | T4-T5 - Kitchenette - Internal alterations | $84k |
| 20 Feb 2017 | Shop 35A - Proposed Tenancy Fitout for Crisp Creative Salad | $86k |
| 14 Feb 2017 | Collins Square - Retail Food Court/Podium - Dry Cleaners - Fit out of Tenancy 41c | $100k |
| 12 Feb 2017 | Stage 2 - Pop-up fit-out | $56k |
| 08 Feb 2017 | Stage 2 - Internal alterations to existing CP1 (Tower 1 Carpark) | $1.7m |
| 07 Feb 2017 | Internal Tenancy Fitout for The Italian at Collins Square | $295k |
| 30 Jan 2017 | T37C - Fitout of a Cafe | $155k |
| 25 Jan 2017 | Alterations – Tenancy fitout to levels 12 and 13 Stage 1 - All works excluding alterations to fire hose reels | $9.5m |
| 19 Jan 2017 | Tower 4 - Level 01 Retail Precinct - New interconnecting Stair from Batmans Ave to Level 1 | $1.5m |
| 22 Dec 2016 | Proposed Tenancy Fitout for Sushi Nori | $376k |
| 21 Dec 2016 | T41a, Podium - Pure Pie | $100k |
| 21 Dec 2016 | Tower 2, Level 22 - Office Fit-Out | $3.4m |
| 20 Dec 2016 | Collins Square, Level 00 Car Park - New Retail Store Rooms | $25k |
| 15 Dec 2016 | Alterations – Tenancy fitout to levels 12 and 13 Stage 1 - All works excluding alterations to fire hose reels | $9.5m |
| 15 Dec 2016 | Stage 2 - Final - Alterations – Tenancy fitout to levels 12 and 13 | $9.5m |
| 15 Dec 2016 | (Tower 2, Level 27) Office fit out | $3.4m |
| 12 Dec 2016 | L14-L16 fitout Tower 2 | $9.2m |
| 12 Dec 2016 | Stage 1 - Internal demolition only | $1.7m |
| 01 Dec 2016 | Tenancy 7, Tower 2 Fitout | $60k |
| 30 Nov 2016 | Level 27 & 28 - Office Fit Out | $3.0m |
| 22 Nov 2016 | (Level 9) Security door alterations | $5k |
| 11 Nov 2016 | (Shop T09C) - Tenancy fitout to retail | $195k |
| 10 Nov 2016 | Tenancy 9a & 9c only, podium level - Base building modifications | $80k |
| 17 Oct 2016 | Tower 2 - Level 7 - Alterations and fit-out of office area | $5k |
| 29 Sept 2016 | Tower 4, Level 16 - Fitout | $4.2m |
| 08 Sept 2016 | Stage 2 - Fit-out including fire services - L14-L16 fitout Tower 2 | $9.2m |
| 01 Sept 2016 | Stage 2 - Level 3 (Part) & Levels 6 to 15 Services Only - Excluding Fire Hose Reels to Comms rooms throughout | $20.0m |
| 31 Aug 2016 | Stage 2 - Final - Alterations – Tenancy fitout to levels 12 and 13 | $9.5m |
| 26 Aug 2016 | Stage 3 - Fit-out to Level 3 Only | $12.8m |
| 22 Aug 2016 | Level 15 - Office fitout to existing tenancy | $82k |
| 09 Aug 2016 | Tower 2 - Alterations and fit-out of office area | $579k |
| 04 Aug 2016 | Level 18 , Tower 4 - BDO fitout | $3.4m |
| 25 July 2016 | Stage 3 - Fire Services to Comms Rooms on Levels 6 to 15 | $20.0m |
| 09 June 2016 | building 2 - tenancy fit out | $5.1m |
| 19 May 2016 | Stage 3 - Remainder of works Pop-up fit-out | $102.2m |
| 29 Apr 2016 | Fitout to Level 7 | $1.1m |
| 05 Feb 2016 | Ground Floor, Tower 1, Fit Out | $32k |
| 18 Jan 2016 | Stage 2 - Level 3 (Part) & Levels 6 to 15 Services Only - Excluding Fire Hose Reels to Comms rooms throughout | $20.0m |
| 15 Jan 2016 | building 2 - tenancy fit out | $5.1m |
| 11 Dec 2015 | Tower 4, Level 6-15 & 16-20, 727 Collins Street - Fit-Out | $20.0m |
| 31 Aug 2015 | Level 23-25 Fitout | $9.3m |
| 21 Aug 2015 | Tower 2 Level 27-36 Proposed Fit out | $55.8m |
| 01 May 2015 | Level 21, Tower 4B, Fit-Out | $473k |
| 01 May 2015 | Stage 2: Remaining Fit Out Works - Level 21, Tower 4B, Fit-Out | $473k |
| 24 Feb 2015 | Level 17: Internal Office Fit-Out | $435k |
| 21 Nov 2014 | Stage 2- Level 17 Alterations to exisitng office | $265k |
| 21 Oct 2014 | Level 17 Alterations to exisitng office | $265k |
| 25 Sept 2014 | Level 17, Tower 4B Fit-Out | $565k |
| 05 Sept 2014 | Level 17, Internal Alterations | $160k |
| 03 Sept 2014 | Stage 3 - Additional Tenancy Separation Works | $320k |
| 21 Aug 2014 | Stage 2 - Level 17, Internal Alterations | $160k |
| 14 Aug 2014 | Stage 2 - Level 17, Tower 4B Fit-Out | $565k |
| 14 May 2014 | Precinct Signage Suspended Under Awning Signage | $117k |
| 27 Feb 2014 | Stage 2 - Construction of a canopy Urban Art Plaza Fit-Out | $1.9m |
| 12 Nov 2013 | Stage 2: Proposed tenancy fitout including external works. Tenancy Fitout for Commonwealth Bank Australia Tenancy TI5 | $440k |
| 24 Oct 2013 | Stairs & Balustrading - Excluding Roof Canopy Structure Urban Art Plaza Fit-Out | $600k |
| 21 Oct 2013 | Tenancy Fitout for Commonwealth Bank Australia Tenancy TI5 | $440k |
| 26 Aug 2013 | Internal tenancy fitout for Long Shot Coffee @ Tenancy T44 | $300k |
| 15 Aug 2013 | Tenancy 47, Internal tenancy fitout for Bar Nacional @ Collins Square. | $600k |
| 30 July 2013 | Tenancy 20 - Rhumba's Fitout | $172k |
| 03 July 2013 | Stage 7: Minor amendments to Level 19 Tea Prep Store & Meeting Rooms | $11.9m |
| 02 July 2013 | Stage 6: Internal Fitout & Alterations | $11.9m |
| 20 June 2013 | lnternal Tenancy Fitout for Nashi Tenancy 19 | $143k |
| 07 June 2013 | Stage 5: Revised Internal Partition Layout to Level 21 | $11.9m |
| 07 June 2013 | Tenancy 22 - Salsa's | $95k |
| 21 May 2013 | Internal tenancy fitout for Big Italian @ Collins Square Tenancy T24 | $200k |
| 08 Mar 2013 | Stage 4: Revised Partition Layout Alteration to a Building (CBA Fitout) | $11.9m |
| 19 Feb 2013 | Stage 3: Amendment to revert back to original partition layout - Alteration to a Building (CBA Fitout) | $11.9m |
| 06 Dec 2012 | Stage 2: Remainder of works including revised partitioning layouts and fire services - Alteration to a Building | $11.9m |
| 26 Oct 2012 | Stage 1: Internal Alterations including partitioning excluding partitioning layout to north of levels and services excluding fire hydrants and hose reels Level 18,19, 20 & 21 (Part) - Alteration to a Building | $11.9m |
Is Collins Square Tower B 1 residential or commercial?
Collins Square Tower B 1 is a commercial building. The City of Melbourne lists its main use as office.
When was Collins Square Tower B 1 built?
Collins Square Tower B 1 was completed in 2013.
How many floors does Collins Square Tower B 1 have?
Collins Square Tower B 1 has 23 floors above ground.
What businesses are in Collins Square Tower B 1?
The latest council census counted 20 businesses in Collins Square Tower B 1, including Bar Nacional, Big Italiano and Commonwealth Bank of Australia.
Is there office or retail space for lease in Collins Square Tower B 1?
See the commercial listings on this page, or search this address on realcommercial.com.au and commercialrealestate.com.au.
Who designed and built Collins Square Tower B 1?
Walker Corporation developed Collins Square Tower B 1, Bates Smart designed it and Brookfield Multiplex built it. The building team section has the sources.
How tall is Collins Square Tower B 1?
About 90 metres, measured from the City of Melbourne's 3D building model. It's number 25 of 286 buildings in Docklands by height.
What public transport is near Collins Square Tower B 1?
Southern Cross Station is the nearest train station, about 3 minutes' walk. The nearest tram stop is Batman's Hill/Collins St #D15, about 1 minute's walk.
What is the planning zone for Collins Square Tower B 1?
The site is in the Docklands Zone - Schedule 3 (DZ3).
Does Collins Square Tower B 1 have an owners corporation?
Plan of subdivision PS800331 has 1 lot.
Has any work been done on Collins Square Tower B 1 recently?
The City of Melbourne has issued 139 building permits for Collins Square Tower B 1 since 2012. The most recent was in May 2026.
Sources: City of Melbourne building permits (CC BY 4.0); CLUE building information (CC BY 4.0); CLUE business establishments (CC BY 4.0); Development Activity Monitor (CC BY 4.0); Geocoded National Address File (G-NAF) (Open G-NAF EULA (CC BY 4.0 based)). General information from public records, not legal, financial or building advice.