| Construction started | Oct 2007 | First major construction permit issued |
| First occupants | Feb 2010 | First occupancy permit issued |
| Completed | 2010 | Seven17 Bourke & Travelodge Docklands completed: 18 floors |
Each cost is the estimate on that record. Stages of a project often repeat its full value, so these don't add up to what was spent.
| 17 Dec 2025 | Level 9 - Internal Tenancy Fitout | $1.0m |
| 10 Oct 2025 | Level 1 - Minor Internal Alterations to Two Levels to Two Level 1 Tenancies | $603k |
| 02 Oct 2025 | Level 12 - Minor internal office alterations | $16k |
| 15 Aug 2025 | INTERNAL ALTERATIONS TO LEVEL 9 TENANCY | $1.7m |
| 31 July 2025 | Stage 2 - External works to remove glazing facade panels for installation of Train Simulator | $1.1m |
| 08 July 2025 | Installation of Additional Sprinklers to Tenancy 12 | $3k |
| 20 Feb 2025 | Tenancy 22 & 23 - Zuppa Soup Kitchen fitout | $150k |
| 13 Feb 2025 | Level 4 - Minor additions/alterations to tenancy. | $1.0m |
| 26 Sept 2024 | MAKE GOOD WORKS TO RETAIL 5 & 6 (DE-FIT) | $129k |
| 28 Aug 2024 | Stage 1 - Retail 9, 10 and 11 - Converting into a training facility for metro rail - Excluding Simulator | $1.1m |
| 07 July 2024 | basement, 717 Bourke - Minor Alterations | $11k |
| 07 May 2024 | CONVERTING LEVEL 2 AND R12 TENANCY INTO A TRAINING FACILITY FOR METRO RAIL | $812k |
| 03 Apr 2024 | Retail 11 - MAKE GOOD WORKS - TOPPING SLAB | $172k |
| 28 Feb 2024 | Tenancy 03-04 - Proposed alterations to existing retail tenancy | $479k |
| 15 Dec 2023 | CONVERTING LEVEL 2 AND R12 TENANCY INTO A TRAINING FACILITY FOR METRO RAIL | $812k |
| 15 Dec 2023 | Part level 10 - Fit out works | $520k |
| 30 Nov 2023 | Part level 12 - Internal Office Fitout for LeasePLUS | $263k |
| 14 Nov 2023 | Level 17 - Minor internal alterations to tenancy | $110k |
| 12 Oct 2023 | ALTERATIONS TO LEVEL 4 LOBBY | $3.0m |
| 10 Oct 2023 | Part level 10 - Fit out works | $520k |
| 06 Oct 2023 | Level 13 - Office Tenancy Fitout | $17k |
| 23 Aug 2023 | Minor internal alterations to office | $10k |
| 28 June 2023 | MAKE GOOD WORKS TO LEVELS 8, 9 & 10 | $1.5m |
| 14 June 2023 | Level 13 - Alterations to existing building - Office tenancy fitout | $40k |
| 29 Sept 2022 | Display Suite Tenancy Fitout | $1.2m |
| 08 June 2022 | Levels 5 & 7 - Office upgrade works | $122k |
| 24 May 2022 | Amadeus office tenancy fit out - Level 3 | $325k |
| 20 May 2022 | Level 12 - Office Fitout | $670k |
| 21 Apr 2022 | Levels 8-10 - Alterations to existing building | $568k |
| 14 Dec 2021 | Level 12 - Internal Office Alterations for LeasePlus | $167k |
| 23 July 2021 | Level 3 - Office tenancy fit out | $576k |
| 19 July 2021 | Level 11 - Alterations (automation) to existing swing door | $17k |
| 06 July 2021 | Level 2, R18 - Internal Non Structural Alterations to Part of the Existing Office | $13k |
| 01 July 2021 | Level 5 & 6 - Fire service works only | $8k |
| 29 June 2021 | Internal Alterations to Mailroom | $51k |
| 26 May 2021 | Level 14. Proposed internal door alterations | $25k |
| 03 May 2021 | Internal Alterations to Mailroom | $51k |
| 15 Apr 2021 | Level 3 - Internal Alterations to Office Tenancy | $23k |
| 21 Dec 2020 | Level 11 - Minor Demolition and Reconfiguration of the Layout | $17.3m |
| 17 Dec 2020 | Level 4 - Plantroom: Replace existing smoke detectors with thermal | $10k |
| 08 Sept 2020 | Ground Floor. Proposed Minor Internal Fitout | $362k |
| 10 July 2020 | Level 13 slab infill works | $68k |
| 24 June 2020 | Level 4. PROPOSED ALTERATIONS TO SMOKE DETECTION SYSTEM ONLY | $1k |
| 15 June 2020 | Level 13 - AIG Melbourne. Restack and downsize project. | $2.0m |
| 20 Mar 2020 | Level 3 - Office fitout | $120k |
| 06 Mar 2020 | Proposed alterations to existing office tenancy | $102k |
| 06 Feb 2020 | LEVEL 8 - ADDITIONAL 30 WORK STATIONS | $44k |
| 16 Jan 2020 | Alterations to existing office building - Office (Fitout) | $7k |
| 01 Nov 2019 | Level 1 - New End of Trip facilities | $2.1m |
| 29 Oct 2019 | Level 17 - Alterations to existing office amenities | $237k |
| 01 Aug 2019 | Alterations to existing office building - Office (Fitout) | $2.1m |
| 11 July 2019 | Level 1 - Office Tenancy Fitout | $160k |
| 26 June 2019 | Level 1 - New End of Trip facilities | $2.1m |
| 21 June 2019 | LEVEL 7 - GTV9 OFFICE TENANCY REFURBISHMENT - STAGE 1: INTERNAL NON-STRUCTURAL DEMOLITION WORKS ONLY | $2.8m |
| 16 May 2019 | Level 12 INTERNAL ALTERATIONS TO OFFICE TENANCY | $187k |
| 07 May 2019 | STAGE 2: ALL WORKS TO COMPLETION | $2.8m |
| 15 Feb 2019 | Lot 1, Retail 17, Level 2 - Construction of Office Fit Out | $22 |
| 07 Feb 2019 | 717 Bourke - Ground to Level 4 - Proposed Sprinkler Installation to existing external canopies | $100k |
| 03 Dec 2018 | stage 3 additional alterations to level 6 sales area | $474k |
| 01 Nov 2018 | PROPOSED FACADE REPLACEMENT WORKS (INTER-ALIA ASSOCIATED SPRINKLER INSTALLATION WORKS) | $599k |
| 31 Oct 2018 | Level 9 and 10 - PROPOSED INTERNAL OFFICE FIT OUT | $424k |
| 07 Sept 2018 | Level 8 - Proposed Internal office fitout | $186k |
| 27 Aug 2018 | Proposed minor fitout works | $4k |
| 01 Aug 2018 | 717 Bourke - Level 9 & 10 - Proposed carpet replacement | $283k |
| 05 July 2018 | Level 9 - Stage 2: Partitions and Minor Service Modifications to Area 2 (Meeting Rooms) | $303k |
| 18 June 2018 | Level 17 - Office refurbishment | $79k |
| 30 May 2018 | Level 9 - Stage 1: Workstations / Partitions To Area 1 (Work Points) Only | $303k |
| 20 Apr 2018 | Level 8 - Proposed internal office fit out - STAGE 1: NEW CARPET, PAINT AND REMOVAL OF 8 LOW HEIGHT PARTITIONS | $500k |
| 04 Apr 2018 | Level 4 - Proposed alterations and additions | $2.4m |
| 08 Feb 2018 | Level 14 - Office Fitout | $25k |
| 02 Feb 2018 | Stage 2 - alterations works to publicity area of level 6 | $409k |
| 20 Dec 2017 | Levels 11 & 12 - To Completion - Internal Works to Financial Ombudsman Services Office | $102k |
| 05 Dec 2017 | Level 6, Tenancy Alterations | $409k |
| 13 Nov 2017 | Tenancy 11, Ground Floor - Internal office partitions | $55k |
| 11 Sept 2017 | 717 Bourke - Proposed alterations to existing facade | $736k |
| 09 Aug 2017 | 717 Bourke - Tenancy 12 - Proposed Internal Office Fitout | $28k |
| 27 June 2017 | 717 Bourke - Level 10 - Fire Services Works | $11k |
| 24 Feb 2017 | Level 5 - Internal Fit-out of office | $97k |
| 21 Feb 2017 | 717 Bourke - Level 13 - Alterations to an existing building | $43k |
| 28 Dec 2016 | 717 Bourke - Tenancy 2 - Proposed Minor Internal Office Alterations for Bupa | $50k |
| 18 Nov 2016 | 717 Bourke - Suite 20 - Construction of office fitout | $118k |
| 17 Nov 2016 | 717 Bourke - Internal office fit-out & alterations | $1.4m |
| 14 July 2016 | 717 Bourke - L12 - Internal office alteration for @ Financial Ombudsman Service Office | $96k |
| 29 Apr 2016 | 717 Bourke - Level 1 Alterations | $44k |
| 26 Feb 2016 | 717 Bourke - Level 7 Fit-Out | $0 |
| 29 Jan 2016 | 717 Bourke - Retail 1 - Fit-Out | $18k |
| 24 Nov 2015 | 717 Bourke - Stage 1 - Level 9 Internal fit-out excluding fire services | $200k |
| 09 Apr 2015 | 717 Bourke - Stage 1 - Level 13 - Internal Alterations/Refurbishment | $170k |
| 24 Mar 2015 | Stage 2 - Remaining Works and Services | $170k |
| 25 Feb 2015 | 717 Bourke - Level 12 - Office Fit Out | $180k |
| 16 Jan 2015 | BUPA Fit-Out | $160k |
| 09 Dec 2014 | Retail 9 & 10 - Fit out of dental surgery as per plans | $255k |
| 13 Oct 2014 | Tenancy T1 and T2, Level 1(part) - Financial ombudsman services tenancy alterations. | $189k |
| 01 Oct 2014 | Retail unit 12 - Alterations to existing tenancy | $42k |
| 05 Sept 2014 | 717 Bourke - Tenancy T20 Level 4 Alterations | $146k |
| 03 Sept 2014 | Tenancy T20 LVL 4 Alterations | $29k |
| 28 Aug 2014 | Alterations to existing tenancy | $16k |
| 18 July 2014 | Stage 2 - Tenancy 19 ( Level 2) Fit-Out - Remainder of Works - Fire Hydrant Shortfall Approval | $2.2m |
| 23 May 2014 | Stage 1 - Tenancy Fitout- Excluding Fire Hydrant - Mezzanine Level | $2.2m |
| 06 May 2014 | Aiterations to T8 tenancy Ground Floor | $69k |
| 14 Feb 2014 | Internal alterations to Existing building Ground Floor-Tenancy T18 | $128k |
| 30 Jan 2014 | Office tenancy fitout, including change of use from retail Level 2 (Tenancy 17) | $205k |
| 14 Nov 2013 | Internal Tenancy 2-4 Fitout for Pilates on Bourke | $50k |
| 09 Aug 2013 | Internal Office Tenancy 18 Fitout | $30k |
| 15 July 2013 | Internal alterations to Existing building Ground Floor-Tenancy T9, T10,T11 & T12 | $42k |
| 02 Apr 2013 | Internal alterations to Existing building Ground Floor-Tenancy T19 | $222k |
| 02 Apr 2013 | Internal office fitout to existing Tenancy 17, Level 3 | $50k |
| 26 Feb 2013 | STAGE 3 - FINANCIAL OMBUDSMAN SERVICES TENANCY ALTERATIONS. TO COMPLETION (OFFICE 3) | $280k |
| 16 Nov 2012 | STAGE 3 - FINANCIAL OMBUDSMAN SERVICES TENANCY ALTERATIONS. TO COMPLETION (EXCLUDING OFFICE 3) | $280k |
| 18 Oct 2012 | Proposed security room fitout to existing tenancy 16A | $51k |
| 03 Sept 2012 | TENANCY ALTERATIONS LEVELS 11 & 12, 717 BOURKE STREET, DOCKLANDS | $300k |
| 21 Aug 2012 | Minor Alterations Level 12 | $15k |
| 09 Aug 2012 | Vesda Installation to a data room Level 12 | $44k |
| 31 Jan 2012 | Office fit out (Reach Local Tenancy) Level 7 | $50k |
| 25 Jan 2012 | A fitout to tenancies 22 and 23 - Grain Cafe | $250k |
| 20 Dec 2011 | 717 Bourke - Upgrade Works to the Electrical Services of a New Generator | $505k |
| 16 Dec 2011 | 717 Bourke - Soffit Rectification Alterations - Curtain Wall, Levels 5, 7, 9, 11, 13 & 15 | $200k |
| 25 Oct 2011 | Proposed alterations and additions to shop - Tenancy 7 Ground Floor | $66k |
| 05 Sept 2011 | A fitout to tenancies 22 and 23 - Grain Cafe | $250k |
| 06 July 2011 | Internal alteration to shop T21 | $200k |
| 01 July 2011 | Internal Alterations to Shop (Fit Out) Shop 5 & 6 | $400k |
| 11 May 2011 | Alterations to Financial Ombudsman Servies (FOS) at level 11 & level 12 offices | $100k |
| 10 May 2011 | Removal of exisiting ewis to levels 4 & 5 | $1k |
| 09 Feb 2011 | Stage 1: PBL Media GTV9 fitout. Architectural, structural and services (excluding external works, fire services, undercroft fuel tank, architectural and mechanical works associated with stair void connecting Levels 5-7, studio control rooms - Level 5) | $8.0m |
| 25 Jan 2011 | Alterations - Cafe Cavallino, Level 4 | $350k |
| 19 Jan 2011 | Upgrade of EWIS Tone at Fire indicator panel at 717 Bourke Street, Docklands 3008 | $4k |
| 16 Dec 2010 | Stage 3: PBL Media GTV9 offices and studio fitout including ground floor mail room and garage, levels 4 and 5 (part) office and plant room, levels 6-7 offices, undercroft fuel tank, generator (Level 1 car park) and level 18 radio room, levels 4-7. | $8.0m |
| 13 Dec 2010 | Office fitout-Levels 12 part & 13 (Chartis) | $3.0m |
| 11 Nov 2010 | Telstra office fitout & call centre Levels 8 9 10 | $13.5m |
| 18 Oct 2010 | Cafe fitout (Cavallino) Podium Level 4 | $390k |
| 13 Oct 2010 | Level 12: New inter-tenancy walls and fire hose reel to base buidling. | $80k |
| 27 Aug 2010 | PBL Media GTV9 offices and studio fitout including ground floor mail room and garage, levels 4 and 5 (part) office and plant room, levels 6-7 offices, undercroft fuel tank, generator (Level 1 car park) and level 18 radio room, levels 4-7. Stage 2: All works to completion (excluding external works and studio control rooms) | $8.0m |
| 28 July 2010 | 171 Bourke, Level 3 (Hotel) - Building Management Office Fitout | $80k |
| 08 July 2010 | Financial ombudsman service office tenancy fitout | $2.1m |
| 02 July 2010 | BP Map Office fit-out, including ground floor, level 1 and level 4 | $7.5m |
| 28 June 2010 | Stage 12: Architectural works and services, excluding fire and all works associated with bourke street and Aurora Lane canopies, podium Level steel, cafe roof, plant Levels 17 & 18 (office) & 14 (Hotel) and link bridge. | $140.0m |
| 12 May 2010 | Level 3 & 4 South Podium Tower: Metier 3 Office Fitout | $330k |
| 18 Feb 2010 | Commercial office/hotel development, Lot 3. Stage 3: Piles caps only. | $130.0m |
| 18 Feb 2010 | Stage 14: Structural works associated with office level 17 and 18 plant slabs, office level 19 roof steel, hotel level 15 roof steel, fire services to completion & alterations to office level 15 slab. | $140.0m |
| 19 Jan 2010 | Stage 15: All works associated with the link bridge to completion, including structural & architectural works | $140.0m |
| 06 Mar 2009 | Stage 13: Architectural works associated with Bourke Street and Aurora Lane canopies, podium Level 6 office roof, hotel level 3 & podium facade steel,cafe roof & hotel level 14 plant slab. | $140.0m |
| 05 Dec 2008 | Stage 11: Structural Works - Including Office Levels 4,5,6 & 7 (Typical) Slabs & Columns, Excluding Plant Levels 17 & 18 and Office Podium Level Steel Work | $140.0m |
| 30 Oct 2008 | Stage 10: Structural works - Hotel Levels 5 slab & columns, Hotel typcal Levels 6-13 slabs & columns, and lift core details. | $140.0m |
| 14 Oct 2008 | Stage 9: Structural works - Hotel Levels 3 & 4 slabs, columns & carpark ramps. | $140.0m |
| 29 Sept 2008 | Stage 8: Structural works - Office Level 3 & Hotel Level 2 slabs and columns. | $140.0m |
| 02 Sept 2008 | Commercial office/hotel development. Stage 7: Structural works - Level 2 slabs & columns for offices only. | $140.0m |
| 17 July 2008 | Stage 6: Balance of Ground & First Floor slabs. | $140.0m |
| 05 May 2008 | Commercial office/hotel development, Lot 3. Stage 4: Columns & revised ground retention system | $140.0m |
| 17 Jan 2008 | Commercial office/hotel development. Stage 2: Piling & associated earth Ground works, excluding pile caps. | $130.0m |
| 20 Dec 2007 | Commercial Office /Hotel Development Stage 5 | $140.0m |
| 23 Oct 2007 | Early site works & demolition of structure Stage 1 | $130.0m |
Is Seven17 Bourke & Travelodge Docklands residential or commercial?
Seven17 Bourke & Travelodge Docklands is a commercial building. The City of Melbourne lists its main use as office.
When was Seven17 Bourke & Travelodge Docklands built?
Seven17 Bourke & Travelodge Docklands was completed in 2010.
How many floors does Seven17 Bourke & Travelodge Docklands have?
Seven17 Bourke & Travelodge Docklands has 18 floors above ground.
Does Seven17 Bourke & Travelodge Docklands have hotel or student accommodation?
The City of Melbourne records 294 hotel rooms at Seven17 Bourke & Travelodge Docklands.
What businesses are in Seven17 Bourke & Travelodge Docklands?
The latest council census counted 16 businesses in Seven17 Bourke & Travelodge Docklands, including AIG Australia Limited, Asuka Sushi and B P Australia Pty Ltd.
Is there office or retail space for lease in Seven17 Bourke & Travelodge Docklands?
See the commercial listings on this page, or search this address on realcommercial.com.au and commercialrealestate.com.au.
Who designed and built Seven17 Bourke & Travelodge Docklands?
Metier3 Architects designed Seven17 Bourke & Travelodge Docklands and Probuild built it. The building team section has the sources.
How tall is Seven17 Bourke & Travelodge Docklands?
About 68 metres, measured from the City of Melbourne's 3D building model. It's number 43 of 286 buildings in Docklands by height.
What public transport is near Seven17 Bourke & Travelodge Docklands?
Southern Cross Station is the nearest train station, about 1 minute's walk. The nearest tram stop is Batman's Hill/Collins St #D15, about 2 minutes' walk.
What is the planning zone for Seven17 Bourke & Travelodge Docklands?
The site is in the Docklands Zone - Schedule 3 (DZ3).
Does Seven17 Bourke & Travelodge Docklands have an owners corporation?
Plan of subdivision PS627612 has 2 lots and common property, which means it is managed by an owners corporation.
What sale activity has the 717 Bourke Street office seen?
In October 2010, REST was close to buying the 717 Bourke Street office for about $240 million. In August 2022, REST offered the office for sale at over $490 million.
Has any work been done on Seven17 Bourke & Travelodge Docklands recently?
The City of Melbourne has issued 108 building permits for Seven17 Bourke & Travelodge Docklands since 2007. The most recent was in December 2025.
Sources: City of Melbourne building permits (CC BY 4.0); CLUE building information (CC BY 4.0); CLUE business establishments (CC BY 4.0); Development Activity Monitor (CC BY 4.0); Geocoded National Address File (G-NAF) (Open G-NAF EULA (CC BY 4.0 based)). General information from public records, not legal, financial or building advice.