| Planning application | 2020 | Planning application TP-2020-500 lodged |
| Approved | By 2017 | Planning permit granted (exact date not recorded) |
| Construction started | Jun 2017 | First major construction permit issued |
| Completed | 2022 | Victorian Police Centre completed: 14 floors |
Each cost is the estimate on that record. Stages of a project often repeat its full value, so these don't add up to what was spent.
| 04 July 2025 | Retail 3 Ground floor - Cafe Retail Tenancy Fitout | $500k |
| 26 May 2025 | Level 12 Tenancy 12.1 - Office Fitout - Alterations to existing building | $40k |
| 22 Aug 2024 | Tenancy Fitout of Office 5 & Ground floor - (Stage 1 internal fitout works excluding ground floor door) | $3.2m |
| 09 July 2024 | Level 9 - Internal alterations to an existing building - Internal Office Fitout for IMC | $257k |
| 05 July 2024 | Proposed Alterations to Existing Office Level 7 | $137k |
| 02 July 2024 | Stage 2 - Internal alterations to an existing office (ground floor door) | $12k |
| 03 Apr 2024 | Ground floor - 1/637 - Alterations to an existing building | $40k |
| 04 Mar 2024 | Level 12 Tenancy 12.1 - Office Fitout - Alterations to existing building | $40k |
| 08 Feb 2024 | Level 13 - Office fitout works | $650k |
| 21 Dec 2023 | Tenancy Split and Make Good | $139k |
| 13 Oct 2023 | Ground floor, Alterations to an Existing Building | $902k |
| 30 June 2023 | Levels 7 & 9, and Internal Office Fitout to Level 8 - Internal Tenancy Split and Office Fitout. | $7.0m |
| 02 June 2023 | Level 10 - Internal Office Fitout and Tenancy Split for Artifex Property | $902k |
| 24 Nov 2022 | Level 11 - Alterations to an existing office building | $511k |
| 16 Feb 2022 | Partial Level 3 - Internal Office Fitout (Office only) | $22k |
| 13 Aug 2021 | Cladding Rectification to Rear of World Trade Centre | $2.3m |
| 24 Apr 2019 | Level 3, Tower 1 - ESTA VESDA System Modification located at the World Trade Centre | $12k |
| 13 Dec 2018 | Stage 5 - tower 1 ground floor - relocation of fire hydrants and Hose reels | $3.8m |
| 05 Dec 2018 | Vic Pol Tower 3 Level 9 Alterations | $159k |
| 30 Nov 2018 | Suite 101-103 Atrium Lobby PLX Asset Management Office Fitout | $229k |
| 04 Apr 2018 | Alteration - Vic Pol T3 Lower Concourse, T1 Carpark 3 | $406k |
| 04 Apr 2018 | Stage 2 - Alteration - Vic Pol T3 Lower Concourse, T1 Carpark 3 | $406k |
| 04 Apr 2018 | Variation to the store rooms in Tower 1 Carpark 3 | $406k |
| 16 Jan 2018 | Vic Pol - Stage 1 - 3A T1 L4, T3 L3, 3B T1 L4 - Alterations | $740k |
| 16 Jan 2018 | Vic Pol - Stage 4 -1B T2L1; 2A T1L2 - Final - conditional | $3.7m |
| 27 July 2017 | Vic Pol - Stage 3 -1B T2L1; 2A T1L2 - Alterations | $3.7m |
| 30 June 2017 | Vic Pol - Stage 2 - 1A T3 LI; 2B T1 L1 - Alterations | $2.5m |
| 17 June 2017 | Tower 3, Level 1 - Internal Demo - Alterations (Internal stripout) | $177k |
| 16 Nov 2016 | Tower 1 - Level 3 (Parts) - Alteration | $119k |
| 15 July 2016 | Alteration | $124k |
| 06 Nov 2015 | Tower 1 - Level 1 - Stage 1 – Removal of ceiling grid and ceiling tiles only | $247k |
| 19 Aug 2015 | Victoria Police Tower 1 Level 5: World Trade Centre, | $106k |
| 03 July 2015 | Level 3, T1 - Fitout of existing office building - Breakout, Toilets & Office partitions as per plans | $323k |
| 19 Mar 2015 | LEVEL 11, TOWER 4 PROPOSED OFFICE FIT-OUT | $75k |
| 24 Feb 2015 | Victoria Police - Tower 1, Level 3 - World Trade Centre | $59k |
| 23 Feb 2015 | Victona Police T2 L5 & T1 LG Alteration | $87k |
| 28 Nov 2014 | T1 - L5 L6 ALTERATIONS | $272k |
| 23 Oct 2014 | Tower 4, Levels 1, 2, 3 & Atrium (part) - CHANGE OF USE OF AN EXISTING BUILDING | $1.5m |
| 16 Oct 2014 | Alterations - Tower 2, Level 8, 637 Flinders Street Melbourne | $381k |
| 02 Oct 2014 | Tower 4 - Level 11 - Objective corporation - Internal Non Structural Alterations to the Existing Offices | $30k |
| 08 Sept 2014 | Tower 3, Level 9, Proposed services fitout to office. | $275k |
| 05 Sept 2014 | Alterations, World Trade Centre, Victoria Police Tower 2 Level 4. | $34k |
| 23 May 2014 | Alterations - Level 8, Tower 3, World Trade Centre, 637 Flinders Street, Melbourne | $20k |
| 23 May 2014 | Internal Alterations Vic Police - Level 2, Tower 2, World Trade Centre, 637 Flinders Street, Melbourne | $14k |
| 12 May 2014 | Alterations - Tower 3, Level, 2 637 Flinders Street, Melbourne | $52k |
| 08 May 2014 | Tower 4, Level 6 proposed office fitout | $255k |
| 02 Apr 2014 | Alterations to Level 1, Tower 2, World Trade Centre | $61k |
| 16 July 2013 | Stage 1: LEVELS 1 TO 4 - ARCHITECTURAL WORKS - Refurbishment, Victoria Police, Level 1 - 7 of Tower 2 | $2.9m |
| 12 July 2013 | Stage 6: Final - Level 7 | $4.7m |
| 01 July 2013 | Office fitout - Tower 1, Level 5 | $18k |
| 21 May 2013 | SOR Office - Tower 2 - Level 8 | $4k |
| 08 Mar 2013 | Department of Treasury and Finance - Victoria Police Level 10 (Tower 3) Office Fitout. Stage 1: Internal Stripout | $1.2m |
| 25 Jan 2013 | Alterations, Level 5 - Building E | $330k |
| 25 Jan 2013 | Amenity Fitout - Victoria Police Centre, Transit Dept, Level 4 Building E | $330k |
| 07 Jan 2013 | Stage 3: Level 1, Tender Room, MFB Approval for Fire Hydrant and Hose Reel Coverage Shortfall - Refurbishment, Victoria Police, WTC Level 1 - 7 of Tower 2 | $2.9m |
| 14 Dec 2012 | STAGE 2: LEVELS 1 TO 4 - SERVICES WORKS - Refurbishment, Victoria Police, Level 1 - 7 of Tower 2 | $2.9m |
| 10 Dec 2012 | Stage 1- Internal Strip Out - Amenity Fitout Alterations Level 5 | $71k |
| 07 Dec 2012 | Variation: Service Works | $330k |
| 07 Dec 2012 | Variation: Service Works - Alterations (Victoria Police Centre - Level 5 - Building E) | $330k |
| 26 Nov 2012 | Variation: Architectural Works - Alterations (Victoria Police Centre - Level 5 - Building E) | $330k |
| 26 Nov 2012 | Variation: Architectural Works - Amenity Fitout - Victoria Police Centre (Level 4 Building E) | $330k |
| 13 July 2012 | OFFICE FITOUT - (Tower 2, Levels 1-4) | $1.5m |
| 17 May 2012 | Alterations Level 7 Building D (Audit Department) | $27k |
| 20 Apr 2012 | Office fitout Level 3, Building C | $18k |
| 08 Mar 2012 | Restaurant fitout Shop G16 | $500k |
| 23 Jan 2012 | Alterations Building C Protection Services Division | $221k |
| 07 Sept 2011 | Office fitout Level 4 | $50k |
| 23 Aug 2011 | Building B - An office fit out on level 5 for the Victoria Police Complex | $0 |
| 04 July 2011 | Alteration to Office Tenancy Level 1 | $9k |
| 11 Mar 2011 | Alterations to Building D, Level 2, Victoria Police Centre | $646k |
| 17 Feb 2011 | 18-38 Siddeley Street (Level 3) Additions and alterations to an existing office at WTC (Asset 1 Office) | $50k |
| 09 Feb 2011 | STAGE 2: FINAL: ALL SERVICES WORKS | $487k |
| 03 Feb 2011 | Proposed Office Fitout at Victoria Police Centre, Building C, Level 10, 633-669 Flinders Street, Melbourne. | $42k |
| 13 Jan 2011 | Installation of security access gates to lower and concourse level siddley st (thales sec access gates) | $102k |
| 10 Dec 2010 | PROPOSED TENANCY FITOUT - T M07 | $350k |
| 11 Nov 2010 | INSTALL A GENERATOR TO GROUND FLOOR AT WTC | $30k |
| 27 Oct 2010 | Retail Tenancy Fitout - Shop G10 - Northbank Whard Precint, World Trade Centre Docklands | $6k |
| 13 Oct 2010 | Internal fitout Tenancy G17 | $760k |
| 16 Aug 2010 | Alterations to Restaurant (6) Tenancy G14 (Wilsons Boat House P/L). | $600k |
| 01 June 2010 | Level 3, Yarra Tower (World Trade Centre): Internal office fitout to tenancy M08 | $70k |
| 19 Apr 2010 | Buildin D, Level 9 / 637 Flinders Street: Office Alterations. | $6k |
| 30 Oct 2009 | Internal shop fitout TG08 | $100k |
| 05 Aug 2009 | Office Alterations Building C Level 9 | $60k |
| 03 Aug 2009 | Alterations & Internal fitout Tenancy G02 & G03 | $210k |
| 09 Apr 2009 | Office partition alterations to existing tenancy Level 8 | $190k |
| 17 Dec 2008 | Internal Demolition to Lower Concourse and Ground Level. Stage 6: Building works which includes architectural and services. | $5.7m |
| 15 Dec 2008 | Variation: This building permit variation is for structural variations as per the approved drawings. | $100k |
| 11 Nov 2008 | Partition fitout to Lower Concourse level at World Trade Centre. Stage 0: Building works which includes all building works. | $61k |
| 17 Sept 2008 | Internal Demolition to Lower Concourse and Ground Level. Stage 5: Structural works only. Structural works to rear of hotel and retail tenancy G05. | $100k |
| 15 Sept 2008 | Internal Demolition to Lower Concourse and Ground Level. Stage 4: Structural works only. Structural works to rear of hotel and retail tenancy G05. | $100k |
| 11 Sept 2008 | Internal Demolition to Lower Concourse and Ground Level. Stage 3: Structural works only. Structural works to waterfront section. | $500k |
| 04 Sept 2008 | Office Partition Alterations to Existing Tenancy | $6 |
| 02 July 2008 | Internal Demolition to Lower Concourse and Ground Level. Stage 2: Building works which includes Structural Works Only specific to main hanging structure (floor, roof and supports) and all associated structure (stairs, lift, etc) to new function centre, between grids Q-S/16-23 and Ground and promenade works between grids 16-23 and south of gridline P and shall be read in-conjunction with the existing building permit dated 0710512008. | $3.5m |
| 28 Apr 2008 | Office Fit-out to Level 6 Yarra Tower | $10k |
| 28 Apr 2008 | Toilets and Staff Room Lower Concourse Level | $25k |
| 06 Feb 2008 | Office fitout - Part Level 12 - Matthew Flinders Tower | $10k |
| 05 Feb 2008 | Office fitout to Lower Concourse Level for Thales Tenancy. | $1.7m |
| 19 July 2007 | Esta tenancy internal fit out works only, Level 3. Construction of a wall with acoustic sound proofing. | $8k |
| 09 July 2007 | Office alterations to Building C, Concourse Level, non-habitable. | $7k |
| 07 July 2007 | Variation: Variations to layout of partitions and associated services. Office fitout Concourse Level (Thales) | $2.7m |
| 26 June 2007 | Alterations and additions to Ground Floor retail and office area North East section. Stage 2: Internal and external alterations - structural approval only. | $80k |
| 11 June 2007 | Alterations to the lower concourse level - public areas. Stage 3: Structural and mechanical services, variation to architectural , fire services, hydraulic and electrical. | $500k |
| 11 June 2007 | Alterations to the lower concourse level - Thales 2 tenancy. Stage 1: Architectural, structural, fire services, hydraulic, electrical and mechanical services. | $1.2m |
| 30 May 2007 | Alterations and additions to Ground Floor retail and office area North East section. Stage 1: Internal demolition services & nonload bearing internal walls. | $80k |
| 28 Mar 2007 | Office partitions and new data room to Level 5 of Victorian Police building World Trade Centre. | $685k |
| 27 Feb 2007 | Alterations and additions to ground floor Western carpark area (Thales carpark). Stage 3: Structural approval of South Western Stair. | $40k |
| 26 Feb 2007 | Construct a child care centre to the roof on the concourse level. Stage 1: Structural works to roof and floor structure of the proposed child care centre. | $500k |
| 16 Feb 2007 | Install stair pressurisation system to Stair D1 | $90k |
| 19 Dec 2006 | Alterations to construct retail and office shells, lower concourse level. Stage 2: Architectural, fire services and electrical excluding mechanical services. | $1.5m |
| 15 Dec 2006 | Internal upgrade works to bridge link. All building works. | $50k |
| 13 Dec 2006 | Alterations and additions to ground floor Western carpark area (Thales carpark). Stage 1: Architectural including new toilets, new exit stair to S-W corner and general carpark arrangement. Structural ramps and new exist stair. Electrical and hydraulic services. | $200k |
| 06 Dec 2006 | Office alterations-Building C Concourse Level | $5k |
| 21 Nov 2006 | Demolition Stage 1 Lower Concourse Level | $250k |
| 17 Nov 2006 | Alterations Ground Floor & Concourse Level Stage 1 | $3 |
| 15 Nov 2006 | Alterations to ground floor and concourse level. Stage 2: Mechanical works to concourse level Thales tenancy including smoke exhaust system to atrium areas. | $100k |
| 06 Oct 2006 | Office alterations to Building C level 6, non-habitable. | $26k |
| 03 May 2006 | Internal demolition of western section of the building. Office internal demolition, excludes all external works, ground lower concourse and concourse levels. | $75k |
| 03 May 2006 | Office alterations to building C, level 3. | $19k |
| 03 May 2006 | Office alterations to Yarra Tower level 6, non-habitable. | $20k |
| 20 Apr 2006 | Office alterations building D level 1, non-habitable | $15k |
| 13 Apr 2006 | New fire control room and alterations to security control centre to ground floor, all building works | $30k |
| 21 Feb 2006 | Alterations to an existing office building, building C, levels 2 & 3 non habitable. | $35k |
| 17 Oct 2005 | Office alterations Level 5 Building C & E | $100k |
| 01 Sept 2005 | office alterations | $18k |
| 09 Feb 2005 | Alterations to stairs B1 and D1 discharge to a building. | $65k |
| 28 Jan 2005 | Office partition alterations Level 3 | $151k |
| 20 Oct 2004 | Alterations office tenancy Level 3 | $100k |
| 30 Aug 2004 | Office alterations - Building D, Level 5 | $18k |
| 30 Aug 2004 | Office Fitout, Building A - Level 5 | $9k |
| 06 Aug 2004 | Alterations to an existing building. Stage 3 - Alterations to south end levels 1 & 2. | $2.2m |
| 15 June 2004 | Office alterations - Building C - Level 3 | $16k |
| 25 Mar 2004 | World Trade Centre Building D, Level 4. Internal alterations to building. | $70k |
| 28 Oct 2003 | Internal Alterations to existing building - World Trade Centre, Level 11, Building A | $40k |
| 17 Oct 2003 | Internal alterationsLevel 9Building D | $16k |
| 12 Aug 2003 | Internal alterations to existing building - World Trade Centre, Level 5, Building C | $12k |
| 24 July 2003 | Internal Alterations to existing building - World Trade Centre, Level 4, Building C | $85k |
| 07 Feb 2003 | Alterations to an existing building. Stage 2 - Internal alterations, including works to services. | $2.5m |
| 14 Jan 2003 | Alterations to an existing building. Stage 1 - Internal demolition only. Ground Floor, Level 1 & 2. | $200k |
| 07 Oct 2002 | Stage 4- Removal of existing partitions and installation of new partitions and work stations and alterations to services on part of level 7 | $1.0m |
| 01 Oct 2002 | office alts World Trade Centre bldg D lvl 7 for Vic Police Station | $6k |
| 01 Aug 2002 | Stage 3 - Removal of existing internal paritions and construction of new tenancy layout within Levels 1 and Level 2 of Building B World Trade Centre | $2.8m |
| 17 July 2002 | Stage 2 - Removal of existing internal paritions and construction of new tenancy layout within Levels 6 and Level 8 of Building B World Trade Centre | $1.8m |
| 01 July 2002 | Stage 1 - Removal of existing internal paritions and construction of new tenancy layout within Levels 6 and Level 8 of Building B World Trade Centre - All works excluding new serices structural alterations and compactus installation. | $49k |
| 26 Apr 2002 | Internal Fitout - Offices Level B1 & B2 | $40k |
| 23 Oct 2001 | Internal alterations to office Level 9 - Victoria Police department | $17k |
| 08 June 2001 | lvl2 bldg d yarra tower world trade centre office alts & refurbishment - Vic Energy Corp Networks | $300k |
| 04 June 2001 | int office alts to Vic Police Centre World Trade Bldg c Lvl 5 | $8k |
| 24 July 2000 | Office fitout on lvl 8 | $18k |
| 18 July 2000 | Office fitout on lvl 5 | $36k |
| 21 June 2000 | Tenancy alterations Building C concourse and level 2 | $120k |
| 10 June 2000 | lvl 2 bldg e inertnal alterationsto existing bldg | $15k |
| 22 May 2000 | Office fitout | $70k |
| 01 Sept 1999 | Office alterations Level 5 Building C | $10k |
| 08 June 1999 | Internal partition alterations | $150k |
| 03 June 1999 | Tenancy fitout on level 7 | $60k |
| 28 Jan 1999 | Internal partitioning on level 9 | $9k |
| 06 Oct 1998 | Fitout to ground floor lobby area | $71k |
| 12 Aug 1998 | Installation of FM200 Fire Suppression System to PABX and Comms Room on level 1, Building 2, 637 Flinders Street, Melbourne | $51k |
Is Victorian Police Centre residential or commercial?
Victorian Police Centre is a commercial building. The City of Melbourne lists its main use as unoccupied - unused.
When was Victorian Police Centre built?
Victorian Police Centre was completed in 2022.
How many floors does Victorian Police Centre have?
Victorian Police Centre has 14 floors above ground.
What businesses are in Victorian Police Centre?
The latest council census counted 1 business in Victorian Police Centre, including Australian Pharmaceutical Industries Pty Ltd.
Is there office or retail space for lease in Victorian Police Centre?
See the commercial listings on this page, or search this address on realcommercial.com.au and commercialrealestate.com.au.
Who designed and built Victorian Police Centre?
Peakstone developed Victorian Police Centre, Cox Architecture designed it and Built built it. The building team section has the sources.
How tall is Victorian Police Centre?
About 58 metres, measured from the City of Melbourne's 3D building model. It's number 59 of 286 buildings in Docklands by height.
What public transport is near Victorian Police Centre?
Southern Cross Railway Station is the nearest train station, about 5 minutes' walk. The nearest tram stop is Flinders Street West/Flinders St #D6, about 1 minute's walk.
What is the planning zone for Victorian Police Centre?
The site is in the Capital City Zone - Schedule 1 (CCZ1).
Does Victorian Police Centre have an owners corporation?
Plan of subdivision PP5514C has 1 lot.
Was the old police headquarters ever proposed for demolition?
A proposal for partial demolition and redevelopment, costing $73 million, was put forward in July 2020. Before that, by November 2018, Zone Q had bought the former police headquarters site and announced plans for an office precinct there.
Has any work been done on Victorian Police Centre recently?
The City of Melbourne has issued 108 building permits for Victorian Police Centre since 1998. The most recent was in August 2024.
Sources: City of Melbourne building permits (CC BY 4.0); CLUE building information (CC BY 4.0); CLUE business establishments (CC BY 4.0); Development Activity Monitor (CC BY 4.0); Geocoded National Address File (G-NAF) (Open G-NAF EULA (CC BY 4.0 based)). General information from public records, not legal, financial or building advice.