| Planning application | 2022 | Planning application TPM-2022-18/A lodged |
Each cost is the estimate on that record. Stages of a project often repeat its full value, so these don't add up to what was spent.
| 27 Mar 2026 | Level 1 - Tenancy F06 - Alteration to existing Uniqlo change rooms | $8k |
| 10 Nov 2025 | Installation of smoke detector/s | $2k |
| 09 July 2025 | Internal fitout alterations to existing tenancy (NC G05) | $90k |
| 04 June 2025 | 19-35 Wharf street - Change of Use | $352k |
| 23 May 2025 | Shop SW13 - Internal alterations to an existing shop | $70k |
| 30 Mar 2025 | Tenancy NW F0205-01 - Proposed extension to an existing office/entertainment facility- Dreamrace, Docklands | $300k |
| 13 Feb 2025 | NEG02, 440 Docklands drive - Fitout works | $34k |
| 25 Oct 2024 | TMNT Fitout - Tenancy NW F02 - Assembly building / exhibit | $94k |
| 18 Sept 2024 | CW G06 - Proposed alterations to existing retail shop | $60k |
| 09 May 2024 | Removal of an IT wall and construction of a new IT wall (reconfigurtion to G18 & G19). | $10k |
| 03 Apr 2024 | Tenancy CW F01ABC, 440 Docklands Drive - Proposed alterations to an existing office/entertainment facility | $200k |
| 04 Mar 2024 | F01/01A and F01B/01C - Removal of non-loadbearing IT wall between F01/01A and F01B/01C | $10k |
| 04 Mar 2024 | Removal of an IT wall and construction of a new IT wall (reconfigurtion to G18 & G19). | $10k |
| 21 Feb 2024 | Tenancy Fitout of Shop G18/19(Peter Jackson) | $200k |
| 08 Feb 2024 | 9 The Arcade - Cladding replacement works | $75k |
| 24 Jan 2024 | G01/01A - TT aesthetics fit out Tenancy SE G01 | $560k |
| 12 Jan 2024 | NC G11 - Proposed Alterations to Existing Retail Shop NC G11 | $70k |
| 30 Nov 2023 | G01/01A - TT aesthetics fit out - Stage 2 - External alterations ot the existing building and construction and display of illuminated business identification signs | $560k |
| 21 Nov 2023 | Shop TM-G-T10, 440 Docklands Drive - "East west Eatery" Proposed fitout | $92k |
| 20 Oct 2023 | Tenancy CW F03a - Proposed alterations to an existing restaurant | $600k |
| 17 Oct 2023 | Tenancy fitout of Shop | $150k |
| 11 Sept 2023 | Internal Shop fitout | $723k |
| 31 Aug 2023 | Construction of IT wall to Shop TW T16 | $10k |
| 03 Aug 2023 | Tenancy SS G01 MSOW - Internal alteration to an existing commercial tenancy | $120k |
| 20 July 2023 | SS G07 MSOW - Proposed alterations to existing retail tenancy | $100k |
| 11 July 2023 | Tenancy CW F03a - Proposed alterations to an existing restaurant | $600k |
| 09 May 2023 | Stage 1 - Level 1 internal non-loadbearing framework for partitional walls, ceilings & raised floor area amenities only | $3.0m |
| 20 Apr 2023 | Internal shop fit out for Spudbar | $100k |
| 22 Dec 2022 | Proposed shop fitout for "Fantastic Variety" | $135k |
| 04 Nov 2022 | 120 Studio Lane - Combustible cladding removal and replacement works and installation of smoke detection system | $605k |
| 16 Sept 2022 | 3 Star Circus - Reinstatement of damaged base building timber, structural floor and water ingress. Alteration of a building – floor repair | $90k |
| 11 Aug 2022 | Removal of IT wall and shopfront to G15 & G16 | $41k |
| 04 Aug 2022 | T01 / T02 - Reconfiguration (relocation of IT wall) of tenancies T01 / T02 | $10k |
| 23 June 2022 | 120 Studio Lane - Combustible cladding removal and replacement works and installation of smoke detection system STAGE 2: DRY FIRE | $714k |
| 01 June 2022 | Tenancies F01 and F02 - Alterations to Krabby's Crab Boil | $600k |
| 04 May 2022 | Tenancies SC G23 & G24 - Internal Tenancy Reconfiguration | $10k |
| 30 Mar 2022 | Tenancies F01 and F02 - Stage 2: Alterations to Krabby's Crab Boil | $100k |
| 20 Dec 2021 | Lot 1 - Internal Fitout of tenancies T2, T3, T4A, T4B, T08, T08A. | $4.0m |
| 30 Sept 2021 | Proposed Fit-out of Tenancy G10 - Australia Post | $144k |
| 13 Sept 2021 | Tenancy SE F06/F06A - Internal Alterations | $60k |
| 09 Sept 2021 | Lot 1 - Internal Fitout of tenancies T2, T3, T4A, T4B, T08, T08A. | $4.0m |
| 14 Jan 2021 | Stage 2 – Completion of fit-out works including external structural works to facade | $700k |
| 14 Jan 2021 | Tenancy CW-F03A - Internal Fit-Out to Existing Restaurant Tenancy, Including External Alterations to Existing Facade and New Business Signage | $640k |
| 23 Dec 2020 | Tenancy CW-G02 - Proposed renovation to an existing restaurant (Miss Pings). | $0 |
| 02 Dec 2020 | SC Building Level 1 Works - Stage 1: Internal Alterations | $10.9m |
| 19 Nov 2020 | Stage 3 - Canopy completion. | $2.3m |
| 03 July 2020 | Fitout to Shop NC G12 (LUXM Salon) | $92k |
| 19 Mar 2020 | Tenancy SW 08/08A, Level 1 - Proposed Internal Partitions and Office Fitout for Gap Maps on Part Level One Only | $73k |
| 25 Feb 2020 | Internal alterations to tenancy SW-F01-F04 | $300k |
| 21 Dec 2019 | Shops T10 & T11, "Magic Cuisine" - Proposed Internal alterations to an existing shop | $268k |
| 02 Dec 2019 | Stage 4 - Demolition works within loading dock and new structural steelwork. Construction of a new hotel and residential apartment development. | $123.7m |
| 02 Dec 2019 | Stage 5 - Driven piles to existing loading dock and temporary access door to first floor site lunch shed. Construction of a new hotel and residential apartment development. | $123.7m |
| 02 Dec 2019 | Stage 6 - Pile caps, tie beams to existing loading dock. Construction of a new hotel and residential apartment development. | $123.7m |
| 02 Dec 2019 | Stage 8 - Loading dock level 1 slab reinstatement. Construction of a new hotel and residential apartment development. | $123.7m |
| 29 Nov 2019 | Shop SC G01-G02 - Fitout to a bike shop with espresso bar. Stage 1 - Internal fitout onnly, no external or facade works | $150k |
| 28 Nov 2019 | S4 CW G16, 440 Docklands Drv – Alteration Works to an Existing tenancy | $37k |
| 22 Nov 2019 | Tenancy fit out shop T17 | $110k |
| 18 Nov 2019 | Tenancy SW-08/08A - Internal alterations | $98k |
| 14 Nov 2019 | Tenancy Met 20 - Tenancy enabling works limited to demolition of existing services, construction of the new electrical room and structural works as documented by 4D Workshop | $39k |
| 12 Nov 2019 | Stage 10 - Fitout and roof structure works of existing shopping centre loading dock area. Construction of a new hotel and residential apartment development. | $123.7m |
| 24 Oct 2019 | NEF06 - RETAIL TENANCY FITOUT TO TENANCY | $139k |
| 24 Oct 2019 | Proposed Alterations to Existing Kiosk TM-G-K01 | $0 |
| 24 Oct 2019 | Tenancy T18A, Sushi Yuzen Internal Restaurant Fitout | $250k |
| 11 Oct 2019 | Stage 7 - Superstructure level 4-8 including temporary fire hydrants and hose reels. Construction of a new hotel and residential apartment development. | $123.7m |
| 08 Oct 2019 | Proposed Tenancy Fitout Works for Woolworths at The District | $23k |
| 03 Oct 2019 | Construction of a new opening and two stud walls to an existing retail tenancy - ARTVO | $10k |
| 24 Sept 2019 | Proposed Tenancy Fitout Works for Woolworths at The District | $23k |
| 17 Sept 2019 | Fitout to Tenancy T16 | $168k |
| 17 Sept 2019 | Tenancy Met 20 - Tenancy enabling works limited to demolition of existing services, construction of the new electrical room and structural works as documented by 4D Workshop | $39k |
| 13 Sept 2019 | Stage 2 - RETAIL TENANCY FITOUT TO TENANCY CWF03B | $50k |
| 12 Sept 2019 | Stage 9 - Loading dock columns. Construction of a new hotel and residential apartment development. | $123.7m |
| 11 Sept 2019 | SE F05-F07 & Shop NW G06 - Alterations to existing Office & Alterations to existing Retail | $971k |
| 11 Sept 2019 | Stage 6 - Superstructure level 3. Construction of a new hotel and residential apartment development. | $123.7m |
| 23 Aug 2019 | Stage 7 - Loading dock ground floor reinstatement. Construction of a new hotel and residential apartment development. | $123.7m |
| 25 July 2019 | CW G14A - Proposed construction of a Internal alterations to an existing shop. | $327k |
| 23 July 2019 | RETAIL TENANCY FITOUT TO TENANCY CWF03B | $300k |
| 16 July 2019 | Relocation of Escalator | $442k |
| 28 June 2019 | Tenancy SE-F02 - Tenancy enabling works | $225k |
| 26 June 2019 | Partial Demolition of Existing Ground Slab - Marriot Hotel | $50k |
| 19 June 2019 | Tenancy F01 -F02 - Fitout | $450k |
| 05 June 2019 | Tenancy NW-G05 and G06 - Demolition of existing internal walls and shopfront, and penetrations in existing walls. | $216k |
| 28 May 2019 | Partial Demolition of Existing Ground Slab - Marriot Hotel | $50k |
| 30 Apr 2019 | Stage 3 - Demolition works within the existing loading dock and new structural steelworks to walls. Early works to facilitate construction of adjoining residential development. | $123.7m |
| 16 Apr 2019 | Proposed Tenancy Upgrade for Uniqlo @ The District Docklands (Base Build ONLY) Stage 1 To Permit the Completion of all Structural Building Works Only | $363 |
| 09 Apr 2019 | Stage 2 - To Permit Internal Base Building Architectural Alteration Works Only | $363k |
| 05 Apr 2019 | RETAIL TENANCY FITOUT TO TENANCY NEG01 & NEG01A | $30k |
| 05 Apr 2019 | Stage 3 - Ground floor structural slab. Construction of a new hotel and residential apartment development. | $123.7m |
| 08 Mar 2019 | Tenancy CE-G02 - Internal Tenancy Fitout for Jon Smith Subs | $220 |
| 04 Mar 2019 | Stage 2 - Pile caps, sheet piling and footings. Construction of a new hotel and residential apartment development. | $123.7m |
| 08 Feb 2019 | S.14 Happy Lemon Tenancy fitout | $45 |
| 08 Feb 2019 | Tenancy CW G 14 - PROPOSED ALTERATIONS TO EXISTING TENANCY | $597k |
| 08 Feb 2019 | Tenancy S01-CWG16 - Tenancy fitout | $45 |
| 05 Feb 2019 | Tenancy NW G16 - Proposed Base Building Internal Fit-out for 8 Street at the District Docklands | $510k |
| 01 Feb 2019 | Construction of a new hotel and residential apartment development - Stage 1 - Partial piling works. 600mm and 900mm piling for main part of building | $123.7m |
| 01 Feb 2019 | Stage 2 - Plant deck to roof, relocated services and ceiling demolition to tenancy F06/F07. Early works to facilitate construction of adjoining residential development. | $123.7m |
| 29 Jan 2019 | Alteration to Shop S10 (GJ Grill) | $50k |
| 29 Jan 2019 | BASE BUILDING WORKS TO SPLIT TENANCY CW-F03 AT HARBOUR TOWN (THE DISTRICT) | $152k |
| 21 Jan 2019 | SE Building - Stage 1 - Relocation of existing services equipment. Early works to facilitate construction of adjoining residential development. | $123 |
| 16 Jan 2019 | RETAIL TENANCY FITOUT TO SHOP NW G01-G03 | $120 |
| 16 Jan 2019 | Stage 1- all Internal Works - Shop C/ G01 Ground Floor - Alterations & Additions to an existing Cafe/Restaurant (6a) | $46k |
| 14 Dec 2018 | Proposed fitout and alterations for "Pancake Parlour" | $800k |
| 12 Dec 2018 | Shop NE G01 - Proposed retail tenancy fit out | $250 |
| 05 Dec 2018 | Retail Tenancy Fitout to Tenancy S04 | $15k |
| 30 Nov 2018 | SHOP S03 - RETAIL TENANCY FITOUT | $130k |
| 13 Nov 2018 | Shop CC-G06 - Construction of an internal shop fitout - Nails Avenue - Stage 1 - Internal shop fitout | $130k |
| 13 Nov 2018 | Shop CC-G06 - Construction of an internal shop fitout - Nails Avenue - Stage 2 - Shopfront alterations only | $30k |
| 08 Nov 2018 | Yummy Dockland Tenancy S.11 fitout | $45k |
| 07 Nov 2018 | Tenancy CW G 14 - PROPOSED ALTERATIONS TO EXISTING TENANCY | $597k |
| 30 Oct 2018 | CW G05 - RETAIL TENANCY FITOUT TO TENANCY | $150k |
| 25 Oct 2018 | Tenancy CW G07 - Proposed restaurant fitout for "Dosa Hut" | $260k |
| 12 Oct 2018 | RETAIL TENANCY FITOUT TO TENANCY G15 | $400k |
| 12 Oct 2018 | Stage 3 - Installation of fire services | $660k |
| 12 Oct 2018 | Tenancy SE-F01 - Endota Spa Trainging Facility Fit-Out | $660k |
| 27 Aug 2018 | Tenancy SW-F09 - Proposed Tenancy Fitout for Chipmunks Playland & Cafe - Excluding Any Structural and Shopfront Works (Carried out by Base Building Surveyor) | $250k |
| 20 Aug 2018 | G03C - Retail Tenancy Fitout to tenancy SE | $25k |
| 31 July 2018 | Stage 3 - Steel tanks structure | $10k |
| 06 June 2018 | Tenancy NC G04 - Retail fitout | $120k |
| 29 May 2018 | Tenancies SW-F01 & SW-FO2 - Installation of Wall Wetting Sprinkler and Fire protection to Existing Tenancy Shopfronts | $36k |
| 14 May 2018 | Pad 1 - Tenancy Fitout - Star Car Wash | $142k |
| 24 Apr 2018 | Tenancy fiout for Sunglass Hut | $242k |
| 26 Feb 2018 | Tenancy CW-G09/10 - Internal Fitout to Existing Tenancy | $350k |
| 23 Feb 2018 | Pad 1 - Proposed New Car Wash @ Star Car Wash Docklands | $148k |
| 15 Jan 2018 | Tenancy SCG13 - Proposed retail fitout for "Zylish Design" | $87k |
| 13 Dec 2017 | Tenancy SW G05, - Internal Tenancy Fitout for Forcast | $169k |
| 20 Nov 2017 | Tenancies NC-G18, NC-G19, NC-G20 - Construction of New Fire Walls | $76k |
| 17 Nov 2017 | Stage 2: Proposed Tenancy Fitout for Sportspower | $250k |
| 17 Nov 2017 | Tenancy 12 - Proposed Tenancy Fitout for Sportspower | $250k |
| 16 Nov 2017 | External Signage Package ID4.1 | $61k |
| 16 Nov 2017 | Shop CW G02 - Retail tenancy fit out | $280k |
| 14 Nov 2017 | Stage 3 - Architectural and Services to Roof | $5.8m |
| 14 Nov 2017 | Tenancy CEG01A - Fit-out of existing tenancy for Vodafone | $241k |
| 14 Nov 2017 | Tenancy SW G04 - Fit Out | $68k |
| 08 Nov 2017 | Southern Entries External Signage Package 1D6, ID4.2, DIR2 | $76k |
| 08 Nov 2017 | Tenancy NC-G01 - Base building modifications | $34k |
| 08 Nov 2017 | Tenancy SW-G04A - Base building tenancy works | $57k |
| 08 Nov 2017 | Tenancy SW-G05 - Base building tenancy enabling works | $38k |
| 27 Oct 2017 | Retail Tenancy Fit Out for Shop NC G07 | $380k |
| 25 Oct 2017 | Shop SW-G07 - Oxford Tenancy fitout | $180k |
| 19 Oct 2017 | NC-G18 - Base building modifications only | $75k |
| 18 Oct 2017 | SC-G03 - Base building tenancy works | $140k |
| 17 Oct 2017 | Tenancy fitout and alterations for "Orientcare & Massage" | $110k |
| 06 Oct 2017 | Tenancy NC-G08 - Base building tenancy works | $74k |
| 06 Oct 2017 | Tenancy NW-G02 and G04 - Base building tenancy works | $186k |
| 04 Oct 2017 | Ed Harry Tenancy SW-G06 Fitout | $165k |
| 28 Sept 2017 | Suite 11 - Retail Strip out & Inter Tenancy Wall | $155k |
| 27 Sept 2017 | Shop CC G04 - Tenancy Fitout - "Miniso" Tenancy Fitout | $243k |
| 26 Sept 2017 | Stage 2 - External works only - Shop NC G08 - Retail Tenancy Fit Out | $72k |
| 25 Sept 2017 | Shop G01A-03 - Retail Tenancy Fit Out | $110k |
| 21 Sept 2017 | Stage 2 - Additional demoliton, roof structure and in-ground services - Studio Lane Roof Canopy | $5.8m |
| 19 Sept 2017 | Shop NC G02 - Retail tenancy fitout | $360k |
| 15 Sept 2017 | Shop NC G08 - Retail Tenancy Fit Out | $136k |
| 15 Sept 2017 | Tenancy M-03 - Installation of furnishings and front of house lighting | $880k |
| 25 Aug 2017 | Tenancy Fit Out to Canterbury Tenancy NC-G05 | $230k |
| 17 Aug 2017 | Tenancy CW G-04 - Harbour Town Shopping Centre - Base building tenancy enabling works | $50k |
| 17 Aug 2017 | Tenancy SC-F05 - Harbour Town Shopping Centre - Base building tenancy enabling works | $84k |
| 29 June 2017 | Tenancy SEG02 - Internal Tenancy Fitout for Urban Hub @ Habour Town | $246k |
| 27 June 2017 | Stage 1 - Harbour Town Shopping Centre, Studio Lane Roof Canopy - Works. | $600k |
| 19 June 2017 | Tenancy NC G-17 - Base building tenancy works | $87k |
| 06 June 2017 | Tenancy CW GO2 - Base Building Tenancy Enabling Works | $196k |
| 01 June 2017 | Tenancy F03-04 - Stage 4 - Completion of facade works including ACM panels, illuminated signage | $1.1m |
| 26 May 2017 | Tenancy F03-04 - Stage 1 - Internal strip out works, internal partitions, ceiling grids and sub floor structures | $1.1m |
| 26 May 2017 | Tenancy F03-04 - Stage 3 - Facade works excluding ACM panels, illuminated signage (Fire engineering items) | $1.1m |
| 17 Mar 2017 | Tenancy F03-04 - Stage 2 - Completion of all works excluding any external facade works | $1.1m |
| 21 Dec 2016 | Harbour Town Star Crescent North and South - Installation of louvres to existing canopy | $669k |
| 29 Nov 2016 | Tenancy SWF01 - Construction of a new inter-Tenancy Wall at Habourtown | $6k |
| 28 Oct 2016 | Harbour Town Bridges 7A and 3A - Balustrading alterations works to existing bridges | $176 |
| 02 June 2016 | Stage 5 - Wharf Street North and South demolition of canopies and bridges 06A, 07, 07A, 10A, 12A, 12 and 15A. | $1.4m |
| 15 Mar 2016 | Stage 1 - Tenancy CW F03 Level 1 - Internal fitout of existing restaurant | $158k |
| 01 Mar 2016 | Stage 8 - Star Crescent North and South. Construction of the canopy structure and ETFE canopies, electrical and hydraulic services works. | $10.9m |
| 11 Dec 2015 | Stage 7 - Wharf Street North and South. Installation of ETFE canopies. | $5.2m |
| 12 Nov 2015 | Shop CC G04A Construction of an internal shop fitout - Sweet hut | $30k |
| 04 Nov 2015 | Tenancy No. CCG01 The Fish Depart - 5 Star Circus. Proposed Construction of a Fit Out to Shop | $15k |
| 09 Oct 2015 | 132 Studio Lane - Existing fire alarm monitoring system converted to another approved monitoring system (ASE replaced) | $2k |
| 24 Sept 2015 | Stage 6 - Wharf Street North and South. Construction of the canopy structure, electrical and hydraulic services works. | $5.2m |
| 17 Aug 2015 | Stage 3 - Construction of prototype canopy. | $545k |
| 17 Aug 2015 | Stage 4 - Removal of glazed facade and installation of cafe blind. | $545k |
| 31 July 2015 | Alterations to existing office tenancy level 1 | $8k |
| 23 July 2015 | Alterations & additions to existing Harbour Town Hotel | $13k |
| 07 July 2015 | Stage 2 - Early works. Removal of escalators 12,13,14 and 15 and the removal and assoicated works to bridge 10A. | $545k |
| 03 July 2015 | Tenancy CE-G01, Construction of an internal shop fitout, Bonds | $27k |
| 01 July 2015 | Shop NWG03, 23 Star Crescent - Retail tenancy fitout | $15k |
| 19 June 2015 | Shop SE G01, Harbour Town, Construction of internal fitout works - Verve Real Estate | $75k |
| 17 June 2015 | Stage 1 - Harbour Town Mall Roof. Demolition. | $131k |
| 16 Apr 2015 | Shop CC G07 - Construction of shop front canopy and installation of internal wall linings - Gelatoria on the Docks. | $25k |
| 18 Dec 2014 | Level 1, Shop 10-11 Star circus restaurant alterations | $200k |
| 05 Dec 2014 | Shop G10-11A - Degani Cafe Tenancy Fit Out at harbour Town Shopping Centre | $345k |
| 21 Nov 2014 | Refurbishment to Nando's store | $140k |
| 12 Nov 2014 | Tenancy CW F02-04 proposed Tenancy fit out | $30k |
| 16 Sept 2014 | Shop Cc 607, PROPOSAL: Ice Cream Shop | $30k |
| 25 Aug 2014 | Tenancy NE G05 - Alterations to existing shop - Ollie's Place | $40k |
| 07 July 2014 | Shop Fitout- Pumpkin Patch G12 & G13 | $139k |
| 02 June 2014 | Tenancy NW F03-04 fit out | $80k |
| 22 May 2014 | TSCG17 Tenancy Fitout | $28k |
| 08 Apr 2014 | Tennancy NCG10A Fitout - DEL SOL | $25k |
| 28 Feb 2014 | demolition og an existing kiosk - kiosk 1 | $22k |
| 07 Dec 2012 | Fitout of existing building - "Sura' Restaurant, level 1, Circus Central and East building | $400k |
| 01 Nov 2012 | Stage Final: Signage to Retail Shop - Tenancy Fitout SW F01-04 Level 1 | $15k |
| 11 Oct 2012 | Retail fitout SW F01-04 Level 1 | $400k |
| 05 Sept 2012 | Alterations to SE-F04&F05 Level 1 | $110k |
| 02 Aug 2012 | Construction of 2 new canopies | $400k |
| 30 July 2012 | Shop fitout to Tenancy SE G08 Bossini Menswear, 122 Studio Lane | $51k |
| 22 June 2012 | Alterations - Retail fitout - Kaffe & Cream Store | $110k |
| 22 June 2012 | Alterations Shop fitout NC-F16 NC-F17, Level 1 | $140k |
| 27 Jan 2012 | A proposed fitout at F12 South Central Building | $35k |
| 25 Jan 2012 | Retail fitout SW F01-04 Level 1 | $400k |
| 23 Jan 2012 | Tenancy fitout (Subway) CW G06 | $82k |
| 07 Dec 2011 | Retail Tenancy Fitout to Shop SC G15 | $35k |
| 21 Nov 2011 | Fitout of Shop FC F110 | $50k |
| 16 Nov 2011 | Stage 2: Retail fitout to tenancy NE-F10A & NE-F10B (Shine Forever Men) North East Building | $410k |
| 23 Sept 2011 | Stage 1 - Waterfront Quay reactivation works. Early ground structural works including piling. | $7.6m |
| 12 Aug 2011 | NEW KIOSK - K2 | $105k |
| 12 July 2011 | Retail fitout to tenancy NE-F10A & NE-F10B (Shine Forever Men) North East Building | $41k |
| 06 June 2011 | Alterations & additions Shop NEOG 07 | $50k |
| 20 May 2011 | Fitout Shop NC F03 (FB Salons) | $100k |
| 28 Apr 2011 | Internal alterations to Shop NEF06, Level 1 | $90k |
| 18 Apr 2011 | EXODUS - COMBINE 3 RETAIL TENANCIES: SC F11A, SC F12A & SC F12 | $30k |
| 15 Apr 2011 | Retail Fitout to shop NE F09 on Level 1 | $83k |
| 11 Apr 2011 | Alteration to Shop 6 Tenancy SC F12B (Maharani) | $20k |
| 25 Feb 2011 | Shire Forever Men - Retail refurbishment, Tenancy NCF07 | $950k |
| 03 Feb 2011 | Alteration to Shop 6 - Tenancy SE F04 (Soda Kid0 | $10k |
| 20 Dec 2010 | Alteration to Shop Fitout at SW F05 & SW F06 Harbourtown, Docklands VIC 3008 | $49k |
| 22 Nov 2010 | FITOUT - CWF01A LEVEL 1 | $5k |
| 13 Oct 2010 | Shop NCF01A - construction of shop alterations - Nothing Simple | $15k |
| 22 July 2010 | Shop Fitout T-NC F17A | $32k |
| 29 June 2010 | Tenancy fitout of existing tenancy shell for Bank of Queensland | $198k |
| 23 June 2010 | Tenancy NEF05 - Tenancy fitout ( Amendment: new nominated builder) | $0 |
| 10 June 2010 | Office Fitout - Water Front City | $750k |
| 21 May 2010 | Sakura Sushi Tenancy Alterations - G04 | $70k |
| 17 May 2010 | 25 Wharf St: Proposed Tenancy fitout of Shop NCF14a 5th Avenue | $25k |
| 04 May 2010 | Tenancy SEG01 - Alteration to existing commercial tenancy | $50k |
| 23 Mar 2010 | Tenancy NEF05 - Tenancy fitout | $80k |
| 17 Mar 2010 | Shop NW G01. Tenancy fitout - Fantastic Home & Gifts | $64k |
| 19 Feb 2010 | Internal fit-out to Shop NWG02 - Most Wanted | $84k |
| 16 Feb 2010 | NE F09 - Jewellery shop fitout | $50k |
| 22 Dec 2009 | Tenancy fitout Shop NE F01 | $72k |
| 17 Dec 2009 | Retail Fitout - Danzol Direct - SC F10 | $30k |
| 14 Dec 2009 | Tenancy NC F04 - Internal tenancy fitout - Vic D'Armour Day Spa (Amended to include additional storage areas and hot water service room) | $200k |
| 11 Dec 2009 | Minor Alterations to an existing tenancy- Shop No. SWF02-04 | $65k |
| 11 Dec 2009 | Retail Fitout Kidswear X Factory NC F21 | $50k |
| 10 Dec 2009 | Internal shop fitout Tenancy NW F03 | $8k |
| 04 Dec 2009 | Stage 2: Retail fit-out for La Desire NC F18 Waterfront City. Remainder of works - shopfront | $80k |
| 27 Nov 2009 | Alterations to existing tenancy Shop SCF04/05 | $36k |
| 27 Nov 2009 | Minor alterations to existing tenancy Shop NCF02A | $45k |
| 27 Nov 2009 | Minor Alterations to existing tenancy- Shop No. SCF12B | $45k |
| 27 Nov 2009 | Minor Alterations to existing tenancy SWF06 | $18k |
| 23 Nov 2009 | Tenancy fitout Shop NEF 03-04A | $120k |
| 19 Nov 2009 | An internal fitout at tenancy NC FO2A Waterfront City Docklands | $25k |
| 12 Nov 2009 | SEGO3A - Shop fitout- 426 Docklands Drive | $80k |
| 10 Nov 2009 | A tenancy fitout for Gold Blend Jewellers Shop NCF02 Waterfront City Harbour Town | $100k |
| 10 Nov 2009 | Stage 2: To completion of all works including fire service and excluding any external building works | $150k |
| 06 Nov 2009 | Stage 2 - Retail tenancy fitout to Shop EC G01 at Star Circus. Balance of works | $100k |
| 29 Oct 2009 | A proposed internal tenancy fit out for tenancies FO6A/FO6/FO7 at 420-424 Docklands Drive, Docklands | $150 |
| 29 Oct 2009 | Construction of shop fitout - all parts NCF20 | $80k |
| 29 Oct 2009 | Retail fit-out for La Desire NC F18 Waterfront City | $80k |
| 21 Oct 2009 | SHop G03 - Tenancy Fitout of Retail Space 'My Range' | $150k |
| 20 Oct 2009 | Tenancy 10A, 7 The Arcade, Pearl River Road - Internal Shop Fitout | $125k |
| 19 Oct 2009 | Shop No SCG09 - Internal shop fitout (Cosy) | $30k |
| 16 Oct 2009 | Shop T05, Star Crescent - Retail Fitout Alterations to an Existing Building | $100k |
| 14 Oct 2009 | Shop NWF03 - Minor alterations to an existing tenancy | $39k |
| 09 Oct 2009 | Retail Tenancy Fitout to NC G13A | $80k |
| 02 Oct 2009 | Minor alterations Shop NCG02 | $30k |
| 02 Oct 2009 | Shop No. SEG03 - Minor Alterations to an existing tenancy | $31k |
| 02 Oct 2009 | Shop SCF12 - Minor Alterations to an existing tenancy | $26k |
| 30 Sept 2009 | Construction of Shop Fitout All Parts- T-NE-F07 Lot FFL | $50k |
| 25 Sept 2009 | Tenancy NC F04 - Internal tenancy fitout - Vic D'Armour Day Spa | $200k |
| 07 Sept 2009 | Retail tenancy fitout to Shop EC G01 at Star Circus | $100k |
| 14 Aug 2009 | Tenancy fitout Shop SWG 04A | $38k |
| 13 Aug 2009 | Proposed fitout of a shop NC G03 Harbour Town (Ritzy Lady) | $30k |
| 09 July 2009 | Tenancy NEF 10B, No 7 The Arcade, Pearl River Road - Internal Shop Fitout | $125k |
| 12 June 2009 | Tenancy Fitout of shop NW G07 Lot 31 - Soundstream (Construction of a new building, extension, alteration, change of use, demolition, removal or re-erection of a building | $175k |
| 09 June 2009 | Tenancy Fitout - Bike Force Office | $45k |
| 18 May 2009 | Retail fitout - Movenpick Icecreams- Shop no. CC G07 | $330 |
| 14 May 2009 | Internal shop fitoutto shop NCF15 - Queenspark | $90k |
| 30 Apr 2009 | Internal fitout to shop NCG20-katies | $0 |
| 27 Apr 2009 | Fitout works (new partitions) - Botica Clothing. Tenancy SC G11A. | $15k |
| 24 Apr 2009 | Retail Tenancy Fitout to Shop T12 | $350k |
| 06 Apr 2009 | Internal fit out to shop NC 022 - Autograph, Shop No. NC 022. | $75k |
| 03 Apr 2009 | Internal shop fitout- cross roads- Shop No: NCG07A | $65k |
| 03 Apr 2009 | Retail Fitout works - mechanical ventilation registers, artificial lighting, emergency lighting & exit signage and portable fire extinguisher, retail fitout works - mechanical ventilation registers, artificial lighting, emergency lighting & exit signage and portable fire extinguisher. | $50k |
| 18 Mar 2009 | Tenancy fitout for globalize - CE G01 2-4 The Arcade. Stage 1: Internal tenancy fitout works. | $200k |
| 13 Mar 2009 | Proposed Office Fit-Out. Internal demolition. | $80k |
| 25 Feb 2009 | Tenancy NC G07-1 Medical Centre | $150k |
| 24 Feb 2009 | Shop No. SCG21 Waterfront City Harbour Town, Tenancy Fitout | $0 |
| 18 Feb 2009 | Tenancy fitout Shop SCG 23 (Bike Force) | $47k |
| 17 Feb 2009 | Internal shop fitout, ten NCG10 7 the arcade | $185k |
| 10 Feb 2009 | Retail, The Designers House. Minor architectural amendments. | $3.0m |
| 30 Jan 2009 | Alteration to shop fitout - Suite SWG03 Harbour Town, Docklands Drive | $75k |
| 14 Jan 2009 | Internal fitout for tenancy NEG10 1/14 Star Crescent Docklands for Forever New | $10k |
| 16 Dec 2008 | Alterations to a building - Retail/Cafe Fitout | $200k |
| 15 Dec 2008 | Retail Fitout - SE G07 | $60k |
| 05 Dec 2008 | Retail tenancy Fitout to Shop F03, 22 Wharf Street, Docklands. | $60k |
| 03 Dec 2008 | Proposed Office Fit-Out. Balance of works. | $320k |
| 01 Dec 2008 | Tenancy Fitout at Waterfront City Tenancy NC G09 440 Docklands Drive, DOCKLANDS | $283k |
| 28 Nov 2008 | Alterations to a building - retail fitout, tenancy SS G06, Wheel Precinct, 440 Docklands Drive | $100k |
| 28 Nov 2008 | Shop fitout - Shop CC G01 5 Star Circus, Waterfront City | $200k |
| 19 Nov 2008 | Alterations to a building. External Works. | $3.0m |
| 31 Oct 2008 | Marco Polo Retail Tenancy fitout Tenancy SE G12, 18 WHARFSTREET, DOCKLANDS 3008 | $48k |
| 31 Oct 2008 | Retail Fitout, remainder of works (artificial lighting). Tenancy SC F15. | $96k |
| 27 Oct 2008 | Retail Fitout, remainder of works - artificial lighting. Tenancy SC G15. | $92k |
| 23 Oct 2008 | (Restaurant/takeaway)Tenancy Fitout CE G03. Remainder of works - fire services. | $300k |
| 22 Oct 2008 | Retail fitout Shop SC G03 (Fila) | $152k |
| 21 Oct 2008 | Retail fitout SC G11 119 Studio Lane, Docklands. Aussie Sox | $52k |
| 21 Oct 2008 | Shop fit-out SWG13. 127 Studio Lane, Docklands. | $50k |
| 20 Oct 2008 | Construction of internal shop fit out - 'Tokyo Vogue' SC F12a Lvl 1 | $40k |
| 20 Oct 2008 | Docklands Drive, Waterfront City, Stage 1B north. Construction of a new building, commercial/residential development. Piles and inground infrastructure. | $119.3m |
| 20 Oct 2008 | Partition Alterations at Tenancy G04/1B North Central Building | $240k |
| 20 Oct 2008 | Tenancy fitout and shop installation of an external sign. Bright Eyes G14 440 Docklands Drive | $81k |
| 20 Oct 2008 | Tenancy Fitout @ Gloria Jeans Coffee (Shop SCG22B) | $100k |
| 10 Oct 2008 | Alterations to a building - SC G09 | $33k |
| 10 Oct 2008 | Alterations to a building - Takeaway restaurant fitout, Tenancy CW G06, 9 The Circus, Harbour Town | $170k |
| 08 Oct 2008 | Alterations to a building - internal works only SC G03 | $28k |
| 06 Oct 2008 | Tenancy fitout for globalize - CE G01 2-4 The Arcade. Stage 2: External signage and shopfront works. | $200k |
| 03 Oct 2008 | Internal tenancy fitout & signage for Michael Ridley Tenancy SCG12 | $50k |
| 03 Oct 2008 | Retail Fitout - Lonsdale , Harbour Town SC G05 8 Star Crescent | $120k |
| 02 Oct 2008 | Stage 1, Internal alterations Retail The Designers House Level 1 | $3.0m |
| 30 Sept 2008 | Retail Fitout, all works excluding artificial lighting. Tenancy SC F15. | $85k |
| 30 Sept 2008 | Retail Fitout, all works excluding artificial lighting. Tenancy SC G15. | $80k |
| 29 Sept 2008 | Construction of an internal alteration to an existing shop SC F06, Level G. | $105k |
| 26 Sept 2008 | Internal tenancy fitout SEF06 South East Building. | $150k |
| 18 Sept 2008 | Tenancy Fitout CE G03 Star Circus Precinct, Waterfront City DOCKLANDS, | $300k |
| 12 Sept 2008 | Fitout of new restaurant Tenancy CW G07 Circus West Building, Docklands | $400k |
| 12 Sept 2008 | Fitout shop CCG02 Harbour Town at Waterfront City - Waterfront City Health Habits | $250k |
| 08 Sept 2008 | A shop fitout for GDL factory outlet - SE G05 | $41k |
| 05 Sept 2008 | Fitout of children's clothing store Tenancy NC G17 | $210k |
| 01 Sept 2008 | Internal fitout for tenancy NEG10 1/14 Star Crescent Docklands for Forever New | $150k |
| 26 Aug 2008 | Retail fitout-Tenancy SC F13-14 (Pacific Brands) | $150k |
| 22 Aug 2008 | Tenancy fitout to shop G06 - Discount Vitamins | $98k |
| 18 Aug 2008 | Retail fitout shop SC F07 | $165k |
| 05 Aug 2008 | Tenancy fitout Shop SCF 11 (Exodus Clothing) | $44k |
| 28 July 2008 | Shop fitout ,Shop SW- G11 (15 Star Crescent) | $14 |
| 11 July 2008 | Retail Tenancy Fitout to Shop SC G07 | $12k |
| 23 Nov 2005 | Demolition of warehouse - Building 1 Footscray Road | $75k |
| 12 Apr 2005 | cafe fit-out | $330k |
| 12 Oct 2004 | Stage 3 - Construction of two new commercial buildings excl. fire services, pavillions and public realm (master works) areas | $60.5m |
| 12 Sept 2003 | Demolition of warehouse - Building 1 Footscray Road | $75k |
| 11 Sept 2002 | Demolition of 10 Existing Buildings - Cnr Sudhoz & Docklands Drive | $313k |
Is The District Docklands residential or commercial?
The District Docklands is a residential building.
How many floors does The District Docklands have?
The District Docklands has 2 floors above ground.
How many apartments are in The District Docklands?
The District Docklands has 242 homes. The national address file lists 0 unit addresses here, and some of those can be shops or offices.
What do apartments cost near The District Docklands?
The median unit price in Docklands was $585,000 in 2025, from the Victorian Property Sales Report. That's for the whole suburb, not this building.
Are there apartments for sale or rent in The District Docklands?
See the residential listings on this page, or use the shortcuts to search 420-454 Docklands Drive on realestate.com.au and Domain.
Who designed and built The District Docklands?
AsheMorgan developed The District Docklands. The building team section has the sources.
What public transport is near The District Docklands?
North Melbourne Station is the nearest train station, about 9 minutes' walk. The nearest tram stop is Waterfront City/Docklands Dr #D11, about 2 minutes' walk.
What is the planning zone for The District Docklands?
The site is in the Docklands Zone - Schedule 6 (DZ6).
Does The District Docklands have an owners corporation?
Plan of subdivision PS523148 has 1 lot.
Has any work been done on The District Docklands recently?
The City of Melbourne has issued 220 building permits for The District Docklands since 2002. The most recent was in March 2026.
Sources: City of Melbourne building permits (CC BY 4.0); Development Activity Monitor (CC BY 4.0); Geocoded National Address File (G-NAF) (Open G-NAF EULA (CC BY 4.0 based)). General information from public records, not legal, financial or building advice.