← Back to The District Docklands
That's Built · Building report

The District Docklands

420-454 Docklands Drive, Docklands VIC 3008
Generated 8 November 2026
Residential ·
—height
2floors
—completed
242homes
220permits

Development milestones

Planning application2022Planning application TPM-2022-18/A lodged

Building team

Developer
AsheMorgan

Planning & subdivision

Zone
DZ6
Overlays
DDO12, DDO54, DDO54-A1, DPO7, PO10
Strata plan
PS523148 · 1 lots
Scores
🚆 5 · ☕ 7 · 🌳 7 · ✨ 6

Timeline

20261 building permit · about $8k of new works
Largest: Level 1 - Tenancy F06 - Alteration to existing Uniqlo change rooms
20254 building permits and 2 certificates · about $688k of new works
Largest: 19-35 Wharf street - Change of Use
20246 building permits and 4 certificates · about $709k of new works
Largest: G01/01A - TT aesthetics fit out Tenancy SE G01
20237 building permits and 4 certificates · about $4.9m of new works
Largest: Stage 1 - Level 1 internal non-loadbearing framework for partitional walls, ceilings & raised floor area amenities only
2022Planning application TPM-2022-18/A lodged
Derived from City of Melbourne Development Activity Monitor
20225 building permits and 4 certificates · about $2.3m of new works
Largest: 120 Studio Lane - Combustible cladding removal and replacement works and installation of smoke detection system STAGE 2: DRY FIRE
20212 building permits and 4 certificates · about $5.5m of new works
Largest: Lot 1 - Internal Fitout of tenancies T2, T3, T4A, T4B, T08, T08A.
20204 building permits and 2 certificates · about $13.7m of new works
Largest: SC Building Level 1 Works - Stage 1: Internal Alterations
201935 building permits and 16 certificates · about $129.0m of new works
Largest: Stage 4 - Demolition works within loading dock and new structural steelwork. Construction of a new hotel and residential apartment developme
201814 building permits and 9 certificates · about $4.6m of new works
Largest: Proposed fitout and alterations for "Pancake Parlour"
17 Nov 2017The District Docklands opens, taking over from Harbour Town
Wikipedia says The District Docklands opened on 17 November 2017, formally taking over from Harbour Town.
Aug 2017$150 million facelift and rebrand announced for Harbour Town, becoming The District Docklands
A $150 million facelift and rebranding of the former Harbour Town centre to The District Docklands was announced in August 2017. Wikipedia records the announcement.
201731 building permits and 9 certificates · about $12.9m of new works
Largest: Stage 3 - Architectural and Services to Roof
20163 building permits and 3 certificates · about $833k of new works
Largest: Stage 8 - Star Crescent North and South. Construction of the canopy structure and ETFE canopies, electrical and hydraulic services works.
201511 building permits and 4 certificates · about $11.1m of new works
Largest: Stage 7 - Wharf Street North and South. Installation of ETFE canopies.
20148 building permits and 3 certificates · about $940k of new works
Largest: Shop G10-11A - Degani Cafe Tenancy Fit Out at harbour Town Shopping Centre
20126 building permits and 5 certificates · about $1.2m of new works
Largest: Fitout of existing building - "Sura' Restaurant, level 1, Circus Central and East building
20116 building permits and 8 certificates · about $9.4m of new works
Largest: Stage 1 - Waterfront Quay reactivation works. Early ground structural works including piling.
20108 building permits and 6 certificates · about $1.4m of new works
Largest: Office Fitout - Water Front City
200929 building permits and 25 certificates · about $2.5m of new works
Largest: Retail, The Designers House. Minor architectural amendments.
200829 building permits and 14 certificates · about $126.7m of new works
Largest: Docklands Drive, Waterfront City, Stage 1B north. Construction of a new building, commercial/residential development. Piles and inground inf
20051 building permit and 1 certificate · about $330k of new works
Largest: cafe fit-out
20041 building permit · about $60.5m of new works
Largest: Stage 3 - Construction of two new commercial buildings excl. fire services, pavillions and public realm (master works) areas
20031 building permit · about $75k of new works
Largest: Demolition of warehouse - Building 1 Footscray Road
20021 building permit · about $313k of new works
Largest: Demolition of 10 Existing Buildings - Cnr Sudhoz & Docklands Drive

Building permits and certificates (336)

Each cost is the estimate on that record. Stages of a project often repeat its full value, so these don't add up to what was spent.

27 Mar 2026Level 1 - Tenancy F06 - Alteration to existing Uniqlo change rooms$8k
10 Nov 2025Installation of smoke detector/s$2k
09 July 2025Internal fitout alterations to existing tenancy (NC G05)$90k
04 June 202519-35 Wharf street - Change of Use$352k
23 May 2025Shop SW13 - Internal alterations to an existing shop$70k
30 Mar 2025Tenancy NW F0205-01 - Proposed extension to an existing office/entertainment facility- Dreamrace, Docklands$300k
13 Feb 2025NEG02, 440 Docklands drive - Fitout works$34k
25 Oct 2024TMNT Fitout - Tenancy NW F02 - Assembly building / exhibit$94k
18 Sept 2024CW G06 - Proposed alterations to existing retail shop$60k
09 May 2024Removal of an IT wall and construction of a new IT wall (reconfigurtion to G18 & G19).$10k
03 Apr 2024Tenancy CW F01ABC, 440 Docklands Drive - Proposed alterations to an existing office/entertainment facility$200k
04 Mar 2024F01/01A and F01B/01C - Removal of non-loadbearing IT wall between F01/01A and F01B/01C$10k
04 Mar 2024Removal of an IT wall and construction of a new IT wall (reconfigurtion to G18 & G19).$10k
21 Feb 2024Tenancy Fitout of Shop G18/19(Peter Jackson)$200k
08 Feb 20249 The Arcade - Cladding replacement works$75k
24 Jan 2024G01/01A - TT aesthetics fit out Tenancy SE G01$560k
12 Jan 2024NC G11 - Proposed Alterations to Existing Retail Shop NC G11$70k
30 Nov 2023G01/01A - TT aesthetics fit out - Stage 2 - External alterations ot the existing building and construction and display of illuminated business identification signs$560k
21 Nov 2023Shop TM-G-T10, 440 Docklands Drive - "East west Eatery" Proposed fitout$92k
20 Oct 2023Tenancy CW F03a - Proposed alterations to an existing restaurant$600k
17 Oct 2023Tenancy fitout of Shop$150k
11 Sept 2023Internal Shop fitout$723k
31 Aug 2023Construction of IT wall to Shop TW T16$10k
03 Aug 2023Tenancy SS G01 MSOW - Internal alteration to an existing commercial tenancy$120k
20 July 2023SS G07 MSOW - Proposed alterations to existing retail tenancy$100k
11 July 2023Tenancy CW F03a - Proposed alterations to an existing restaurant$600k
09 May 2023Stage 1 - Level 1 internal non-loadbearing framework for partitional walls, ceilings & raised floor area amenities only$3.0m
20 Apr 2023Internal shop fit out for Spudbar$100k
22 Dec 2022Proposed shop fitout for "Fantastic Variety"$135k
04 Nov 2022120 Studio Lane - Combustible cladding removal and replacement works and installation of smoke detection system$605k
16 Sept 20223 Star Circus - Reinstatement of damaged base building timber, structural floor and water ingress. Alteration of a building – floor repair$90k
11 Aug 2022Removal of IT wall and shopfront to G15 & G16$41k
04 Aug 2022T01 / T02 - Reconfiguration (relocation of IT wall) of tenancies T01 / T02$10k
23 June 2022120 Studio Lane - Combustible cladding removal and replacement works and installation of smoke detection system STAGE 2: DRY FIRE$714k
01 June 2022Tenancies F01 and F02 - Alterations to Krabby's Crab Boil$600k
04 May 2022Tenancies SC G23 & G24 - Internal Tenancy Reconfiguration$10k
30 Mar 2022Tenancies F01 and F02 - Stage 2: Alterations to Krabby's Crab Boil$100k
20 Dec 2021Lot 1 - Internal Fitout of tenancies T2, T3, T4A, T4B, T08, T08A.$4.0m
30 Sept 2021Proposed Fit-out of Tenancy G10 - Australia Post$144k
13 Sept 2021Tenancy SE F06/F06A - Internal Alterations$60k
09 Sept 2021Lot 1 - Internal Fitout of tenancies T2, T3, T4A, T4B, T08, T08A.$4.0m
14 Jan 2021Stage 2 – Completion of fit-out works including external structural works to facade$700k
14 Jan 2021Tenancy CW-F03A - Internal Fit-Out to Existing Restaurant Tenancy, Including External Alterations to Existing Facade and New Business Signage$640k
23 Dec 2020Tenancy CW-G02 - Proposed renovation to an existing restaurant (Miss Pings).$0
02 Dec 2020SC Building Level 1 Works - Stage 1: Internal Alterations$10.9m
19 Nov 2020Stage 3 - Canopy completion.$2.3m
03 July 2020Fitout to Shop NC G12 (LUXM Salon)$92k
19 Mar 2020Tenancy SW 08/08A, Level 1 - Proposed Internal Partitions and Office Fitout for Gap Maps on Part Level One Only$73k
25 Feb 2020Internal alterations to tenancy SW-F01-F04$300k
21 Dec 2019Shops T10 & T11, "Magic Cuisine" - Proposed Internal alterations to an existing shop$268k
02 Dec 2019Stage 4 - Demolition works within loading dock and new structural steelwork. Construction of a new hotel and residential apartment development.$123.7m
02 Dec 2019Stage 5 - Driven piles to existing loading dock and temporary access door to first floor site lunch shed. Construction of a new hotel and residential apartment development.$123.7m
02 Dec 2019Stage 6 - Pile caps, tie beams to existing loading dock. Construction of a new hotel and residential apartment development.$123.7m
02 Dec 2019Stage 8 - Loading dock level 1 slab reinstatement. Construction of a new hotel and residential apartment development.$123.7m
29 Nov 2019Shop SC G01-G02 - Fitout to a bike shop with espresso bar. Stage 1 - Internal fitout onnly, no external or facade works$150k
28 Nov 2019S4 CW G16, 440 Docklands Drv – Alteration Works to an Existing tenancy$37k
22 Nov 2019Tenancy fit out shop T17$110k
18 Nov 2019Tenancy SW-08/08A - Internal alterations$98k
14 Nov 2019Tenancy Met 20 - Tenancy enabling works limited to demolition of existing services, construction of the new electrical room and structural works as documented by 4D Workshop$39k
12 Nov 2019Stage 10 - Fitout and roof structure works of existing shopping centre loading dock area. Construction of a new hotel and residential apartment development.$123.7m
24 Oct 2019NEF06 - RETAIL TENANCY FITOUT TO TENANCY$139k
24 Oct 2019Proposed Alterations to Existing Kiosk TM-G-K01$0
24 Oct 2019Tenancy T18A, Sushi Yuzen Internal Restaurant Fitout$250k
11 Oct 2019Stage 7 - Superstructure level 4-8 including temporary fire hydrants and hose reels. Construction of a new hotel and residential apartment development.$123.7m
08 Oct 2019Proposed Tenancy Fitout Works for Woolworths at The District$23k
03 Oct 2019Construction of a new opening and two stud walls to an existing retail tenancy - ARTVO$10k
24 Sept 2019Proposed Tenancy Fitout Works for Woolworths at The District$23k
17 Sept 2019Fitout to Tenancy T16$168k
17 Sept 2019Tenancy Met 20 - Tenancy enabling works limited to demolition of existing services, construction of the new electrical room and structural works as documented by 4D Workshop$39k
13 Sept 2019Stage 2 - RETAIL TENANCY FITOUT TO TENANCY CWF03B$50k
12 Sept 2019Stage 9 - Loading dock columns. Construction of a new hotel and residential apartment development.$123.7m
11 Sept 2019SE F05-F07 & Shop NW G06 - Alterations to existing Office & Alterations to existing Retail$971k
11 Sept 2019Stage 6 - Superstructure level 3. Construction of a new hotel and residential apartment development.$123.7m
23 Aug 2019Stage 7 - Loading dock ground floor reinstatement. Construction of a new hotel and residential apartment development.$123.7m
25 July 2019CW G14A - Proposed construction of a Internal alterations to an existing shop.$327k
23 July 2019RETAIL TENANCY FITOUT TO TENANCY CWF03B$300k
16 July 2019Relocation of Escalator$442k
28 June 2019Tenancy SE-F02 - Tenancy enabling works$225k
26 June 2019Partial Demolition of Existing Ground Slab - Marriot Hotel$50k
19 June 2019Tenancy F01 -F02 - Fitout$450k
05 June 2019Tenancy NW-G05 and G06 - Demolition of existing internal walls and shopfront, and penetrations in existing walls.$216k
28 May 2019Partial Demolition of Existing Ground Slab - Marriot Hotel$50k
30 Apr 2019Stage 3 - Demolition works within the existing loading dock and new structural steelworks to walls. Early works to facilitate construction of adjoining residential development.$123.7m
16 Apr 2019Proposed Tenancy Upgrade for Uniqlo @ The District Docklands (Base Build ONLY) Stage 1 To Permit the Completion of all Structural Building Works Only$363
09 Apr 2019Stage 2 - To Permit Internal Base Building Architectural Alteration Works Only$363k
05 Apr 2019RETAIL TENANCY FITOUT TO TENANCY NEG01 & NEG01A$30k
05 Apr 2019Stage 3 - Ground floor structural slab. Construction of a new hotel and residential apartment development.$123.7m
08 Mar 2019Tenancy CE-G02 - Internal Tenancy Fitout for Jon Smith Subs$220
04 Mar 2019Stage 2 - Pile caps, sheet piling and footings. Construction of a new hotel and residential apartment development.$123.7m
08 Feb 2019S.14 Happy Lemon Tenancy fitout$45
08 Feb 2019Tenancy CW G 14 - PROPOSED ALTERATIONS TO EXISTING TENANCY$597k
08 Feb 2019Tenancy S01-CWG16 - Tenancy fitout$45
05 Feb 2019Tenancy NW G16 - Proposed Base Building Internal Fit-out for 8 Street at the District Docklands$510k
01 Feb 2019Construction of a new hotel and residential apartment development - Stage 1 - Partial piling works. 600mm and 900mm piling for main part of building$123.7m
01 Feb 2019Stage 2 - Plant deck to roof, relocated services and ceiling demolition to tenancy F06/F07. Early works to facilitate construction of adjoining residential development.$123.7m
29 Jan 2019Alteration to Shop S10 (GJ Grill)$50k
29 Jan 2019BASE BUILDING WORKS TO SPLIT TENANCY CW-F03 AT HARBOUR TOWN (THE DISTRICT)$152k
21 Jan 2019SE Building - Stage 1 - Relocation of existing services equipment. Early works to facilitate construction of adjoining residential development.$123
16 Jan 2019RETAIL TENANCY FITOUT TO SHOP NW G01-G03$120
16 Jan 2019Stage 1- all Internal Works - Shop C/ G01 Ground Floor - Alterations & Additions to an existing Cafe/Restaurant (6a)$46k
14 Dec 2018Proposed fitout and alterations for "Pancake Parlour"$800k
12 Dec 2018Shop NE G01 - Proposed retail tenancy fit out$250
05 Dec 2018Retail Tenancy Fitout to Tenancy S04$15k
30 Nov 2018SHOP S03 - RETAIL TENANCY FITOUT$130k
13 Nov 2018Shop CC-G06 - Construction of an internal shop fitout - Nails Avenue - Stage 1 - Internal shop fitout$130k
13 Nov 2018Shop CC-G06 - Construction of an internal shop fitout - Nails Avenue - Stage 2 - Shopfront alterations only$30k
08 Nov 2018Yummy Dockland Tenancy S.11 fitout$45k
07 Nov 2018Tenancy CW G 14 - PROPOSED ALTERATIONS TO EXISTING TENANCY$597k
30 Oct 2018CW G05 - RETAIL TENANCY FITOUT TO TENANCY$150k
25 Oct 2018Tenancy CW G07 - Proposed restaurant fitout for "Dosa Hut"$260k
12 Oct 2018RETAIL TENANCY FITOUT TO TENANCY G15$400k
12 Oct 2018Stage 3 - Installation of fire services$660k
12 Oct 2018Tenancy SE-F01 - Endota Spa Trainging Facility Fit-Out$660k
27 Aug 2018Tenancy SW-F09 - Proposed Tenancy Fitout for Chipmunks Playland & Cafe - Excluding Any Structural and Shopfront Works (Carried out by Base Building Surveyor)$250k
20 Aug 2018G03C - Retail Tenancy Fitout to tenancy SE$25k
31 July 2018Stage 3 - Steel tanks structure$10k
06 June 2018Tenancy NC G04 - Retail fitout$120k
29 May 2018Tenancies SW-F01 & SW-FO2 - Installation of Wall Wetting Sprinkler and Fire protection to Existing Tenancy Shopfronts$36k
14 May 2018Pad 1 - Tenancy Fitout - Star Car Wash$142k
24 Apr 2018Tenancy fiout for Sunglass Hut$242k
26 Feb 2018Tenancy CW-G09/10 - Internal Fitout to Existing Tenancy$350k
23 Feb 2018Pad 1 - Proposed New Car Wash @ Star Car Wash Docklands$148k
15 Jan 2018Tenancy SCG13 - Proposed retail fitout for "Zylish Design"$87k
13 Dec 2017Tenancy SW G05, - Internal Tenancy Fitout for Forcast$169k
20 Nov 2017Tenancies NC-G18, NC-G19, NC-G20 - Construction of New Fire Walls$76k
17 Nov 2017Stage 2: Proposed Tenancy Fitout for Sportspower$250k
17 Nov 2017Tenancy 12 - Proposed Tenancy Fitout for Sportspower$250k
16 Nov 2017External Signage Package ID4.1$61k
16 Nov 2017Shop CW G02 - Retail tenancy fit out$280k
14 Nov 2017Stage 3 - Architectural and Services to Roof$5.8m
14 Nov 2017Tenancy CEG01A - Fit-out of existing tenancy for Vodafone$241k
14 Nov 2017Tenancy SW G04 - Fit Out$68k
08 Nov 2017Southern Entries External Signage Package 1D6, ID4.2, DIR2$76k
08 Nov 2017Tenancy NC-G01 - Base building modifications$34k
08 Nov 2017Tenancy SW-G04A - Base building tenancy works$57k
08 Nov 2017Tenancy SW-G05 - Base building tenancy enabling works$38k
27 Oct 2017Retail Tenancy Fit Out for Shop NC G07$380k
25 Oct 2017Shop SW-G07 - Oxford Tenancy fitout$180k
19 Oct 2017NC-G18 - Base building modifications only$75k
18 Oct 2017SC-G03 - Base building tenancy works$140k
17 Oct 2017Tenancy fitout and alterations for "Orientcare & Massage"$110k
06 Oct 2017Tenancy NC-G08 - Base building tenancy works$74k
06 Oct 2017Tenancy NW-G02 and G04 - Base building tenancy works$186k
04 Oct 2017Ed Harry Tenancy SW-G06 Fitout$165k
28 Sept 2017Suite 11 - Retail Strip out & Inter Tenancy Wall$155k
27 Sept 2017Shop CC G04 - Tenancy Fitout - "Miniso" Tenancy Fitout$243k
26 Sept 2017Stage 2 - External works only - Shop NC G08 - Retail Tenancy Fit Out$72k
25 Sept 2017Shop G01A-03 - Retail Tenancy Fit Out$110k
21 Sept 2017Stage 2 - Additional demoliton, roof structure and in-ground services - Studio Lane Roof Canopy$5.8m
19 Sept 2017Shop NC G02 - Retail tenancy fitout$360k
15 Sept 2017Shop NC G08 - Retail Tenancy Fit Out$136k
15 Sept 2017Tenancy M-03 - Installation of furnishings and front of house lighting$880k
25 Aug 2017Tenancy Fit Out to Canterbury Tenancy NC-G05$230k
17 Aug 2017Tenancy CW G-04 - Harbour Town Shopping Centre - Base building tenancy enabling works$50k
17 Aug 2017Tenancy SC-F05 - Harbour Town Shopping Centre - Base building tenancy enabling works$84k
29 June 2017Tenancy SEG02 - Internal Tenancy Fitout for Urban Hub @ Habour Town$246k
27 June 2017Stage 1 - Harbour Town Shopping Centre, Studio Lane Roof Canopy - Works.$600k
19 June 2017Tenancy NC G-17 - Base building tenancy works$87k
06 June 2017Tenancy CW GO2 - Base Building Tenancy Enabling Works$196k
01 June 2017Tenancy F03-04 - Stage 4 - Completion of facade works including ACM panels, illuminated signage$1.1m
26 May 2017Tenancy F03-04 - Stage 1 - Internal strip out works, internal partitions, ceiling grids and sub floor structures$1.1m
26 May 2017Tenancy F03-04 - Stage 3 - Facade works excluding ACM panels, illuminated signage (Fire engineering items)$1.1m
17 Mar 2017Tenancy F03-04 - Stage 2 - Completion of all works excluding any external facade works$1.1m
21 Dec 2016Harbour Town Star Crescent North and South - Installation of louvres to existing canopy$669k
29 Nov 2016Tenancy SWF01 - Construction of a new inter-Tenancy Wall at Habourtown$6k
28 Oct 2016Harbour Town Bridges 7A and 3A - Balustrading alterations works to existing bridges$176
02 June 2016Stage 5 - Wharf Street North and South demolition of canopies and bridges 06A, 07, 07A, 10A, 12A, 12 and 15A.$1.4m
15 Mar 2016Stage 1 - Tenancy CW F03 Level 1 - Internal fitout of existing restaurant$158k
01 Mar 2016Stage 8 - Star Crescent North and South. Construction of the canopy structure and ETFE canopies, electrical and hydraulic services works.$10.9m
11 Dec 2015Stage 7 - Wharf Street North and South. Installation of ETFE canopies.$5.2m
12 Nov 2015Shop CC G04A Construction of an internal shop fitout - Sweet hut$30k
04 Nov 2015Tenancy No. CCG01 The Fish Depart - 5 Star Circus. Proposed Construction of a Fit Out to Shop$15k
09 Oct 2015132 Studio Lane - Existing fire alarm monitoring system converted to another approved monitoring system (ASE replaced)$2k
24 Sept 2015Stage 6 - Wharf Street North and South. Construction of the canopy structure, electrical and hydraulic services works.$5.2m
17 Aug 2015Stage 3 - Construction of prototype canopy.$545k
17 Aug 2015Stage 4 - Removal of glazed facade and installation of cafe blind.$545k
31 July 2015Alterations to existing office tenancy level 1$8k
23 July 2015Alterations & additions to existing Harbour Town Hotel$13k
07 July 2015Stage 2 - Early works. Removal of escalators 12,13,14 and 15 and the removal and assoicated works to bridge 10A.$545k
03 July 2015Tenancy CE-G01, Construction of an internal shop fitout, Bonds$27k
01 July 2015Shop NWG03, 23 Star Crescent - Retail tenancy fitout$15k
19 June 2015Shop SE G01, Harbour Town, Construction of internal fitout works - Verve Real Estate$75k
17 June 2015Stage 1 - Harbour Town Mall Roof. Demolition.$131k
16 Apr 2015Shop CC G07 - Construction of shop front canopy and installation of internal wall linings - Gelatoria on the Docks.$25k
18 Dec 2014Level 1, Shop 10-11 Star circus restaurant alterations$200k
05 Dec 2014Shop G10-11A - Degani Cafe Tenancy Fit Out at harbour Town Shopping Centre$345k
21 Nov 2014Refurbishment to Nando's store$140k
12 Nov 2014Tenancy CW F02-04 proposed Tenancy fit out$30k
16 Sept 2014Shop Cc 607, PROPOSAL: Ice Cream Shop$30k
25 Aug 2014Tenancy NE G05 - Alterations to existing shop - Ollie's Place$40k
07 July 2014Shop Fitout- Pumpkin Patch G12 & G13$139k
02 June 2014Tenancy NW F03-04 fit out$80k
22 May 2014TSCG17 Tenancy Fitout$28k
08 Apr 2014Tennancy NCG10A Fitout - DEL SOL$25k
28 Feb 2014demolition og an existing kiosk - kiosk 1$22k
07 Dec 2012Fitout of existing building - "Sura' Restaurant, level 1, Circus Central and East building$400k
01 Nov 2012Stage Final: Signage to Retail Shop - Tenancy Fitout SW F01-04 Level 1$15k
11 Oct 2012Retail fitout SW F01-04 Level 1$400k
05 Sept 2012Alterations to SE-F04&F05 Level 1$110k
02 Aug 2012Construction of 2 new canopies$400k
30 July 2012Shop fitout to Tenancy SE G08 Bossini Menswear, 122 Studio Lane$51k
22 June 2012Alterations - Retail fitout - Kaffe & Cream Store$110k
22 June 2012Alterations Shop fitout NC-F16 NC-F17, Level 1$140k
27 Jan 2012A proposed fitout at F12 South Central Building$35k
25 Jan 2012Retail fitout SW F01-04 Level 1$400k
23 Jan 2012Tenancy fitout (Subway) CW G06$82k
07 Dec 2011Retail Tenancy Fitout to Shop SC G15$35k
21 Nov 2011Fitout of Shop FC F110$50k
16 Nov 2011Stage 2: Retail fitout to tenancy NE-F10A & NE-F10B (Shine Forever Men) North East Building$410k
23 Sept 2011Stage 1 - Waterfront Quay reactivation works. Early ground structural works including piling.$7.6m
12 Aug 2011NEW KIOSK - K2$105k
12 July 2011Retail fitout to tenancy NE-F10A & NE-F10B (Shine Forever Men) North East Building$41k
06 June 2011Alterations & additions Shop NEOG 07$50k
20 May 2011Fitout Shop NC F03 (FB Salons)$100k
28 Apr 2011Internal alterations to Shop NEF06, Level 1$90k
18 Apr 2011EXODUS - COMBINE 3 RETAIL TENANCIES: SC F11A, SC F12A & SC F12$30k
15 Apr 2011Retail Fitout to shop NE F09 on Level 1$83k
11 Apr 2011Alteration to Shop 6 Tenancy SC F12B (Maharani)$20k
25 Feb 2011Shire Forever Men - Retail refurbishment, Tenancy NCF07$950k
03 Feb 2011Alteration to Shop 6 - Tenancy SE F04 (Soda Kid0$10k
20 Dec 2010Alteration to Shop Fitout at SW F05 & SW F06 Harbourtown, Docklands VIC 3008$49k
22 Nov 2010FITOUT - CWF01A LEVEL 1$5k
13 Oct 2010Shop NCF01A - construction of shop alterations - Nothing Simple$15k
22 July 2010Shop Fitout T-NC F17A$32k
29 June 2010Tenancy fitout of existing tenancy shell for Bank of Queensland$198k
23 June 2010Tenancy NEF05 - Tenancy fitout ( Amendment: new nominated builder)$0
10 June 2010Office Fitout - Water Front City$750k
21 May 2010Sakura Sushi Tenancy Alterations - G04$70k
17 May 201025 Wharf St: Proposed Tenancy fitout of Shop NCF14a 5th Avenue$25k
04 May 2010Tenancy SEG01 - Alteration to existing commercial tenancy$50k
23 Mar 2010Tenancy NEF05 - Tenancy fitout$80k
17 Mar 2010Shop NW G01. Tenancy fitout - Fantastic Home & Gifts$64k
19 Feb 2010Internal fit-out to Shop NWG02 - Most Wanted$84k
16 Feb 2010NE F09 - Jewellery shop fitout$50k
22 Dec 2009Tenancy fitout Shop NE F01$72k
17 Dec 2009Retail Fitout - Danzol Direct - SC F10$30k
14 Dec 2009Tenancy NC F04 - Internal tenancy fitout - Vic D'Armour Day Spa (Amended to include additional storage areas and hot water service room)$200k
11 Dec 2009Minor Alterations to an existing tenancy- Shop No. SWF02-04$65k
11 Dec 2009Retail Fitout Kidswear X Factory NC F21$50k
10 Dec 2009Internal shop fitout Tenancy NW F03$8k
04 Dec 2009Stage 2: Retail fit-out for La Desire NC F18 Waterfront City. Remainder of works - shopfront$80k
27 Nov 2009Alterations to existing tenancy Shop SCF04/05$36k
27 Nov 2009Minor alterations to existing tenancy Shop NCF02A$45k
27 Nov 2009Minor Alterations to existing tenancy- Shop No. SCF12B$45k
27 Nov 2009Minor Alterations to existing tenancy SWF06$18k
23 Nov 2009Tenancy fitout Shop NEF 03-04A$120k
19 Nov 2009An internal fitout at tenancy NC FO2A Waterfront City Docklands$25k
12 Nov 2009SEGO3A - Shop fitout- 426 Docklands Drive$80k
10 Nov 2009A tenancy fitout for Gold Blend Jewellers Shop NCF02 Waterfront City Harbour Town$100k
10 Nov 2009Stage 2: To completion of all works including fire service and excluding any external building works$150k
06 Nov 2009Stage 2 - Retail tenancy fitout to Shop EC G01 at Star Circus. Balance of works$100k
29 Oct 2009A proposed internal tenancy fit out for tenancies FO6A/FO6/FO7 at 420-424 Docklands Drive, Docklands$150
29 Oct 2009Construction of shop fitout - all parts NCF20$80k
29 Oct 2009Retail fit-out for La Desire NC F18 Waterfront City$80k
21 Oct 2009SHop G03 - Tenancy Fitout of Retail Space 'My Range'$150k
20 Oct 2009Tenancy 10A, 7 The Arcade, Pearl River Road - Internal Shop Fitout$125k
19 Oct 2009Shop No SCG09 - Internal shop fitout (Cosy)$30k
16 Oct 2009Shop T05, Star Crescent - Retail Fitout Alterations to an Existing Building$100k
14 Oct 2009Shop NWF03 - Minor alterations to an existing tenancy$39k
09 Oct 2009Retail Tenancy Fitout to NC G13A$80k
02 Oct 2009Minor alterations Shop NCG02$30k
02 Oct 2009Shop No. SEG03 - Minor Alterations to an existing tenancy$31k
02 Oct 2009Shop SCF12 - Minor Alterations to an existing tenancy$26k
30 Sept 2009Construction of Shop Fitout All Parts- T-NE-F07 Lot FFL$50k
25 Sept 2009Tenancy NC F04 - Internal tenancy fitout - Vic D'Armour Day Spa$200k
07 Sept 2009Retail tenancy fitout to Shop EC G01 at Star Circus$100k
14 Aug 2009Tenancy fitout Shop SWG 04A$38k
13 Aug 2009Proposed fitout of a shop NC G03 Harbour Town (Ritzy Lady)$30k
09 July 2009Tenancy NEF 10B, No 7 The Arcade, Pearl River Road - Internal Shop Fitout$125k
12 June 2009Tenancy Fitout of shop NW G07 Lot 31 - Soundstream (Construction of a new building, extension, alteration, change of use, demolition, removal or re-erection of a building$175k
09 June 2009Tenancy Fitout - Bike Force Office$45k
18 May 2009Retail fitout - Movenpick Icecreams- Shop no. CC G07$330
14 May 2009Internal shop fitoutto shop NCF15 - Queenspark$90k
30 Apr 2009Internal fitout to shop NCG20-katies$0
27 Apr 2009Fitout works (new partitions) - Botica Clothing. Tenancy SC G11A.$15k
24 Apr 2009Retail Tenancy Fitout to Shop T12$350k
06 Apr 2009Internal fit out to shop NC 022 - Autograph, Shop No. NC 022.$75k
03 Apr 2009Internal shop fitout- cross roads- Shop No: NCG07A$65k
03 Apr 2009Retail Fitout works - mechanical ventilation registers, artificial lighting, emergency lighting & exit signage and portable fire extinguisher, retail fitout works - mechanical ventilation registers, artificial lighting, emergency lighting & exit signage and portable fire extinguisher.$50k
18 Mar 2009Tenancy fitout for globalize - CE G01 2-4 The Arcade. Stage 1: Internal tenancy fitout works.$200k
13 Mar 2009Proposed Office Fit-Out. Internal demolition.$80k
25 Feb 2009Tenancy NC G07-1 Medical Centre$150k
24 Feb 2009Shop No. SCG21 Waterfront City Harbour Town, Tenancy Fitout$0
18 Feb 2009Tenancy fitout Shop SCG 23 (Bike Force)$47k
17 Feb 2009Internal shop fitout, ten NCG10 7 the arcade$185k
10 Feb 2009Retail, The Designers House. Minor architectural amendments.$3.0m
30 Jan 2009Alteration to shop fitout - Suite SWG03 Harbour Town, Docklands Drive$75k
14 Jan 2009Internal fitout for tenancy NEG10 1/14 Star Crescent Docklands for Forever New$10k
16 Dec 2008Alterations to a building - Retail/Cafe Fitout$200k
15 Dec 2008Retail Fitout - SE G07$60k
05 Dec 2008Retail tenancy Fitout to Shop F03, 22 Wharf Street, Docklands.$60k
03 Dec 2008Proposed Office Fit-Out. Balance of works.$320k
01 Dec 2008Tenancy Fitout at Waterfront City Tenancy NC G09 440 Docklands Drive, DOCKLANDS$283k
28 Nov 2008Alterations to a building - retail fitout, tenancy SS G06, Wheel Precinct, 440 Docklands Drive$100k
28 Nov 2008Shop fitout - Shop CC G01 5 Star Circus, Waterfront City$200k
19 Nov 2008Alterations to a building. External Works.$3.0m
31 Oct 2008Marco Polo Retail Tenancy fitout Tenancy SE G12, 18 WHARFSTREET, DOCKLANDS 3008$48k
31 Oct 2008Retail Fitout, remainder of works (artificial lighting). Tenancy SC F15.$96k
27 Oct 2008Retail Fitout, remainder of works - artificial lighting. Tenancy SC G15.$92k
23 Oct 2008(Restaurant/takeaway)Tenancy Fitout CE G03. Remainder of works - fire services.$300k
22 Oct 2008Retail fitout Shop SC G03 (Fila)$152k
21 Oct 2008Retail fitout SC G11 119 Studio Lane, Docklands. Aussie Sox$52k
21 Oct 2008Shop fit-out SWG13. 127 Studio Lane, Docklands.$50k
20 Oct 2008Construction of internal shop fit out - 'Tokyo Vogue' SC F12a Lvl 1$40k
20 Oct 2008Docklands Drive, Waterfront City, Stage 1B north. Construction of a new building, commercial/residential development. Piles and inground infrastructure.$119.3m
20 Oct 2008Partition Alterations at Tenancy G04/1B North Central Building$240k
20 Oct 2008Tenancy fitout and shop installation of an external sign. Bright Eyes G14 440 Docklands Drive$81k
20 Oct 2008Tenancy Fitout @ Gloria Jeans Coffee (Shop SCG22B)$100k
10 Oct 2008Alterations to a building - SC G09$33k
10 Oct 2008Alterations to a building - Takeaway restaurant fitout, Tenancy CW G06, 9 The Circus, Harbour Town$170k
08 Oct 2008Alterations to a building - internal works only SC G03$28k
06 Oct 2008Tenancy fitout for globalize - CE G01 2-4 The Arcade. Stage 2: External signage and shopfront works.$200k
03 Oct 2008Internal tenancy fitout & signage for Michael Ridley Tenancy SCG12$50k
03 Oct 2008Retail Fitout - Lonsdale , Harbour Town SC G05 8 Star Crescent$120k
02 Oct 2008Stage 1, Internal alterations Retail The Designers House Level 1$3.0m
30 Sept 2008Retail Fitout, all works excluding artificial lighting. Tenancy SC F15.$85k
30 Sept 2008Retail Fitout, all works excluding artificial lighting. Tenancy SC G15.$80k
29 Sept 2008Construction of an internal alteration to an existing shop SC F06, Level G.$105k
26 Sept 2008Internal tenancy fitout SEF06 South East Building.$150k
18 Sept 2008Tenancy Fitout CE G03 Star Circus Precinct, Waterfront City DOCKLANDS,$300k
12 Sept 2008Fitout of new restaurant Tenancy CW G07 Circus West Building, Docklands$400k
12 Sept 2008Fitout shop CCG02 Harbour Town at Waterfront City - Waterfront City Health Habits$250k
08 Sept 2008A shop fitout for GDL factory outlet - SE G05$41k
05 Sept 2008Fitout of children's clothing store Tenancy NC G17$210k
01 Sept 2008Internal fitout for tenancy NEG10 1/14 Star Crescent Docklands for Forever New$150k
26 Aug 2008Retail fitout-Tenancy SC F13-14 (Pacific Brands)$150k
22 Aug 2008Tenancy fitout to shop G06 - Discount Vitamins$98k
18 Aug 2008Retail fitout shop SC F07$165k
05 Aug 2008Tenancy fitout Shop SCF 11 (Exodus Clothing)$44k
28 July 2008Shop fitout ,Shop SW- G11 (15 Star Crescent)$14
11 July 2008Retail Tenancy Fitout to Shop SC G07$12k
23 Nov 2005Demolition of warehouse - Building 1 Footscray Road$75k
12 Apr 2005cafe fit-out$330k
12 Oct 2004Stage 3 - Construction of two new commercial buildings excl. fire services, pavillions and public realm (master works) areas$60.5m
12 Sept 2003Demolition of warehouse - Building 1 Footscray Road$75k
11 Sept 2002Demolition of 10 Existing Buildings - Cnr Sudhoz & Docklands Drive$313k

Questions and answers

Is The District Docklands residential or commercial?
The District Docklands is a residential building.

How many floors does The District Docklands have?
The District Docklands has 2 floors above ground.

How many apartments are in The District Docklands?
The District Docklands has 242 homes. The national address file lists 0 unit addresses here, and some of those can be shops or offices.

What do apartments cost near The District Docklands?
The median unit price in Docklands was $585,000 in 2025, from the Victorian Property Sales Report. That's for the whole suburb, not this building.

Are there apartments for sale or rent in The District Docklands?
See the residential listings on this page, or use the shortcuts to search 420-454 Docklands Drive on realestate.com.au and Domain.

Who designed and built The District Docklands?
AsheMorgan developed The District Docklands. The building team section has the sources.

What public transport is near The District Docklands?
North Melbourne Station is the nearest train station, about 9 minutes' walk. The nearest tram stop is Waterfront City/Docklands Dr #D11, about 2 minutes' walk.

What is the planning zone for The District Docklands?
The site is in the Docklands Zone - Schedule 6 (DZ6).

Does The District Docklands have an owners corporation?
Plan of subdivision PS523148 has 1 lot.

Has any work been done on The District Docklands recently?
The City of Melbourne has issued 220 building permits for The District Docklands since 2002. The most recent was in March 2026.

Sources: City of Melbourne building permits (CC BY 4.0); Development Activity Monitor (CC BY 4.0); Geocoded National Address File (G-NAF) (Open G-NAF EULA (CC BY 4.0 based)). General information from public records, not legal, financial or building advice.