Residential · Residential Apartment
33 mheight
9floors
2009completed
84homes
5permits

Development milestones

Construction startedJul 2008First major construction permit issued
First occupantsApr 2009First occupancy permit issued
Completed2009The Montage completed: 9 floors

Building team

Developer
MAB Corporation
Developer
Lend Lease
Architect
Plus Architecture
Builder
Bovis Lend Lease

Planning & subdivision

Zone
DZ2
Overlays
DDO12, DDO50, DDO50-A4, DPO3, PO6
Strata plan
PS602178 · 77 lots
Scores
🚆 7 · ☕ 9 · 🌳 10 · ✨ 4

Timeline

20251 building permit · about $1.8m of new works
Largest: Refurbishment of external waterproofing
20191 building permit · about $150k of new works
Largest: Stage 2: Soffit Cladding Replacement Apartments 801, 808, 901, 902, 903 & 904
20171 building permit · about $24k of new works
Largest: Proposed Alteration to Facade - Stage 1: Installation of Thermal Detectors & Sounders in Units 1, 9, 801, 808, 901 and 904
2009The Montage completed: 9 floors
Derived from City of Melbourne building census (CLUE) 2024
Apr 2009First occupancy permit issued
Derived from City of Melbourne building permits
2009Council census records it as residential apartment, 9 floors
Name recorded: The Montage
20091 certificate
Largest: Construction of a new building (Commercial/Residential Development). Stage 1: Excavation, piling, Basement slab.
Jul 2008First major construction permit issued
Derived from City of Melbourne building permits
20082 building permits · about $26.7m of new works
Largest: Construction of a new building (Commercial/Residential Development). Stage 3: Structure Levels 9-10 and Architectural Basement - Level 10.
29 Oct 2007Lend Lease and MAB Corporation announce Docklands residential towers including The Montage
A Real Estate Source article reported that The Montage, a tower to be built opposite Docklands Park on Geographe Street, would include 77 apartments over 9 levels and eight 3-level terraces. A Lend Lease Victoria general manager said the project was on schedule to open in mid 2009. The article also covers other Docklands projects, including a mixed-use development by MAB Corporation on the northern banks of Victoria Harbour, designed by Plus Architecture.
2007First council census entry: unoccupied - under construction, 1 floors

Building permits and certificates (6)

Each cost is the estimate on that record. Stages of a project often repeat its full value, so these don't add up to what was spent.

05 Dec 2025Refurbishment of external waterproofing$1.8m
21 Nov 2019Stage 2: Soffit Cladding Replacement Apartments 801, 808, 901, 902, 903 & 904$150k
17 Nov 2017Proposed Alteration to Facade - Stage 1: Installation of Thermal Detectors & Sounders in Units 1, 9, 801, 808, 901 and 904$24k
07 Apr 2009Construction of a new building (Commercial/Residential Development). Stage 1: Excavation, piling, Basement slab.$26.7m
28 July 2008Construction of a new building (Commercial/Residential Development). Stage 3: Structure Levels 9-10 and Architectural Basement - Level 10.$26.7m
01 May 2008Structural (Levels 1 -8) and Services$26.7m

Questions and answers

Is The Montage residential or commercial?
The Montage is a residential building. The City of Melbourne lists its main use as residential apartment.

When was The Montage built?
The Montage was completed in 2009.

How many floors does The Montage have?
The Montage has 9 floors above ground.

How many apartments are in The Montage?
The Montage has 84 homes. The national address file lists 77 unit addresses here, and some of those can be shops or offices.

Does The Montage have parking?
The City of Melbourne records 85 residential car spaces at this property. Which apartments have a space isn't recorded, so check the listing.

What do apartments cost near The Montage?
The median unit price in Docklands was $585,000 in 2025, from the Victorian Property Sales Report. That's for the whole suburb, not this building.

Are there apartments for sale or rent in The Montage?
See the residential listings on this page, or use the shortcuts to search 1 Encounter Way on realestate.com.au and Domain.

Who designed and built The Montage?
Lend Lease developed The Montage, Plus Architecture designed it and Bovis Lend Lease built it. The building team section has the sources.

How tall is The Montage?
About 33 metres, measured from the City of Melbourne's 3D building model. It's number 80 of 286 buildings in Docklands by height.

What public transport is near The Montage?
Southern Cross Station is the nearest train station, about 7 minutes' walk. The nearest tram stop is Collins Landing/Collins St #D17, about 2 minutes' walk.

What is the planning zone for The Montage?
The site is in the Docklands Zone - Schedule 2 (DZ2).

Does The Montage have an owners corporation?
Plan of subdivision PS602178 has 77 lots.

Has any work been done on The Montage recently?
The City of Melbourne has issued 5 building permits for The Montage since 2008. The most recent was in December 2025.

Sources: City of Melbourne building permits (CC BY 4.0); CLUE building information (CC BY 4.0); CLUE residential dwellings (CC BY 4.0); Development Activity Monitor (CC BY 4.0); Geocoded National Address File (G-NAF) (Open G-NAF EULA (CC BY 4.0 based)). General information from public records, not legal, financial or building advice.

Suggest a correction

Something wrong or missing? Tell us what it should say. We check every suggestion before changing anything.

By sending, you agree to the contributor terms. See how we handle your details in the privacy policy.