Each cost is the estimate on that record. Stages of a project often repeat its full value, so these don't add up to what was spent.
| 10 Feb 2026 | 7 Siddely Street - Alterations to existing retail tenancy - Removal of exit signage (Liv Aston Ezymart) | $250 |
| 25 Sept 2025 | Lot S6 - Alterations to existing retail tenancy - Stage 2 | $0 |
| 25 Sept 2025 | Lot S6 - Change of use from class 5 to a 9B and fitout to L3 & L4 | $8.8m |
| 16 Sept 2025 | Stage 24 - Architectural - finishes L3, L10 to L22 excluding roof guardrails | $258.5m |
| 08 Sept 2025 | Lot S6 - Alterations to existing retail tenancy | $85k |
| 22 May 2025 | Stage 27 - Structural - LG to L20 Steel Graming Only | $258.5m |
| 27 Feb 2025 | Tenancy 3 - The Simple Foodie - Proposed alterations to exiting retail tenancy - Stage 1 | $200k |
| 26 Feb 2025 | Retail tenancy 5 - Proposed alterations to existing retail | $220k |
| 26 Feb 2025 | Stage 23 - Structural - Level 17 to level 22 slabs only | $258.5m |
| 07 Feb 2025 | Stage 20 - Architectural - Basebuild L4 to L9 only | $258.5m |
| 06 Nov 2024 | Stage 17 - Glazed facade - L1 to L16 only | $258.5m |
| 31 Oct 2024 | Stage 18 - Structural - Level 10 to 16 slabs only | $258.5m |
| 18 Oct 2024 | Stage 12 - Services - Levels B1 to 3 only | $258.5m |
| 21 Aug 2024 | Stage 16 - Structural - Level 6 to 9 slabs only | $258.5m |
| 18 July 2024 | Stage 10 - Services - Basement to level 5 cladding M05 & M06 | $218.9m |
| 18 July 2024 | Stage 11 - Facade Types FT01A, FT01B, FT01C, FT02A, FT02B, FT04, FT06A, FT07, FT09, FT10, GC1 AND Balustrades (excluding external signage) - Levels 1 TO 29 | $218.9m |
| 18 July 2024 | Stage 13 Architectural basebuild - Levels B3-32 excluding pool and pool safety barrier. | $218.9m |
| 18 July 2024 | Stage 17 - Final - Ground Floor Facade and Civil; and Level B1 to Roof Architectural Fit out | $240.8m |
| 18 July 2024 | Stage 1 - New Building - Tower 2 BTR - Residential - Flinders West Development Precinct. Early works including excavation, piling and retention system only | $218.9m |
| 18 July 2024 | Stage 3 - Pile Caps; Footings; Slab on Ground Basement; Hydraulic and Stormwater Services. | $218.9m |
| 18 July 2024 | Stage 6 - Level 1 PT slab and Ground floor in-ground hydraulic services | $226.6m |
| 18 July 2024 | Stage 7 - Structural - Levels 2 to 4 PT Slabs | $226.6m |
| 25 June 2024 | Stage 13 - Structural - Level 3 and Level 4 Slabs only | $258.5m |
| 03 May 2024 | Stage 11 - Structural - Level 1 to Level 2 Slabs only | $258.5m |
| 01 Dec 2023 | Stage 9- Structural - Ground floor slab only | $258.5m |
| 23 Nov 2023 | Stage 16 - Facade - L30-33 and Services L31-Roof - New Building - 7 Siddeley St - Project Flinders West Development Precinct - Tower 2 BTR - Residential | $218.9m |
| 22 Nov 2023 | Stage 8 - Structural - Vertical Structure up to Level 2 | $258.5m |
| 21 Aug 2023 | Stage 7 - In-ground services and basement concrete slab | $258.5m |
| 12 July 2023 | Stage 12 - Services - Level 6 to 30 Only | $218.9m |
| 23 June 2023 | Stage 6 - Structural - Pile caps, capping beams, retention wall and eastern ground floor slab (part) | $258.5m |
| 12 May 2023 | Stage 5 - Structural - Foundation Piles | $258.5m |
| 11 Apr 2023 | Stage 4 - Structural - retention piles | $258.5m |
| 20 Mar 2023 | Stage 10 - Services - Basement to level 5 cladding M05 & M06 | $218.9m |
| 02 Nov 2022 | Tower 1 COM - New Building - Flinders West Development Precinct. Stage 2 - Site Preparation, Excavation, Footings, Piling and Pile Caps | $232.1m |
| 07 Oct 2022 | Alteration | $254k |
| 07 Oct 2022 | Alteration - Flinders West Precinct - Services Diversion Works | $990k |
| 19 Aug 2022 | Stage 6 - Level 1 PT slab and Ground floor in-ground hydraulic services | $226.6m |
| 05 Aug 2022 | Stage 3 - Permanent protection decks over existing ramps | $232.1m |
| 29 June 2022 | Stage 5 - Structure - Ground Floor Slab only | $226.6m |
| 17 June 2022 | Stage 4 - Vertical structure - B1 to roof | $0 |
| 18 Feb 2022 | Tower 1 COM - New Building - Flinders West Development Precinct. Stage 1 - Installation of new reinforced concrete upstand walls, eastern ramp steel framing, and local demolition as required to facilitate installation of steel columns | $232.1m |
| 21 May 2021 | Alteration | $254k |
| 14 Aug 2014 | 1-5 Demolition of the former Melbourne Convention Centre ( FMCC) at Crowne Plaza | $4.8m |
| 20 June 2008 | Alterations to Convention Centre Level 4-Services area | $45k |
| 12 May 2008 | Alteration to essential service Level 1 - MCC | $250 |
| 02 May 2008 | Alterations to emergency lights on level 4 - Melbourne Convention Centre. | $4k |
| 14 Dec 2007 | Alterations to Level 2 Melbourne Convention Centre. | $13k |
| 10 Mar 2006 | Internal alterations on level 2, 3 and 4 - variation on level 2 and 3 | $0 |
| 02 Mar 2006 | Disconnection of the SA and OA smoke detectors from Fire Brigade notification | $3k |
| 10 Nov 2005 | Internal alterations on level 2, 3 and 4 (Internal Broadcasting Centre) | $1.8m |
| 22 June 2004 | Decomissioning of level 5 storeroom door. | $500 |
| 23 Jan 2002 | Refurbishment of amenities - Level 4 Melbourne Convention Centre | $770k |
| 09 Jan 1998 | Internal alterations to the Melbourne Convention Centre (Kitchen on Level 1) | $3.3m |
Is LIV Aston residential or commercial?
LIV Aston is neither homes nor offices. The City of Melbourne lists its main use as unoccupied - under construction.
How many floors does LIV Aston have?
LIV Aston has 32 floors above ground.
Who designed and built LIV Aston?
Mirvac developed LIV Aston and FK (Fender Katsalidis) designed it. The building team section has the sources.
What public transport is near LIV Aston?
Southern Cross Railway Station is the nearest train station, about 5 minutes' walk. The nearest tram stop is Batman Park/Flinders St #124, about 1 minute's walk.
What is the planning zone for LIV Aston?
The site is in the Capital City Zone - Schedule 1 (CCZ1).
Does LIV Aston have an owners corporation?
Plan of subdivision PS644635 has 1 lot.
Has any work been done on LIV Aston recently?
The City of Melbourne has issued 51 building permits for LIV Aston since 1998. The most recent was in September 2025.
Sources: City of Melbourne building permits (CC BY 4.0); CLUE building information (CC BY 4.0); Geocoded National Address File (G-NAF) (Open G-NAF EULA (CC BY 4.0 based)). General information from public records, not legal, financial or building advice.